Samruddhi Evergreens-Phase-4a

Completed

Badlapur (M Cl), Thane 421503 |Promoter: Poddar Housing and Development Limited

22 Aug 2017Registered with MahaRERA
31 Mar 2018Promised completion
10Buildings
160Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
10
Unit types
3 BHK, Shop, 2 BHK160 units in all
Land area for this project
4,190 sq m (45,101 sq ft)
Permissible built-up area
7,986 sq m (85,961 sq ft)
Sanctioned built-up area
7,986 sq m (85,961 sq ft)
Address
Gut No.4/2 PartPIN 421503
Designated bank account
Hdfc Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.13994, 73.25249
Samruddhi Evergreens-Phase-4a is at latitude 19.13994, longitude 73.25249.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Mar 2018

The latest completion date on record passed 8 years and 7 months ago.

Registered
22 Aug 2017
Promised
31 Mar 2018

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170000940722 Aug 201731 Mar 2018—Poddar Housing and Development LimitedProject page

10 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
119416
120416
121416
122416
123416
124416
125416
126416
127416
128416

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

160 units registered

3 BHK · 12 unitsShop · 20 units2 BHK · 128 units
BuildingTypeCarpet areaUnits
1193 BHK64 sq m · 689 sq ft6
119Shop12 sq m · 129 sq ft10
1203 BHK64 sq m · 689 sq ft6
120Shop12 sq m · 129 sq ft10
1212 BHK47 sq m · 506 sq ft16
1222 BHK48 sq m · 517 sq ft16
1232 BHK48 sq m · 517 sq ft16
1242 BHK47 sq m · 506 sq ft16
Show all 12 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnits
1252 BHK47 sq m · 506 sq ft16
1262 BHK47 sq m · 506 sq ft16
1272 BHK47 sq m · 506 sq ft16
1282 BHK47 sq m · 506 sq ft16

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
119Closed/Covered00000
119Open Space00000
120Closed/Covered00000
120Open Space00000
121Closed/Covered00000
121Open Space00000
122Closed/Covered00000
122Open Space00000
Show all 20 parking rowsShow fewer parking rows
BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
123Closed/Covered00000
123Open Space00000
124Closed/Covered00000
124Open Space00000
125Closed/Covered00000
125Open Space00000
126Closed/Covered00000
126Open Space00000
127Closed/Covered00000
127Open Space00000
128Closed/Covered00000
128Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

119

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

120

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

121

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Show all 11 buildings and common areasShow fewer buildings and common areas

122

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

123

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

124

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

125

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

126

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

127

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

128

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & Footpathsunder progress100%
  • Water Supplyunder progress100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)STP ready for entire project100%
  • Storm Water Drainsunder progress100%
  • Landscaping & Tree Plantingunder progress90%
  • Street Lightingunder progress100%
Show all 15 activitiesShow fewer activities
  • Community Buildingscommon for entire project100%
  • Treatment And Disposal Of Sewage And Sullage Waterunder progress100%
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRain water Harvesting100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsFire Extiguisher as G+3 Building0%
  • Electrical meter room, sub-station, receiving stationunder progress100%
  • Aggregate area of recreational Open Spacecommon for entire project100%
  • Open ParkingCommon100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

21 documents held by Deedo, 26 filings listed on MahaRERA's project page

Title report

Commencement certificate

Encumbrance details

Form B

Form 1 (2)

Form 2 (3)

Show all 47 documentsShow fewer documents

Form 2 (3)

Registration certificate

Form 5 (2)

Other (2)

Form 4

Occupancy / completion certificate

  • Occupancy / completion certificate6 Sep 2021ViewSource

Building plan (3)

Allotment letter

Layout plan

Document library

  • Copy of the legal title reportsearch report.pdf · uploaded 29 Jul 2017View
  • Details of encumbrancesSelf Declaration-4A.pdf · uploaded 29 Jul 2017View
  • Declaration in FORM BForm B - 4 A.pdf · uploaded 29 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Arch Cert-4A.pdf · uploaded 29 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form-2 Engg crt 4A.pdf · uploaded 29 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentNA And CC 7 may 2012.pdf · uploaded 29 Jul 2017View
  • Building Plan Approval (IOD)TYPE A3-A4 and B4-B6.pdf · uploaded 29 Jul 2017View
  • Building Plan Approval (IOD)TYPE B3-B5 and C4.pdf · uploaded 29 Jul 2017View
  • Building Plan Approval (IOD)TYPE C3 and D4.pdf · uploaded 29 Jul 2017View
  • Proforma of Allotment letterAllotment Letter and Agreement for sale.pdf · uploaded 31 Jul 2017View
  • Copy of Layout Approval (in case of layout)4A.pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arch Certificate 4a.pdf · uploaded 4 Jun 2018View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)4a Engg Certificate.pdf · uploaded 26 Jun 2018View
  • Certificates of CA (Form 5)Form 5 Badlapur Phase-4A.pdf · uploaded 10 Sep 2018View
  • Status of Formation of Legal Entity (Society/Co Op etc.)SOCIETY CERTIFICATE 119-128.pdf · uploaded 10 Sep 2018View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form-2 Phase 4A.pdf · uploaded 19 Sep 2018View
  • Certificates of CA (Form 5)4A_Form 5_Mar-19.pdf · uploaded 20 Sep 2019View
  • Architect’s Certificate on Completion of Project (Form 4)Form-4_Architect Certificate Phase 4A_119 to 128.pdf · uploaded 2 Sep 2020View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentPhase 4 A Building No B119 to B128 Occupancy Certificate C.pdf · uploaded 6 Sep 2021View

Promoter documents

  • Legal Title reportsearch report.pdf · uploaded 29 Jul 2017View
  • Declaration Form BForm B - 4 A.pdf · uploaded 29 Jul 2017View

Technical documents

  • Layout Approval4A.pdfView
  • Building Plan ApprovalTYPE A3-A4 and B4-B6.pdfView
  • Building Plan ApprovalTYPE B3-B5 and C4.pdfView
  • Building Plan ApprovalTYPE C3 and D4.pdfView

Proforma allotment letter

  • Proforma allotment letterAllotment Letter and Agreement for sale.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Badlapur (M Cl), Ambarnath taluka

Survey, CTS, gat or plot numbers

GUT NO.4/2 PART

As published on MahaRERA's project page

GUT NO.4/2 PART

Boundaries

North
Phase-4b Samruddhi Evergreen
South
Phase-3 Samruddhi Evergreen
East
Badlapur Karjat Road
West
Club House Samruddhi Evergreen

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectParin Shah Architects—
EngineerSemac Constultants Pvt. Ltd.—
Real Estate AgentAmar Rajendra Pawar—
Real Estate AgentDeepak Thikade—
Real Estate AgentJainam Paresh Parekh—
Real Estate AgentMeena Sandeep Chavan—
Real Estate AgentNilesh Tanaji Vanage—
Real Estate AgentNilesh Tanaji Vanage—
Show all 32 professionalsShow fewer professionals
RoleNameRegistration no.
Real Estate AgentParesh Shanker Nagrani—
Real Estate AgentRakesh Gopal Surve—
Real Estate AgentShantaram Shet—
Real Estate AgentShantaram Shet—
Real Estate AgentSmc Real Estate Advisors Private Limited—
Real Estate AgentSquare Yards Consulting Private Limited—
Real Estate AgentSunil Subhash Shelke—
Real Estate AgentThe Search Engine—
Real Estate AgentVikas Vilas Bhagat—
Registered real estate agentAmarrajendra PawarA51700008156
Registered real estate agentDeepak ThikadeA51700015244
Registered real estate agentJainamParesh ParekhA51800003852
Registered real estate agentMeenasandeep ChavanA52000009230
Registered real estate agentNileshTanaji VanageA51700012444
Registered real estate agentNileshTanaji VanageA51700012444
Registered real estate agentPareshShanker NagraniA51800000874
Registered real estate agentRakeshgopal SurveA51700006906
Registered real estate agentShantaram ShetA51900006183
Registered real estate agentShantaram ShetA51900006183
Registered real estate agentSmc Investech Private LimitedA51900000042
Registered real estate agentSquare Yards Consulting Private LimitedA51800000454
Registered real estate agentSunilSubhash ShelkeA51700000840
Registered real estate agentThe Search EngineA52000004536
Registered real estate agentVikasVilas BhagatA51800009047

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology