Residential / Group Housing · 5 buildings · 264 unitsRERA P51700022023

Radhe Krishna Residency

Deedo IDDP-THN-6735

MahaRERA shows it completed; no MahaRERA orders on record; 85% of its units are booked.

Dawale, Thane 400612 · by Mangalam Infra

DeliveryCompletedCompletion / occupancy certificate on MahaRERARegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales85% booked224 of 264 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

MahaRERA shows it completed

  • This projectRegistered 25 Aug 2019, completion promised 30 Dec 2024.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

5 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700022023
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170002202325 Aug 201930 Dec 202430 Dec 2024Mangalam InfraProject page
Documents99

2 documents held by Deedo, 97 filings listed on MahaRERA's project page

Registration certificate

Other

  • OtherDate not statedView

Finance

  • PAN CardPAN CARD.pdf · uploaded 10 Aug 2019Source

Legal

  • Legal Title reportTITLE CERTIFICATE .pdf · uploaded 8 Aug 2019Source
  • Legal Title reportSEARCH REPORT .pdf · uploaded 8 Aug 2019Source
  • Declaration Form Bmangalam Infra form B notarised.pdf · uploaded 10 Aug 2019Source

Migrated

  • 1 Copy of the legal title reportTITLE CERTIFICATE .pdf · uploaded 8 Aug 2019Source
  • 2 Copy of the legal title reportSEARCH REPORT .pdf · uploaded 8 Aug 2019Source
Show all 99 documentsShow fewer documents

Migrated

  • 1 Details of encumbrancesencumbrance mangalam.pdf · uploaded 8 Aug 2019Source
  • 1 PAN CardPAN CARD.pdf · uploaded 10 Aug 2019Source
  • 1 Copy of Layout Approval (in case of layout)LAYOUT.pdf · uploaded 10 Aug 2019Source
  • 2 Copy of Layout Approval (in case of layout)LAYOUT PG2.pdf · uploaded 10 Aug 2019Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 10 Aug 2019Source
  • 1 Declaration in FORM Bmangalam Infra form B notarised.pdf · uploaded 10 Aug 2019Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 10 Aug 2019Source
  • 1 Building Plan Approval / NA Order for plotted developmentBLDG PLAN APPROVAL.pdf · uploaded 12 Aug 2019Source
  • 1 Proforma of Allotment letterMANGALAM INFRA_RADHE KRISHNA RESIDENCY_AGREEMENT FOR SALE.pdf · uploaded 12 Aug 2019Source
  • 2 Proforma of Allotment letterDRAFT.pdf · uploaded 29 Feb 2020Source
  • 2 Details of encumbrances001.pdf · uploaded 27 Apr 2021Source
  • 1 Declaration about Commencement CertificateMangalam Infra -Radhe Krishna Residency.pdf · uploaded 22 Jul 2021Source
  • 2 Building Plan Approval / NA Order for plotted developmentPLAN 1_rotated (1).pdf · uploaded 27 Oct 2021Source
  • 3 Building Plan Approval / NA Order for plotted developmentPLAN 2_rotated (2) (2).pdf · uploaded 27 Oct 2021Source
  • 4 Building Plan Approval / NA Order for plotted developmentPLAN 3_rotated (2) (2).pdf · uploaded 27 Oct 2021Source
  • 2 Commencement Certificates / NA Order for plotted developmentCC COPY (2).pdf · uploaded 27 Oct 2021Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Radhe Krishna Residency June 2021.pdf · uploaded 4 Dec 2021Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Radhe Krishna Residency Sept 2021.pdf · uploaded 4 Dec 2021Source
  • 1 CERSAI detailsRadhe Krishna Residency.pdf · uploaded 4 Dec 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A Radha Krishna Residency.pdf · uploaded 6 Dec 2021Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Radhe Krishna Residency September 2021_compressed.pdf · uploaded 6 Dec 2021Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Radhe Krishna Residency Jun 2021_compressed.pdf · uploaded 6 Dec 2021Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE_compressed.pdf · uploaded 10 Dec 2021Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Radhe Krishna Residency Dec 2021_compressed.pdf · uploaded 18 Feb 2022Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 radha Krishna Residency Dec 2021_compressed.pdf · uploaded 18 Feb 2022Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Radhe Krishna Residency Form 2- 31 March 2022.pdf · uploaded 1 Jun 2022Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_Radhe Krishna Residency_March 2022_compressed.pdf · uploaded 1 Jun 2022Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Radhe Krishna Residency Form 2- 30 June 2022.pdf · uploaded 19 Jul 2022Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_Radhe Krishna Residency_June 2022_compressed.pdf · uploaded 19 Jul 2022Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Radhe Krishna Residency Form 2- 30 September 2022.pdf · uploaded 27 Oct 2022Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Radhe Krishna Residency as on September 2022.pdf · uploaded 27 Oct 2022Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Radhe Krishna Residency as on September 2022.pdf · uploaded 27 Oct 2022Source
  • 1 Disclosure of sold/ booked inventoryRadhe Krishna Residency Circular 29_compressed.pdf · uploaded 31 Oct 2022Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Radhe Krishna Residency.pdf · uploaded 21 Nov 2022Source
  • 5 Building Plan Approval / NA Order for plotted developmentRadhe Krishna Residency- Layout.pdf · uploaded 30 Nov 2022Source
  • 3 Commencement Certificates / NA Order for plotted developmentRadhe Krishna Residency- Commencement Certificate.pdf · uploaded 30 Nov 2022Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Radhe Krishna Residency as on December 2022.pdf · uploaded 28 Jan 2023Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Radhe Krishna Residency as on December 2022.pdf · uploaded 28 Jan 2023Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Radhe Krishna Residency as on December 2019.pdf · uploaded 25 Feb 2023Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Radhe Krishna Residency as on March 2020.pdf · uploaded 25 Feb 2023Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Radhe Krishna Residency as on December 2020.pdf · uploaded 25 Feb 2023Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Radhe Krishna Residency as on March 2021.pdf · uploaded 25 Feb 2023Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Radhe Krishna Residency as on December 2019 .pdf · uploaded 25 Feb 2023Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Radhe Krishna Residency as on March 2020.pdf · uploaded 25 Feb 2023Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Radhe Krishna Residency as on December 2020.pdf · uploaded 25 Feb 2023Source
  • 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Radhe Krishna Residency as on March 2021.pdf · uploaded 25 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 as on 2019-20.pdf · uploaded 25 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 as on 2020-21.pdf · uploaded 25 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 as on 2021-22.pdf · uploaded 25 Feb 2023Source
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Radhe Krishna Residency as on March 2023.pdf · uploaded 8 May 2023Source
  • 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Radhe Krishna Residency as on March 2023.pdf · uploaded 8 May 2023Source
  • 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Radhe Krishna Residency as on June 2023.pdf · uploaded 31 Jul 2023Source
  • 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Radhe Krishna Residency as on June 2023.pdf · uploaded 31 Jul 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Adobe Scan Aug 23, 2023 (2).pdf · uploaded 24 Aug 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Adobe Scan Aug 23, 2023.pdf · uploaded 24 Aug 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Adobe Scan Aug 23, 2023 (1).pdf · uploaded 24 Aug 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - BUILDING-A as on Sep 2023.pdf · uploaded 17 Oct 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - BUILDING-B as on Sep 2023.pdf · uploaded 17 Oct 2023Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - BUILDING-C as on Sep 2023.pdf · uploaded 17 Oct 2023Source
  • 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Radhe Krishna Residency as on Sep 2023.pdf · uploaded 17 Oct 2023Source
  • 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Radhe Krishna Residency as on 30-09-2023.pdf · uploaded 17 Oct 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 of Radhe Krishna Residency for FY 22-23.pdf · uploaded 1 Dec 2023Source
  • 3 Details of encumbrancesIMG_0003.pdf · uploaded 23 Dec 2023Source
  • 4 Details of encumbrancesEncumbrance - Finance.pdf · uploaded 26 Dec 2023Source
  • 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Radhe Krishna Residency as on December 2023.pdf · uploaded 26 Feb 2024Source
  • 17 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Radhe Krishna Residency as on 31st December 2023.pdf · uploaded 26 Feb 2024Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC - Radhe Krishna Residency.pdf · uploaded 13 Apr 2024Source
  • 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Radhe Krishna Residency as on March 2024.pdf · uploaded 20 Apr 2024Source
  • 18 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Radhe Krishna Residency as on 31st March 2024.pdf · uploaded 20 Apr 2024Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Adobe Scan 3 Jun 2024 (8).pdf · uploaded 6 Jun 2024Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Adobe Scan 3 Jun 2024 (8).pdf · uploaded 6 Jun 2024Source
  • 1 Architect’s Certificate on Completion of Project (Form 4)F4.pdf · uploaded 13 Jun 2024Source
  • 2 Declaration about Commencement CertificateFormat D.pdf · uploaded 21 Jun 2024Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Adobe Scan 20 Jun 2024.pdf · uploaded 21 Jun 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)2A -19-20.pdf · uploaded 21 Jun 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)2A -20-21.pdf · uploaded 21 Jun 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)2A - 21-22.pdf · uploaded 21 Jun 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)2A -22-23.pdf · uploaded 21 Jun 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)2A -23-24.pdf · uploaded 21 Jun 2024Source
  • 2 Disclosure of sold/ booked inventoryC - 29_11zon (1).pdf · uploaded 21 Jun 2024View
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)Society Formation.pdf · uploaded 21 Jun 2024Source
  • 1 Status of ConveyanceConveyance.pdf · uploaded 21 Jun 2024Source

Technical

  • DocumentLAYOUT.pdf · uploaded 10 Aug 2019Source
  • DocumentLAYOUT PG2.pdf · uploaded 10 Aug 2019Source
  • DocumentBLDG PLAN APPROVAL.pdf · uploaded 12 Aug 2019Source
  • DocumentPLAN 1_rotated (1).pdf · uploaded 27 Oct 2021Source
  • DocumentPLAN 2_rotated (2) (2).pdf · uploaded 27 Oct 2021Source
  • DocumentPLAN 3_rotated (2) (2).pdf · uploaded 27 Oct 2021Source
  • DocumentRadhe Krishna Residency- Layout.pdf · uploaded 30 Nov 2022Source

Technical (Architect)

  • DocumentAdobe Scan 20 Jun 2024.pdf · uploaded 21 Jun 2024Source

Technical (Engineer)

  • DocumentForm 2 Radhe Krishna Residency as on March 2024.pdf · uploaded 20 Apr 2024Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel Survey No 4 Hissa No 14

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 2BHK264 units in all
Address
Survey No -4 Hissa No -14, Shil Diva Road, DawalePIN 400612
Village
Thane (M Corp.), Thane taluka
Land area for this project
6,750 sq m (72,656 sq ft)
Permissible built-up area
13,619 sq m (1,46,591 sq ft)
Sanctioned built-up area
9,630 sq m (1,03,659 sq ft)
Recreational open space
1,209 sq m (13,011 sq ft)
Designated bank account
51
Developed in phases
Yes

Survey, CTS, gat or plot numbers

Survey No 4 Hissa No 14

Land as published on MahaRERA's project page

Survey No -4 Hissa No -14

Boundaries

North
Natural Pond
South
12 Mtr DP Road
East
Hissa No -10
West
Survey No -3

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking264 units

224 of 264 units booked (85%), as the promoter reported to MahaRERA

1BHK · 201 units2BHK · 63 units
BuildingTypeCarpet areaUnitsBooked
A -Building1BHK31.65 sq m · 341 sq ft1110
A -Building1BHK32.23 sq m · 347 sq ft1313
A -Building1BHK32.65 sq m · 351 sq ft1311
A -Building1BHK32.84 sq m · 353 sq ft1312
A -Building1BHK34.57 sq m · 372 sq ft2622
A -Building1BHK36.99 sq m · 398 sq ft2415
A -Building2BHK46.01 sq m · 495 sq ft22
A -Building2BHK49.06 sq m · 528 sq ft1312
Show all 32 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
B -Building1BHK25.95 sq m · 279 sq ft77
B -Building1BHK27.42 sq m · 295 sq ft75
B -Building1BHK28.46 sq m · 306 sq ft74
B -Building1BHK30.47 sq m · 328 sq ft1312
B -Building1BHK30.99 sq m · 334 sq ft76
B -Building1BHK31.74 sq m · 342 sq ft44
B -Building1BHK33.15 sq m · 357 sq ft66
B -Building1BHK35 sq m · 377 sq ft66
B -Building2BHK37.16 sq m · 400 sq ft74
B -Building2BHK37.72 sq m · 406 sq ft77
B -Building2BHK43.08 sq m · 464 sq ft66
C -Building1BHK29.62 sq m · 319 sq ft52
C -Building1BHK30.98 sq m · 333 sq ft51
C -Building1BHK31.26 sq m · 336 sq ft54
C -Building1BHK32.03 sq m · 345 sq ft55
C -Building1BHK32.98 sq m · 355 sq ft55
C -Building1BHK33.15 sq m · 357 sq ft77
C -Building1BHK36.37 sq m · 391 sq ft66
C -Building1BHK37.54 sq m · 404 sq ft66
C -Building2BHK38.46 sq m · 414 sq ft52
C -Building2BHK40.25 sq m · 433 sq ft55
C -Building2BHK44.92 sq m · 484 sq ft87
C -Building2BHK48.35 sq m · 520 sq ft88
C -Building2BHK52.86 sq m · 569 sq ft22

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals7

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectVinay Patil & Associates—
Chartered accountantCa Rupesh Gupta—
Chartered accountantRutuja Narsingh & Associates—
EngineerAdharshila Consultant—
EngineerSK Consultants & Engineers—
OtherRERA Easy—
OtherVankut Enterprises—

Source: MahaRERA project page. Contact details are not shown.