Sagar Enclave
Deedo IDDP-THN-G98TCompletion was pushed back 4 months, to Apr 2027; no MahaRERA orders on record; 8% of its units are booked.
Dawale, Thane 400612 · by Kanchan Builders & Developers
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2027
- This projectRegistered 9 Jun 2022, completion promised 25 Dec 2026, revised to 25 Apr 2027.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700045775
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700045775 | 9 Jun 2022 | 25 Dec 2026 | 25 Apr 2027 | Kanchan Builders & Developers | Project page |
Documents165
1 document held by Deedo, 164 filings listed on MahaRERA's project page
Finance
- PAN CardKBD_PAN_compressed.pdf · uploaded 12 Apr 2022Source
Legal
Migrated
- 1 PAN CardKBD_PAN_compressed.pdf · uploaded 12 Apr 2022Source
- 1 Copy of Layout Approval (in case of layout)SANCTION PLAN CC.pdf · uploaded 12 Apr 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentCC.pdf · uploaded 12 Apr 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 12 Apr 2022Source
Show all 165 documentsShow fewer documents
Migrated
- 1 Proforma of Allotment letterSagar Allotment letter .pdf · uploaded 12 Apr 2022Source
- 1 Declaration in FORM BAFFIDAVIT CUM DECLARATION.pdf · uploaded 14 Apr 2022Source
- 1 CERSAI detailsCERSAI_Search_Report_200235182738_For_Debtor_Based_Search_14_04_2022_16_31_37_106.pdf · uploaded 14 Apr 2022Source
- 2 CERSAI detailsCERSAI_Search_Report_200235182821_For_Asset_Based_Search_14_04_2022_16_36_03_636.pdf · uploaded 14 Apr 2022Source
- 1 Details of encumbrancesNon Encumbrance Declaration.pdf · uploaded 16 Apr 2022Source
- 1 Declaration about Commencement CertificateDeclaration about CC.pdf · uploaded 16 Apr 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_signed.pdf · uploaded 18 Apr 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_Signed.pdf · uploaded 30 Apr 2022Source
- 1 Copy of the legal title reportRERA sagar.pdf · uploaded 6 May 2022Source
- 2 Proforma of Allotment letterAS_Part_1.pdf · uploaded 30 May 2022Source
- 3 Proforma of Allotment letterAS_Part_2.pdf · uploaded 30 May 2022Source
- 4 Proforma of Allotment letterAS_Part_3.pdf · uploaded 30 May 2022Source
- 5 Proforma of Allotment letterAS_Part_4.pdf · uploaded 30 May 2022Source
- 6 Proforma of Allotment letterAS_Part_5.pdf · uploaded 30 May 2022Source
- 7 Proforma of Allotment letterAS_Part_6.pdf · uploaded 30 May 2022Source
- 8 Proforma of Allotment letterAS_Part_7.pdf · uploaded 30 May 2022Source
- 9 Proforma of Allotment letterAS_Part_8.pdf · uploaded 30 May 2022Source
- 10 Proforma of Allotment letterAS_Part_9.pdf · uploaded 30 May 2022Source
- 11 Proforma of Allotment letterAS_Part_10.pdf · uploaded 30 May 2022Source
- 12 Proforma of Allotment letterAS_Part_11.pdf · uploaded 30 May 2022Source
- 13 Proforma of Allotment letterAS_Part_12.pdf · uploaded 30 May 2022Source
- 14 Proforma of Allotment letterAS_Part_13.pdf · uploaded 30 May 2022Source
- 15 Proforma of Allotment letterAS_Part_14.pdf · uploaded 30 May 2022Source
- 16 Proforma of Allotment letterAS_Part_15.pdf · uploaded 30 May 2022Source
- 17 Proforma of Allotment letterAS_Part_16.pdf · uploaded 30 May 2022Source
- 18 Proforma of Allotment letterAS_Part_17.pdf · uploaded 30 May 2022Source
- 19 Proforma of Allotment letterAS_Part_18.pdf · uploaded 30 May 2022Source
- 20 Proforma of Allotment letterAS_Part_19.pdf · uploaded 30 May 2022Source
- 21 Proforma of Allotment letterAS_Part_20.pdf · uploaded 30 May 2022Source
- 22 Proforma of Allotment letterAS_Part_21.pdf · uploaded 30 May 2022Source
- 23 Proforma of Allotment letterAS_Part_22.pdf · uploaded 30 May 2022Source
- 24 Proforma of Allotment letterAS_Part_23.pdf · uploaded 30 May 2022Source
- 25 Proforma of Allotment letterAS_Part_24.pdf · uploaded 30 May 2022Source
- 26 Proforma of Allotment letterAS_Part_25.pdf · uploaded 30 May 2022Source
- 27 Proforma of Allotment letterAS_Part_26.pdf · uploaded 30 May 2022Source
- 28 Proforma of Allotment letterAS_Part_27.pdf · uploaded 30 May 2022Source
- 29 Proforma of Allotment letterAS_Part_28.pdf · uploaded 30 May 2022Source
- 30 Proforma of Allotment letterAS_Part_29.pdf · uploaded 30 May 2022Source
- 31 Proforma of Allotment letterAS_Part_30.pdf · uploaded 30 May 2022Source
- 32 Proforma of Allotment letterAS_Part_31.pdf · uploaded 30 May 2022Source
- 33 Proforma of Allotment letterAS_Part_32.pdf · uploaded 30 May 2022Source
- 34 Proforma of Allotment letterAS_Part_33.pdf · uploaded 30 May 2022Source
- 35 Proforma of Allotment letterAS_Part_34.pdf · uploaded 30 May 2022Source
- 36 Proforma of Allotment letterAS_Part_35.pdf · uploaded 30 May 2022Source
- 37 Proforma of Allotment letterAS_Part_36.pdf · uploaded 30 May 2022Source
- 2 a Details of encumbrances concerned to FinanceEncumbrance to legal finance.pdf · uploaded 18 Jan 2023Source
- 3 a Details of encumbrances concerned to FinanceAnnexure K - Non Emburance Concern to Finance And Legal.pdf · uploaded 18 Jan 2023Source
- 1 b Details of encumbrances concerned to LegalEncumbrance to legal finance.pdf · uploaded 18 Jan 2023Source
- 2 b Details of encumbrances concerned to LegalAnnexure K - Non Emburance Concern to Finance And Legal.pdf · uploaded 18 Jan 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 (oct-dec22) Q3 Final_compressed.pdf · uploaded 18 Jan 2023Source
- 3 CERSAI detailsAnnexture G-Asset based report.pdf · uploaded 18 Jan 2023Source
- 4 CERSAI detailsFinal-CERSAI Undertaking_Debtor Based.pdf · uploaded 18 Jan 2023Source
- 5 CERSAI detailsAnnexure G - Assest Based Decelration.pdf · uploaded 18 Jan 2023Source
- 6 CERSAI detailsAnnexure D - CERSAI Undertaking Debtor Based.pdf · uploaded 18 Jan 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameAnnexure I - Decelration About Seprate Bank Ac.pdf · uploaded 18 Jan 2023Source
- 4 a Details of encumbrances concerned to FinanceAnnexture K_Non Encumbrance concerned to legal.pdf · uploaded 19 Apr 2023Source
- 3 b Details of encumbrances concerned to LegalAnnexture K_Non Encumbrance concerned to legal.pdf · uploaded 19 Apr 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Jan23-Mar23_Q4.pdf · uploaded 19 Apr 2023Source
- 7 CERSAI detailsAnnexture G_Asset Based declaration.pdf · uploaded 19 Apr 2023Source
- 8 CERSAI detailsAnnexture L_Debtor based declaration.pdf · uploaded 19 Apr 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A (20-6-23).pdf · uploaded 26 Jun 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A_(16-6-23).pdf · uploaded 26 Jun 2023Source
- 5 a Details of encumbrances concerned to FinanceNon-encumbrance concerned to legal and Finance.pdf · uploaded 20 Jul 2023Source
- 4 b Details of encumbrances concerned to LegalNon-encumbrance concerned to legal and Finance.pdf · uploaded 20 Jul 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certifcate Form 1.pdf · uploaded 25 Jul 2023Source
- 9 CERSAI detailsAsset based Report.pdf · uploaded 25 Jul 2023Source
- 10 CERSAI detailsDebtor based declaration.pdf · uploaded 25 Jul 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_.pdf · uploaded 11 Nov 2023Source
- 6 a Details of encumbrances concerned to FinanceNon Encumbrance- Legal .pdf · uploaded 20 Nov 2023Source
- 5 b Details of encumbrances concerned to LegalNon Encumbrance- Legal .pdf · uploaded 20 Nov 2023Source
- 11 CERSAI detailsAsset Based Report.pdf · uploaded 20 Nov 2023Source
- 12 CERSAI detailsDebtor Based Report.pdf · uploaded 20 Nov 2023Source
- 2 Copy of Layout Approval (in case of layout)Layout Approval_010823.pdf · uploaded 9 Dec 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentCC_Upto 7th Floor_010823.pdf · uploaded 9 Dec 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)04-12-23_Architect Form 1.pdf · uploaded 9 Dec 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5_FY 22-23.pdf · uploaded 13 Dec 2023Source
- 7 a Details of encumbrances concerned to FinanceFinancial Encumbrance.pdf · uploaded 31 Jan 2024Source
- 8 a Details of encumbrances concerned to FinanceLegal Encumbrance.pdf · uploaded 31 Jan 2024Source
- 6 b Details of encumbrances concerned to LegalFinancial Encumbrance.pdf · uploaded 31 Jan 2024Source
- 7 b Details of encumbrances concerned to LegalLegal Encumbrance.pdf · uploaded 31 Jan 2024Source
- 1 Disclosure of sold/ booked inventoryDisclosure of sold or unsold.pdf · uploaded 31 Jan 2024Source
- 13 CERSAI detailsAsset Based Declaration.pdf · uploaded 31 Jan 2024Source
- 14 CERSAI detailsDebtor Based Declaration.pdf · uploaded 31 Jan 2024Source
- 9 a Details of encumbrances concerned to FinanceNon-Encumbrance concered to Legal.pdf · uploaded 30 Apr 2024Source
- 8 b Details of encumbrances concerned to LegalNon-Encumbrance concered to Legal.pdf · uploaded 30 Apr 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 signed_1 March 2024.pdf · uploaded 30 Apr 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_KBD.pdf · uploaded 30 Apr 2024Source
- 15 CERSAI detailsAsset Based Declaration.pdf · uploaded 30 Apr 2024Source
- 16 CERSAI detailsDebtor Based Declaration.pdf · uploaded 30 Apr 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_.pdf · uploaded 30 Apr 2024Source
- 2 Declaration about Commencement CertificateDeclaration of CC.pdf · uploaded 4 May 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A_FY 2023-24.pdf · uploaded 4 May 2024Source
- 2 Disclosure of sold/ booked inventoryDecl of Sold-Unsold Inventory.pdf · uploaded 4 May 2024Source
- 10 a Details of encumbrances concerned to FinanceNon Encumbrance concered to legal.pdf · uploaded 19 Jul 2024Source
- 9 b Details of encumbrances concerned to LegalNon Encumbrance concered to legal.pdf · uploaded 19 Jul 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Q1 .pdf · uploaded 19 Jul 2024Source
- 17 CERSAI detailsAsset Based Decl.pdf · uploaded 19 Jul 2024Source
- 18 CERSAI detailsDebtor Based Decl.pdf · uploaded 19 Jul 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Final_FORM 5_FY 2023-24.pdf · uploaded 10 Aug 2024Source
- 2 a Details of encumbrances concerned to Financenon encumbrance.pdf · uploaded 18 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryDisclosure of Soldunsold inventory.pdf · uploaded 18 Oct 2024Source
- 3 CERSAI detailsassets based declaration.pdf · uploaded 18 Oct 2024Source
- 4 CERSAI detailsdebtor based declaration.pdf · uploaded 18 Oct 2024Source
- 2 b Details of encumbrances concerned to Legalnon encumbrance.pdf · uploaded 18 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 Revised dated.pdf · uploaded 19 Oct 2024Source
- 1 a Details of encumbrances concerned to FinanceNon Encumbrance Declaration.pdf · uploaded 11 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 Q3 SAGAR ENCLAVE.pdf · uploaded 11 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Sold Unsold Inventory.pdf · uploaded 11 Jan 2025Source
- 1 CERSAI detailsAssets based declaration.pdf · uploaded 11 Jan 2025Source
- 2 CERSAI detailsDebtor based declaration.pdf · uploaded 11 Jan 2025Source
- 1 b Details of encumbrances concerned to LegalNon Encumbrance Declaration.pdf · uploaded 11 Jan 2025Source
- 1 a Details of encumbrances concerned to FinanceNon-encumbrance Declaration.pdf · uploaded 21 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1-Q4.pdf · uploaded 21 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure of sold-unsold.pdf · uploaded 21 Apr 2025Source
- 1 CERSAI detailsAssets Based Declaration.pdf · uploaded 21 Apr 2025Source
- 2 CERSAI detailsDebtor Based Declaration.pdf · uploaded 21 Apr 2025Source
- 1 b Details of encumbrances concerned to LegalNon-encumbrance Declaration.pdf · uploaded 21 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 CA CETIFICATE_compressed.pdf · uploaded 22 Apr 2025Source
- Form 1FORM 1 Q3 SAGAR ENCLAVE.pdf · uploaded 22 May 2025Source
- Form 2FORM 2 FINAL 30-4-2025 (1).pdf · uploaded 22 May 2025Source
- Form 3FORM 3 CA CETIFICATE.pdf · uploaded 22 May 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold Inventory.pdf · uploaded 22 May 2025Source
- Self-declaration of Quarterly ProgressDeclarations.pdf · uploaded 22 May 2025Source
- Self-declaration of Quarterly ProgressDeclarations.pdf · uploaded 31 May 2025Source
- Form 1FORM 1-Q4.pdf · uploaded 31 May 2025Source
- Form 2RERA Certificate_Sagar Enclave-Q4.pdf · uploaded 31 May 2025Source
- Form 3Form 3-Q4 Signed-Promoter.pdf · uploaded 31 May 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold-unsold.pdf · uploaded 31 May 2025Source
- Form 2A (FY 2024-2025)FORM 2 A 2025 2024-25.pdf · uploaded 23 Jun 2025Source
- Withdrawal Update Form 1FORM 1 for Q1 FY 25-26_Sagar Enclave.pdf · uploaded 1 Oct 2025Source
- Withdrawal Update Form 2FORM 2 Q1 of FY 25-26 Sagar Enclave.pdf · uploaded 1 Oct 2025Source
- Withdrawal Update Form 3Signed FORM 3 Q1 FY 25-26 Project Sagar Enclave.pdf · uploaded 1 Oct 2025Source
- Withdrawal Update Form 1FORM 1 for Q1 FY 25-26_Sagar Enclave.pdf · uploaded 4 Oct 2025Source
- Withdrawal Update Form 2FORM 2 Q1 of FY 25-26 Sagar Enclave.pdf · uploaded 4 Oct 2025Source
- Withdrawal Update Form 3Signed FORM 3 Q1 FY 25-26 Sagar Enclave.pdf · uploaded 4 Oct 2025Source
- Withdrawal Update Form 1FORM 1 Q2.pdf · uploaded 24 Dec 2025Source
- Withdrawal Update Form 2Form2 Q2 25-26.pdf · uploaded 24 Dec 2025Source
- Withdrawal Update Form 3FORM 3_compressed.pdf · uploaded 24 Dec 2025Source
- Form 5 (FY 2024-2025)Form 5 Draft Kanchan UDIN Signed Final Singed.pdf · uploaded 9 Feb 2026Source
- Withdrawal Update Form 1Form 3 Q3.pdf · uploaded 26 Feb 2026Source
- Withdrawal Update Form 2FORM 2 Q3 Final.pdf · uploaded 26 Feb 2026Source
- Withdrawal Update Form 3Signed and Stamp Form 3 Q3 Lastest compressed.pdf · uploaded 26 Feb 2026Source
- Withdrawal Update Form 1FORM 1 SYSTEM GERETAED.pdf · uploaded 17 Jun 2026Source
- Withdrawal Update Form 2form 2.pdf · uploaded 17 Jun 2026Source
- Withdrawal Update Form 3FORM 3 Q4 FY 25-26.pdf · uploaded 17 Jun 2026Source
- Withdrawal Update Form 1Form 1-signed.pdf · uploaded 7 Aug 2026Source
- Withdrawal Update Form 2Form 2-signed.pdf · uploaded 7 Aug 2026Source
- Withdrawal Update Form 3Form 3-signed.pdf · uploaded 7 Aug 2026Source
- Form 2A (FY 2025-2026)KBD-FORM 2A_25-26.pdf · uploaded 21 Sep 2026Source
Technical
Technical (Architect)
Technical (Engineer)
- DocumentForm 2-signed.pdf · uploaded 7 Aug 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel SURVEY NO 177/2/2
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 1BHK TENANT, 2BHK, 2BHK TENANT, Office space61 units in all
- Address
- Survey No 177/2/2, Sector 11, DawalePIN 400612
- Village
- Thane (M Corp.), Thane taluka
- Location
- 19.16752, 73.04637
- Land area for this project
- 1,000 sq m (10,764 sq ft)
- Permissible built-up area
- 2,921 sq m (31,441 sq ft)
- Sanctioned built-up area
- 2,921 sq m (31,441 sq ft)
- Designated bank account
- 119
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
SURVEY NO 177/2/2
Boundaries
- North
- Survey No 174
- South
- Survey No 210
- East
- Survey No 206
- West
- Survey No 176
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking61 units
5 of 61 units booked (8%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 28.89 sq m · 311 sq ft | 1 | 1 |
| 1BHK | 29.03 sq m · 312 sq ft | 4 | 1 |
| 1BHK | 35.04 sq m · 377 sq ft | 7 | 0 |
| 1BHK | 36.5 sq m · 393 sq ft | 2 | 0 |
| 1BHK | 45.09 sq m · 485 sq ft | 3 | 3 |
| 1BHK TENANT | 28.89 sq m · 311 sq ft | 5 | 0 |
| 1BHK TENANT | 29.03 sq m · 312 sq ft | 26 | 0 |
| 1BHK TENANT | 36.5 sq m · 393 sq ft | 4 | 0 |
Show all 13 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK | 29.03 sq m · 312 sq ft | 1 | 0 |
| 2BHK TENANT | 29.03 sq m · 312 sq ft | 2 | 0 |
| 2BHK TENANT | 45.09 sq m · 485 sq ft | 4 | 0 |
| Office space | 46.84 sq m · 504 sq ft | 1 | 0 |
| Office space | 84.21 sq m · 906 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals4
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Vinay Patil & Associates | — |
| Chartered accountant | Roshan Gawde & Co | — |
| Engineer | Nizami Anfaal Ayaz Ahmed | — |
| Engineer | Sscons Consulting Structurer Engineer | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Dawale
- Shiv Shriditya HeightsRERA PM1330002601057
- Narayan ResidencyRERA PR1330002600661
- Laxmi Aangan - KaveriRERA PR1330002600204
- Rameshwar Park - Daffodil CRERA P51700079711
- Laxmi Aangan - Mahanadi, Krishna And GangaRERA P51700045456
- Samruddhi ResidencyRERA P51700027136
- Radhe Krishna ResidencyRERA P51700022023
- Rameshwar Park - Daffodil BRERA P51700021673
All 13 projects in Dawale · Compare Sagar Enclave with another project