Skip to content
Deedo home
Menu

Pooja Appartmets

Lapsed

Dhule (M Corp.), Dhule 424001 |Promoter: Ishwar Dnyandeo Lade

24 Nov 2020Registered with MahaRERA
9 Feb 2023Promised completion
1Building
11Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Lapsed
Buildings
1
Unit types
2BHK, Shop11 units in all
Land area for this project
288 sq m (3,100 sq ft)
Permissible built-up area
403 sq m (4,338 sq ft)
Sanctioned built-up area
403 sq m (4,338 sq ft)
Address
01 Part, Plt No 01(Part) S.no 488, DhulePIN 424001
Designated bank account
Idbi Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Pooja Appartmets is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 9 Feb 2023

The latest completion date on record passed 3 years and 8 months ago.

Registered
24 Nov 2020
Promised
9 Feb 2023

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P4980002720724 Nov 20209 Feb 2023—Ishwar Dnyandeo LadeProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Pooja Appartments611

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

11 units registered

2BHK · 6 unitsShop · 5 units
TypeCarpet areaUnits
2BHK305.19 sq m · 3,285 sq ft6
Shop63.7 sq m · 686 sq ft5

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Pooja Appartments

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water Supply00%
  • Sewerage (Chamber, Lines, Septic Tank , STP)00%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And Disposal00%
  • Water conservation /Rain water harvesting00%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

11 documents held by Deedo, 20 filings listed on MahaRERA's project page

Title

Encumbrance

Commencement certificate

Form b

Form 1

Form 2

Registration certificate

Other

Layout plan

Building plan

Allotment letter

Document library

  • Copy of the legal title reportSEARCH REPORT_compressed.pdf · uploaded 22 Nov 2020View
  • Details of encumbrancesEncumbrance cirtificate.pdf · uploaded 22 Nov 2020View
  • Building Plan Approval / NA Order for plotted developmentSanction Plan.pdf · uploaded 22 Nov 2020View
  • Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CIRTIFICATE_compressed.pdf · uploaded 22 Nov 2020View
  • Declaration in FORM BStamp Declaration_compressed.pdf · uploaded 22 Nov 2020View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CIRTIFICATE_compressed.pdf · uploaded 22 Nov 2020View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Cirtificate_compressed.pdf · uploaded 22 Nov 2020View
  • Proforma of Allotment letterAGREEMENT TO DRAFT.pdf · uploaded 22 Nov 2020View
  • Copy of Layout Approval (in case of layout)LAYOUT.pdf · uploaded 22 Nov 2020View
  • Copy of Layout Approval (in case of layout)LAYOUT.pdf · uploaded 22 Nov 2020View
  • Copy of Layout Approval (in case of layout)LAYOUT.pdf · uploaded 22 Nov 2020View
  • Copy of Layout Approval (in case of layout)LAYOUT.pdf · uploaded 22 Nov 2020View

Promoter documents

  • Legal Title reportSEARCH REPORT_compressed.pdf · uploaded 22 Nov 2020View
  • Declaration Form BStamp Declaration_compressed.pdf · uploaded 22 Nov 2020View

Technical documents

  • Building Plan ApprovalSanction Plan.pdfView
  • Layout ApprovalLAYOUT.pdfView
  • Layout ApprovalLAYOUT.pdfView
  • Layout ApprovalLAYOUT.pdfView
  • Layout ApprovalLAYOUT.pdfView

Proforma allotment letter

  • Proforma allotment letterAGREEMENT TO DRAFT.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Dhule (M Corp.), Dhule taluka

Survey, CTS, gat or plot numbers

01 PART

As published on MahaRERA's project page

01 PART

Boundaries

North
13-50
South
13-50
East
21-33
West
21-33

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAkshay Pradeep Kucheria—
Chartered accountantDharam M Shah—
EngineerAkshay Pradeep Kucheria—

Source: MahaRERA project page. Contact details are not shown.

Data through8 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology