Midtown Adam
Deedo IDDP-THN-AE4KCompletion was pushed back 4 months, to Nov 2027; no MahaRERA orders on record; 7% of its units are booked.
Adharwadi, Thane 421301 · by Moon Star Developers LLP
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Nov 2027
- This projectRegistered 4 Mar 2024, completion promised 31 Jul 2027, revised to 30 Nov 2027.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700055145
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700055145 | 4 Mar 2024 | 31 Jul 2027 | 30 Nov 2027 | Moon Star Developers LLP | Project page |
Documents117
1 document held by Deedo, 116 filings listed on MahaRERA's project page
Finance
- PAN CardPAN CARD.pdf · uploaded 9 Jan 2024Source
Legal
Show all 117 documentsShow fewer documents
Migrated
- 1 Building Plan Approval / NA Order for plotted developmentscan0316.pdf · uploaded 10 Jan 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentscan0317.pdf · uploaded 10 Jan 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentscan0318.pdf · uploaded 10 Jan 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentscan0319.pdf · uploaded 10 Jan 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentMidtown Adam Basic Commencement Certific.pdf · uploaded 10 Jan 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)MIDTOWN ADAM FORM 1.pdf · uploaded 10 Jan 2024Source
- 1 Copy of the legal title reportTitle Report_compressed.pdf · uploaded 25 Jan 2024Source
- 1 a Details of encumbrances concerned to FinanceMIDTOWN ADAM ENCUMBRANCE CERTIFICATE - LEGAL.pdf · uploaded 25 Jan 2024Source
- 1 b Details of encumbrances concerned to LegalMIDTOWN ADAM ENCUMBRANCE CERTIFICATE - LEGAL.pdf · uploaded 25 Jan 2024Source
- 1 Copy of Layout Approval (in case of layout)scan0316.pdf · uploaded 25 Jan 2024Source
- 1 Declaration in FORM BFORM B - AFFIDAVIT CUM DECLARATION FOR RERA-NEW with date compressed.pdf · uploaded 25 Jan 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsANNEXURE A - MURLI SACHANANDANI.pdf · uploaded 25 Jan 2024Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsANNEXURE A - PRAKASH SACHANANDANI.pdf · uploaded 25 Jan 2024Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsANNEXURE A - RAJESH SACHANANDANI.pdf · uploaded 25 Jan 2024Source
- 4 Disclosure of Interest in Other Real Estate OrganizationsANNEXURE A - VINOD SACHANANDANI.pdf · uploaded 25 Jan 2024Source
- 1 Proforma of Allotment letterProforma of Allotment letter.pdf · uploaded 25 Jan 2024Source
- 1 Deviation Report with respect to Allotment letterDevia letter.pdf · uploaded 25 Jan 2024Source
- 1 Deviation Report with respect to model copy of AgreementcOMPRESSED DEVIATION AGREE (2).pdf · uploaded 25 Jan 2024Source
- 1 Declaration about Commencement CertificateDECLARATION OF COMMENCEMENT CERTIFICATE FINAL.pdf · uploaded 29 Jan 2024Source
- 1 Other – TechnicalMIDTOWN ADAM - ANNEXURE A.pdf · uploaded 29 Jan 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFINAL DECLARATION OF BANK ACCOUNT.pdf · uploaded 5 Feb 2024Source
- 2 a Details of encumbrances concerned to FinanceMIDTOWN ADAM ENCUMBRANCE CERTIFICATE - FINANCE FINAL.pdf · uploaded 8 Feb 2024Source
- 2 b Details of encumbrances concerned to LegalMIDTOWN ADAM ENCUMBRANCE CERTIFICATE - FINANCE FINAL.pdf · uploaded 8 Feb 2024Source
- 1 Other – LegalDEED OF CONVEYANCE compressed.pdf · uploaded 8 Feb 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)MIDTOWN ADAM REVISED FORM 3 compressed.pdf · uploaded 17 Feb 2024Source
- 2 Other – TechnicalProforma of Agreement for sale 16 Feb 24.pdf · uploaded 20 Feb 2024Source
- 1 Proforma of Agreement for saleProforma of Agreement for sale 16 Feb 24.pdf · uploaded 21 Feb 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)MIDTOWN ADAM FORM 1 Q4 FY 23-24.pdf · uploaded 2 May 2024Source
- 1 Disclosure of sold/ booked inventoryMIDTOWN ADAM SOLD UNSOLD INVENTORY Q4 FY 23-24.pdf · uploaded 2 May 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)MIDTOWN ADAM FORM 3 Q4 FY 23-24.pdf · uploaded 2 May 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)MIDTOWN ADAM FORM 2.pdf · uploaded 3 May 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)MIDTOWN ADAM FORM 1 Q1 FY 24-25.pdf · uploaded 19 Jul 2024Source
- 2 Disclosure of sold/ booked inventoryMIDTOWN ADAM SOLD UNSOLD INVENTORY as on 30 June 2024.pdf · uploaded 27 Jul 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)MIDTOWN ADAM FORM 3 Q1 FY 2024-25.pdf · uploaded 27 Jul 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)MIDTOWN ADAM FORM 2 Q1 FY 24-25.pdf · uploaded 30 Jul 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)MIDTOWN ADAM FORM 1 Q2 FY 24-25.pdf · uploaded 10 Dec 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)MIDTOWN ADAM FORM 3 Q2 FY 24-25 Compressed.pdf · uploaded 10 Dec 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)MIDTOWN ADAM FORM 2 Q2 FY 24-25.pdf · uploaded 10 Dec 2024Source
- 2 Disclosure of sold/ booked inventoryMIDTOWN ADAM SOLD UNSOLD INVENTORY Q2 FY 24-25.pdf · uploaded 10 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)MIDTOWN ADAM FORM 1 Q3 FY 24-25.pdf · uploaded 20 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)MIDTOWN ADAM FORM 3 Q3 FY 24-25.pdf · uploaded 29 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryMIDTOWN ADAM SOLD UNSOLD INVENTORY as on 31 Dec 2024.pdf · uploaded 29 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)MIDTOWN ADAM FORM 2 Q3 FY 24-25.pdf · uploaded 30 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)moonstar llp adam signed.pdf · uploaded 26 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryMOONSTAR LLP ADAM SIGNED.pdf · uploaded 28 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)MIDTOWN ADAM FORM 3 Q4 FY 24-25.pdf · uploaded 16 May 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)MIDTOWN ADAM FORM 2 Q4 FY 24-25.pdf · uploaded 16 May 2025Source
- Form 1MIDTOWN ADAM FORM 1 Q4 FY 24-25.pdf · uploaded 1 Aug 2025Source
- Form 2MIDTOWN ADAM FORM 2 Q4 FY 24-25.pdf · uploaded 1 Aug 2025Source
- Form 3MIDTOWN ADAM FORM 3 Q4 FY 24-25.pdf · uploaded 1 Aug 2025Source
- Disclosure of Sold and Booked InventoryMOONSTAR ADAM SOLD UNSOLD INVENTORY SIGNED.pdf · uploaded 1 Aug 2025Source
- Form 5 (FY 2023-2024)FORM 5 - MIDTOWN ADAM FY 23-24.pdf · uploaded 17 Oct 2025Source
- Form 5 (FY 2024-2025)FORM 5 - MIDTOWN ADAM FY 24-25.pdf · uploaded 17 Oct 2025Source
- Form 2A (FY 2023-2024)FORM 2A ADAM 23-24.pdf · uploaded 17 Jan 2026Source
- Form 2A (FY 2024-2025)FORM 2A SIGNED.pdf · uploaded 17 Jan 2026Source
- Withdrawal Update Form 1MIDTOWN ADAM FORM 1 Q4 FY 23-24.pdf · uploaded 19 Feb 2026Source
- Withdrawal Update Form 1MIDTOWN ADAM FORM 1 Q4 FY 23-24.pdf · uploaded 19 Feb 2026Source
- Withdrawal Update Form 2MIDTOWN ADAM FORM 2 Q4 FY 23-24.pdf · uploaded 19 Feb 2026Source
- Withdrawal Update Form 2MIDTOWN ADAM FORM 2 Q4 FY 23-24.pdf · uploaded 19 Feb 2026Source
- Withdrawal Update Form 3MIDTOWN ADAM FORM 3 Q4 FY 23-24.pdf · uploaded 19 Feb 2026Source
- Withdrawal Update Form 3MIDTOWN ADAM FORM 3 Q4 FY 23-24.pdf · uploaded 19 Feb 2026Source
- Form 1MIDTOWN ADAM FORM 1 Q4 FY 23-24.pdf · uploaded 20 Feb 2026Source
- Form 2MIDTOWN ADAM FORM 2 Q4 FY 23-24.pdf · uploaded 20 Feb 2026Source
- Form 3MIDTOWN ADAM FORM 3 Q4 FY 23-24.pdf · uploaded 20 Feb 2026Source
- Disclosure of Sold and Booked InventoryMIDTOWN ADAM SOLD UNSOLD INVENTORY Q4 FY 23-24.pdf · uploaded 20 Feb 2026Source
- Form 1MIDTOWN ADAM FORM 1 Q1 FY 24-25.pdf · uploaded 20 Feb 2026Source
- Form 2MIDTOWN ADAM FORM 2 Q1 FY 24-25.pdf · uploaded 20 Feb 2026Source
- Form 3MIDTOWN ADAM FORM 3 Q1 FY 2024-25.pdf · uploaded 20 Feb 2026Source
- Disclosure of Sold and Booked InventoryMIDTOWN ADAM SOLD UNSOLD INVENTORY as on 30 June 2024.pdf · uploaded 20 Feb 2026Source
- Form 1MIDTOWN ADAM FORM 1 Q3 FY 24-25.pdf · uploaded 20 Feb 2026Source
- Form 2MIDTOWN ADAM FORM 2 Q3 FY 24-25.pdf · uploaded 20 Feb 2026Source
- Form 3MIDTOWN ADAM FORM 3 Q3 FY 24-25.pdf · uploaded 20 Feb 2026Source
- Disclosure of Sold and Booked InventoryMIDTOWN ADAM SOLD UNSOLD INVENTORY as on 31 Dec 2024.pdf · uploaded 20 Feb 2026Source
- Form 1MIDTOWN ADAM FORM 1 Q2 FY 24-25.pdf · uploaded 20 Feb 2026Source
- Form 2MIDTOWN ADAM FORM 2 Q2 FY 24-25.pdf · uploaded 20 Feb 2026Source
- Form 3MIDTOWN ADAM FORM 3 Q2 FY 24-25 Compressed.pdf · uploaded 20 Feb 2026Source
- Disclosure of Sold and Booked InventoryIMG_20260220_0001.pdf · uploaded 20 Feb 2026Source
- Withdrawal Update Form 1MIDTOWN ADAM FORM 1 Q1 FY 25-26.pdf · uploaded 25 Feb 2026Source
- Withdrawal Update Form 1MIDTOWN ADAM FORM 1 Q2 FY 2025-26 SIGNED.pdf · uploaded 25 Feb 2026Source
- Withdrawal Update Form 1MIDTOWN ADAM FORM 1 Q3 FY 2025-26 SIGNED.pdf · uploaded 25 Feb 2026Source
- Withdrawal Update Form 2MIDTOWN ADAM FORM 2 Q1 FY 25-26.pdf · uploaded 25 Feb 2026Source
- Withdrawal Update Form 2MIDTOWN ADAM FORM 2 Q2 FY 2025-26 SIGNED.pdf · uploaded 25 Feb 2026Source
- Withdrawal Update Form 2MIDTOWN ADAM FORM 2 Q3 FY 25-26 SIGNED.pdf · uploaded 25 Feb 2026Source
- Withdrawal Update Form 3MIDTOWN ADAM FORM 3 Q1 FY 25-26 PHYSICALLY SIGNED.pdf · uploaded 25 Feb 2026Source
- Withdrawal Update Form 3MIDTOWN ADAM FORM 3 Q2 FY 25-26 SIGNED_compressed (1).pdf · uploaded 25 Feb 2026Source
- Withdrawal Update Form 3MIDTOWN ADAM FORM 3 Q3 FY 25-26 SIGNED_compressed.pdf · uploaded 25 Feb 2026Source
- Form 2A (FY 2025-2026)FORM 2A SIGNED MOONSTAR DEVELOPERS LLP MIDTOWN ADAM 2025-26.pdf · uploaded 2 May 2026Source
- Withdrawal Update Form 1MIDTOWN ADAM FORM 1 Q4 FY 25-26 SIGNED.pdf · uploaded 4 May 2026Source
- Withdrawal Update Form 2MIDTOWN ADAM FORM 2 Q4 FY 25-26 SIGNED.pdf · uploaded 4 May 2026Source
- Withdrawal Update Form 3Moonstar Developers LLP ADAM Form 3 Q4 25-26.pdf · uploaded 4 May 2026Source
- Withdrawal Update Form 1MIDTOWN ADAM FORM 1 Q1 FY 26-27.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 2MIDTOWN ADAM FORM 2 Q1 FY 26-27.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 3MIDTOWN ADAM FORM 3 Q1 FY 26-27.pdf · uploaded 20 Jul 2026Source
- Form 5 (FY 2025-2026)Midtown Adam (Form 5) FY 2025-26.pdf · uploaded 28 Sep 2026Source
Technical
- Documentscan0316.pdf · uploaded 10 Jan 2024Source
- Documentscan0317.pdf · uploaded 10 Jan 2024Source
- Documentscan0318.pdf · uploaded 10 Jan 2024Source
- Documentscan0319.pdf · uploaded 10 Jan 2024Source
- Documentscan0316.pdf · uploaded 25 Jan 2024Source
- Other – TechnicalMIDTOWN ADAM - ANNEXURE A.pdf · uploaded 29 Jan 2024Source
- Other – TechnicalProforma of Agreement for sale 16 Feb 24.pdf · uploaded 20 Feb 2024Source
Technical (Architect)
Technical (Engineer)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel SURVEY NO 40 HISSA NO 1 PLOT B
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK, Office space, Shop148 units in all
- Address
- SURVEY NO 40 HISSA NO 1 PLOT B, Ring Road, KalyanPIN 421301
- Village
- adharwadi, Kalyan taluka
- Land area for this project
- 1,975 sq m (21,259 sq ft)
- Permissible built-up area
- 13,128 sq m (1,41,308 sq ft)
- Sanctioned built-up area
- 3,564 sq m (38,364 sq ft)
- Designated bank account
- 190
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
SURVEY NO 40 HISSA NO 1 PLOT B
Boundaries
- North
- 30M Road
- South
- Survey No 67 P
- East
- 30M Road
- West
- Survey No 40 Hissa No 3 P
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking148 units
10 of 148 units booked (7%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 37.93 sq m · 408 sq ft | 4 | 0 |
| 1BHK | 38.55 sq m · 415 sq ft | 2 | 2 |
| 1BHK | 38.56 sq m · 415 sq ft | 18 | 0 |
| 1BHK | 39.33 sq m · 423 sq ft | 3 | 3 |
| 1BHK | 39.98 sq m · 430 sq ft | 17 | 0 |
| 1BHK | 40.01 sq m · 431 sq ft | 19 | 0 |
| 2BHK | 48.65 sq m · 524 sq ft | 16 | 0 |
| 2BHK | 55.25 sq m · 595 sq ft | 19 | 0 |
Show all 34 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK | 55.3 sq m · 595 sq ft | 7 | 4 |
| 2BHK | 55.32 sq m · 595 sq ft | 14 | 0 |
| Office space | 12.84 sq m · 138 sq ft | 1 | 0 |
| Office space | 13.26 sq m · 143 sq ft | 1 | 0 |
| Office space | 14.02 sq m · 151 sq ft | 1 | 0 |
| Office space | 14.25 sq m · 153 sq ft | 1 | 0 |
| Office space | 15.92 sq m · 171 sq ft | 1 | 0 |
| Office space | 16.65 sq m · 179 sq ft | 2 | 0 |
| Office space | 17.05 sq m · 184 sq ft | 1 | 0 |
| Office space | 17.58 sq m · 189 sq ft | 1 | 0 |
| Office space | 18 sq m · 194 sq ft | 1 | 0 |
| Office space | 18.61 sq m · 200 sq ft | 1 | 0 |
| Office space | 18.96 sq m · 204 sq ft | 2 | 0 |
| Office space | 19.07 sq m · 205 sq ft | 1 | 0 |
| Office space | 22.17 sq m · 239 sq ft | 1 | 0 |
| Office space | 23.3 sq m · 251 sq ft | 1 | 0 |
| Shop | 13.11 sq m · 141 sq ft | 1 | 0 |
| Shop | 13.87 sq m · 149 sq ft | 1 | 0 |
| Shop | 14.06 sq m · 151 sq ft | 1 | 0 |
| Shop | 16.87 sq m · 182 sq ft | 1 | 0 |
| Shop | 17.41 sq m · 187 sq ft | 1 | 0 |
| Shop | 17.85 sq m · 192 sq ft | 1 | 0 |
| Shop | 18.81 sq m · 202 sq ft | 4 | 0 |
| Shop | 18.82 sq m · 203 sq ft | 1 | 1 |
| Shop | 20.6 sq m · 222 sq ft | 1 | 0 |
| Shop | 22.02 sq m · 237 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals1
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Engineer | Reji George | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Adharwadi
- Earth ParkRERA PM1331012500817
- Triveni PearlRERA P51700055690
- Midtown EveRERA P51700049094
- Raunak City Sector VI - F3RERA P51700033972
- Raunak City Sector VI - F1RERA P51700033762
- Raunak City Sector VI - F2RERA P51700033757
- Triveni GrandeRERA P51700029471
- Raunak City Sector IV - D5RERA P51700020240
All 25 projects in Adharwadi · Compare Midtown Adam with another project