RERA projects in Pune
13,424 projects under 14,395 MahaRERA registrations across 463 localities, registered 2017–2026. 17% have a completion date extended beyond the one promised.
13,424RERA projectsin 463 localities
14,395Registrationssome projects hold several
5,052Completion still due7,918 past their completion date, 1 marked completed
18 monthsMedian extension beyond promised date17% of registrations extended
588Regulatory caseson 545 projects
2,073Buildings on recordfrom registration certificates
Registrations per year
New MahaRERA registrations by registration date.
| Year | Registrations |
|---|---|
| 2017 | 3,292 |
| 2018 | 1,004 |
| 2019 | 953 |
| 2020 | 840 |
| 2021 | 1,001 |
| 2022 | 1,247 |
| 2023 | 1,414 |
| 2024 | 1,151 |
| 2025 | 1,145 |
| 2026 | 923 |
Localities in Pune
By number of registered projects. Talukas and localities as MahaRERA names them.
Pune (M Corp.)1,225 projectsHaveli1,130 projectsPimpri Chinchawad (M Corp.)1,056 projectsBaner370 projectsKothrud331 projectsWakad296 projectsWagholi266 projectsHadapsar201 projectsPune City200 projectsTalegaon Dabhade (M Cl)199 projectsBaramati (M Cl)191 projectsPunawale183 projects
All 463 localities
- Pune (M Corp.)1,225
- Haveli1,130
- Pimpri Chinchawad (M Corp.)1,056
- Baner370
- Kothrud331
- Wakad296
- Wagholi266
- Hadapsar201
- Pune City200
- Talegaon Dabhade (M Cl)199
- Baramati (M Cl)191
- Punawale183
- Mulshi179
- Charholi169
- Ravet169
- Tathwade163
- Ambegaon Bk151
- Lohgaon141
- Kondhwa Bk137
- Moshi136
- Mundhawa132
- Parvati127
- Jalochi124
- Chikhali122
- Mawal114
- Kharadi113
- Wadagaon (Ct)111
- Undri109
- Dhayari (Part)102
- Dhanori99
- Balewadi97
- Mohammadwadi97
- Talegaon Dabhade (R)96
- Bhosari90
- Bavadhan Bk83
- Hinjavadi (Ct)82
- Sus80
- Dighi79
- Bhugaon77
- Katraj73
- Khed70
- Pimpale Saudagar69
- Baramati68
- Mahalunge68
- Man67
- Wadgaon Bk67
- Kiwale66
- Pashan63
- Chakan (Ct)61
- Dehu61
- Fursungi61
- Sasvad (M Cl)56
- Thergaon56
- Kondhwa Khurd55
- Shirur54
- Shirur53
- Pimpale Gurav50
- Karve Nagar49
- Pirangut49
- Dhankawadi48
- Wadmukhwadi48
- Peth47
- Warje45
- Kasar Amboli43
- Pimple Nilakh43
- Yawalewadi43
- Manjari Bk42
- Pisoli42
- Lonavala (M Cl)40
- Kivale39
- Rajgurunagar (Ct)39
- Varale38
- Ghorpadi36
- Narhe35
- Narayangaon34
- Ambegaon Kh33
- Gultekadi33
- Kirkatwadi33
- Shikrapur33
- Vadgaonsheri33
- Bavdhan Kh.32
- Gahunje31
- Kesnand31
- Ouatade Handewadi30
- Daund (M Cl)29
- Mamurdi28
- Charoli27
- Dasave27
- Daund27
- Manchar (Ct)27
- Marunji27
- Purandhar27
- Kadamwak Wasti26
- Keshavnagarmundwa26
- Manjari Kh25
- Rui25
- Somatane25
- Pune (Cb)24
- Aalandi23
- Junnar23
- Kharabwadi (Ct)23
- Lahagaon23
- Uruli Kanchan22
- Charholi Kh21
- Jambe21
- Shirur Gramin21
- Wanwadi21
- Mahalunge20
- Tandulwadi20
- Alandi (M Cl)19
- Bhor19
- Bhukum19
- Nanded19
- Otur19
- Borhadewadi18
- Dudulgaon18
- Junnar (M Cl)18
- Keshavnagar Mundwa18
- Erandwana North17
- Lavale17
- Lonikalbhor17
- Talegaon Dhamdhere17
- Uravade17
- Uruli Devachi17
- Ambegaon16
- Shivajinagar Bhamburda16
- Ale15
- Chinchwad15
- Saswad Rural15
- Chovisawadi14
- Bavdhan Khurd13
- Bhor (M Cl)13
- Bopodi13
- Chikhali Bk.13
- Erandwane South13
- Shewalewadi13
- Vadgaon Sheri13
- Varulwadi13
- Alefata (N.V.)12
- Baramati Rural12
- Chinchwad12
- Daund (Ct)12
- Dehu Road (Cb)12
- Koregaon Mul12
- Medankarwadi12
- Nanekarwadi (Ct)12
- Urse12
- Alandi Rural11
- Erandwana11
- Kanhe11
- Sangavi11
- Akurdi10
- Chandkhed10
- Erandwane10
- Gopalwadi10
- Indapur (M Cl)10
- Jambhul10
- Jejuri (M Cl)10
- Katavi10
- Munjeri10
- Nere10
- Shivne (Part)10
- Boripardhi9
- Market Yard9
- Paud9
- Aundh8
- Gorhe Bk.8
- Karla8
- Kune N.M.8
- Parandvadi8
- Perane8
- Rahatani8
- Sadashiv Peth8
- Akurdi7
- Jamgaon7
- Khadakwasala7
- Malegaon Bk7
- Pimpri7
- Bakori6
- Baner South6
- Bhigvan6
- Bhoirwadi6
- Ghotavade6
- Kalas6
- Kondhve Dhawade6
- Kondhwa Budruk6
- Mordewadi6
- Pimpri Waghere6
- Shivane (Uttamnagr)6
- Sinhgad Road6
- Swargate6
- Waksai6
- Ambadvet5
- Bhegadewadi5
- Bhilarewadi5
- Khadakale (Ct)5
- Kothrud-Ext5
- Loni Kalbhor5
- Nande5
- Ravade5
- Sangavade5
- Sate5
- Shiraswadi5
- Vimannagar5
- Yawat5
- Ambegaon4
- Bibwewadi Munjeri4
- Chinchwad4
- Dapodi4
- Dingrajwadi4
- Gultekadi4
- Holewadi4
- Kalyaninagar4
- Kedgaon Station4
- Khedshivapur4
- Kolwadi4
- Koregaon Bhima (Ct)4
- Kothrud-North4
- Kusgaon Kh.4
- Lingali4
- Lonikand4
- Loni Kand4
- Maan4
- Malinagar4
- Manjari4
- Nasrapur4
- Nighoje4
- Others4
- Padali4
- Patas4
- Sadapur4
- Sangavi4
- Satkarsthal4
- Shilatane4
- Vadgaon-Khurd4
- Aalandi Mhatoba3
- Aundh3
- Aundhe Kh.3
- Bhare3
- Bibwewadi-Munjeri3
- Chimbali3
- Darumbare3
- Ghodegaon3
- Indapur3
- Kalewadi Darekarwadi3
- Kamshet3
- Karanjgaon3
- Kasarsai3
- Kondhwa Khurd – Ext3
- Mugavade3
- Rajuri3
- Ranjangaon Ganpati3
- Sadashiv Peth3
- Sangarun3
- Sudumbare3
- Theur3
- Vadgaon Anand3
- Vanjarwadi3
- Varale3
- Varsoli3
- Vishrantwadi3
- Wade Bolhai3
- Wadki3
- Yerawada3
- Adhale Bk2
- Adhe Kh.2
- Ambi2
- Autadwadi Handewadi2
- Bhivari2
- Bopgaon2
- Chande2
- Chikhalse2
- Devadi2
- Dhamane2
- Dhayari2
- Dive2
- Erandwane North2
- Ghorapade Peth2
- Girim2
- Harishchandri2
- Jadhavwadi2
- Jejuri Rural2
- Kapurhol2
- Karanjepul2
- Karegaon2
- Kasurdi Khe Ba2
- Katraj Ext2
- Khanapur2
- Kiwale2
- Kondhwa Khurd2
- Kopare2
- Kunjirwadi2
- Kurkumbh2
- Kurunji2
- Kusgaon Bk. (Ct)2
- Malegaon Kh.2
- Mangadewadi2
- Morgaon2
- Moshi Pradhikaran2
- Mugaon2
- Mundhwa Keshavnagar2
- Mundhwa North2
- Mundhwa North2
- Mundhwa South2
- Narayan Peth2
- Nighutwadi2
- Osade2
- Pachane2
- Pasure2
- Pimpri2
- Punawale2
- Rahatwade2
- Rakshewadi2
- Salawade2
- Sanganwadi Tps2
- Saradwadi2
- Shindvane2
- Shirgaon2
- Takave Bk.2
- Umbare Navalakh2
- Undri- Ext2
- Vadgaonsheri-Ext2
- Valane2
- Varve Bk.2
- Varve Kh.2
- Vitthal Nagar2
- Vitthalvadi2
- Wadhu Bk.2
- Warwand2
- Agalambe1
- Ambavane1
- Amrapur1
- Andgaon1
- Ane1
- Asade1
- Ashtapur1
- Atvan1
- Babhulsar Kh.1
- Barav1
- Bavdhan1
- Bebad Ohol1
- Belhe1
- Bhagatwadi1
- Bhamboli1
- Bhamburda1
- Bhandgaon1
- Bhavadi1
- Boraj1
- Boribhadak1
- Boriyendi1
- Botarwadi1
- Chale1
- Chandoli1
- Charholi Budruk1
- Dattawadi1
- Devale1
- Devghar1
- Dholwad1
- Dhondmal Shindewadi1
- Donaje1
- Done1
- Dongargaon1
- Dongargaon1
- Eklahare1
- Gunwadi1
- Hingane Khurd1
- Hingne Budrukh1
- Hivare1
- Holkarwadi1
- Induri1
- Jambhali1
- Jogwadi1
- Kadachiwadi1
- Kaldari1
- Kalyan1
- Karandoli1
- Katphal1
- Kedgaon1
- Khadki1
- Khalumbre1
- Khamboli1
- Kharpudi Kh1
- Khed-Shivapur1
- Khor1
- Kohakdewadi1
- Kolewadi1
- Kondhapuri1
- Kondhwa-Budruk North1
- Kondhwe Dhawade1
- Kondivade A.M.1
- Koregaon Park1
- Korhale Bk1
- Kothrud-South1
- Kuruli1
- Kusur1
- Lasurne1
- Lavharde1
- Malad1
- Malawali N.M.1
- Male1
- Male1
- Malewadi1
- Malthan1
- Mangalwar Peth1
- Markal1
- Mau1
- Misalawadi (Nv)1
- Mokarwadi1
- Mukaiwadi1
- Mulshi Kh.1
- Naigaon1
- Nana Peth1
- Nandoshi1
- Nayagaon1
- Nhavara1
- Nigade1
- Nigadi Pradhikaran1
- Nimbut1
- Others1
- Pangaloli1
- Parvati North1
- Pimpalgaon Tarf Khed1
- Pimpalvandi1
- Pimpari Pendhar1
- Pondhe1
- Puneman1
- Pune (M Corp.)1
- Pune Pune (Cb)1
- Punepune (M Corp.)1
- Pune Pune (M Corp.)1
- Pur1
- Rase1
- Saiv Kh1
- Salumbare1
- Sanas Nagar1
- Sanaswadi (Ct)1
- Sangamner1
- Sangurdi1
- Sarole1
- Sasewadi1
- Sashte1
- Savardari1
- Shere1
- Shind1
- Shinoli1
- Shirvali1
- Shivatkar (Nira) (Ct)1
- Shiwapur1
- Shukrawar Peth1
- Station1
- Supe Kh.1
- Tahmini1
- Tardobachiwadi1
- Thapewadi1
- Tulapur1
- Udhat1
- Vadivale1
- Valavanti1
- Vanpuri1
- Walhe1
- Wanjalewadi1
- Yelwadi1
- Zendewadi1
Projects in Pune
13,424 projects registered with MahaRERA in this district and the places within it.
