RERA projects in Ahmednagar
491 projects under 499 MahaRERA registrations across 60 localities, registered 2017–2026. 7% have a completion date extended beyond the one promised.
491RERA projectsin 60 localities
499Registrationssome projects hold several
121Completion still due289 past their completion date
23 monthsMedian extension beyond promised date7% of registrations extended
35Regulatory caseson 32 projects
68Buildings on recordfrom registration certificates
Registrations per year
New MahaRERA registrations by registration date.
| Year | Registrations |
|---|---|
| 2017 | 80 |
| 2018 | 43 |
| 2019 | 37 |
| 2020 | 38 |
| 2021 | 42 |
| 2022 | 47 |
| 2023 | 46 |
| 2024 | 29 |
| 2025 | 23 |
| 2026 | 25 |
Localities in Ahmednagar
By number of registered projects. Talukas and localities as MahaRERA names them.
Ahmadnagar (M Corp.)167 projectsNagar43 projectsShrirampur (M Cl)35 projectsKopargaon (M Cl)29 projectsShrigonda(Mcl)20 projectsSangamner (Mcl)12 projectsSupa11 projectsRahata Pimpalas (Mcl)9 projectsShrirampur9 projectsAkola7 projectsJamkhed (Ct)7 projectsParner6 projects
All 60 localities
- Ahmadnagar (M Corp.)167
- Nagar43
- Shrirampur (M Cl)35
- Kopargaon (M Cl)29
- Shrigonda(Mcl)20
- Sangamner (Mcl)12
- Supa11
- Rahata Pimpalas (Mcl)9
- Shrirampur9
- Akola7
- Jamkhed (Ct)7
- Parner6
- Sangamner6
- Shirdi(N P)6
- Ghulewadi (Ct)5
- Gunjalwadi5
- Deolali Pravara (M Cl)4
- Kopargaon (R)4
- Nagapur (Ct)4
- Nighoj4
- Rahta4
- Ahmadnagar (Cb)3
- (Ct)3
- Karjat3
- Nevasa3
- Rahuri Mcl3
- Rui3
- Vadgaongupta3
- Arangaon2
- Burhanagar (Ct)2
- Jamkhed2
- Kopargaon2
- Loni Bk.2
- Mukindapur2
- Others2
- Rahuri2
- Rashin2
- Shrigonda2
- Akola1
- Chitali1
- Dattanagar1
- Dholewadi (N.V.)1
- Jategaon1
- Jogeshwarwadi1
- Kh.1
- Kolgaon1
- Nagardevale1
- Nevasa Kh.1
- Nighoj1
- Parner1
- Pathardi(Mc)1
- Rahuri New1
- Sakur1
- Sakuri1
- Sangamner Kh.1
- Savedi1
- Shevgaon1
- Shirasgaon1
- Takali1
- Wakodi1
Projects in Ahmednagar
491 projects registered with MahaRERA in this district and the places within it.
| Project | RERA | Registered | Promised completion | Revised completion | Timing | Cases |
|---|---|---|---|---|---|---|
| Sandeep PrideVenkatesh Buildcon | P52200028599 | 25 Mar 2021 | 30 Jun 2032 | — | Not yet due | 0 |
| Saraswati ResidencyPratap Gulab Bhogade | P52200028476 | 4 Mar 2021 | 30 Jun 2023 | — | Promised date passed | 0 |
| Silveroak Gold CoastSilver Oak Builders And Developers | P52200028247 | 18 Feb 2021 | 23 Dec 2024 | 23 Dec 2025 | Extended 12 mo | 0 |
| MagnoliaMadhumalti Costruction Pvt Ltd | P52200028201 | 10 Feb 2021 | 30 Jun 2026 | — | Promised date passed | 0 |
| Shree Ganesh ApartmentShree Ganesh Developers | P52200028175 | 10 Feb 2021 | 30 Oct 2022 | — | Promised date passed | 0 |
| Sukrutam ApartmentMakarand Krishnaji Deshpande | P52200028127 | 4 Feb 2021 | 30 Jun 2023 | — | Promised date passed | 0 |
| Arihant Park Phase 8Madan Nemichand Bafana | P52200027943 | 21 Jan 2021 | 30 Dec 2022 | — | Promised date passed | 0 |
| Nature ValleyRadhakrushna Madhukar Kale | P52200027579 | 16 Dec 2020 | 30 Jun 2024 | — | Promised date passed | 0 |
| Bhansali SquareSarthak Bhansali and Siddharth Bhansali | P52200027445 | 10 Dec 2020 | 30 Jun 2024 | — | Promised date passed | 0 |
| Meher BlissGlorious Construction Company | P52200027424 | 10 Dec 2020 | 30 Jun 2024 | — | Promised date passed | 0 |
| Neelkanth SubhadraNeelkanth Developers | P52200027266 | 28 Nov 2020 | 25 May 2025 | — | Promised date passed | 0 |
| Pride ParkGaurav Vishwanath Awati | P52200027233 | 25 Nov 2020 | 11 Oct 2023 | — | Promised date passed | 0 |
| Sukriti Apartment Phase IIINitin Machindra Shewale | P52200027146 | 19 Nov 2020 | 7 Sep 2025 | — | Promised date passed | 0 |
| Siyaram Phase IIMadhumalti Costruction Pvt Ltd | P52200027000 | 10 Nov 2020 | 30 Jun 2024 | — | Promised date passed | 0 |
| Mauli Green ParkMauli Developers | P52200026981, P52200032285 | 7 Nov 2020 | 30 Jun 2028 | — | Not yet due | 0 |
| Sai Ashirwad residencyGlobal Construction Services | P52200026987 | 7 Nov 2020 | 30 Sep 2023 | — | Promised date passed | 0 |
| Sai SurajRavindra Balasaheb Kharde | P52200026946 | 7 Nov 2020 | 30 Jun 2022 | — | Promised date passed | 0 |
| Apana gharWeston Land Developers | P52200026894 | 3 Nov 2020 | 30 Dec 2021 | — | Promised date passed | 0 |
| Casa Row ColonyCasa Builders | P52200026735 | 21 Oct 2020 | 30 Sep 2023 | — | Promised date passed | 0 |
| AKash 21Akash Construction | P52200026602 | 7 Oct 2020 | 30 Nov 2022 | — | Promised date passed | 0 |
| Parth Heights Phase - 2Rajendra Ramchandra Pawar | P52200026588 | 7 Oct 2020 | 30 Oct 2022 | — | Promised date passed | 0 |
| Laxmi Angan D BuildingMalhar Associates | P52200026168 | 25 Aug 2020 | 30 Jun 2022 | — | Promised date passed | 0 |
| Sairaj Phase 2-Wing-ABhaskar Jaywant Kale | P52200026159 | 25 Aug 2020 | 30 Jun 2022 | — | Promised date passed | 0 |
| Swapna Saakar - Phase 1Shubh Reality | P52200026150 | 25 Aug 2020 | 30 Jun 2026 | — | Promised date passed | 0 |
| Swapna Saakar - Phase 2Shubh Reality | P52200026167 | 25 Aug 2020 | 30 Jun 2026 | — | Promised date passed | 0 |
| Orchid ChambersVitthala Infrastructure | P52200026100 | 19 Aug 2020 | 29 Feb 2024 | — | Promised date passed | 0 |
| Classic IconSanjay Shantilal Gugale | P52200025882 | 24 Jul 2020 | 30 Jun 2026 | — | Promised date passed | 0 |
| Sai SarthakKamath Associates | P52200025664 | 1 Jul 2020 | 30 Jun 2025 | — | Promised date passed | 0 |
| Shivmudra TowersAshish Sudhakar Dandawate | P52200025678 | 1 Jul 2020 | 30 Sep 2024 | — | Promised date passed | 0 |
| Aurum Commercial / Business HubSai Midas Realties | P52200025567 | 28 Jun 2020 | 31 Mar 2027 | — | Not yet due | 0 |
| MadhubanPrasad Developers | P52200025544 | 28 Jun 2020 | 12 Feb 2030 | — | Not yet due | 0 |
| Unicorn Nest IIUnicorn Developers | P52200025454 | 3 Jun 2020 | 30 Jun 2026 | — | Promised date passed | 0 |
| Shri Swami Samarth ResidencySuman Associates | P52200025409 | 23 May 2020 | 31 Dec 2024 | 30 Jun 2026 | Extended 18 mo | 0 |
| Neminath HeightsNaresh Sudhakar Ganorkar | P52200025405 | 21 May 2020 | 7 Jun 2024 | — | Promised date passed | 1 |
| Kalpruksha ResidencyNarendra Gokarshanath Chavan | P52200025367 | 13 May 2020 | 30 Dec 2023 | — | Promised date passed | 1 |
| Adikailas A1 A2Madhumalti Costruction Pvt Ltd | P52200025319 | 10 Apr 2020 | 30 Mar 2025 | — | Promised date passed | 0 |
| Rachana Park Wing IPrasad Subhash Naik | P52200025216 | 23 Mar 2020 | 30 Jun 2022 | — | Promised date passed | 0 |
| Devgiri ApartmentSandip Balchand Surana | P52200024985 | 18 Mar 2020 | 30 Dec 2023 | — | Promised date passed | 0 |
| Arihant Park Phase 7Madan Nemichand Bafana | P52200024690 | 28 Feb 2020 | 30 Jun 2022 | — | Promised date passed | 0 |
| Krushna PropertiesKrushna Properties | P52200024657 | 26 Feb 2020 | 30 May 2023 | — | Promised date passed | 0 |
| Pari AppartmentAnil Mohan Gite | P52200024483 | 18 Feb 2020 | 30 Jun 2021 | 30 Jun 2022 | Extended 12 mo | 0 |
| Dhawal ParkHemchandra Ramkrishna Ingale | P52200024450 | 13 Feb 2020 | 24 Jun 2022 | — | Promised date passed | 0 |
| Shivkunj Phase 2Vedanta Reality | P52200024048 | 16 Jan 2020 | 30 Dec 2022 | — | Promised date passed | 0 |
| Yuvraj ResidencyAshok Lalchand Desarda | P52200024018 | 14 Jan 2020 | 30 Mar 2025 | — | Promised date passed | 0 |
| SaptamalaiVilas Bhagwat Khond | P52200023718 | 2 Jan 2020 | 30 Dec 2022 | — | Promised date passed | 0 |
| Shree Sai Nirman Dream CityShree Sai Nirman Realty | P52200023379 | 12 Dec 2019 | 30 Dec 2024 | 31 Dec 2026 | Extended 24 mo | 0 |
| Jayashree TowerPrasad Babanrao Andhale | P52200023188 | 5 Dec 2019 | 29 Nov 2024 | — | Promised date passed | 0 |
| Harishila ParkDeepak Haribhau Bangar | P52200023161 | 4 Dec 2019 | 30 Dec 2026 | — | Not yet due | 0 |
| Adarsh Colony Phase 4 and 5Akash Construction | P52200022885 | 1 Nov 2019 | 30 Mar 2022 | — | Promised date passed | 0 |
| Vyankatesh ResidancySandip Balchand Surana | P52200022910 | 1 Nov 2019 | 1 Oct 2024 | — | Promised date passed | 0 |
| Sai AjinkyaA.r.k. Developers | P52200022732 | 16 Oct 2019 | 30 Dec 2023 | — | Promised date passed | 0 |
| Sai Vishwa BSai Kripa Promoters & Developers | P52200022674 | 12 Oct 2019 | 30 Dec 2024 | — | Promised date passed | 0 |
| Sharanya Row Housing Phase 2Pranali Infrastructure | P52200022441 | 24 Sep 2019 | 30 Dec 2021 | — | Promised date passed | 0 |
| Sukhsagar NagarSkyline Enterprises | P52200022341 | 16 Sep 2019 | 30 Dec 2023 | — | Promised date passed | 0 |
| Vardhman HomesVardhman Homes | P52200022312 | 9 Sep 2019 | 23 Aug 2026 | — | Promised date passed | 0 |
| Maple Row HouseAkash Construction | P52200022209 | 5 Sep 2019 | 30 Oct 2021 | — | Promised date passed | 0 |
| The Courtyard Phase IIMarc Developers | P52200022201 | 5 Sep 2019 | 30 Mar 2024 | — | Promised date passed | 0 |
| Madhukosh HeightsGaurav Vishwanath Awati | P52200022069 | 25 Aug 2019 | 8 Aug 2023 | — | Promised date passed | 0 |
| Chaitanya ResidencyGurukrupa Promoters And Builders | P52200021660 | 19 Jul 2019 | 31 Dec 2026 | — | Not yet due | 0 |
| Shiv-Pushpa SerenitySpace Buildcon | P52200021667 | 19 Jul 2019 | 30 Dec 2027 | — | Not yet due | 0 |
| ValenciaS & G Developers | P52200021709 | 19 Jul 2019 | 1 Mar 2023 | — | Promised date passed | 0 |
| Ashwamedh Capital1Ashwamedh Spaces Private Limited | P52200021637 | 15 Jul 2019 | 30 Dec 2021 | — | Promised date passed | 0 |
| Swapn PurtiShubh Vastu Realty | P52200021417 | 28 Jun 2019 | 30 Mar 2023 | — | Promised date passed | 0 |
| Royal Palms II WingCharudatta Moreshwar Mulay | P52200021307 | 21 Jun 2019 | 30 Nov 2020 | — | Promised date passed | 0 |
| Darshan ParkBajaj And Chhabriya Associates | P52200021243 | 14 Jun 2019 | 31 Jan 2021 | — | Promised date passed | 0 |
| Riddhi Siddhi HeightsRiddhi Siddhi Builders And Promoters | P52200021217 | 14 Jun 2019 | 28 Nov 2021 | — | Promised date passed | 0 |
| Kisangiri Complex And Vihan ResidencySharad Namdeo Thange | P52200020906 | 16 May 2019 | 30 May 2025 | — | Promised date passed | 0 |
| Samruddhi Row BunglowSubhash Laxman Kale | P52200020571 | 26 Apr 2019 | 22 Mar 2023 | — | Promised date passed | 0 |
| Dhanashri VishwaGiriraj Developers | P52200020495 | 18 Apr 2019 | 8 Mar 2023 | 7 Mar 2024 | Extended 12 mo | 0 |
| Amin TowerShaan Associates | P52200020463 | 15 Apr 2019 | 30 Dec 2021 | — | Promised date passed | 0 |
| Silver sandNeelkanth Developers | P52200020328 | 5 Apr 2019 | 28 Mar 2023 | — | Promised date passed | 0 |
| Shri Swami Samarth HeightsM/s. Shri Sai Developers | P52200020288 | 2 Apr 2019 | 23 Mar 2024 | — | Promised date passed | 0 |
| Construction of 96 Ts EWS, 6 Ts MIG, 40 shops and 1 MHADA office on F P No 109 110 savedi AhmednagaNashik Housing & Area Development Board | P52200019849 | 5 Mar 2019 | 30 Dec 2023 | — | Promised date passed | 0 |
| Guruprasad ResidencyNaresh Sampatlal Parakh V Itar | P52200019707 | 22 Feb 2019 | 30 Dec 2023 | 31 Dec 2029 | Extended 72 mo | 0 |
| SargamKamal Ganga Developers | P52200019694 | 22 Feb 2019 | 30 Sep 2024 | — | Promised date passed | 0 |
| Sukhkarta ResidencyM S Kiran R Waghe | P52200019611 | 14 Feb 2019 | 30 Mar 2022 | — | Promised date passed | 0 |
| Sai Anand ResidencySai Anand Realty | P52200019491 | 6 Feb 2019 | 30 Jun 2021 | 30 Dec 2022 | Extended 18 mo | 0 |
| Shambhavi ApartmentRatnakar Marutirao Kulkarni | P52200019340 | 23 Jan 2019 | 30 Sep 2022 | — | Promised date passed | 0 |
| Utkarsha Phase - IIIMakarand Madhav Kulkarni | P52200019301 | 21 Jan 2019 | 30 Dec 2023 | — | Promised date passed | 0 |
| Arihantpark Phase-6Madan Nemichand Bafana | P52200019149 | 9 Jan 2019 | 30 Dec 2020 | — | Promised date passed | 0 |
| Vrundavan CityRaman Babaso Khamkar | P52200018783 | 4 Dec 2018 | 31 Dec 2019 | 31 Dec 2024 | Extended 60 mo | 0 |
| Siya Ram ResidencyMakarand Madhav Kulkarni | P52200018653 | 22 Nov 2018 | 30 Dec 2023 | — | Promised date passed | 0 |
| Parth HeightsRajendra Ramchandra Pawar | P52200018420 | 30 Oct 2018 | 31 Dec 2019 | — | Promised date passed | 0 |
| Trimurti Phase 3Trimurti Developers | P52200018237 | 16 Oct 2018 | 30 Sep 2021 | 30 Sep 2022 | Extended 12 mo | 0 |
| Navkar PrathamNaVKAR CONSTRUCTION & REALTY | P52200018192 | 15 Oct 2018 | 30 Mar 2021 | — | Promised date passed | 0 |
| Sai Icon Business CentreSai Srushti Builders and Developers | P52200017932 | 27 Sep 2018 | 30 Dec 2021 | 31 Dec 2028 | Extended 84 mo | 0 |
| Amrutkalash Phase-03Madhumalti Costruction Pvt Ltd | P52200017860 | 24 Sep 2018 | 15 Mar 2023 | — | Promised date passed | 0 |
| RiverparkAdeshwar Builders | P52200017634 | 29 Aug 2018 | 28 Feb 2021 | — | Promised date passed | 0 |
| Appa ResidencyRahul Madhukar Kanherkar | P52200017505 | 23 Aug 2018 | 30 Mar 2021 | — | Promised date passed | 0 |
| Kamath GlitteratiKamath Associates | P52200017527 | 23 Aug 2018 | 6 Aug 2023 | — | Promised date passed | 0 |
| Adikailas Wing A03Madhumalti Costruction Pvt Ltd | P52200017194 | 23 Jul 2018 | 30 Mar 2022 | — | Promised date passed | 0 |
| Shoora ResidencyDinesh Sadashiv Kshirsagar | P52200017217 | 23 Jul 2018 | 29 Aug 2024 | — | Promised date passed | 0 |
| Veda HomesSawan Developers | P52200017213 | 23 Jul 2018 | 15 Dec 2020 | — | Promised date passed | 0 |
| Dk ResidencyDk Developers | P52200017095 | 11 Jul 2018 | 30 Dec 2020 | — | Promised date passed | 0 |
| Arihant Park Phase - 5Madan Nemichand Bafana | P52200016902 | 22 Jun 2018 | 30 Sep 2020 | — | Promised date passed | 0 |
| Vedant Park IIIPrasad Babanrao Andhale | P52200016834 | 18 Jun 2018 | 31 Dec 2019 | — | Promised date passed | 0 |
| SairajBhaskar Jaywant Kale | P52200016763 | 12 Jun 2018 | 30 Nov 2020 | — | Promised date passed | 0 |
| Gulmohor ParkPrasad Babanrao Andhale | P52200016641 | 5 Jun 2018 | 30 May 2022 | — | Promised date passed | 0 |
| Siddhi ResidencyPrasad Babanrao Andhale | P52200016653 | 5 Jun 2018 | 30 May 2022 | — | Promised date passed | 0 |
| Sant Wamanbhau ResidencyGurukrupa Associates | P52200016604 | 25 May 2018 | 30 Dec 2021 | — | Promised date passed | 0 |
Other districts
- Pune13,424 projects
- Thane7,170 projects
- Mumbai Suburban6,592 projects
- Raigarh5,728 projects
- Nashik4,171 projects
- Palghar3,084 projects
- Nagpur2,793 projects
- Aurangabad1,469 projects
- Mumbai City1,380 projects
- Satara1,181 projects
- Ratnagiri1,138 projects
- Kolhapur863 projects
Most active promoters
By projects registered here, as named on MahaRERA.
- Neelkanth Developers11 projects
- Gaurav Vishwanath Awati9 projects
- Madan Nemichand Bafana9 projects
- Madhumalti Costruction Pvt Ltd7 projects
- Prasad Subhash Naik7 projects
- Makarand Madhav Kulkarni6 projects
- Prasad Babanrao Andhale6 projects
- Kamath Associates5 projects
- Akash Construction4 projects
- Marc Developers4 projects
Data through8 Oct 2026SourcesMahaRERA project search, registration and extension certificates, regulatory lists and ordersExtensions count where MahaRERA's extension certificate could be read; MahaRERA cannot serve some certificates, so the share extended may be understated.Methodology