RERA projects in Ahmednagar
491 projects under 499 MahaRERA registrations across 60 localities, registered 2017–2026. 7% have a completion date extended beyond the one promised.
491RERA projectsin 60 localities
499Registrationssome projects hold several
121Completion still due289 past their completion date
23 monthsMedian extension beyond promised date7% of registrations extended
35Regulatory caseson 32 projects
68Buildings on recordfrom registration certificates
Registrations per year
New MahaRERA registrations by registration date.
| Year | Registrations |
|---|---|
| 2017 | 80 |
| 2018 | 43 |
| 2019 | 37 |
| 2020 | 38 |
| 2021 | 42 |
| 2022 | 47 |
| 2023 | 46 |
| 2024 | 29 |
| 2025 | 23 |
| 2026 | 25 |
Localities in Ahmednagar
By number of registered projects. Talukas and localities as MahaRERA names them.
Ahmadnagar (M Corp.)167 projectsNagar43 projectsShrirampur (M Cl)35 projectsKopargaon (M Cl)29 projectsShrigonda(Mcl)20 projectsSangamner (Mcl)12 projectsSupa11 projectsRahata Pimpalas (Mcl)9 projectsShrirampur9 projectsAkola7 projectsJamkhed (Ct)7 projectsParner6 projects
All 60 localities
- Ahmadnagar (M Corp.)167
- Nagar43
- Shrirampur (M Cl)35
- Kopargaon (M Cl)29
- Shrigonda(Mcl)20
- Sangamner (Mcl)12
- Supa11
- Rahata Pimpalas (Mcl)9
- Shrirampur9
- Akola7
- Jamkhed (Ct)7
- Parner6
- Sangamner6
- Shirdi(N P)6
- Ghulewadi (Ct)5
- Gunjalwadi5
- Deolali Pravara (M Cl)4
- Kopargaon (R)4
- Nagapur (Ct)4
- Nighoj4
- Rahta4
- Ahmadnagar (Cb)3
- (Ct)3
- Karjat3
- Nevasa3
- Rahuri Mcl3
- Rui3
- Vadgaongupta3
- Arangaon2
- Burhanagar (Ct)2
- Jamkhed2
- Kopargaon2
- Loni Bk.2
- Mukindapur2
- Others2
- Rahuri2
- Rashin2
- Shrigonda2
- Akola1
- Chitali1
- Dattanagar1
- Dholewadi (N.V.)1
- Jategaon1
- Jogeshwarwadi1
- Kh.1
- Kolgaon1
- Nagardevale1
- Nevasa Kh.1
- Nighoj1
- Parner1
- Pathardi(Mc)1
- Rahuri New1
- Sakur1
- Sakuri1
- Sangamner Kh.1
- Savedi1
- Shevgaon1
- Shirasgaon1
- Takali1
- Wakodi1
Projects in Ahmednagar
491 projects registered with MahaRERA in this district and the places within it.
| Project | RERA | Registered | Promised completion | Revised completion | Timing | Cases |
|---|---|---|---|---|---|---|
| Madhav BagAbhijit Arun Pund | P52200051131 | 30 May 2023 | 30 Jun 2024 | — | Promised date passed | 0 |
| Sai GalaxyShree Sai Galaxy | P52200051083 | 29 May 2023 | 31 Mar 2027 | — | Not yet due | 0 |
| Sarvadnya HeightsPriyanka Krishna Agarkar | P52200050957 | 16 May 2023 | 31 May 2025 | — | Promised date passed | 0 |
| Shobha HeritageNilesh Vasantrao Chavan | P52200050972 | 16 May 2023 | 31 Mar 2026 | — | Promised date passed | 0 |
| Chandrabhaga ApartmentS V BUILDERS and DEVELOPERS | P52200050954 | 15 May 2023 | 31 Dec 2027 | — | Not yet due | 0 |
| RegentRiselife Spaces | P52200050913 | 15 May 2023 | 31 Dec 2027 | — | Not yet due | 0 |
| PasaydanAdiraj Developers | P52200050766 | 3 May 2023 | 31 Mar 2027 | — | Not yet due | 0 |
| Mauli TowerMayur Anand Shinde | P52200050742 | 28 Apr 2023 | 31 Dec 2025 | — | Promised date passed | 0 |
| Shivganga PrideAjit Kundlik Ghodake | P52200050706 | 28 Apr 2023 | 25 May 2026 | — | Promised date passed | 0 |
| Sky CourtPranali Infra | P52200050501 | 17 Apr 2023 | 30 Jun 2026 | — | Promised date passed | 0 |
| Dhole ComplexGaurav Vishwanath Awati | P52200050319 | 1 Apr 2023 | 1 May 2024 | — | Promised date passed | 0 |
| D R PrideD R Buildcon | P52200050251 | 27 Mar 2023 | 30 Oct 2026 | — | Not yet due | 0 |
| Weston City Phase 3Weston Land Developers | P52200050132 | 20 Mar 2023 | 31 Dec 2027 | — | Not yet due | 0 |
| Fatema EliteSameena Anjum Shaikh | P52200050092 | 15 Mar 2023 | 31 Dec 2029 | — | Not yet due | 0 |
| MehtacornerAdeshwar Builders | P52200049897 | 6 Mar 2023 | 31 Mar 2026 | — | Promised date passed | 0 |
| Ranmale ResidentialMangesh Bhagwan Ranmale | P52200050054 | 6 Mar 2023 | 26 Jan 2025 | — | Promised date passed | 0 |
| Vivekanand Row-BungalowRahul Balasaheb Bhosale | P52200049896 | 6 Mar 2023 | 31 Dec 2026 | — | Not yet due | 1 |
| Anand VistaShubh Anand Realty | P52200049796 | 24 Feb 2023 | 31 Jul 2026 | — | Promised date passed | 0 |
| Golden LeafGaurav Vishwanath Awati | P52200049448 | 14 Feb 2023 | 1 Nov 2024 | — | Promised date passed | 0 |
| AbhiramMakarand Madhav Kulkarni | P52200049407 | 8 Feb 2023 | 31 Mar 2026 | — | Promised date passed | 0 |
| VivantaB And G Ventures | P52200048884 | 24 Jan 2023 | 1 Dec 2024 | — | Promised date passed | 0 |
| Dhadiwal Raisoni PlazaDhadiwal Raisoni Associates | P52200048602 | 10 Jan 2023 | 31 Dec 2026 | — | Not yet due | 0 |
| Saffron EliteDhanraj Lalchand Sancheti | P52200048618 | 10 Jan 2023 | 31 Dec 2027 | — | Not yet due | 0 |
| Aai ResidencyVinod Dilip Pacharne | P52200048158 | 15 Dec 2022 | 31 Jul 2025 | — | Promised date passed | 0 |
| ArabellaMarc Developers | P52200048057 | 8 Dec 2022 | 31 Mar 2027 | — | Not yet due | 0 |
| Sky HeightPranali Infrastructure | P52200048032 | 7 Dec 2022 | 31 Jan 2027 | — | Not yet due | 0 |
| Nakshatra HeightsShashikant Gopinath Bhambare | P52200047966 | 2 Dec 2022 | 31 Dec 2024 | — | Promised date passed | 0 |
| Nathkrupa PlazaNathkrupa Developers | P52200047969 | 2 Dec 2022 | 30 Jun 2025 | — | Promised date passed | 0 |
| Pink City-IIAmit Ashok Mutha | P52200047775 | 28 Nov 2022 | 29 Mar 2027 | — | Not yet due | 0 |
| Kritikka AarambhaKritikka Realty | P52200047724 | 21 Nov 2022 | 30 Jun 2027 | — | Not yet due | 0 |
| Kadampatil PlazaBhanudas Janardhan Gaikwad | P52200047678 | 17 Nov 2022 | 15 Jun 2026 | — | Promised date passed | 0 |
| Anantaa City CenterSuvarna Lifespace Developers LLP | P52200047466 | 2 Nov 2022 | 1 Aug 2025 | — | Promised date passed | 0 |
| Morya GangaiMorya Construction | P52200046982 | 26 Sep 2022 | 31 Dec 2026 | — | Not yet due | 0 |
| Rachana NakshatraPrasad Subhash Naik | P52200046780 | 10 Sep 2022 | 31 Dec 2024 | — | Promised date passed | 0 |
| Classic AuraSanjay Shantilal Gugale | P52200046771 | 5 Sep 2022 | 31 Dec 2027 | — | Not yet due | 0 |
| Jlp Business TowerAditya Builders & Developers (Prop. Jalindar Laxman Palve HUF) | P52200046537 | 10 Aug 2022 | 1 Nov 2024 | — | Promised date passed | 0 |
| Subhadra HeightsNeelkanth Developers | P52200046501 | 10 Aug 2022 | 30 Jun 2026 | — | Promised date passed | 0 |
| Kuber HeightsMula Pravara Corporation | P52200046496 | 6 Aug 2022 | 30 Apr 2023 | — | Promised date passed | 0 |
| Morya ApartmentsMangalmurti Constructions | P52200046460 | 4 Aug 2022 | 1 Dec 2025 | — | Promised date passed | 0 |
| Adesh Heights Phase 8Suresh Namdev Lagad | P52200046099 | 20 Jun 2022 | 31 Dec 2024 | — | Promised date passed | 0 |
| Ganesh PrideSanklecha Construction | P52200046160 | 20 Jun 2022 | 31 Dec 2024 | — | Promised date passed | 0 |
| Vivekanand Row BungalowYogesh Balasaheb Mustapure | P52200046161 | 20 Jun 2022 | 31 Dec 2026 | — | Not yet due | 0 |
| ArianaMarc Developers | P52200045983 | 15 Jun 2022 | 31 Mar 2027 | — | Not yet due | 0 |
| Bappa Residencyketan shrikrishna navle | P52200045823 | 15 Jun 2022 | 31 Mar 2025 | — | Promised date passed | 0 |
| Bramha CityBhagwan Parasharam Dhoot | P52200045756 | 9 Jun 2022 | 30 Jun 2024 | — | Promised date passed | 0 |
| Samairakamath and mulay associates | P52200045476 | 24 May 2022 | 6 Feb 2024 | — | Promised date passed | 0 |
| Team57prideAnand Construction | P52200035121 | 10 May 2022 | 31 Dec 2024 | — | Promised date passed | 0 |
| Kamath Mithilakamathdevelopers | P52200035026 | 29 Apr 2022 | 22 Dec 2023 | — | Promised date passed | 0 |
| SampurnamKamalganga Buildcon | P52200034730 | 20 Apr 2022 | 31 Dec 2026 | — | Not yet due | 0 |
| Stellar HeightsVision Group | P52200034632 | 20 Apr 2022 | 31 Dec 2026 | — | Not yet due | 0 |
| Nova CasaAllied Realty | P52200034574 | 11 Apr 2022 | 31 Dec 2025 | — | Promised date passed | 0 |
| Shri Swami Samarth HeightsNandalal Shankarlal Kasat | P52200034560 | 11 Apr 2022 | 31 Dec 2023 | — | Promised date passed | 0 |
| Atharva HeightsGaurav Vishwanath Awati | P52200033871 | 14 Mar 2022 | 11 Oct 2024 | — | Promised date passed | 0 |
| Ashapura ApartmentGautam Popatlal Bhandari | P52200033765 | 8 Mar 2022 | 31 Mar 2024 | — | Promised date passed | 0 |
| Kamath Shalomkamathdevelopers | P52200033769 | 8 Mar 2022 | 24 Dec 2024 | — | Promised date passed | 0 |
| Swami Vivekanand PalaceVivekanand Construction | P52200033694 | 2 Mar 2022 | 31 Dec 2026 | — | Not yet due | 0 |
| Anand AppartmentOm Sai Trimurti Buildcon LLP | P52200033296 | 15 Feb 2022 | 31 Dec 2024 | — | Promised date passed | 0 |
| Babushet Mundada ComplexMundadabuildcon | P52200033188 | 9 Feb 2022 | 10 Oct 2023 | — | Promised date passed | 0 |
| Oro Residential SchemeImperio Towers | P52200033222 | 9 Feb 2022 | 31 Dec 2027 | — | Not yet due | 0 |
| Sai Hermitage Shirdi - By Ananta Block - 7Harihar Infraventure (India) Private Limited | P52200033138 | 9 Feb 2022 | 31 Dec 2023 | — | Promised date passed | 1 |
| Shankar Parvati Park Phase 2Ganesh Shankarrao Fulari | P52200033213 | 9 Feb 2022 | 1 Oct 2025 | — | Promised date passed | 0 |
| Jai Shriram ComplexVarun Shashikant Agrawal | P52200033027 | 3 Feb 2022 | 31 Dec 2026 | — | Not yet due | 0 |
| Sai Hermitage Shirdi By AnantaHarihar Infraventure (India) Private Limited | P52200032959, P52200032980, P52200032981 +1 | 2 Feb 2022 | 31 Jan 2024 | — | Promised date passed | 4 |
| Gouras Developers and ConstructionGouras Developers and Construction | P52200032728 | 24 Jan 2022 | 31 Jul 2025 | — | Promised date passed | 0 |
| Casa Row Colony Phase - 2Casa Developers | P52200032505 | 10 Jan 2022 | 1 Jan 2024 | — | Promised date passed | 0 |
| Urban RealtyJ G Enterprises | P52200032512 | 10 Jan 2022 | 27 Sep 2023 | — | Promised date passed | 0 |
| Sai VishwaGaurav Vishwanath Awati | P52200032441 | 4 Jan 2022 | 11 Sep 2023 | — | Promised date passed | 0 |
| Bhagwati TowerBhagwati Enterprises | P52200032314 | 29 Dec 2021 | 31 Dec 2027 | — | Not yet due | 0 |
| Niramay ParkMonarch Properties | P52200032266 | 22 Dec 2021 | 31 Dec 2025 | — | Promised date passed | 0 |
| Rachana CornerPrasad Subhash Naik | P52200032268 | 22 Dec 2021 | 30 Jun 2023 | — | Promised date passed | 0 |
| Borude EliteExtreme Properties | P52200032223 | 15 Dec 2021 | 31 Dec 2026 | — | Not yet due | 0 |
| Sneha ApartmentNikhil Subhashchandra Fegade HUF | P52200031890 | 22 Nov 2021 | 1 Jan 2025 | — | Promised date passed | 0 |
| Krushna Pride 21Krushna Properties | P52200031826 | 12 Nov 2021 | 31 Dec 2025 | — | Promised date passed | 0 |
| Sai Kuber TowerPankaj Ashoklal Lodha | P52200031771 | 9 Nov 2021 | 31 Dec 2023 | — | Promised date passed | 0 |
| Venkatesh PlazaPratibha Rajendra Joshi | P52200031717 | 8 Nov 2021 | 31 Oct 2025 | — | Promised date passed | 0 |
| Krushna HeightsKrishna Constructions | P52200031659 | 3 Nov 2021 | 31 Dec 2026 | — | Not yet due | 0 |
| Sky Bridge VillasManoj Madanlal Chhajed | P52200031527 | 25 Oct 2021 | 31 Dec 2023 | — | Promised date passed | 0 |
| Ulka SrushtiSai Associates | P52200031535 | 25 Oct 2021 | 31 Mar 2025 | — | Promised date passed | 0 |
| AarambhA To Z Construction | P52200031478 | 23 Oct 2021 | 31 Mar 2024 | — | Promised date passed | 0 |
| Arihant Park Phase 9Madan Nemichand Bafana | P52200031254 | 15 Oct 2021 | 15 Aug 2023 | — | Promised date passed | 0 |
| Ideal HomesSamarth Construction | P52200031154 | 11 Oct 2021 | 31 Mar 2025 | — | Promised date passed | 0 |
| Shri Swami Samarth ApartmentKavita Sanjay Baraskar | P52200031094 | 5 Oct 2021 | 30 Jun 2025 | — | Promised date passed | 0 |