| Project | RERA | Registered | Promised completion | Revised completion | Timing | Cases |
|---|---|---|---|---|---|---|
| 1st Avenue - VinaykunjNavikaran Buildcon LLP | PR1261012602185 | 7 Oct 2026 | 31 Dec 2028 | — | Not yet due | 0 |
| Bhakti AceBhakti Infra | PR1260002602169 | 7 Oct 2026 | 31 Dec 2028 | — | Not yet due | 0 |
| Gokul ResidencyRajmata Infra | PM1260002602172 | 7 Oct 2026 | 15 Sep 2030 | — | Not yet due | 0 |
| Miracle Madhubon AMiracle Nirmitee | PR1260002602171 | 7 Oct 2026 | 31 Oct 2029 | — | Not yet due | 0 |
| ROHAN NITARA – Phase BUrban Life Ventures | PR1261012602175 | 7 Oct 2026 | 30 Sep 2030 | — | Not yet due | 0 |
| Samrajya B WingGarve Patil Construction Company | PR1260002602189 | 7 Oct 2026 | 31 Dec 2031 | — | Not yet due | 0 |
| Skyline ResidencyTamboli Builders & Developers | PM1260002602184 | 7 Oct 2026 | 31 Dec 2027 | — | Not yet due | 0 |
| Urban Business BourseUrban Cityscape Greens LLP | PC1260002602181 | 7 Oct 2026 | 31 Dec 2028 | — | Not yet due | 0 |
| Viman ImperiaRPB Realtors LLP | PR1260002602182 | 7 Oct 2026 | 31 Dec 2029 | — | Not yet due | 0 |
| Shubharambh CorpShubharambh Corporate | PC1260002602164 | 6 Oct 2026 | 31 Dec 2030 | — | Not yet due | 0 |
| Ats - The CondominiumsSangram Sharad Paatil | PR1260002602136 | 5 Oct 2026 | 31 Dec 2028 | — | Not yet due | 0 |
| Balwant EmpireKcnest Housing Corporation LLP | PR1260002602126 | 5 Oct 2026 | 31 Dec 2029 | — | Not yet due | 0 |
| Kapil Akhila - 2S B Estate Pvt Ltd | PR1260002602153 | 5 Oct 2026 | 31 Dec 2030 | — | Not yet due | 0 |
| MadhughatRanjekar Realty LLP | PR1260002602129 | 5 Oct 2026 | 31 Jan 2030 | — | Not yet due | 0 |
| Oxygen Park Phase 2Yogiraj Developers and Construction | PM1261012602139 | 5 Oct 2026 | 31 Dec 2028 | — | Not yet due | 0 |
| Que 101 Phase IANNR Unique Realty LLP | PM1261012602127 | 5 Oct 2026 | 31 Mar 2030 | — | Not yet due | 0 |
| Siddhi AurumSiddhivinayak Developers | PR1260002602133 | 5 Oct 2026 | 31 Dec 2028 | — | Not yet due | 0 |
| Anushree sahakari Gruhrachana Sanstha Maryadit.Trisha Developers | PR1260002602093 | 1 Oct 2026 | 31 Dec 2030 | — | Not yet due | 0 |
| EkaantAbhay Construction | PR1260002602104 | 1 Oct 2026 | 31 Dec 2031 | — | Not yet due | 0 |
| Ekdant PlazaShree Developers And Builders | PR1260002602066 | 1 Oct 2026 | 30 Jun 2028 | — | Not yet due | 0 |
| Green City Phase II J BuildingAjit Girdharilal Nahar | PC1260002602123 | 1 Oct 2026 | 31 Dec 2028 | — | Not yet due | 0 |
| HibiscusAssetplus Infrastructure | PM1260002602075 | 1 Oct 2026 | 1 Dec 2028 | — | Not yet due | 0 |
| Hrishikesh And Vasantili ApartmentDeshpande Anshu Global Associates LLP | PR1260002602055 | 1 Oct 2026 | 31 Dec 2028 | — | Not yet due | 0 |
| Kumar ProsperShree Venkatesh Vasturachana LLP | PC1260002602074 | 1 Oct 2026 | 19 Mar 2030 | — | Not yet due | 0 |
| Lotus CrestBalaji Kimaya Homes | PR1260002602114 | 1 Oct 2026 | 31 Dec 2028 | — | Not yet due | 0 |
| Mahindra RivenzaMahindra Lifespace Developers limited | PM1261012602103, PR1261012602102 | 1 Oct 2026 | 30 Dec 2031 | — | Not yet due | 0 |
| Mann NaturaIntella Homes | PR1260002602115 | 1 Oct 2026 | 31 Dec 2029 | — | Not yet due | 0 |
| NakshatrabanNakshatra Lifespaces | PM1260002602090 | 1 Oct 2026 | 31 Dec 2028 | — | Not yet due | 0 |
| One SpaceNexoria Corp LLP | PR1260002602087 | 1 Oct 2026 | 30 Dec 2028 | — | Not yet due | 0 |
| Prabhavan Phase-1Janki Constructions | PR1260002602065 | 1 Oct 2026 | 30 Sep 2031 | — | Not yet due | 0 |
| Sai TowerOm Sai Constructions | PR1260002602095 | 1 Oct 2026 | 31 Dec 2029 | — | Not yet due | 0 |
| SanjeevanKapil Ulhas Trimal | PR1260002602058 | 1 Oct 2026 | 31 Dec 2028 | — | Not yet due | 0 |
| Shantivan Homes Phase 6Nikhil Jayavant Dange | PP1260002602080 | 1 Oct 2026 | 30 Sep 2027 | — | Not yet due | 0 |
| Shantivan Homes Phase 7Sharad Kisan Kurandale | PP1260002602067 | 1 Oct 2026 | 30 Sep 2027 | — | Not yet due | 0 |
| Shree RamkunjSamarth Buildcon | PR1260002602096 | 1 Oct 2026 | 31 Dec 2028 | — | Not yet due | 0 |
| The ElementThe 5 Elements | PM1260002602060 | 1 Oct 2026 | 31 Dec 2030 | — | Not yet due | 0 |
| Truspace Prima AltioraTruspace Developments Private Limited | PR1260002602057 | 1 Oct 2026 | 31 Dec 2031 | — | Not yet due | 0 |
| Vasundhara AishwaryamVasundhara Buildspace Private Limited | PM1260002602108 | 1 Oct 2026 | 31 Aug 2030 | — | Not yet due | 0 |
| VighnahartaSharayu Developers | PR1260002602119 | 1 Oct 2026 | 30 Apr 2028 | — | Not yet due | 0 |
| Yash AuraShree Vision Reality | PR1260002602111 | 1 Oct 2026 | 31 Dec 2027 | — | Not yet due | 0 |
| AnandiBhokre Properties | PR1260002602040 | 24 Sep 2026 | 1 Jan 2029 | — | Not yet due | 0 |
| Belmont ReserveEden Real Projects LLP | PP1260002602048, PP1260002602151 | 24 Sep 2026 | 31 Dec 2031 | — | Not yet due | 0 |
| Belmont SkyoneBelmont Realtech LLP | PM1260002602036 | 24 Sep 2026 | 31 Dec 2030 | — | Not yet due | 0 |
| Ganga Lake ViewShreenath Developers | PR1260002602038 | 24 Sep 2026 | 21 Jul 2028 | — | Not yet due | 0 |
| Kausar ParqueM/S Arham Construction | PM1260002602033 | 24 Sep 2026 | 31 Dec 2032 | — | Not yet due | 0 |
| Om ParadiseOm Ghule Legacies LLP | PM1260002602030 | 24 Sep 2026 | 31 Dec 2029 | — | Not yet due | 0 |
| The Central Park Phase-2Supreme Infra | PR1260002602031 | 24 Sep 2026 | 31 Dec 2033 | — | Not yet due | 0 |
| VedantaVelstand Infra | PM1260002602044 | 24 Sep 2026 | 11 Jun 2031 | — | Not yet due | 0 |
| Vikram MarqueeVikram Developers | PM1260002602035 | 24 Sep 2026 | 30 Sep 2031 | — | Not yet due | 0 |
| Arham PalazzoVedant Infrastructures | PM1260002602013 | 23 Sep 2026 | 24 Jun 2029 | — | Not yet due | 0 |
| Jhamtani BizOneJhamtani Realty Private Limited | PC1260002602029 | 23 Sep 2026 | 31 Dec 2030 | — | Not yet due | 0 |
| Shreeram ShreeShreeram Chandrai Rt LLP | PR1260002602005 | 23 Sep 2026 | 31 Dec 2028 | — | Not yet due | 0 |
| Sonigara New KalpataruShree Sonigara Developers LLP | PM1260002602021 | 23 Sep 2026 | 31 Dec 2031 | — | Not yet due | 0 |
| SovranoKiran Creators and Developers Private Limited | PM1260002602024 | 23 Sep 2026 | 30 Sep 2031 | — | Not yet due | 0 |
| Vedant PrideG And D Developers | PM1260002602007 | 23 Sep 2026 | 31 Dec 2028 | — | Not yet due | 0 |
| Imperial ResidencyUday Developers | PR1261012601989 | 22 Sep 2026 | 30 Jun 2029 | — | Not yet due | 0 |
| Shreeram IconShreeram Developers | PR1260002602002 | 22 Sep 2026 | 31 Mar 2029 | — | Not yet due | 0 |
| TrinayanChaphalkar Karandikar Developers LLP | PR1260002601999 | 22 Sep 2026 | 31 Dec 2029 | — | Not yet due | 0 |
| Belmont Reserve Phase 3Eden Real Projects LLP | PP1260002601975 | 21 Sep 2026 | 31 Dec 2031 | — | Not yet due | 0 |
| Duville AviraTwin Bungalows Mundhwa LLP | PM1260002601985 | 21 Sep 2026 | 31 Dec 2031 | — | Not yet due | 0 |
| Lambodar HeightsSawali Developers | PR1260002601972 | 21 Sep 2026 | 31 Dec 2028 | — | Not yet due | 0 |
| Rayat RegencySoham Constructions And Developers | PM1260002601983 | 21 Sep 2026 | 30 Aug 2030 | — | Not yet due | 0 |
| Bkc PearlRani Maruti Landge | PR1260002601966 | 18 Sep 2026 | 31 Dec 2028 | — | Not yet due | 0 |
| Pankaj EkaantPankaj Developers | PM1260002601964 | 18 Sep 2026 | 31 Dec 2031 | — | Not yet due | 0 |
| Satvam Hills C5Synergy Properties | PP1260002601969 | 18 Sep 2026 | 31 Aug 2029 | — | Not yet due | 0 |
| Capital Tower & Silver LeafShinde Dream Buildcon LLP | PR1260002601947 | 17 Sep 2026 | 31 Aug 2031 | — | Not yet due | 0 |
| Shantivan Homes Phase 8Shekhar Valmik Kurundale | PP1260002601949 | 17 Sep 2026 | 30 Sep 2027 | — | Not yet due | 0 |
| Skyridge LandmarkSkyridge Properties Private Limited | PM1260002601962 | 17 Sep 2026 | 31 Mar 2029 | — | Not yet due | 0 |
| SmrutigandhaKhairnar Brothers | PM1260002601953 | 17 Sep 2026 | 30 Aug 2029 | — | Not yet due | 0 |
| S M TowerJawaleshwar Construction | PR1260002601950 | 17 Sep 2026 | 31 Dec 2029 | — | Not yet due | 0 |
| Sukhwani GemzsPrime Properties | PR1260002601952 | 17 Sep 2026 | 30 Jun 2030 | — | Not yet due | 0 |
| Belmont Reserve Phase 5Eden Real Projects LLP | PP1260002601939 | 16 Sep 2026 | 31 Dec 2031 | — | Not yet due | 0 |
| Prasun SrishtiRachana Developers | PM1260002601943 | 16 Sep 2026 | 31 Dec 2029 | — | Not yet due | 0 |
| Shantivan Homes Phase 5Sagar Khaserao Dandawate | PP1260002601940 | 16 Sep 2026 | 30 Sep 2027 | — | Not yet due | 0 |
| Brpl Mhada ClusterBenchmarrk Realty Private Limited | PR1260002601912 | 15 Sep 2026 | 30 Aug 2031 | — | Not yet due | 0 |
| F5 SkyraAnand Construction Company | PR1260002601909 | 15 Sep 2026 | 30 Sep 2030 | — | Not yet due | 0 |
| Shriram NyraShriram Samruddhi Developers | PR1261012601931 | 15 Sep 2026 | 15 Dec 2029 | — | Not yet due | 0 |
| Skyway EliteSkyway Builder & Developers | PM1260002601911 | 15 Sep 2026 | 31 Jan 2030 | — | Not yet due | 0 |
| Urban NestGM Ventures | PR1260002601913 | 15 Sep 2026 | 31 Dec 2030 | — | Not yet due | 0 |
| Amaltas EnclaveSSP Infraspaces LLP | PP1261012601906 | 11 Sep 2026 | 31 Dec 2030 | — | Not yet due | 0 |
| Giridhar ResidencyDinesh Nemichandra Ganeshwade And Mahesh Nemichandra Ganeshwade | PM1260002601900 | 11 Sep 2026 | 30 Jun 2029 | — | Not yet due | 0 |
| Harmony HeightsBramhacorp Limited | PR1260002601901 | 11 Sep 2026 | 31 May 2027 | — | Not yet due | 0 |
| Hexa Towers A WingDML Associates | PR1260002601898 | 11 Sep 2026 | 30 Jun 2029 | — | Not yet due | 0 |
| Lake Ridge CityBhaishree Landmarks LLP | PR1260002601880 | 11 Sep 2026 | 31 Dec 2029 | — | Not yet due | 0 |
| Miracle - IIVijay Raj Associates | PR1260002601874 | 11 Sep 2026 | 31 Dec 2029 | — | Not yet due | 0 |
| Pharande VivirPharande Promoters and Builders | PM1260002601888, PR1260002601942 | 11 Sep 2026 | 30 Sep 2031 | — | Not yet due | 0 |
| Shakuntal Alentia Phase - IShakuntal Developers | PR1261012601907 | 11 Sep 2026 | 31 May 2031 | — | Not yet due | 0 |
| AranyaDwelluxe Construction LLP | PR1260002601873 | 10 Sep 2026 | 30 Jun 2028 | — | Not yet due | 0 |
| Shrihari VishwaRahul Balasaheb Taru | PR1260002601868 | 10 Sep 2026 | 1 Apr 2030 | — | Not yet due | 0 |
| Sparkle EnclaveKaisar Jamil Khan | PR1260002601862 | 10 Sep 2026 | 31 Dec 2028 | — | Not yet due | 0 |
| Venkatesh GitanjaliVenkatesh Associates | PR1260002601871 | 10 Sep 2026 | 31 Oct 2028 | — | Not yet due | 0 |
| Vtp Skylights MhadaM/S. Prasanna Developers | PR1260002601869 | 10 Sep 2026 | 31 Dec 2030 | — | Not yet due | 0 |
| Pawar SkyoraPawar Buildcon Landmarks LLP | PM1261012601841 | 9 Sep 2026 | 31 Dec 2031 | — | Not yet due | 0 |
| Siddhi SafalyaBhairav Promoters Unit 5 | PR1260002601835 | 9 Sep 2026 | 31 Dec 2030 | — | Not yet due | 0 |
| Ultima Grandeur Wing-CTribute Victoria Realty LLP | PR1262022601836 | 9 Sep 2026 | 31 Mar 2029 | — | Not yet due | 0 |
| MansionMantra Prime Properties Private Limited | PM1260002601823 | 8 Sep 2026 | 31 Dec 2031 | — | Not yet due | 0 |
| The MonarchRudra Developers | PM1260002601832 | 8 Sep 2026 | 31 Dec 2029 | — | Not yet due | 0 |
| PriyanjaliMadane Constructions | PR1260002601815 | 7 Sep 2026 | 19 Dec 2028 | — | Not yet due | 0 |
| Shivay ResidencySR Buildcon | PR1260002601810 | 7 Sep 2026 | 30 Dec 2028 | — | Not yet due | 0 |
| Shree HeightsR R Associates | PR1260002601801 | 7 Sep 2026 | 31 Dec 2031 | — | Not yet due | 0 |
Other districts
- Thane7,170 projects
- Mumbai Suburban6,592 projects
- Raigarh5,728 projects
- Nashik4,171 projects
- Palghar3,084 projects
- Nagpur2,793 projects
- Aurangabad1,469 projects
- Mumbai City1,380 projects
- Satara1,181 projects
- Ratnagiri1,138 projects
- Kolhapur863 projects
- Sangli785 projects
Most active promoters
By projects registered here, as named on MahaRERA.
- Kolte-Patil Developers Limited45 projects
- Pandit Javdekar Associates37 projects
- Lavasa Corporation Ltd29 projects
- Kotibhaskar Infrastructures &Developers Pvt.Ltd.28 projects
- Bramhacorp Limited26 projects
- Paranjape Schemes (Construction) Ltd.25 projects
- Jagrutsara Structures LLP21 projects
- Lodha Developers Limited21 projects
- Mahindra Lifespace Developers limited19 projects
- Goel Ganga India Pvt Ltd18 projects
Data through8 Oct 2026SourcesMahaRERA project search, registration and extension certificates, regulatory lists and ordersExtensions count where MahaRERA's extension certificate could be read; MahaRERA cannot serve some certificates, so the share extended may be understated.Methodology