RERA projects in Kolhapur
863 projects under 875 MahaRERA registrations across 51 localities, registered 2017–2026. 14% have a completion date extended beyond the one promised.
863RERA projectsin 51 localities
875Registrationssome projects hold several
289Completion still due492 past their completion date
18 monthsMedian extension beyond promised date14% of registrations extended
31Regulatory caseson 31 projects
84Buildings on recordfrom registration certificates
Registrations per year
New MahaRERA registrations by registration date.
| Year | Registrations |
|---|---|
| 2017 | 189 |
| 2018 | 53 |
| 2019 | 49 |
| 2020 | 62 |
| 2021 | 59 |
| 2022 | 103 |
| 2023 | 89 |
| 2024 | 63 |
| 2025 | 56 |
| 2026 | 58 |
Localities in Kolhapur
By number of registered projects. Talukas and localities as MahaRERA names them.
Kolhapur (M Corp.)452 projectsKarvir59 projectsIchalkaranji (M Cl)57 projectsGadhinglaj (M Cl)33 projectsGadhinglaj27 projectsUjalaiwadi (Ct)26 projectsJaysingpur (M Cl)23 projectsHatkanangle17 projectsKarvir17 projectsGadhinglaj16 projectsKagal (M Cl)16 projectsJaysingpur12 projects
All 51 localities
- Kolhapur (M Corp.)452
- Karvir59
- Ichalkaranji (M Cl)57
- Gadhinglaj (M Cl)33
- Gadhinglaj27
- Ujalaiwadi (Ct)26
- Jaysingpur (M Cl)23
- Hatkanangle17
- Karvir17
- Gadhinglaj16
- Kagal (M Cl)16
- Jaysingpur12
- Vadgaon Kasba (M Cl)11
- Uchgaon (Ct)7
- Balinge6
- Gijavane4
- Kagal4
- Morewadi (Ct)4
- Ajara (Ct)3
- Vadgaon Kasaba3
- Gargoti2
- Hupari (Ct)2
- Kabnur (Ct)2
- Malkapur (M Cl)2
- Pachgaon (Ct)2
- Panhala2
- Sarnobatwadi2
- Wadipir2
- Yadrav2
- Ajra1
- Bambavade1
- Bhudargad1
- Chandgad1
- Danewadi1
- Gagan Bavda1
- Hatkanangale1
- Japhale1
- Kalambe T. Thane (Ct)1
- Kandalgaon1
- Kodoli1
- Madale1
- Majale1
- Nagdevwadi1
- Nrusinhawadi1
- Panhala (M Cl)1
- Radhanagari1
- Radhanagari1
- Shirol1
- Shiroli1
- Shiye1
- Vathar Tarf Vadgaon1
Projects in Kolhapur
863 projects registered with MahaRERA in this district and the places within it.
| Project | RERA | Registered | Promised completion | Revised completion | Timing | Cases |
|---|---|---|---|---|---|---|
| Mangalam ImperiaGaikwad Infrastructure Private Limited | PM1150002602081 | 1 Oct 2026 | 31 Dec 2031 | — | Not yet due | 0 |
| Time SquareGrey Bricks Reality | PM1150002602106 | 1 Oct 2026 | 31 Dec 2030 | — | Not yet due | 0 |
| Yashshri - Grand Lake VistaDestiny Builders | PM1150002602049 | 1 Oct 2026 | 28 Feb 2029 | — | Not yet due | 0 |
| Shubhashish PrideVp Developers | PR1150002601977 | 21 Sep 2026 | 31 Dec 2029 | — | Not yet due | 0 |
| Dwarka Adreno Building BRandive Builders And Developers | PR1151012601927 | 15 Sep 2026 | 31 Dec 2030 | — | Not yet due | 0 |
| Aero CityPanjwani Developers | PR1150002601876 | 11 Sep 2026 | 31 Dec 2031 | — | Not yet due | 0 |
| Eminent Vision TowerAce Developers | PC1150002601889 | 11 Sep 2026 | 31 Dec 2031 | — | Not yet due | 0 |
