Midtown Eve

Deedo IDDP-THN-JGX3

Completion was pushed back 4 months, to Oct 2027; no MahaRERA orders on record; 50% of its units are booked.

Adharwadi, Thane 421301 · by Moon Star Developers LLP

DeliveryExtended 4 moPromised Jun 2027 · now due Oct 2027RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales50% booked49 of 98 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Oct 2027

  • This projectRegistered 30 Jan 2023, completion promised 30 Jun 2027, revised to 30 Oct 2027.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700049094
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170004909430 Jan 202330 Jun 202730 Oct 2027Moon Star Developers LLPProject page
Documents164

2 documents held by Deedo, 162 filings listed on MahaRERA's project page

Extension certificate

Registration certificate

Legal

  • Declaration Form BFORM B AFFIDAVIT CUM DECLARATION compressed.pdf · uploaded 5 Dec 2022Source
  • Legal Title reportTitle Certificate Form A.pdf · uploaded 23 Dec 2022Source

Migrated

  • 1 PAN CardPAN CARD.pdf · uploaded 26 Nov 2022Source
  • 1 Copy of Layout Approval (in case of layout)MIDTOWN EVE APPROVED PLAN.pdf · uploaded 26 Nov 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC LETTER.pdf · uploaded 26 Nov 2022Source
  • 1 a Details of encumbrances concerned to FinanceNO ENCUMBRANCES CERTIFICATE.pdf · uploaded 1 Dec 2022Source
Show all 164 documentsShow fewer documents