| Kamath ElinaKamath Associates | P52200031030 | 1 Oct 2021 | 31 Dec 2025 | — | Promised date passed | 0 |
| Premium IconPremium Builders & Developers | P52200030905 | 29 Sep 2021 | 31 Aug 2027 | — | Not yet due | 0 |
| Sairaj Phase 2 Wing-BSuman Vishwanath Kolhe | P52200030975 | 29 Sep 2021 | 30 Jul 2024 | — | Promised date passed | 0 |
| Trimurti ResidencyTrimurti Constructions | P52200030627 | 8 Sep 2021 | 30 Jun 2024 | — | Promised date passed | 0 |
| Yashraj ApartmentDnyaneshwar Chandrakant Khetmalis | P52200030678 | 8 Sep 2021 | 1 Aug 2025 | — | Promised date passed | 0 |
| Tulsi ParkDevendra Babulal Patel | P52200030500 | 25 Aug 2021 | 31 Dec 2025 | — | Promised date passed | 0 |
| Adesh HeightsSuresh Namdev Lagad | P52200030368 | 17 Aug 2021 | 31 Dec 2023 | — | Promised date passed | 0 |
| Sai Greenwoods - ASaikripa Promoters And Developers | P52200030339 | 15 Aug 2021 | 31 Dec 2025 | — | Promised date passed | 0 |
| Vedika PlazaA. R. Developers | P52200030206 | 5 Aug 2021 | 16 Jul 2025 | — | Promised date passed | 0 |
| Sadguru TowersBaba Developers | P52200029989 | 20 Jul 2021 | 31 Mar 2025 | — | Promised date passed | 0 |
| Kamath The OneKamath Associates | P52200029914 | 15 Jul 2021 | 30 Dec 2024 | — | Promised date passed | 0 |
| Shriram ParkSai Kuber Developers | P52200029611 | 11 Jun 2021 | 31 May 2025 | — | Promised date passed | 0 |
| Shri Sai Sindhu Park DevelopersShri Sai Sindhu Park Developers | P52200029238 | 10 May 2021 | 31 Dec 2026 | — | Not yet due | 0 |
| ValenciaShete Patil Developers | P52200029222 | 10 May 2021 | 1 Apr 2023 | 31 Mar 2024 | Extended 11 mo | 0 |
| Laxmi HeightsNeelkanth Developers | P52200029115 | 26 Apr 2021 | 15 Apr 2025 | — | Promised date passed | 0 |
| Swapnapurti NagarSwapnapurti | P52200028954 | 15 Apr 2021 | 31 Dec 2024 | — | Promised date passed | 0 |
| Nayantara apartmentPrafulla Nandanmal Bafna | P52200028887 | 5 Apr 2021 | 30 Jun 2024 | — | Promised date passed | 0 |
| Platinum Phase 2Silveroak Buildcon Pvt. Ltd. | P52200028721 | 25 Mar 2021 | 23 Dec 2025 | — | Promised date passed | 0 |
Other districts
- Pune13,424 projects
- Thane7,170 projects
- Mumbai Suburban6,592 projects
- Raigarh5,728 projects
- Nashik4,171 projects
- Palghar3,084 projects
- Nagpur2,793 projects
- Aurangabad1,469 projects
- Mumbai City1,380 projects
- Satara1,181 projects
- Ratnagiri1,138 projects
- Kolhapur863 projects
Most active promoters
By projects registered here, as named on MahaRERA.
- Neelkanth Developers11 projects
- Gaurav Vishwanath Awati9 projects
- Madan Nemichand Bafana9 projects
- Madhumalti Costruction Pvt Ltd7 projects
- Prasad Subhash Naik7 projects
- Makarand Madhav Kulkarni6 projects
- Prasad Babanrao Andhale6 projects
- Kamath Associates5 projects
- Akash Construction4 projects
- Marc Developers4 projects
Data through8 Oct 2026SourcesMahaRERA project search, registration and extension certificates, regulatory lists and ordersExtensions count where MahaRERA's extension certificate could be read; MahaRERA cannot serve some certificates, so the share extended may be understated.Methodology