| Radha RegencyVj And Space Realtors | PM1150002601892 | 11 Sep 2026 | 31 Dec 2031 | — | Not yet due | 0 |
| Geeta BlossomsViva Deva Realty | PM1150002601738 | 1 Sep 2026 | 31 Dec 2030 | — | Not yet due | 0 |
| Divine EnclaveDivine Construction | PM1150002601602 | 21 Aug 2026 | 31 Dec 2031 | — | Not yet due | 0 |
| Sharada SquareSquare Angle Infrastructure | PM1150002601548 | 14 Aug 2026 | 31 Dec 2030 | — | Not yet due | 0 |
| Krystal TowerM/S SD Associates | PR1150002601510 | 11 Aug 2026 | 31 Dec 2030 | — | Not yet due | 0 |
| Kalyani EnclaveMasute and Patil Builders | PR1150002601251 | 20 Jul 2026 | 1 May 2031 | — | Not yet due | 0 |
| Kamal KunjBiyani & Sons | PR1150002601263 | 20 Jul 2026 | 31 Mar 2028 | — | Not yet due | 0 |
| Acharya Shree VidyasagarMasute Builders And Developers | PR1150002601102 | 8 Jul 2026 | 31 Mar 2029 | — | Not yet due | 0 |
| Dream Key 3Bhaskar Ramgonda Patil | PR1150002601051 | 6 Jul 2026 | 31 Dec 2029 | — | Not yet due | 0 |
| Lm EmpireRajendra Lalasaheb Chavan | PM1150002600888 | 22 Jun 2026 | 31 Dec 2030 | — | Not yet due | 0 |
| Vrindavan HeightsMahalaxmi Buildcon | PR1150002600878 | 22 Jun 2026 | 31 Dec 2028 | — | Not yet due | 0 |
| Arnika Business BayParikh Sygmia Ventures | PC1150002600840 | 18 Jun 2026 | 31 Oct 2028 | — | Not yet due | 0 |
| Mg Market Block AMg Developers | PR1150002600850 | 18 Jun 2026 | 31 Dec 2030 | — | Not yet due | 0 |
| Sharad Pride 41Pratik Infra | PR1150002600765 | 12 Jun 2026 | 30 Apr 2030 | — | Not yet due | 0 |
| Shri Ram ResidencyShri Mangaraya Developers | PR1151012600720 | 10 Jun 2026 | 31 Dec 2027 | — | Not yet due | 0 |
| Green CountyMirajkar Nichite Builders And Developers Private Limited | PR1150002600697 | 8 Jun 2026 | 31 Mar 2029 | — | Not yet due | 0 |
| Samarth ResidencyS P Associates | PM1150002600615 | 1 Jun 2026 | 31 Dec 2030 | — | Not yet due | 0 |
| The BalsamM/S Jotiraditya Builders | PR1150002600572 | 29 May 2026 | 31 Dec 2030 | — | Not yet due | 0 |
| Loknagari Karande MalaVikesh Abhaykumar Oswal | PR1150002600528 | 25 May 2026 | 31 Mar 2030 | — | Not yet due | 0 |
| Samarth Krupa ResidencySwamisamarthbuildon | PM1150002600504 | 22 May 2026 | 31 Jan 2030 | — | Not yet due | 0 |
| Nimbalkar HeritageMorbale Infra Project Private Limited | PM1150002600491 | 21 May 2026 | 29 Dec 2029 | — | Not yet due | 0 |
| Vasant Villas ResidencyShree Datta Developers | PR1150002600487 | 21 May 2026 | 31 Dec 2029 | — | Not yet due | 0 |
| Anant Pride Phase IIIAnant Estate Developers | PM1150002600383 | 11 May 2026 | 31 Dec 2030 | — | Not yet due | 0 |
| Sequoia RiseDevika Construction | PR1150002600266 | 27 Apr 2026 | 31 Dec 2032 | — | Not yet due | 0 |
| Vihanga ResidencyIndo Buildcon Developers | PM1150002600245 | 22 Apr 2026 | 31 Dec 2030 | — | Not yet due | 0 |
| Palace GrandeurMangal Realty | PR1150002600226 | 21 Apr 2026 | 31 Dec 2029 | — | Not yet due | 0 |
| Meen Kiran ResidencyBhumi Builders | PM1150002600217 | 18 Apr 2026 | 31 Dec 2030 | — | Not yet due | 0 |
| Goldenn ProsperaCskcon Private Limited | PM1150002600111 | 15 Apr 2026 | 31 Dec 2028 | — | Not yet due | 0 |
| Digvijay HeightsDigvijay Associates Builders Developers & Earthmovers | PR1150002600054 | 9 Apr 2026 | 31 Mar 2031 | — | Not yet due | 0 |
| Veerashri HeightsViraj Sunilkumar Sarnaik | PR1150002502950 | 18 Mar 2026 | 31 Dec 2029 | — | Not yet due | 0 |
| Lords HighlandBalraj Digambar Jadhav | P53000081108 | 13 Mar 2026 | 31 May 2028 | — | Not yet due | 0 |
| 33 West AvenueAtk Infra | PM1150002502728 | 12 Mar 2026 | 31 Dec 2030 | — | Not yet due | 0 |
| Brahmandnayak SankulLandmark Developers | PM1150002502763 | 12 Mar 2026 | 31 Dec 2030 | — | Not yet due | 0 |
| CellestiaBalaji Infra | PM1150002502678 | 9 Mar 2026 | 31 Aug 2029 | — | Not yet due | 0 |
| Ideal Aero PlazaIdeal Developers | PC1150002502675 | 9 Mar 2026 | 31 Dec 2027 | — | Not yet due | 0 |
| Varun Flora Township Jasmine BuildingVertex Developers | PR1150002502639 | 9 Mar 2026 | 31 Dec 2030 | — | Not yet due | 0 |
| Galaxy HeightsA Space Developers | PM1150002502423 | 20 Feb 2026 | 31 Dec 2029 | — | Not yet due | 0 |
| Joy NestAniket Rajendra Khade | PR1150002502226 | 30 Jan 2026 | 31 Dec 2029 | — | Not yet due | 0 |
| Gateway ResidenciesSiddhivinayak Developers | PR1150002502203 | 29 Jan 2026 | 31 Dec 2031 | — | Not yet due | 0 |
| Growing GraceAmit Bapu Lokhande | PR1150002502205 | 29 Jan 2026 | 31 Dec 2029 | — | Not yet due | 0 |
| Sadguru PlazaMadhuri Shrikant Shirale | PM1150002502200 | 29 Jan 2026 | 31 Dec 2028 | — | Not yet due | 0 |
| WaterlilyLife Style Developers | PR1150002502206 | 29 Jan 2026 | 31 Dec 2030 | — | Not yet due | 0 |
| SkylineShree Constructions | PR1150002502192 | 27 Jan 2026 | 31 Dec 2030 | — | Not yet due | 0 |
| Redekar CrownHankare Patil Landmarks | PM1150002502161 | 22 Jan 2026 | 31 Dec 2030 | — | Not yet due | 0 |
| The Indira PalatialShree Mahalaxmi Realty | PM1150002502156 | 22 Jan 2026 | 31 Dec 2029 | — | Not yet due | 0 |
| 339 Tapasya NiwaraM/s Niwara Builders & Developers | PR1150002502133 | 21 Jan 2026 | 31 Dec 2029 | — | Not yet due | 0 |
| Ideal EliteIdeal Properties | PR1150002502143 | 21 Jan 2026 | 31 Dec 2028 | — | Not yet due | 0 |
| Maheshwari HeightsSubhash Ramgopal Maheshwari | P53000081087 | 16 Jan 2026 | 31 Dec 2027 | — | Not yet due | 0 |
| Mahapadma AvenueM S Infrastructure | PM1150002501829 | 19 Dec 2025 | 1 Nov 2029 | — | Not yet due | 0 |
| Emmanuel CornerstoneSantosh Mohan Arawattigi | P53000081072 | 16 Dec 2025 | 31 Oct 2032 | — | Not yet due | 0 |
| The ClayNarayan Auto Works | PR1150002501777 | 15 Dec 2025 | 31 Dec 2029 | — | Not yet due | 0 |
| The Grand PinnacleSairaj Builders And Developers | PM1150002501767 | 15 Dec 2025 | 31 Dec 2030 | — | Not yet due | 0 |
| One EarthDeshpande Infra | PR1150002501739 | 10 Dec 2025 | 31 Dec 2032 | — | Not yet due | 0 |
| Sky HeightsKirtikumar Balasaheb Masute | PR1150002501532 | 21 Nov 2025 | 31 Dec 2028 | — | Not yet due | 0 |
| Niranjan HeightsProprietor B S Developers SABIHA FIROJ SHIKALAGAR | PM1150002501276 | 20 Oct 2025 | 31 Dec 2029 | — | Not yet due | 0 |
| The ApexShiv Siddhi Buildcon | PM1150002501268 | 20 Oct 2025 | 31 Dec 2029 | — | Not yet due | 0 |
| HorizonDeshpande Infra | PM1150002501261 | 16 Oct 2025 | 31 Dec 2028 | — | Not yet due | 0 |
| Padalkar ResidencyShirke More Builders and Developers | PM1150002501222 | 13 Oct 2025 | 31 Dec 2028 | — | Not yet due | 0 |
| Shakuntala HeightsGaikwad Infrastructure Private Limited | PR1150002501128 | 9 Oct 2025 | 31 Dec 2028 | — | Not yet due | 0 |
| Guru Vedas ResidencyGM Infrastructure | PR1150002501087 | 1 Oct 2025 | 31 Dec 2029 | — | Not yet due | 0 |
| Ishwar KrupaChavan Builders and Developers | PM1150002500934 | 24 Sep 2025 | 31 Dec 2028 | — | Not yet due | 0 |
| Nanda Bal ParadiseUnity Pramoters And Builders | PR1150002500882 | 22 Sep 2025 | 31 Dec 2029 | — | Not yet due | 0 |
| Galaxy HeightsAditya Bhimrao Kolawale | PM1150002500795 | 15 Sep 2025 | 31 Mar 2029 | — | Not yet due | 0 |
| Amey Hi Life Wing C & DAmey Estates | PR1151012500763 | 11 Sep 2025 | 31 Dec 2032 | — | Not yet due | 0 |
| Hira HeightsOm Construction | PM1150002500633 | 22 Aug 2025 | 31 Dec 2028 | — | Not yet due | 0 |
| Dinkar ResidencySwamiraj Developers | PM1150002500519 | 7 Aug 2025 | 31 Dec 2029 | — | Not yet due | 0 |
| Mira Co-Op Hou Soc Ltd KopRamsina Redefine Homes LLP | PR1151012500365 | 25 Jul 2025 | 30 Sep 2027 | — | Not yet due | 0 |
| 24 Keywest East And West AvenueKeywest Infra | PM1150002500269 | 14 Jul 2025 | 31 Dec 2031 | — | Not yet due | 0 |
| KrishnaprabhaM/s Citi Developers | PR1151012500268 | 14 Jul 2025 | 31 Dec 2027 | — | Not yet due | 0 |
| Sahyadri HeightsShree Datta Developers | P53000080830 | 14 Jul 2025 | 1 Jun 2028 | — | Not yet due | 0 |
| Om ElegantSunil Gajanan Shrishrimal | P53000080808 | 10 Jul 2025 | 31 Dec 2027 | — | Not yet due | 0 |
| Brk Aura ResidencyManibhadra (Brk) Builders And Developers | P53000080755 | 3 Jul 2025 | 31 Dec 2029 | — | Not yet due | 0 |
| EvaraUrban Infra | P53000080758 | 3 Jul 2025 | 31 Dec 2028 | — | Not yet due | 0 |
| Ekdant HeightsPerfect Developers-Ekdant Heights | P53000080745 | 1 Jul 2025 | 31 Dec 2027 | — | Not yet due | 0 |
| Shubh ApartmentReema Premkant Jha | P53000080724 | 27 Jun 2025 | 31 Dec 2027 | — | Not yet due | 0 |
| Sanskruti HeightsShreeyog Constructions | PR1150002500122 | 25 Jun 2025 | 31 Dec 2030 | — | Not yet due | 0 |
| Shaskiya And Z P Health Employees Sahakari Grah Nirman Sanstha Marya - Building No 3Shaskiya And Z P Health Employees Sahakari Grah Nirman Sanstha Marya | P53000080677 | 25 Jun 2025 | 31 Dec 2028 | — | Not yet due | 0 |
| Parshawa Sujit EmpireParshawa Developers | P53000080571 | 16 Jun 2025 | 31 Dec 2028 | — | Not yet due | 0 |
| Pallavi Cooperative Housing SocietyVaradlaxmi And Kapade Developers | P53000080500 | 11 Jun 2025 | 31 Dec 2028 | — | Not yet due | 0 |
| Vardhaman Chintamani Wing CSpm Constructions | P53000080480 | 10 Jun 2025 | 30 Sep 2028 | — | Not yet due | 0 |
| Laxman RoyaleDiamond Crown Realtors LLP | P53000080332 | 22 May 2025 | 31 Dec 2028 | — | Not yet due | 0 |
| Executive EmeraldRajendra Sukhraj Oswal | P53000080320 | 21 May 2025 | 31 Dec 2028 | — | Not yet due | 0 |
| Parshawa ParkParshawa Developers And Builders | P53000080128 | 29 Apr 2025 | 31 Dec 2027 | — | Not yet due | 0 |
| Palace EdgeH S Venture | P53000080071 | 22 Apr 2025 | 31 Dec 2028 | — | Not yet due | 0 |
| Dhanashree SvastiBedekar Lifespaces LLP | P53000080005 | 17 Apr 2025 | 31 Dec 2028 | — | Not yet due | 0 |
| Soni HeightsShashwat Builders | P53000079942 | 7 Apr 2025 | 31 Dec 2026 | — | Not yet due | 0 |
| Krishna ResidencyMahendrasingh Gumansingh Deora | P53000079891 | 28 Mar 2025 | 31 Dec 2028 | — | Not yet due | 0 |
| Arihant PrideChougule Jirge Developers | P53000079824 | 27 Mar 2025 | 31 Dec 2028 | — | Not yet due | 0 |
| Highstreet CbdHighstreet Developers | P53000079840, P53000079851, P53000079962 +2 | 27 Mar 2025 | 31 Dec 2031 | — | Not yet due | 0 |
| AnuradhaNitin Vishnu Shinde | P53000079753 | 26 Mar 2025 | 31 Dec 2029 | — | Not yet due | 0 |
| Krishnae ResidencyHemlata Sunil Bhosale | P53000079783 | 26 Mar 2025 | 30 Sep 2028 | — | Not yet due | 0 |
| Rdm Elite - KissanAbi Builders | P53000079671 | 20 Mar 2025 | 31 May 2026 | — | Promised date passed | 0 |
| The SkylinePanjwani Developers | P53000079571 | 12 Mar 2025 | 31 Dec 2028 | — | Not yet due | 0 |
Other districts
- Pune13,424 projects
- Thane7,170 projects
- Mumbai Suburban6,592 projects
- Raigarh5,728 projects
- Nashik4,171 projects
- Palghar3,084 projects
- Nagpur2,793 projects
- Aurangabad1,469 projects
- Mumbai City1,380 projects
- Satara1,181 projects
- Ratnagiri1,138 projects
- Sangli785 projects
Most active promoters
By projects registered here, as named on MahaRERA.
- Deshpande Infra7 projects
- Pune Housing and Area Development Board Pune7 projects
- Bhaskar Ramgonda Patil6 projects
- M/S SD Associates6 projects
- Shendre and Associates5 projects
- The Ideal Construction5 projects
- Bedekar Lifespaces LLP4 projects
- Fortune Developers4 projects
- Mahabharat Construction Corporation4 projects
- Patki-Joshi Engineers and Contractors Pvt. Ltd.4 projects
Data through8 Oct 2026SourcesMahaRERA project search, registration and extension certificates, regulatory lists and ordersExtensions count where MahaRERA's extension certificate could be read; MahaRERA cannot serve some certificates, so the share extended may be understated.Methodology