Migrated

  • 1 b Details of encumbrances concerned to LegalNO ENCUMBRANCES CERTIFICATE.pdf · uploaded 1 Dec 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentMIDTOWN EVE APPROVED PLAN.pdf · uploaded 1 Dec 2022Source
  • 1 Declaration about Commencement CertificateDECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf · uploaded 1 Dec 2022Source
  • 1 CERSAI detailsCERSAI_Search_Report_200253684411_For_Asset_Based_Search_01_12_2022_15_13_37_415.pdf · uploaded 1 Dec 2022Source
  • 1 Declaration in FORM BFORM B AFFIDAVIT CUM DECLARATION compressed.pdf · uploaded 5 Dec 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Rera Certificate For Midtown E.pdf · uploaded 5 Dec 2022Source
  • 1 Disclosure of sold/ booked inventoryMOONSTAR DEV LLP SOLD UNSOLD INVENTORY.pdf · uploaded 5 Dec 2022Source
  • 1 Copy of the legal title reportTitle Certificate Form A.pdf · uploaded 23 Dec 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate FORM 2.pdf · uploaded 23 Dec 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)MIDTOWN EVE FORM 3 compressed.pdf · uploaded 23 Dec 2022Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDECLARATION OF BANK ACCOUNT FORMAT A.pdf · uploaded 23 Dec 2022Source
  • 1 Proforma of Allotment letterFINAL FORMAT OF ALLOTMENT LETTER.pdf · uploaded 28 Dec 2022Source
  • 1 Deviation Report with respect to Allotment letterDEVIATION REPORT.pdf · uploaded 28 Dec 2022Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A MTS.pdf · uploaded 31 Dec 2022Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A PTS.pdf · uploaded 31 Dec 2022Source
  • 3 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A RTS.pdf · uploaded 31 Dec 2022Source
  • 4 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A VTS.pdf · uploaded 31 Dec 2022Source
  • 1 Proforma of Agreement for saleMid-Town Eve Draft Agreement for Sale Residential 21 JAN 23.pdf · uploaded 21 Jan 2023Source
  • 2 Proforma of Agreement for saleMid-Town Eve Draft Agreement for Sale Commercial 21 JAN 23.pdf · uploaded 21 Jan 2023Source
  • 1 Deviation Report with respect to model copy of AgreementDEVIATION REPORT 21 JAN 2023.pdf · uploaded 21 Jan 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - Q4 - FY 2022-23_compressed.pdf · uploaded 8 Apr 2023Source
  • 2 Disclosure of sold/ booked inventoryMOONSTAR DEV LLP SOLD UNSOLD INVENTORY.pdf · uploaded 8 Apr 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 - Q4 - FY 2022-23_compressed.pdf · uploaded 19 Apr 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - Q4 FY 2022-23_compressed.pdf · uploaded 22 Apr 2023Source
  • 2 Copy of Layout Approval (in case of layout)scan4542-compressed.pdf · uploaded 23 May 2023Source
  • 3 Copy of Layout Approval (in case of layout)scan4543-compressed.pdf · uploaded 23 May 2023Source
  • 4 Copy of Layout Approval (in case of layout)scan4541-compressed.pdf · uploaded 23 May 2023Source
  • 2 Commencement Certificates / NA Order for plotted developmentRevised Commencement Certificate Of Midtown Eve_compressed.pdf · uploaded 23 May 2023Source
  • 2 Declaration about Commencement CertificateRevised Commencement Certificate Of Midtown Eve_compressed.pdf · uploaded 23 May 2023Source
  • 3 Declaration about Commencement CertificateREVISED DECLARATION.pdf · uploaded 23 May 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)MID TOWN EVE.pdf · uploaded 8 Jul 2023Source
  • 3 Disclosure of sold/ booked inventoryMOONSTAR DEV LLP SOLD UNSOLD INVENTORY.pdf · uploaded 19 Jul 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)MOON STAR DEV LLP FORM 3 Q1 FY 2023-24_compressed.pdf · uploaded 19 Jul 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)MOON STAR DEV LLP FORM 2 Q1 FY 23-24_compressed.pdf · uploaded 20 Jul 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)MOON STAR DEV LLP FORM 1 Q2 FY 23-24_compressed.pdf · uploaded 20 Oct 2023Source
  • 4 Disclosure of sold/ booked inventoryMOONSTAR DEV LLP SOLD UNSOLD INVENTORY Q2 FY 23-24.pdf · uploaded 20 Oct 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)MOON STAR DEV LLP FORM 3 Q2 FY 23-24_compressed.pdf · uploaded 20 Oct 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)MOON STAR DEV LLP FORM 5 FY 22-223.pdf · uploaded 25 Oct 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)MOON STAR DEV LLP FORM 2 FY 22-23.pdf · uploaded 26 Oct 2023Source
  • 5 Disclosure of sold/ booked inventoryMOON STAR DEV LLP FORM 1 Q3 FY 23-24.pdf · uploaded 11 Jan 2024Source
  • 6 Disclosure of sold/ booked inventoryMOONSTAR DEV LLP SOLD UNSOLD INVENTORY AS ON 31 Dec 23.pdf · uploaded 26 Jan 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)MOON STAR DEV LLP FORM 3 FY 23-24.pdf · uploaded 26 Jan 2024Source
  • 2 a Details of encumbrances concerned to FinanceMIDTOWN EVE REVISED ENCUMBRANCE CERTIFICATE - FINANCE.pdf · uploaded 27 Jan 2024Source
  • 3 a Details of encumbrances concerned to FinanceMIDTOWN EVE REVISED ENCUMBRANCE CERTIFICATE - LEGAL.pdf · uploaded 27 Jan 2024Source
  • 2 b Details of encumbrances concerned to LegalMIDTOWN EVE REVISED ENCUMBRANCE CERTIFICATE - FINANCE.pdf · uploaded 27 Jan 2024Source
  • 3 b Details of encumbrances concerned to LegalMIDTOWN EVE REVISED ENCUMBRANCE CERTIFICATE - LEGAL.pdf · uploaded 27 Jan 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)MOON STAR DEV LLP FORM 2 Q3 FY 23-24.pdf · uploaded 29 Jan 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)MIDTOWN EVE FORM 1 Q4 FY 23-24.pdf · uploaded 24 Apr 2024Source
  • 7 Disclosure of sold/ booked inventoryMIDTOWN EVE SOLD UNSOLD INVENTORY - Q4 - FY 2023-24.pdf · uploaded 24 Apr 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)MIDTOWN EVE FORM 3 Q4 FY 23-24.pdf · uploaded 2 May 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)MIDTOWN EVE FORM 2.pdf · uploaded 3 May 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)MIDTOWN EVE FORM 1 Q1 FY 24-25.pdf · uploaded 19 Jul 2024Source
  • 8 Disclosure of sold/ booked inventoryMOONSTAR DEV LLP SOLD UNSOLD INVENTORY.pdf · uploaded 27 Jul 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)MIDTOWN EVE FORM 3 Q1 FY 2024-25.pdf · uploaded 27 Jul 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)MIDTOWN EVE FORM 2 Q1 FY 24-25.pdf · uploaded 30 Jul 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)MIDTOWN EVE FORM 1 Q2 FY 24-25.pdf · uploaded 10 Dec 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)MIDTOWN EVE FORM 3 Q2 FY 24-25 Compressed.pdf · uploaded 10 Dec 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)MIDTOWN EVE FORM 2 Q2 FY 24-25.pdf · uploaded 10 Dec 2024Source
  • 2 Disclosure of sold/ booked inventoryMIDTOWN EVE SOLD UNSOLD INVENTORY Q2 FY 24-25.pdf · uploaded 10 Dec 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)MIDTOWN EVE FORM 1 Q3 FY 24-25.pdf · uploaded 20 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)MIDTOWN EVE FORM 3 Q3 FY 24-25.pdf · uploaded 29 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryMOONSTAR DEV LLP SOLD UNSOLD INVENTORY.pdf · uploaded 29 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)MIDTOWN EVE FORM 2 Q3 FY 24-25.pdf · uploaded 30 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)moonstar llp eve signed.pdf · uploaded 26 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryMOONSTAR DEV LLP EVE SOLD UNSOLD INVENTORY signed.pdf · uploaded 28 Apr 2025Source
  • 1 Disclosure of sold/ booked inventorySOLD AND UNSOLD INVENTORY MIDTOWN EVE Q4 24-25.pdf · uploaded 6 May 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)midtown eve form 3 q4 fy 24-25 f.pdf · uploaded 16 May 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)MIDTOWN EVE FORM 2 Q4 FY 24-25.pdf · uploaded 16 May 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)MIDTOWN EVE FORM 1 Q1 FY 25-26.pdf · uploaded 25 Jul 2025Source
  • 1 Disclosure of sold/ booked inventoryMIDTOWN EVE SOLD UNSOLD INVENTORY Q1 FY 2025-26 SIGNED.pdf · uploaded 25 Jul 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)MIDTOWN EVE FORM 3 Q1 FY 25-26.pdf · uploaded 29 Jul 2025Source
  • Form 1MIDTOWN EVE FORM 1 Q1 FY 25-26.pdf · uploaded 1 Aug 2025Source
  • Form 2MIDTOWN EVE FORM 2 Q1 FY 25-26.pdf · uploaded 1 Aug 2025Source
  • Form 3MIDTOWN EVE FORM 3 Q1 FY 25-26.pdf · uploaded 1 Aug 2025Source
  • Disclosure of Sold and Booked InventoryMIDTOWN EVE SOLD UNSOLD INVENTORY Q1 FY 2025-26 SIGNED.pdf · uploaded 1 Aug 2025Source
  • Form 5 (FY 2024-2025)MIDTOWN EVE FORM 5 FY 2024-25.pdf · uploaded 17 Oct 2025Source
  • Form 5 (FY 2022-2023)MOON STAR DEV LLP FORM 5 FY 22-23.pdf · uploaded 18 Oct 2025Source
  • Form 5 (FY 2023-2024)MIDTOWN EVE FORM 5 FY 2023-24 (2).pdf · uploaded 18 Oct 2025Source
  • Form 2A (FY 2022-2023)FORM 2A EVE 22-23.pdf · uploaded 17 Jan 2026Source
  • Form 2A (FY 2023-2024)FORM 2A EVE 23-24.pdf · uploaded 17 Jan 2026Source
  • Form 2A (FY 2024-2025)FORM 2A SIGNED.pdf · uploaded 17 Jan 2026Source
  • Form 1FORM 1 - Q4 - FY 2022-23_compressed.pdf · uploaded 20 Feb 2026Source
  • Form 2FORM 2 - Q4 FY 2022-23_compressed.pdf · uploaded 20 Feb 2026Source
  • Form 3FORM 3 - Q4 - FY 2022-23_compressed.pdf · uploaded 20 Feb 2026Source
  • Disclosure of Sold and Booked InventoryMOONSTAR DEV LLP SOLD UNSOLD INVENTORY.pdf · uploaded 20 Feb 2026Source
  • Form 1MOON STAR DEV LLP FORM 1 Q1 FY 2023-24.pdf · uploaded 20 Feb 2026Source
  • Form 2MOON STAR DEV LLP FORM 2 Q1 FY 23-24_compressed.pdf · uploaded 20 Feb 2026Source
  • Form 3MOON STAR DEV LLP FORM 3 Q1 FY 2023-24_compressed.pdf · uploaded 20 Feb 2026Source
  • Disclosure of Sold and Booked InventoryMOONSTAR DEV LLP SOLD UNSOLD INVENTORY.pdf · uploaded 20 Feb 2026Source
  • Form 1MOON STAR DEV LLP FORM 1 Q2 FY 23-24_compressed.pdf · uploaded 20 Feb 2026Source
  • Form 3MOON STAR DEV LLP FORM 3 Q2 FY 23-24_compressed.pdf · uploaded 20 Feb 2026Source
  • Disclosure of Sold and Booked InventoryMOONSTAR DEV LLP SOLD UNSOLD INVENTORY Q2 FY 23-24.pdf · uploaded 20 Feb 2026Source
  • Form 2MOON STAR DEV LLP FORM 2 Q2 FY 23-24.pdf · uploaded 20 Feb 2026Source
  • Form 1MOON STAR DEV LLP FORM 1 Q3 FY 23-24.pdf · uploaded 20 Feb 2026Source
  • Form 2MOON STAR DEV LLP FORM 2 Q3 FY 23-24.pdf · uploaded 20 Feb 2026Source
  • Form 3MOON STAR DEV LLP FORM 3 Q3 FY 23-24.pdf · uploaded 20 Feb 2026Source
  • Disclosure of Sold and Booked InventoryMOONSTAR DEV LLP SOLD UNSOLD INVENTORY AS ON 31 Dec 23.pdf · uploaded 20 Feb 2026Source
  • Form 1MIDTOWN EVE FORM 1 Q4 FY 23-24.pdf · uploaded 20 Feb 2026Source
  • Form 2MIDTOWN EVE FORM 2 Q4 FY 23-24.pdf · uploaded 20 Feb 2026Source
  • Form 3MIDTOWN EVE FORM 3 Q4 FY 23-24.pdf · uploaded 20 Feb 2026Source
  • Disclosure of Sold and Booked InventoryMIDTOWN EVE SOLD UNSOLD INVENTORY - Q4 - FY 2023-24.pdf · uploaded 20 Feb 2026Source
  • Form 1MIDTOWN EVE FORM 1 Q1 FY 24-25.pdf · uploaded 20 Feb 2026Source
  • Form 2MIDTOWN EVE FORM 2 Q1 FY 24-25.pdf · uploaded 20 Feb 2026Source
  • Form 3MIDTOWN EVE FORM 3 Q1 FY 2024-25.pdf · uploaded 20 Feb 2026Source
  • Disclosure of Sold and Booked InventoryMOONSTAR DEV LLP SOLD UNSOLD INVENTORY.pdf · uploaded 20 Feb 2026Source
  • Form 2MIDTOWN EVE FORM 2 Q2 FY 24-25.pdf · uploaded 20 Feb 2026Source
  • Form 3MIDTOWN EVE FORM 3 Q2 FY 24-25 Compressed.pdf · uploaded 20 Feb 2026Source
  • Disclosure of Sold and Booked InventoryMIDTOWN EVE SOLD UNSOLD INVENTORY Q2 FY 24-25.pdf · uploaded 20 Feb 2026Source
  • Form 1MIDTOWN EVE FORM 1 Q2 FY 24-25.pdf · uploaded 20 Feb 2026Source
  • Form 1MIDTOWN EVE FORM 1 Q3 FY 24-25.pdf · uploaded 20 Feb 2026Source
  • Form 2MIDTOWN EVE FORM 2 Q3 FY 24-25.pdf · uploaded 20 Feb 2026Source
  • Form 3MIDTOWN EVE FORM 3 Q3 FY 24-25.pdf · uploaded 20 Feb 2026Source
  • Disclosure of Sold and Booked InventoryMOONSTAR DEV LLP SOLD UNSOLD INVENTORY.pdf · uploaded 20 Feb 2026Source
  • Form 1MIDTOWN EVE FORM 1 Q4 FY 24-25.pdf · uploaded 20 Feb 2026Source
  • Form 2MIDTOWN EVE FORM 2 Q4 FY 24-25.pdf · uploaded 20 Feb 2026Source
  • Form 3MIDTOWN EVE FORM 3 Q4 FY 24-25.pdf · uploaded 20 Feb 2026Source
  • Disclosure of Sold and Booked InventorySOLD AND UNSOLD INVENTORY MIDTOWN EVE Q4 24-25 2.pdf · uploaded 20 Feb 2026Source
  • Form 1MIDTOWN EVE FORM 1 Q2 FY 2025-26 SIGNED.pdf · uploaded 20 Feb 2026Source
  • Form 2MIDTOWN EVE FORM 2 Q2 FY 2025-26 SIGNED.pdf · uploaded 20 Feb 2026Source
  • Form 3MIDTOWN EVE FORM 3 Q2 FY 2025-26 SIGNED.pdf · uploaded 20 Feb 2026Source
  • Disclosure of Sold and Booked InventoryMIDTOWN EVE SOLD UNSOLD INVENTORY Q2 FY 2025-26 SIGNED.pdf · uploaded 20 Feb 2026Source
  • Withdrawal Update Form 1MIDTOWN EVE FORM 1 Q3 FY 2025-26 SIGNED.pdf · uploaded 23 Feb 2026Source
  • Withdrawal Update Form 2MIDTOWN EVE FORM 2 Q3 FY 2025-26 SIGNED.pdf · uploaded 23 Feb 2026Source
  • Withdrawal Update Form 3MIDTOWN EVE FORM 3 Q3 FY 2025-26 SIGNED.pdf · uploaded 23 Feb 2026Source
  • Withdrawal Update Form 1MIDTOWN EVE FORM 1 Q2 FY 2025-26 SIGNED.pdf · uploaded 26 Feb 2026Source
  • Withdrawal Update Form 1MIDTOWN EVE FORM 1 Q1 FY 25-26.pdf · uploaded 26 Feb 2026Source
  • Withdrawal Update Form 2MIDTOWN EVE FORM 2 Q2 FY 2025-26 SIGNED.pdf · uploaded 26 Feb 2026Source
  • Withdrawal Update Form 2MIDTOWN EVE FORM 2 Q1 FY 25-26.pdf · uploaded 26 Feb 2026Source
  • Withdrawal Update Form 3MIDTOWN EVE FORM 3 Q2 FY 2025-26 SIGNED.pdf · uploaded 26 Feb 2026Source
  • Withdrawal Update Form 3MIDTOWN EVE FORM 3 Q1 FY 25-26 PHYSICALLY SIGNED.pdf · uploaded 26 Feb 2026Source
  • Form 2A (FY 2025-2026)FORM 2A SIGNED MOONSTAR DEVELOPERS LLP -MIDTOWN EVE 2025-26.pdf · uploaded 2 May 2026Source
  • Withdrawal Update Form 1MIDTOWN EVE FORM 1 Q4 FY 2025-26 SIGNED.pdf · uploaded 4 May 2026Source
  • Withdrawal Update Form 2MIDTOWN EVE FORM 2 Q4 FY 2025-26 SIGNED.pdf · uploaded 4 May 2026Source
  • Withdrawal Update Form 3Moonstar Developers LLP EVE Form 3 Q4 25-26.pdf · uploaded 4 May 2026Source
  • Withdrawal Update Form 1MIDTOWN EVE FORM 1 Q1 FY 2026-27.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 2MIDTOWN EVE FORM 2 Q1 FY 2026-27.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 3MIDTOWN EVE FORM 3 Q1 FY 2026-27.pdf · uploaded 18 Jul 2026Source
  • Form 5 (FY 2025-2026)Midtown Eve (Form 5) FY 2025-26.pdf · uploaded 28 Sep 2026Source

Technical

  • DocumentMIDTOWN EVE APPROVED PLAN.pdf · uploaded 26 Nov 2022Source
  • DocumentMIDTOWN EVE APPROVED PLAN.pdf · uploaded 1 Dec 2022Source
  • Documentscan4542-compressed.pdf · uploaded 23 May 2023Source
  • Documentscan4543-compressed.pdf · uploaded 23 May 2023Source
  • Documentscan4541-compressed.pdf · uploaded 23 May 2023Source
  • DocumentLayout Approval Plan.pdf · uploaded 26 May 2026Source
  • DocumentRevised Sancationed Plan-Sheet No 1.pdf · uploaded 26 May 2026Source
  • DocumentRevised Sancationed Plan-Sheet No 2.pdf · uploaded 26 May 2026Source
  • DocumentRevised Sancationed Plan-Sheet No 3.pdf · uploaded 26 May 2026Source

Technical (Architect)

  • DocumentMIDTOWN EVE FORM 1 Q2 FY 24-25.pdf · uploaded 10 Dec 2024Source
  • DocumentMIDTOWN EVE FORM 1 Q3 FY 24-25.pdf · uploaded 20 Jan 2025Source
  • Documentmoonstar llp eve signed.pdf · uploaded 26 Apr 2025Source
  • DocumentMIDTOWN EVE FORM 1 Q1 FY 25-26.pdf · uploaded 25 Jul 2025Source
  • DocumentMIDTOWN EVE FORM 1 Q1 FY 2026-27.pdf · uploaded 20 Jul 2026Source

Technical (Engineer)

  • DocumentMIDTOWN EVE FORM 2 Q2 FY 24-25.pdf · uploaded 10 Dec 2024Source
  • DocumentMIDTOWN EVE FORM 2 Q3 FY 24-25.pdf · uploaded 30 Jan 2025Source
  • DocumentMIDTOWN EVE FORM 2 Q4 FY 24-25.pdf · uploaded 16 May 2025Source
  • DocumentMIDTOWN EVE FORM 2 Q1 FY 2026-27.pdf · uploaded 18 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 40/1

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 2BHK, Office space, Shop98 units in all
Village
Adharwadi
Land area for this project
1,545 sq m (16,630 sq ft)
Permissible built-up area
7,507 sq m (80,803 sq ft)
Sanctioned built-up area
7,498 sq m (80,705 sq ft)
Recreational open space
0 sq m (0 sq ft)
Designated bank account
190
Developed in phases
No

Survey, CTS, gat or plot numbers

40/1

Land as published on MahaRERA's project page

40/1

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking98 units

49 of 98 units booked (50%), as the promoter reported to MahaRERA

1BHK · 42 units2BHK · 42 unitsOffice space · 8 unitsShop · 6 units
TypeCarpet areaUnitsBooked
1BHK39.64 sq m · 427 sq ft4221
2BHK56.99 sq m · 613 sq ft4214
Office space13.41 sq m · 144 sq ft11
Office space16.18 sq m · 174 sq ft11
Office space44.02 sq m · 474 sq ft11
Office space50.27 sq m · 541 sq ft11
Office space51.06 sq m · 550 sq ft11
Office space51.56 sq m · 555 sq ft11
Show all 16 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
Office space64.31 sq m · 692 sq ft11
Office space78.51 sq m · 845 sq ft11
Shop28.38 sq m · 305 sq ft11
Shop42.1 sq m · 453 sq ft11
Shop42.96 sq m · 462 sq ft11
Shop50.04 sq m · 539 sq ft11
Shop55.57 sq m · 598 sq ft11
Shop73.97 sq m · 796 sq ft11

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals1

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
EngineerReji George—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Adharwadi

All 25 projects in Adharwadi · Compare Midtown Eve with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology