Completion was pushed back 4 months, to Nov 2027; no MahaRERA orders on record; 7% of its units are booked.

Adharwadi, Thane 421301 · by Moon Star Developers LLP

DeliveryExtended 4 moPromised Jul 2027 · now due Nov 2027RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales7% booked10 of 148 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Nov 2027

  • This projectRegistered 4 Mar 2024, completion promised 31 Jul 2027, revised to 30 Nov 2027.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700055145
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P517000551454 Mar 202431 Jul 202730 Nov 2027Moon Star Developers LLPProject page
Documents117

1 document held by Deedo, 116 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPAN CARD.pdf · uploaded 9 Jan 2024Source

Legal

  • Legal Title reportTitle Report_compressed.pdf · uploaded 25 Jan 2024Source
  • Declaration Form BFORM B - AFFIDAVIT CUM DECLARATION FOR RERA-NEW with date compressed.pdf · uploaded 25 Jan 2024Source
  • Other – LegalDEED OF CONVEYANCE compressed.pdf · uploaded 8 Feb 2024Source

Migrated

  • 1 PAN CardPAN CARD.pdf · uploaded 9 Jan 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)MIDTOWN ADAM FORM 2_11zon (1).pdf · uploaded 9 Jan 2024Source
  • 1 CERSAI detailsCERSAI REPORT.pdf · uploaded 9 Jan 2024Source
Show all 117 documentsShow fewer documents

Migrated

  • 1 Building Plan Approval / NA Order for plotted developmentscan0316.pdf · uploaded 10 Jan 2024Source
  • 2 Building Plan Approval / NA Order for plotted developmentscan0317.pdf · uploaded 10 Jan 2024Source
  • 3 Building Plan Approval / NA Order for plotted developmentscan0318.pdf · uploaded 10 Jan 2024Source
  • 4 Building Plan Approval / NA Order for plotted developmentscan0319.pdf · uploaded 10 Jan 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentMidtown Adam Basic Commencement Certific.pdf · uploaded 10 Jan 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)MIDTOWN ADAM FORM 1.pdf · uploaded 10 Jan 2024Source
  • 1 Copy of the legal title reportTitle Report_compressed.pdf · uploaded 25 Jan 2024Source
  • 1 a Details of encumbrances concerned to FinanceMIDTOWN ADAM ENCUMBRANCE CERTIFICATE - LEGAL.pdf · uploaded 25 Jan 2024Source
  • 1 b Details of encumbrances concerned to LegalMIDTOWN ADAM ENCUMBRANCE CERTIFICATE - LEGAL.pdf · uploaded 25 Jan 2024Source
  • 1 Copy of Layout Approval (in case of layout)scan0316.pdf · uploaded 25 Jan 2024Source
  • 1 Declaration in FORM BFORM B - AFFIDAVIT CUM DECLARATION FOR RERA-NEW with date compressed.pdf · uploaded 25 Jan 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsANNEXURE A - MURLI SACHANANDANI.pdf · uploaded 25 Jan 2024Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsANNEXURE A - PRAKASH SACHANANDANI.pdf · uploaded 25 Jan 2024Source
  • 3 Disclosure of Interest in Other Real Estate OrganizationsANNEXURE A - RAJESH SACHANANDANI.pdf · uploaded 25 Jan 2024Source
  • 4 Disclosure of Interest in Other Real Estate OrganizationsANNEXURE A - VINOD SACHANANDANI.pdf · uploaded 25 Jan 2024Source
  • 1 Proforma of Allotment letterProforma of Allotment letter.pdf · uploaded 25 Jan 2024Source
  • 1 Deviation Report with respect to Allotment letterDevia letter.pdf · uploaded 25 Jan 2024Source
  • 1 Deviation Report with respect to model copy of AgreementcOMPRESSED DEVIATION AGREE (2).pdf · uploaded 25 Jan 2024Source
  • 1 Declaration about Commencement CertificateDECLARATION OF COMMENCEMENT CERTIFICATE FINAL.pdf · uploaded 29 Jan 2024Source
  • 1 Other – TechnicalMIDTOWN ADAM - ANNEXURE A.pdf · uploaded 29 Jan 2024Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFINAL DECLARATION OF BANK ACCOUNT.pdf · uploaded 5 Feb 2024Source
  • 2 a Details of encumbrances concerned to FinanceMIDTOWN ADAM ENCUMBRANCE CERTIFICATE - FINANCE FINAL.pdf · uploaded 8 Feb 2024Source
  • 2 b Details of encumbrances concerned to LegalMIDTOWN ADAM ENCUMBRANCE CERTIFICATE - FINANCE FINAL.pdf · uploaded 8 Feb 2024Source
  • 1 Other – LegalDEED OF CONVEYANCE compressed.pdf · uploaded 8 Feb 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)MIDTOWN ADAM REVISED FORM 3 compressed.pdf · uploaded 17 Feb 2024Source
  • 2 Other – TechnicalProforma of Agreement for sale 16 Feb 24.pdf · uploaded 20 Feb 2024Source
  • 1 Proforma of Agreement for saleProforma of Agreement for sale 16 Feb 24.pdf · uploaded 21 Feb 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)MIDTOWN ADAM FORM 1 Q4 FY 23-24.pdf · uploaded 2 May 2024Source
  • 1 Disclosure of sold/ booked inventoryMIDTOWN ADAM SOLD UNSOLD INVENTORY Q4 FY 23-24.pdf · uploaded 2 May 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)MIDTOWN ADAM FORM 3 Q4 FY 23-24.pdf · uploaded 2 May 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)MIDTOWN ADAM FORM 2.pdf · uploaded 3 May 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)MIDTOWN ADAM FORM 1 Q1 FY 24-25.pdf · uploaded 19 Jul 2024Source
  • 2 Disclosure of sold/ booked inventoryMIDTOWN ADAM SOLD UNSOLD INVENTORY as on 30 June 2024.pdf · uploaded 27 Jul 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)MIDTOWN ADAM FORM 3 Q1 FY 2024-25.pdf · uploaded 27 Jul 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)MIDTOWN ADAM FORM 2 Q1 FY 24-25.pdf · uploaded 30 Jul 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)MIDTOWN ADAM FORM 1 Q2 FY 24-25.pdf · uploaded 10 Dec 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)MIDTOWN ADAM FORM 3 Q2 FY 24-25 Compressed.pdf · uploaded 10 Dec 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)MIDTOWN ADAM FORM 2 Q2 FY 24-25.pdf · uploaded 10 Dec 2024Source
  • 2 Disclosure of sold/ booked inventoryMIDTOWN ADAM SOLD UNSOLD INVENTORY Q2 FY 24-25.pdf · uploaded 10 Dec 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)MIDTOWN ADAM FORM 1 Q3 FY 24-25.pdf · uploaded 20 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)MIDTOWN ADAM FORM 3 Q3 FY 24-25.pdf · uploaded 29 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryMIDTOWN ADAM SOLD UNSOLD INVENTORY as on 31 Dec 2024.pdf · uploaded 29 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)MIDTOWN ADAM FORM 2 Q3 FY 24-25.pdf · uploaded 30 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)moonstar llp adam signed.pdf · uploaded 26 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryMOONSTAR LLP ADAM SIGNED.pdf · uploaded 28 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)MIDTOWN ADAM FORM 3 Q4 FY 24-25.pdf · uploaded 16 May 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)MIDTOWN ADAM FORM 2 Q4 FY 24-25.pdf · uploaded 16 May 2025Source
  • Form 1MIDTOWN ADAM FORM 1 Q4 FY 24-25.pdf · uploaded 1 Aug 2025Source
  • Form 2MIDTOWN ADAM FORM 2 Q4 FY 24-25.pdf · uploaded 1 Aug 2025Source
  • Form 3MIDTOWN ADAM FORM 3 Q4 FY 24-25.pdf · uploaded 1 Aug 2025Source
  • Disclosure of Sold and Booked InventoryMOONSTAR ADAM SOLD UNSOLD INVENTORY SIGNED.pdf · uploaded 1 Aug 2025Source
  • Form 5 (FY 2023-2024)FORM 5 - MIDTOWN ADAM FY 23-24.pdf · uploaded 17 Oct 2025Source
  • Form 5 (FY 2024-2025)FORM 5 - MIDTOWN ADAM FY 24-25.pdf · uploaded 17 Oct 2025Source
  • Form 2A (FY 2023-2024)FORM 2A ADAM 23-24.pdf · uploaded 17 Jan 2026Source
  • Form 2A (FY 2024-2025)FORM 2A SIGNED.pdf · uploaded 17 Jan 2026Source
  • Withdrawal Update Form 1MIDTOWN ADAM FORM 1 Q4 FY 23-24.pdf · uploaded 19 Feb 2026Source
  • Withdrawal Update Form 1MIDTOWN ADAM FORM 1 Q4 FY 23-24.pdf · uploaded 19 Feb 2026Source
  • Withdrawal Update Form 2MIDTOWN ADAM FORM 2 Q4 FY 23-24.pdf · uploaded 19 Feb 2026Source
  • Withdrawal Update Form 2MIDTOWN ADAM FORM 2 Q4 FY 23-24.pdf · uploaded 19 Feb 2026Source
  • Withdrawal Update Form 3MIDTOWN ADAM FORM 3 Q4 FY 23-24.pdf · uploaded 19 Feb 2026Source
  • Withdrawal Update Form 3MIDTOWN ADAM FORM 3 Q4 FY 23-24.pdf · uploaded 19 Feb 2026Source
  • Form 1MIDTOWN ADAM FORM 1 Q4 FY 23-24.pdf · uploaded 20 Feb 2026Source
  • Form 2MIDTOWN ADAM FORM 2 Q4 FY 23-24.pdf · uploaded 20 Feb 2026Source
  • Form 3MIDTOWN ADAM FORM 3 Q4 FY 23-24.pdf · uploaded 20 Feb 2026Source
  • Disclosure of Sold and Booked InventoryMIDTOWN ADAM SOLD UNSOLD INVENTORY Q4 FY 23-24.pdf · uploaded 20 Feb 2026Source
  • Form 1MIDTOWN ADAM FORM 1 Q1 FY 24-25.pdf · uploaded 20 Feb 2026Source
  • Form 2MIDTOWN ADAM FORM 2 Q1 FY 24-25.pdf · uploaded 20 Feb 2026Source
  • Form 3MIDTOWN ADAM FORM 3 Q1 FY 2024-25.pdf · uploaded 20 Feb 2026Source
  • Disclosure of Sold and Booked InventoryMIDTOWN ADAM SOLD UNSOLD INVENTORY as on 30 June 2024.pdf · uploaded 20 Feb 2026Source
  • Form 1MIDTOWN ADAM FORM 1 Q3 FY 24-25.pdf · uploaded 20 Feb 2026Source
  • Form 2MIDTOWN ADAM FORM 2 Q3 FY 24-25.pdf · uploaded 20 Feb 2026Source
  • Form 3MIDTOWN ADAM FORM 3 Q3 FY 24-25.pdf · uploaded 20 Feb 2026Source
  • Disclosure of Sold and Booked InventoryMIDTOWN ADAM SOLD UNSOLD INVENTORY as on 31 Dec 2024.pdf · uploaded 20 Feb 2026Source
  • Form 1MIDTOWN ADAM FORM 1 Q2 FY 24-25.pdf · uploaded 20 Feb 2026Source
  • Form 2MIDTOWN ADAM FORM 2 Q2 FY 24-25.pdf · uploaded 20 Feb 2026Source
  • Form 3MIDTOWN ADAM FORM 3 Q2 FY 24-25 Compressed.pdf · uploaded 20 Feb 2026Source
  • Disclosure of Sold and Booked InventoryIMG_20260220_0001.pdf · uploaded 20 Feb 2026Source
  • Withdrawal Update Form 1MIDTOWN ADAM FORM 1 Q1 FY 25-26.pdf · uploaded 25 Feb 2026Source
  • Withdrawal Update Form 1MIDTOWN ADAM FORM 1 Q2 FY 2025-26 SIGNED.pdf · uploaded 25 Feb 2026Source
  • Withdrawal Update Form 1MIDTOWN ADAM FORM 1 Q3 FY 2025-26 SIGNED.pdf · uploaded 25 Feb 2026Source
  • Withdrawal Update Form 2MIDTOWN ADAM FORM 2 Q1 FY 25-26.pdf · uploaded 25 Feb 2026Source
  • Withdrawal Update Form 2MIDTOWN ADAM FORM 2 Q2 FY 2025-26 SIGNED.pdf · uploaded 25 Feb 2026Source
  • Withdrawal Update Form 2MIDTOWN ADAM FORM 2 Q3 FY 25-26 SIGNED.pdf · uploaded 25 Feb 2026Source
  • Withdrawal Update Form 3MIDTOWN ADAM FORM 3 Q1 FY 25-26 PHYSICALLY SIGNED.pdf · uploaded 25 Feb 2026Source
  • Withdrawal Update Form 3MIDTOWN ADAM FORM 3 Q2 FY 25-26 SIGNED_compressed (1).pdf · uploaded 25 Feb 2026Source
  • Withdrawal Update Form 3MIDTOWN ADAM FORM 3 Q3 FY 25-26 SIGNED_compressed.pdf · uploaded 25 Feb 2026Source
  • Form 2A (FY 2025-2026)FORM 2A SIGNED MOONSTAR DEVELOPERS LLP MIDTOWN ADAM 2025-26.pdf · uploaded 2 May 2026Source
  • Withdrawal Update Form 1MIDTOWN ADAM FORM 1 Q4 FY 25-26 SIGNED.pdf · uploaded 4 May 2026Source
  • Withdrawal Update Form 2MIDTOWN ADAM FORM 2 Q4 FY 25-26 SIGNED.pdf · uploaded 4 May 2026Source
  • Withdrawal Update Form 3Moonstar Developers LLP ADAM Form 3 Q4 25-26.pdf · uploaded 4 May 2026Source
  • Withdrawal Update Form 1MIDTOWN ADAM FORM 1 Q1 FY 26-27.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 2MIDTOWN ADAM FORM 2 Q1 FY 26-27.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 3MIDTOWN ADAM FORM 3 Q1 FY 26-27.pdf · uploaded 20 Jul 2026Source
  • Form 5 (FY 2025-2026)Midtown Adam (Form 5) FY 2025-26.pdf · uploaded 28 Sep 2026Source

Technical

  • Documentscan0316.pdf · uploaded 10 Jan 2024Source
  • Documentscan0317.pdf · uploaded 10 Jan 2024Source
  • Documentscan0318.pdf · uploaded 10 Jan 2024Source
  • Documentscan0319.pdf · uploaded 10 Jan 2024Source
  • Documentscan0316.pdf · uploaded 25 Jan 2024Source
  • Other – TechnicalMIDTOWN ADAM - ANNEXURE A.pdf · uploaded 29 Jan 2024Source
  • Other – TechnicalProforma of Agreement for sale 16 Feb 24.pdf · uploaded 20 Feb 2024Source

Technical (Architect)

  • DocumentMIDTOWN ADAM FORM 1 Q2 FY 24-25.pdf · uploaded 10 Dec 2024Source
  • DocumentMIDTOWN ADAM FORM 1 Q3 FY 24-25.pdf · uploaded 20 Jan 2025Source
  • Documentmoonstar llp adam signed.pdf · uploaded 26 Apr 2025Source
  • DocumentMIDTOWN ADAM FORM 1 Q1 FY 26-27.pdf · uploaded 20 Jul 2026Source

Technical (Engineer)

  • DocumentMIDTOWN ADAM FORM 2 Q2 FY 24-25.pdf · uploaded 10 Dec 2024Source
  • DocumentMIDTOWN ADAM FORM 2 Q3 FY 24-25.pdf · uploaded 30 Jan 2025Source
  • DocumentMIDTOWN ADAM FORM 2 Q4 FY 24-25.pdf · uploaded 16 May 2025Source
  • DocumentMIDTOWN ADAM FORM 2 Q1 FY 26-27.pdf · uploaded 20 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel SURVEY NO 40 HISSA NO 1 PLOT B

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 2BHK, Office space, Shop148 units in all
Address
SURVEY NO 40 HISSA NO 1 PLOT B, Ring Road, KalyanPIN 421301
Village
adharwadi, Kalyan taluka
Land area for this project
1,975 sq m (21,259 sq ft)
Permissible built-up area
13,128 sq m (1,41,308 sq ft)
Sanctioned built-up area
3,564 sq m (38,364 sq ft)
Designated bank account
190
Developed in phases
No

Survey, CTS, gat or plot numbers

SURVEY NO 40 HISSA NO 1 PLOT B

Land as published on MahaRERA's project page

SURVEY NO 40 HISSA NO 1 PLOT B

Boundaries

North
30M Road
South
Survey No 67 P
East
30M Road
West
Survey No 40 Hissa No 3 P

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking148 units

10 of 148 units booked (7%), as the promoter reported to MahaRERA

1BHK · 63 units2BHK · 56 unitsOffice space · 16 unitsShop · 13 units
TypeCarpet areaUnitsBooked
1BHK37.93 sq m · 408 sq ft40
1BHK38.55 sq m · 415 sq ft22
1BHK38.56 sq m · 415 sq ft180
1BHK39.33 sq m · 423 sq ft33
1BHK39.98 sq m · 430 sq ft170
1BHK40.01 sq m · 431 sq ft190
2BHK48.65 sq m · 524 sq ft160
2BHK55.25 sq m · 595 sq ft190
Show all 34 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
2BHK55.3 sq m · 595 sq ft74
2BHK55.32 sq m · 595 sq ft140
Office space12.84 sq m · 138 sq ft10
Office space13.26 sq m · 143 sq ft10
Office space14.02 sq m · 151 sq ft10
Office space14.25 sq m · 153 sq ft10
Office space15.92 sq m · 171 sq ft10
Office space16.65 sq m · 179 sq ft20
Office space17.05 sq m · 184 sq ft10
Office space17.58 sq m · 189 sq ft10
Office space18 sq m · 194 sq ft10
Office space18.61 sq m · 200 sq ft10
Office space18.96 sq m · 204 sq ft20
Office space19.07 sq m · 205 sq ft10
Office space22.17 sq m · 239 sq ft10
Office space23.3 sq m · 251 sq ft10
Shop13.11 sq m · 141 sq ft10
Shop13.87 sq m · 149 sq ft10
Shop14.06 sq m · 151 sq ft10
Shop16.87 sq m · 182 sq ft10
Shop17.41 sq m · 187 sq ft10
Shop17.85 sq m · 192 sq ft10
Shop18.81 sq m · 202 sq ft40
Shop18.82 sq m · 203 sq ft11
Shop20.6 sq m · 222 sq ft10
Shop22.02 sq m · 237 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals1

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
EngineerReji George—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Adharwadi

All 25 projects in Adharwadi · Compare Midtown Adam with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology