Residential / Group Housing · 3 buildings · 145 unitsRERA P51700027136

Samruddhi Residency

Deedo IDDP-THN-GXTB

Completion was pushed back 4 months, to Oct 2028; no MahaRERA orders on record; 33% of its units are booked.

Dawale, Thane 400612 · by Shree Sai Ganesh Developers

DeliveryExtended 4 moPromised Jun 2028 · now due Oct 2028RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales33% booked48 of 145 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Oct 2028

  • This projectRegistered 19 Nov 2020, completion promised 30 Jun 2028, revised to 30 Oct 2028.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

3 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700027136
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170002713619 Nov 202030 Jun 202830 Oct 2028Shree Sai Ganesh DevelopersProject page
Documents112

1 document held by Deedo, 111 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN Cardssgd pan_1.pdf · uploaded 13 Nov 2020Source

Legal

  • Legal Title reportTITLE REPORT.pdf · uploaded 8 Nov 2020Source
  • Declaration Form BFORM B.pdf · uploaded 9 Nov 2020Source

Migrated

  • 1 Copy of the legal title reportTITLE REPORT.pdf · uploaded 8 Nov 2020Source
  • 1 Details of encumbrancesDetails of Encumbrance.PDF · uploaded 8 Nov 2020Source
  • 1 Building Plan Approval / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 8 Nov 2020Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 8 Nov 2020Source
Show all 112 documentsShow fewer documents

Migrated

  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTI FICATE.pdf · uploaded 8 Nov 2020Source
  • 1 Proforma of Allotment letterAllotment Letter.pdf · uploaded 8 Nov 2020Source
  • 2 Proforma of Allotment letterUnit Sale Agreement.pdf · uploaded 8 Nov 2020Source
  • 1 OtherAuthority Letter.PDF · uploaded 8 Nov 2020Source
  • 2 OtherCo Promoter Declaration.PDF · uploaded 8 Nov 2020Source
  • 1 Copy of Layout Approval (in case of layout)Layout Plan 09112020.pdf · uploaded 9 Nov 2020Source
  • 1 Declaration in FORM BFORM B.pdf · uploaded 9 Nov 2020Source
  • 1 PAN Cardssgd pan_1.pdf · uploaded 13 Nov 2020Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 31-03-2021.pdf · uploaded 15 Sep 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 30-09-2021.pdf · uploaded 15 Sep 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 31-03-2022.pdf · uploaded 15 Sep 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 30-06-2022.pdf · uploaded 15 Sep 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 30-09-2022.pdf · uploaded 15 Sep 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 31-03-2023.pdf · uploaded 15 Sep 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 30-06-2023.pdf · uploaded 15 Sep 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 30-03-2021.pdf · uploaded 15 Sep 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 30-06-2021.pdf · uploaded 15 Sep 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 30-09-2021.pdf · uploaded 15 Sep 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 30-12-2021.pdf · uploaded 15 Sep 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 30-03-2022.pdf · uploaded 15 Sep 2023Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 30-06-2022.pdf · uploaded 15 Sep 2023Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 30-09-2022.pdf · uploaded 15 Sep 2023Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 1 31-12-2022.pdf · uploaded 15 Sep 2023Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 1 31-03-2023.pdf · uploaded 15 Sep 2023Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 30-06-2023.pdf · uploaded 15 Sep 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Dec 2020.pdf · uploaded 15 Sep 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 March 2021.pdf · uploaded 15 Sep 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 June 2021.pdf · uploaded 15 Sep 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Sep 2021.pdf · uploaded 15 Sep 2023Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 March 2022.pdf · uploaded 15 Sep 2023Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Sep 2022.pdf · uploaded 15 Sep 2023Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 31-03-2023.pdf · uploaded 15 Sep 2023Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 30-06-2023.pdf · uploaded 15 Sep 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 FY 2020-21.pdf · uploaded 15 Sep 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 FY 2021-22.pdf · uploaded 15 Sep 2023Source
  • 2 a Details of encumbrances concerned to FinanceNo encumbrances Certificate FINANCE and LEGAL.pdf · uploaded 17 Sep 2023Source
  • 1 b Details of encumbrances concerned to LegalNo encumbrances Certificate FINANCE and LEGAL.pdf · uploaded 17 Sep 2023Source
  • 1 Declaration about Commencement Certificatedeclaration about comm cert.pdf · uploaded 17 Sep 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A Fy 2020-21.pdf · uploaded 17 Sep 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A Fy 2021-22.pdf · uploaded 17 Sep 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A Fy 2022-23.pdf · uploaded 17 Sep 2023Source
  • 1 Disclosure of sold/ booked inventorySold unsold_1 (4 files merged).pdf · uploaded 17 Sep 2023Source
  • 1 Proforma of Agreement for sale2 Proforma of Allotment letter (4).pdf · uploaded 17 Sep 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A bank account decla.pdf · uploaded 17 Sep 2023Source
  • 1 Deviation Report with respect to Allotment letterdeviation-allotment.pdf · uploaded 17 Sep 2023Source
  • 1 Deviation Report with respect to model copy of Agreementdeviation-draft sale.pdf · uploaded 17 Sep 2023Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Samruddhi Residency.pdf · uploaded 19 Oct 2023Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Samruddhi Residency.pdf · uploaded 19 Oct 2023Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Samruddhi Residency.pdf · uploaded 19 Oct 2023Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 28 Feb 2024Source
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 28 Feb 2024Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 28 Feb 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 20 Feb 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 20 Feb 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 20 Feb 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 20 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 20 Feb 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 20 Feb 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 20 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 20 Feb 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 20 Feb 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 20 Feb 2025Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 20 Feb 2025Source
  • Form 1FORM 1 sai ganesh q4.pdf · uploaded 10 Jun 2025Source
  • Form 2FORM 2 sai ganesh q4.pdf · uploaded 10 Jun 2025Source
  • Form 3FORM 3 sai ganesh q4.pdf · uploaded 10 Jun 2025Source
  • Disclosure of Sold and Booked Inventorysold unsold sai ganesh q4 new.pdf · uploaded 10 Jun 2025Source
  • Self-declaration of Quarterly ProgressSelf declaration of QPR sai ganesh q4.pdf · uploaded 10 Jun 2025Source
  • Form 5 (FY 2022-2023)Form 5 system generated 2022-23.pdf · uploaded 22 Jul 2025Source
  • Form 5 (FY 2023-2024)Form 5 system generated 2023-24.pdf · uploaded 22 Jul 2025Source
  • Form 2A (FY 2023-2024)Form 2A 23-24.pdf · uploaded 25 Jul 2025Source
  • Form 2A (FY 2024-2025)Form 2A 24-25.pdf · uploaded 25 Jul 2025Source
  • Withdrawal Update Form 1FORM 1 SSGD 30-06-25 new.pdf · uploaded 30 Sep 2025Source
  • Withdrawal Update Form 2FORM 2 30-06-25 SSGD.pdf · uploaded 30 Sep 2025Source
  • Withdrawal Update Form 3FORM 3 30-06-25 SSGD.pdf · uploaded 30 Sep 2025Source
  • Withdrawal Update Form 1Form 1 30-09-25 .pdf · uploaded 25 Nov 2025Source
  • Withdrawal Update Form 2Form 2 30-09-25 .pdf · uploaded 25 Nov 2025Source
  • Withdrawal Update Form 3Form 3 SSGD 30-09-2025.pdf · uploaded 25 Nov 2025Source
  • Withdrawal Update Form 1form-1 SSGD.pdf · uploaded 13 Mar 2026Source
  • Withdrawal Update Form 2form 2 31-12-25.pdf · uploaded 13 Mar 2026Source
  • Withdrawal Update Form 3FORM 3 31-12-25 SSGD new.pdf · uploaded 13 Mar 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 27 May 2026Source
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 27 May 2026Source
  • Withdrawal Update Form 3FORM 3 31-12-25 SSGD new.pdf · uploaded 27 May 2026Source
  • Withdrawal Update Form 1FORM 1 30-06-2026 SSGD.pdf · uploaded 26 Aug 2026Source
  • Withdrawal Update Form 2FORM 3 30-06-2026 SSGD.pdf · uploaded 26 Aug 2026Source
  • Withdrawal Update Form 3FORM 3 30-06-2026 SSGD.pdf · uploaded 26 Aug 2026Source
  • Form 2A (FY 2025-2026)Form 2A 2025-26.pdf · uploaded 3 Oct 2026Source

Technical

  • DocumentCommencement Certificate.pdf · uploaded 8 Nov 2020Source
  • DocumentLayout Plan 09112020.pdf · uploaded 9 Nov 2020Source
  • DocumentPLAN 1.pdf · uploaded 27 Jun 2025Source
  • DocumentPLAN 2.pdf · uploaded 27 Jun 2025Source
  • DocumentPLAN 1.pdf · uploaded 27 Jun 2025Source
  • DocumentPLAN 2.pdf · uploaded 27 Jun 2025Source

Technical (Architect)

  • DocumentForm 1.pdf · uploaded 20 Feb 2025Source
  • DocumentForm 1.pdf · uploaded 20 Feb 2025Source
  • DocumentForm 1.pdf · uploaded 20 Feb 2025Source
  • DocumentForm 1.pdf · uploaded 20 Feb 2025Source
  • DocumentFORM 1 30-06-2026 SSGD.pdf · uploaded 26 Aug 2026Source

Technical (Engineer)

  • DocumentForm 2.pdf · uploaded 20 Feb 2025Source
  • DocumentForm 2.pdf · uploaded 20 Feb 2025Source
  • DocumentForm 2.pdf · uploaded 20 Feb 2025Source
  • DocumentForm 2.pdf · uploaded 20 Feb 2025Source
  • DocumentFORM 3 30-06-2026 SSGD.pdf · uploaded 26 Aug 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 166

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 2BHK, Shop, 1RK145 units in all
Address
166, Diva Shilphata Road, DawlePIN 400612
Village
Thane (M Corp.), Thane taluka
Land area for this project
6,880 sq m (74,056 sq ft)
Permissible built-up area
7,910 sq m (85,142 sq ft)
Sanctioned built-up area
5,121 sq m (55,120 sq ft)
Recreational open space
733 sq m (7,888 sq ft)
Designated bank account
85
Developed in phases
Yes

Survey, CTS, gat or plot numbers

166

Land as published on MahaRERA's project page

166

Boundaries

North
Survey No 165
South
Existing Road
East
DP Road
West
Survey No 240

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking145 units

48 of 145 units booked (33%), as the promoter reported to MahaRERA

1BHK · 74 units2BHK · 5 unitsShop · 31 units1RK · 35 units
BuildingTypeCarpet areaUnitsBooked
B21BHK31.59 sq m · 340 sq ft104
B21BHK31.96 sq m · 344 sq ft51
B21BHK32.33 sq m · 348 sq ft60
B21BHK32.42 sq m · 349 sq ft60
B21BHK32.61 sq m · 351 sq ft121
B22BHK45.24 sq m · 487 sq ft50
B2Shop5.57 sq m · 60 sq ft10
B2Shop6.6 sq m · 71 sq ft10
Show all 33 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
B2Shop9.01 sq m · 97 sq ft10
B2Shop9.94 sq m · 107 sq ft20
B2Shop10.22 sq m · 110 sq ft10
B2Shop11.06 sq m · 119 sq ft20
B2Shop11.71 sq m · 126 sq ft10
B2Shop12.82 sq m · 138 sq ft10
B2Shop13.38 sq m · 144 sq ft10
B2Shop14.12 sq m · 152 sq ft10
B2Shop15.7 sq m · 169 sq ft10
B2Shop15.89 sq m · 171 sq ft30
B2Shop17.19 sq m · 185 sq ft10
B2Shop17.19 sq m · 185 sq ft10
B2Shop17.84 sq m · 192 sq ft10
B2Shop18.3 sq m · 197 sq ft30
B2Shop21.37 sq m · 230 sq ft10
B2Shop21.55 sq m · 232 sq ft10
B2Shop21.74 sq m · 234 sq ft10
B2Shop22.95 sq m · 247 sq ft10
B31BHK32.24 sq m · 347 sq ft1410
B31RK22.3 sq m · 240 sq ft1410
B3Shop25.27 sq m · 272 sq ft10
B41BHK35.02 sq m · 377 sq ft2111
B41RK22.02 sq m · 237 sq ft2111
B4Shop11.8 sq m · 127 sq ft20
B4Shop14.31 sq m · 154 sq ft20

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals4

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSameer Lotke & Associates—
Chartered accountantD P Shejwal and Associates—
EngineerPradeep Eknath Panchal—
EngineerSscon Consulting—

Source: MahaRERA project page. Contact details are not shown.