Completion was pushed back 4 months, to Jul 2028; no MahaRERA orders on record; 65% of its units are booked.

Pashane, Raigarh 410101 · by DeepJyoti Infra

DeliveryExtended 4 moPromised Mar 2028 · now due Jul 2028RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales65% booked301 of 462 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Jul 2028

  • This projectRegistered 14 Aug 2017, completion promised 31 Mar 2028, revised to 31 Jul 2028.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

11 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52000006352
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5200000635214 Aug 201731 Mar 202831 Jul 2028DeepJyoti InfraProject page
Documents334

2 documents held by Deedo, 332 filings listed on MahaRERA's project page

Extension certificate

Registration certificate

Finance

  • PAN CardFIRM PAN.pdf · uploaded 28 Jul 2017Source
  • Other – FinanceNon Encumbrance.pdf · uploaded 23 Sep 2022Source

Legal

  • Legal Title reportTital Certificate1.pdf · uploaded 28 Jul 2017Source
  • Legal Title reportTital Certificate2.pdf · uploaded 28 Jul 2017Source
  • Declaration Form BForm B Deep Jyoti Infra.pdf · uploaded 29 Jul 2017Source
  • Declaration Form BAffidivate cum Declaration.pdf · uploaded 28 Feb 2025Source
Show all 334 documentsShow fewer documents

Migrated

  • 1 PAN CardFIRM PAN.pdf · uploaded 28 Jul 2017Source
  • 1 Copy of the legal title reportTital Certificate1.pdf · uploaded 28 Jul 2017Source
  • 2 Copy of the legal title reportTital Certificate2.pdf · uploaded 28 Jul 2017Source
  • 1 Copy of Layout Approval (in case of layout)Layout DEEPJYOTI.pdf · uploaded 28 Jul 2017Source
  • 1 Building Plan Approval (IOD)Layout DEEPJYOTI.pdf · uploaded 28 Jul 2017Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencment cert deepjyoti.pdf · uploaded 28 Jul 2017Source
  • 1 Details of encumbrancesEncumbrance Certificate072.pdf · uploaded 29 Jul 2017Source
  • 1 Declaration in FORM BForm B Deep Jyoti Infra.pdf · uploaded 29 Jul 2017Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate.pdf · uploaded 29 Jul 2017Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate.pdf · uploaded 29 Jul 2017Source
  • 1 Certificates of CA (Form 3)CA Certificate.pdf · uploaded 29 Jul 2017Source
  • 1 Proforma of Allotment letterAllotment Letter.pdf · uploaded 29 Jul 2017Source
  • 2 Proforma of Allotment letterSALE AGREEMENT DRAFT.pdf · uploaded 29 Jul 2017Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)1.pdf · uploaded 15 May 2018Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2.pdf · uploaded 15 May 2018Source
  • 2 Certificates of CA (Form 3)3.pdf · uploaded 15 May 2018Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Deepjyoti Infra Architect cert.pdf · uploaded 21 May 2018Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Deep Jyoti Infra Engineers Certificate.pdf · uploaded 21 May 2018Source
  • 3 Certificates of CA (Form 3)Deepjyoti Infra Form-3.pdf · uploaded 21 May 2018Source
  • 1 Certificates of CA (Form 5)Form 5.pdf · uploaded 16 Jan 2019Source
  • 4 Certificates of CA (Form 3)Form 3 - Sep18.pdf · uploaded 24 Jun 2019Source
  • 5 Certificates of CA (Form 3)Form 3 - DEC 18.pdf · uploaded 24 Jun 2019Source
  • 6 Certificates of CA (Form 3)Form 3 - Mar 19.pdf · uploaded 24 Jun 2019Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5- March 2019 Deepjyoti.pdf · uploaded 12 May 2021Source
  • 7 Certificates of CA (Form 3)RERA FORM-June 19 final.pdf · uploaded 20 May 2021Source
  • 8 Certificates of CA (Form 3)RERA FORM-sep 19 final.pdf · uploaded 20 May 2021Source
  • 9 Certificates of CA (Form 3)RERA FORM-dec 19 final.pdf · uploaded 20 May 2021Source
  • 10 Certificates of CA (Form 3)RERA FORM-march 20 final.pdf · uploaded 20 May 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5- Deepjyoti March 2020.pdf · uploaded 20 May 2021Source
  • 11 Certificates of CA (Form 3)Deepjyoti -JUNE20.pdf · uploaded 15 Aug 2021Source
  • 12 Certificates of CA (Form 3)Deepjyoti -SEPT20.pdf · uploaded 15 Aug 2021Source
  • 13 Certificates of CA (Form 3)Deepjyoti - DEC20.pdf · uploaded 15 Aug 2021Source
  • 14 Certificates of CA (Form 3)Deepjyoti -MARCH21.pdf · uploaded 15 Aug 2021Source
  • 15 Certificates of CA (Form 3)Deepjyoti- JUNE21.pdf · uploaded 15 Aug 2021Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1.pdf · uploaded 18 Aug 2021Source
  • 1 Declaration about Commencement CertificateForm D.pdf · uploaded 22 Dec 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)31-3-2021-FORM 2A (1).pdf · uploaded 22 Dec 2021Source
  • 1 Disclosure of sold/ booked inventoryDeepjyoti Sold Unsold Inventory (1).pdf · uploaded 22 Dec 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 March 2021.pdf · uploaded 22 Dec 2021Source
  • 2 Certificates of CA (Form 5)Form 5- March 2018.pdf · uploaded 5 Jan 2022Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5- March 2019 Deepjyoti.pdf · uploaded 5 Jan 2022Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5- Deepjyoti March 2020.pdf · uploaded 5 Jan 2022Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 March 2021.pdf · uploaded 5 Jan 2022Source
  • 1 CERSAI detailsCresai Report.pdf · uploaded 19 Mar 2022Source
  • 2 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY20220324_17123753.pdf · uploaded 24 Mar 2022Source
  • 3 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 F Y 2018-19.pdf · uploaded 24 Mar 2022Source
  • 3 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 F Y 2019-20.pdf · uploaded 24 Mar 2022Source
  • 3 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 F Y 2020-21.pdf · uploaded 24 Mar 2022Source
  • 3 Disclosure of sold/ booked inventorySold - Booked invetory 20220325_17045185.pdf · uploaded 25 Mar 2022Source
  • 2 Details of encumbrancesNon Encumbrance.pdf · uploaded 23 Sep 2022Source
  • 1 Other – FinanceNon Encumbrance.pdf · uploaded 23 Sep 2022Source
  • 16 Certificates of CA (Form 3)RERA Form -Sep 21_compressed.pdf · uploaded 2 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)form 5 march 2022.pdf · uploaded 31 Mar 2023Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 June 21.pdf · uploaded 5 Apr 2023Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Dec 21.pdf · uploaded 5 Apr 2023Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Mar 22.pdf · uploaded 5 Apr 2023Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 June 22.pdf · uploaded 5 Apr 2023Source
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Sep 22.pdf · uploaded 5 Apr 2023Source
  • 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Dec 22.pdf · uploaded 5 Apr 2023Source
  • 17 Certificates of CA (Form 3)Form 3 Dec 21_compressed.pdf · uploaded 5 Apr 2023Source
  • 18 Certificates of CA (Form 3)Form 3 Mar 22_compressed.pdf · uploaded 5 Apr 2023Source
  • 19 Certificates of CA (Form 3)Form 3 June 22_compressed.pdf · uploaded 5 Apr 2023Source
  • 20 Certificates of CA (Form 3)Form 3 Sep 22_compressed.pdf · uploaded 5 Apr 2023Source
  • 21 Certificates of CA (Form 3)Form 3 Dec 22_compressed.pdf · uploaded 5 Apr 2023Source
  • 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Dec 2021_compressed.pdf · uploaded 12 Apr 2023Source
  • 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Mar 2022_compressed.pdf · uploaded 12 Apr 2023Source
  • 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 June 2022_compressed.pdf · uploaded 12 Apr 2023Source
  • 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Sep 2022_compressed.pdf · uploaded 12 Apr 2023Source
  • 15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Dec 2022_compressed.pdf · uploaded 12 Apr 2023Source
  • 1 Other – TechnicalReply to Notice.pdf · uploaded 12 Apr 2023Source
  • 2 Other – TechnicalApplication for OC F to J.pdf · uploaded 12 Apr 2023Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Mar 22_compressed.pdf · uploaded 17 Apr 2023Source
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 June 22_compressed.pdf · uploaded 17 Apr 2023Source
  • 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Sep 22_compressed.pdf · uploaded 17 Apr 2023Source
  • 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Dec 22_compressed.pdf · uploaded 17 Apr 2023Source
  • 2 Copy of Layout Approval (in case of layout)HPSCANNER2413_11zon.pdf · uploaded 27 May 2023Source
  • 3 Copy of Layout Approval (in case of layout)HPSCANNER2414_11zon.pdf · uploaded 27 May 2023Source
  • 2 Building Plan Approval (IOD)HPSCANNER2412_11zon.pdf · uploaded 27 May 2023Source
  • 2 Commencement Certificates / NA Order for plotted developmentCpmmencement 2022.pdf · uploaded 27 May 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameNew Seperate Bank account declaration Format A.pdf · uploaded 27 May 2023Source
  • 3 Building Plan Approval (IOD)New approv plan deepjyoti 2022-8-26-18-22-20.pdf · uploaded 29 May 2023Source
  • 22 Certificates of CA (Form 3)Form 3 Mar 23_compressed.pdf · uploaded 27 Jun 2023Source
  • 16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 March 23_compressed.pdf · uploaded 30 Jun 2023Source
  • 17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Mar 23.pdf · uploaded 30 Jun 2023Source
  • 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Mar 2023_compressed.pdf · uploaded 30 Jun 2023Source
  • 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 1 Mar 23.pdf · uploaded 30 Jun 2023Source
  • 4 Disclosure of sold/ booked inventorySold or booked inventory_compressed.pdf · uploaded 30 Jun 2023Source
  • 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A separate bank account (new).pdf · uploaded 30 Jun 2023Source
  • 3 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameAnnex A Declaration cum undertaking.pdf · uploaded 30 Jun 2023Source
  • 18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form -1 30-06-2023_.pdf · uploaded 28 Sep 2023Source
  • 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)form-2 30-06-2023_.pdf · uploaded 28 Sep 2023Source
  • 23 Certificates of CA (Form 3)Form 3 Signed_compressed (1).pdf · uploaded 28 Sep 2023Source
  • 19 Certificates of Architect (Form 1)(Mandatory for only ongoing project)30-09-2023_.pdf · uploaded 2 Oct 2023Source
  • 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)30-09-23_.pdf · uploaded 2 Oct 2023Source
  • 24 Certificates of CA (Form 3)form -3 sep23_.pdf · uploaded 7 Oct 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A.pdf · uploaded 12 Oct 2023Source
  • 4 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameNew Doc 10-12-2023.pdf · uploaded 12 Oct 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5-2023.pdf · uploaded 13 Oct 2023Source
  • 20 Certificates of Architect (Form 1)(Mandatory for only ongoing project)form-1 dec 23 (1).pdf · uploaded 15 Jan 2024Source
  • 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 dec-23 (1).pdf · uploaded 15 Jan 2024Source
  • 25 Certificates of CA (Form 3)form 3 december 2023_1.pdf · uploaded 16 Jan 2024Source
  • 21 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form-1 Mar-24_.pdf · uploaded 13 Apr 2024Source
  • 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form-2 mar-24_.pdf · uploaded 13 Apr 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Forn-2A 23-24.pdf · uploaded 13 Apr 2024Source
  • 26 Certificates of CA (Form 3)form 3.pdf · uploaded 24 Apr 2024Source
  • 27 Certificates of CA (Form 3)New Certificates of CA (Form 3).pdf · uploaded 25 Apr 2024Source
  • 28 Certificates of CA (Form 3)April form 3_compressed.pdf · uploaded 21 May 2024Source
  • 5 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeperate bank declaration.pdf · uploaded 21 May 2024Source
  • 6 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameAnnex A Declaration.pdf · uploaded 21 May 2024Source
  • 3 Other – TechnicalAnnex A Declaration.pdf · uploaded 21 May 2024Source
  • 3 a Details of encumbrances concerned to FinanceConcern Letter.pdf · uploaded 16 Jul 2024Source
  • 1 b Details of encumbrances concerned to LegalConcern Letter.pdf · uploaded 16 Jul 2024Source
  • 22 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate Form-1 March-24.pdf · uploaded 16 Jul 2024Source
  • 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form-2 march-2024.pdf · uploaded 16 Jul 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A MARCH 2024.pdf · uploaded 16 Jul 2024Source
  • 1 Disclosure for secured/unsecured finance availed for the projectDCB Sanction Letter.pdf · uploaded 16 Jul 2024Source
  • 5 Disclosure of sold/ booked inventorySOLD UNSOLD TILL MARCH 24.pdf · uploaded 16 Jul 2024Source
  • 29 Certificates of CA (Form 3)31-03-2024 Form 3.pdf · uploaded 16 Jul 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 31-3-24.pdf · uploaded 16 Jul 2024Source
  • 1 Proforma of Agreement for saleDraft Agreement For Sale.pdf · uploaded 16 Jul 2024Source
  • 7 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameANNEXURE A 16-07-2024.pdf · uploaded 16 Jul 2024Source
  • 23 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 JUNE 2024.pdf · uploaded 17 Jul 2024Source
  • 15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 JUNE 2024.pdf · uploaded 17 Jul 2024Source
  • 30 Certificates of CA (Form 3)30-06-2024 Form 3.pdf · uploaded 17 Jul 2024Source
  • 6 Disclosure of sold/ booked inventorySOLD AND UNSOLD TILL JUNE 2024_compressed.pdf · uploaded 15 Aug 2024Source
  • Form 5 (FY 2017-2018)17-18 Rera.pdf · uploaded 21 Sep 2024Source
  • Form 5 (FY 2018-2019)18-19 Rera.pdf · uploaded 21 Sep 2024Source
  • Form 5 (FY 2019-2020)19-20 Rera.pdf · uploaded 21 Sep 2024Source
  • Form 5 (FY 2020-2021)20-21 Rera.pdf · uploaded 21 Sep 2024Source
  • Form 5 (FY 2021-2022)21-22 Rera.pdf · uploaded 21 Sep 2024Source
  • Form 5 (FY 2022-2023)22-23 Rera.pdf · uploaded 21 Sep 2024Source
  • Form 5 (FY 2023-2024)Form 5 rera.pdf · uploaded 21 Sep 2024Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Till September 2024.pdf · uploaded 7 Oct 2024Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Till Sep 24.pdf · uploaded 7 Oct 2024Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Sep 24.pdf · uploaded 11 Oct 2024Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)30-09-2024 Q2.pdf · uploaded 11 Oct 2024Source
  • 2 Certificates of CA (Form 3)Form 3 Till Sep 24_compressed.pdf · uploaded 19 Oct 2024Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Dec 24.pdf · uploaded 22 Jan 2025Source
  • 1 Certificates of CA (Form 3)DEC 2024.pdf · uploaded 22 Jan 2025Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)31-12-2024 Q3.pdf · uploaded 22 Jan 2025Source
  • 1 Declaration in FORM BAffidivate cum Declaration.pdf · uploaded 28 Feb 2025Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Compress.pdf · uploaded 8 Apr 2025Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Compress.pdf · uploaded 8 Apr 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A compress.pdf · uploaded 8 Apr 2025Source
  • 1 Certificates of CA (Form 3)Form 3 compress.pdf · uploaded 15 Apr 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5.pdf · uploaded 15 Apr 2025Source
  • 1 Certificates of CA (Form 3)Form 3 Q4.pdf · uploaded 18 Apr 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5.pdf · uploaded 24 Apr 2025Source
  • 1 Certificates of CA (Form 3)Form 3 16-05-2025.pdf · uploaded 17 May 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)Form 5 24-25.pdf · uploaded 17 May 2025Source
  • Form 1Apr -June.pdf · uploaded 24 Jul 2025Source
  • Form 2Apr to June.pdf · uploaded 24 Jul 2025Source
  • Form 3Form 3 Compress.pdf · uploaded 24 Jul 2025Source
  • Disclosure of Sold and Booked InventorySold unsold Inventory compress.pdf · uploaded 24 Jul 2025Source
  • Self-declaration of Quarterly ProgressSelf Declaration.pdf · uploaded 24 Jul 2025Source
  • Withdrawal Update Form 1Form 1 Final.pdf · uploaded 6 Aug 2025Source
  • Withdrawal Update Form 2Form 2 Final.pdf · uploaded 6 Aug 2025Source
  • Withdrawal Update Form 3Form 3 Final.pdf · uploaded 6 Aug 2025Source
  • Withdrawal Update Form 1Form 1 with RERA Format.pdf · uploaded 14 Oct 2025Source
  • Withdrawal Update Form 2Form 2 From RERA Site.pdf · uploaded 14 Oct 2025Source
  • Withdrawal Update Form 3From-3.pdf · uploaded 14 Oct 2025Source
  • Withdrawal Update Form 1RERA Format Form 1 Oct to Dec 25.pdf · uploaded 8 Feb 2026Source
  • Withdrawal Update Form 2RERA Format Form 2 Oct to Dec 25.pdf · uploaded 8 Feb 2026Source
  • Withdrawal Update Form 3RERA Format Form 3 Oct to Dec 25 Compress.pdf · uploaded 8 Feb 2026Source
  • Form 1Q4.pdf · uploaded 26 Feb 2026Source
  • Form 231-03-2025 Q4.pdf · uploaded 26 Feb 2026Source
  • Form 331-03-2025.pdf · uploaded 26 Feb 2026Source
  • Disclosure of Sold and Booked InventoryTill June 2025.pdf · uploaded 26 Feb 2026Source
  • Form 1Q3.pdf · uploaded 26 Feb 2026Source
  • Form 231-12-2024 Q3.pdf · uploaded 26 Feb 2026Source
  • Form 331-12-2024.pdf · uploaded 26 Feb 2026Source
  • Disclosure of Sold and Booked InventoryTill June 2024.pdf · uploaded 26 Feb 2026Source
  • Form 1Q1 Compress.pdf · uploaded 26 Feb 2026Source
  • Form 230-06-2024 Q1.pdf · uploaded 26 Feb 2026Source
  • Form 330-06-2024.pdf · uploaded 26 Feb 2026Source
  • Disclosure of Sold and Booked InventoryTill June 2024.pdf · uploaded 26 Feb 2026Source
  • Form 1Q1.pdf · uploaded 26 Feb 2026Source
  • Form 230-06-2023 Q1.pdf · uploaded 26 Feb 2026Source
  • Form 330-06-2023.pdf · uploaded 26 Feb 2026Source
  • Disclosure of Sold and Booked InventoryTill March 2024.pdf · uploaded 26 Feb 2026Source
  • Form 1Q2.pdf · uploaded 26 Feb 2026Source
  • Form 230-09-2023 Q2.pdf · uploaded 26 Feb 2026Source
  • Form 330-09-2023.pdf · uploaded 26 Feb 2026Source
  • Disclosure of Sold and Booked InventoryTill March 2024.pdf · uploaded 26 Feb 2026Source
  • Form 1Q3.pdf · uploaded 26 Feb 2026Source
  • Form 231-12-2023 Q3.pdf · uploaded 26 Feb 2026Source
  • Form 331-12-2023.pdf · uploaded 26 Feb 2026Source
  • Disclosure of Sold and Booked InventoryTill March 2024.pdf · uploaded 26 Feb 2026Source
  • Form 1June 22.pdf · uploaded 26 Feb 2026Source
  • Form 230-06-2022 Q1.pdf · uploaded 26 Feb 2026Source
  • Form 331-06-2022.pdf · uploaded 26 Feb 2026Source
  • Disclosure of Sold and Booked InventoryTill March 2023.pdf · uploaded 26 Feb 2026Source
  • Form 1Sep 22.pdf · uploaded 26 Feb 2026Source
  • Form 230-09-2022 Q2.pdf · uploaded 26 Feb 2026Source
  • Form 331-09-2022.pdf · uploaded 26 Feb 2026Source
  • Disclosure of Sold and Booked InventoryTill March 2023.pdf · uploaded 26 Feb 2026Source
  • Form 1Dec 22.pdf · uploaded 26 Feb 2026Source
  • Form 231-12-2022 Q3.pdf · uploaded 26 Feb 2026Source
  • Form 331-12-2022.pdf · uploaded 26 Feb 2026Source
  • Disclosure of Sold and Booked InventoryTill March 2023.pdf · uploaded 26 Feb 2026Source
  • Form 1Mar 23.pdf · uploaded 26 Feb 2026Source
  • Form 231-03-2023 Q4.pdf · uploaded 26 Feb 2026Source
  • Form 331-03-2023.pdf · uploaded 26 Feb 2026Source
  • Disclosure of Sold and Booked InventoryTill March 2023.pdf · uploaded 26 Feb 2026Source
  • Form 1Q4.pdf · uploaded 26 Feb 2026Source
  • Form 231-03-2024 Q4.pdf · uploaded 26 Feb 2026Source
  • Form 331-03-2024.pdf · uploaded 26 Feb 2026Source
  • Disclosure of Sold and Booked InventoryTill March 2024.pdf · uploaded 26 Feb 2026Source
  • Form 1July 17.pdf · uploaded 6 Mar 2026Source
  • Form 2Form-2 25-7-2017.pdf · uploaded 6 Mar 2026Source
  • Form 3June 17.pdf · uploaded 6 Mar 2026Source
  • Disclosure of Sold and Booked Inventorysold and unsold details.pdf · uploaded 6 Mar 2026Source
  • Form 1Dec 17.pdf · uploaded 6 Mar 2026Source
  • Form 2Dec 17.pdf · uploaded 6 Mar 2026Source
  • Form 3Dec 17.pdf · uploaded 6 Mar 2026Source
  • Disclosure of Sold and Booked Inventorysold and unsold details.pdf · uploaded 6 Mar 2026Source
  • Form 1Mar 18.pdf · uploaded 6 Mar 2026Source
  • Form 2Form-2 Mar.pdf · uploaded 6 Mar 2026Source
  • Form 3Apr-18.pdf · uploaded 6 Mar 2026Source
  • Disclosure of Sold and Booked Inventorysold and unsold details.pdf · uploaded 6 Mar 2026Source
  • Form 1June.pdf · uploaded 6 Mar 2026Source
  • Form 2June.pdf · uploaded 6 Mar 2026Source
  • Form 3June 18.pdf · uploaded 6 Mar 2026Source
  • Disclosure of Sold and Booked Inventorysold and unsold details.pdf · uploaded 6 Mar 2026Source
  • Form 1Sep.pdf · uploaded 6 Mar 2026Source
  • Form 2Form 2 Sep.pdf · uploaded 6 Mar 2026Source
  • Form 3Sep 18.pdf · uploaded 6 Mar 2026Source
  • Disclosure of Sold and Booked Inventorysold and unsold details.pdf · uploaded 6 Mar 2026Source
  • Form 1Dec.pdf · uploaded 6 Mar 2026Source
  • Form 2Form 2 Dec.pdf · uploaded 6 Mar 2026Source
  • Form 3Dec-18.pdf · uploaded 6 Mar 2026Source
  • Disclosure of Sold and Booked Inventorysold and unsold details.pdf · uploaded 6 Mar 2026Source
  • Form 1Mar.pdf · uploaded 6 Mar 2026Source
  • Form 2Form 2 Mar.pdf · uploaded 6 Mar 2026Source
  • Form 3Mar 19.pdf · uploaded 6 Mar 2026Source
  • Disclosure of Sold and Booked Inventorysold and unsold details.pdf · uploaded 6 Mar 2026Source
  • Form 1June.pdf · uploaded 6 Mar 2026Source
  • Form 2Form-2 June.pdf · uploaded 6 Mar 2026Source
  • Form 3June 19.pdf · uploaded 6 Mar 2026Source
  • Disclosure of Sold and Booked Inventorysold and unsold details.pdf · uploaded 6 Mar 2026Source
  • Form 1Sep.pdf · uploaded 6 Mar 2026Source
  • Form 2Form 2 Sep.pdf · uploaded 6 Mar 2026Source
  • Form 3Sep 19.pdf · uploaded 6 Mar 2026Source
  • Disclosure of Sold and Booked Inventorysold and unsold details.pdf · uploaded 6 Mar 2026Source
  • Form 1Dec.pdf · uploaded 6 Mar 2026Source
  • Form 2Form 2 Dec.pdf · uploaded 6 Mar 2026Source
  • Form 3Dec 19.pdf · uploaded 6 Mar 2026Source
  • Disclosure of Sold and Booked Inventorysold and unsold details.pdf · uploaded 6 Mar 2026Source
  • Form 1Mar.pdf · uploaded 6 Mar 2026Source
  • Form 2Form 2 Mar.pdf · uploaded 6 Mar 2026Source
  • Form 3Mar 20.pdf · uploaded 6 Mar 2026Source
  • Disclosure of Sold and Booked Inventorysold and unsold details.pdf · uploaded 6 Mar 2026Source
  • Form 1June 20.pdf · uploaded 6 Mar 2026Source
  • Form 2June 20.pdf · uploaded 6 Mar 2026Source
  • Form 3June 20.pdf · uploaded 6 Mar 2026Source
  • Disclosure of Sold and Booked Inventorysold and unsold details.pdf · uploaded 6 Mar 2026Source
  • Form 1Sep 20.pdf · uploaded 6 Mar 2026Source
  • Form 2Sep 20.pdf · uploaded 6 Mar 2026Source
  • Form 3Sep 20.pdf · uploaded 6 Mar 2026Source
  • Disclosure of Sold and Booked Inventorysold and unsold details.pdf · uploaded 6 Mar 2026Source
  • Form 1Dec 20.pdf · uploaded 6 Mar 2026Source
  • Form 2Dec 20.pdf · uploaded 6 Mar 2026Source
  • Form 3Dec 20.pdf · uploaded 6 Mar 2026Source
  • Disclosure of Sold and Booked Inventorysold and unsold details.pdf · uploaded 6 Mar 2026Source
  • Form 1Mar 21_compressed.pdf · uploaded 6 Mar 2026Source
  • Form 2Mar 21.pdf · uploaded 6 Mar 2026Source
  • Form 3Mar 21.pdf · uploaded 6 Mar 2026Source
  • Disclosure of Sold and Booked Inventorysold and unsold details.pdf · uploaded 6 Mar 2026Source
  • Form 1June 21.pdf · uploaded 6 Mar 2026Source
  • Form 2June 21.pdf · uploaded 6 Mar 2026Source
  • Form 330-06-2021.pdf · uploaded 6 Mar 2026Source
  • Disclosure of Sold and Booked Inventorysold and unsold details.pdf · uploaded 6 Mar 2026Source
  • Form 1Sep 21.pdf · uploaded 6 Mar 2026Source
  • Form 2Sep 21.pdf · uploaded 6 Mar 2026Source
  • Form 331-09-2021.pdf · uploaded 6 Mar 2026Source
  • Disclosure of Sold and Booked Inventorysold and unsold details.pdf · uploaded 6 Mar 2026Source
  • Form 1Dec 21.pdf · uploaded 6 Mar 2026Source
  • Form 2Dec 21.pdf · uploaded 6 Mar 2026Source
  • Form 331-12-2021.pdf · uploaded 6 Mar 2026Source
  • Disclosure of Sold and Booked Inventorysold and unsold details.pdf · uploaded 6 Mar 2026Source
  • Form 1Mar 22.pdf · uploaded 6 Mar 2026Source
  • Form 2Mar 22.pdf · uploaded 6 Mar 2026Source
  • Form 331-03-2022.pdf · uploaded 6 Mar 2026Source
  • Disclosure of Sold and Booked Inventorysold and unsold details.pdf · uploaded 6 Mar 2026Source
  • Form 2A (FY 2017-2018)2A 17-18.pdf · uploaded 6 Mar 2026Source
  • Form 2A (FY 2018-2019)2A 18-19.pdf · uploaded 6 Mar 2026Source
  • Form 2A (FY 2019-2020)2A 19-20.pdf · uploaded 6 Mar 2026Source
  • Form 2A (FY 2020-2021)2A 20-21.pdf · uploaded 6 Mar 2026Source
  • Form 2A (FY 2021-2022)2A 21-22.pdf · uploaded 6 Mar 2026Source
  • Form 2A (FY 2022-2023)2A 22-23.pdf · uploaded 6 Mar 2026Source
  • Form 2A (FY 2023-2024)2A 23-24.pdf · uploaded 6 Mar 2026Source
  • Form 2A (FY 2024-2025)2A 24-25.pdf · uploaded 6 Mar 2026Source
  • Form 5 (FY 2024-2025)24-25.pdf · uploaded 6 Mar 2026Source
  • Form 2A (FY 2025-2026)Form 2A F Y 2025-26.pdf · uploaded 15 Apr 2026Source
  • Withdrawal Update Form 1Form 1 Final Jan to Mar 26.pdf · uploaded 17 Apr 2026Source
  • Withdrawal Update Form 1Form 1 Final Jan to Mar 26.pdf · uploaded 17 Apr 2026Source
  • Withdrawal Update Form 2Form 2 (Jan to Mar 26).pdf · uploaded 17 Apr 2026Source
  • Withdrawal Update Form 2Form 2 (Jan to Mar 26).pdf · uploaded 17 Apr 2026Source
  • Withdrawal Update Form 3Deepjyoti_Form 3 Jan to Mar 26 Compress.pdf · uploaded 17 Apr 2026Source
  • Withdrawal Update Form 3Deepjyoti_Form 3 Jan to Mar 26 Compress.pdf · uploaded 17 Apr 2026Source
  • Form 5 (FY 2025-2026)form 5 march 2026.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 101-04-2026 to 30-06-2026.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 2Apr to June 26.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 3form 3 april to june 2026.pdf · uploaded 18 Jul 2026Source

Technical

  • DocumentLayout DEEPJYOTI.pdf · uploaded 28 Jul 2017Source
  • DocumentLayout DEEPJYOTI.pdf · uploaded 28 Jul 2017Source
  • Other – TechnicalReply to Notice.pdf · uploaded 12 Apr 2023Source
  • Other – TechnicalApplication for OC F to J.pdf · uploaded 12 Apr 2023Source
  • DocumentHPSCANNER2413_11zon.pdf · uploaded 27 May 2023Source
  • DocumentHPSCANNER2414_11zon.pdf · uploaded 27 May 2023Source
  • DocumentHPSCANNER2412_11zon.pdf · uploaded 27 May 2023Source
  • DocumentNew approv plan deepjyoti 2022-8-26-18-22-20.pdf · uploaded 29 May 2023Source
  • Other – TechnicalAnnex A Declaration.pdf · uploaded 21 May 2024Source
  • DocumentB Wing Floor Plan_compressed.pdf · uploaded 5 Aug 2026Source
  • DocumentAll Building Layout.pdf · uploaded 5 Aug 2026Source
  • DocumentNew NA Order-21-02-2022 Compress.pdf · uploaded 5 Aug 2026Source

Technical (Architect)

  • DocumentForm 1 Till September 2024.pdf · uploaded 7 Oct 2024Source
  • DocumentForm 1 Sep 24.pdf · uploaded 11 Oct 2024Source
  • DocumentForm 1 Dec 24.pdf · uploaded 22 Jan 2025Source
  • DocumentForm 1 Compress.pdf · uploaded 8 Apr 2025Source
  • Document01-04-2026 to 30-06-2026.pdf · uploaded 18 Jul 2026Source

Technical (Engineer)

  • DocumentForm 2 Till Sep 24.pdf · uploaded 7 Oct 2024Source
  • Document30-09-2024 Q2.pdf · uploaded 11 Oct 2024Source
  • Document31-12-2024 Q3.pdf · uploaded 22 Jan 2025Source
  • DocumentForm 2 Compress.pdf · uploaded 8 Apr 2025Source
  • DocumentJuly to Sep 26.pdf · uploaded 11 Oct 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel S no 140 Hissa no 0 S no 141 Hissa no 2D S no 141 Hissa no 6

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
1 BHK, 1BHK, 2 BHK, 2BHK, 1RK, 1 RK, Shop462 units in all
Address
S no 140 Hissa no 0 S no 141 Hissa no 2D S no 141 Hissa no 6, Pashane Road, PashanePIN 410101
Village
Pashane, Karjat taluka
Land area for this project
2,653 sq m (28,552 sq ft)
Approved layout area
13,660 sq m (1,47,035 sq ft)
Permissible built-up area
18,121 sq m (1,95,055 sq ft)
Sanctioned built-up area
18,097 sq m (1,94,796 sq ft)
Recreational open space
1,426 sq m (15,349 sq ft)
Designated bank account
51
Developed in phases
Yes

Survey, CTS, gat or plot numbers

S no 140 Hissa no 0 S no 141 Hissa no 2D S no 141 Hissa no 6

Land as published on MahaRERA's project page

S no 140 Hissa no 0 S no 141 Hissa no 2D S no 141 Hissa no 6

Boundaries

North
S no 141 H no 5 S no 151 H no 3
South
S no 141 Hissa no 8 and 9
East
S no 151 Hissa no 17 S no 151 Hissa no 19
West
S no 141 Hissa no 2C

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking462 units

301 of 462 units booked (65%), as the promoter reported to MahaRERA

1 BHK · 196 units1BHK · 107 units2 BHK · 18 units2BHK · 16 units1RK · 45 units1 RK · 68 unitsShop · 12 units
BuildingTypeCarpet areaUnitsBooked
Building 10 Wing O1 BHK26.6 sq m · 286 sq ft44
Building 10 Wing O1 BHK27.87 sq m · 300 sq ft86
Building 10 Wing O1 BHK28.72 sq m · 309 sq ft43
Building 10 Wing O1 BHK31.39 sq m · 338 sq ft42
Building 10 Wing O1 BHK31.4 sq m · 338 sq ft11
Building 10 Wing O1BHK27.11 sq m · 292 sq ft43
Building 10 Wing O1BHK27.93 sq m · 301 sq ft22
Building 10 Wing O2 BHK36.08 sq m · 388 sq ft44
Show all 94 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Building 10 Wing O2 BHK38.66 sq m · 416 sq ft43
Building 10 Wing O2 BHK38.8 sq m · 418 sq ft11
Building 11 Wing P1 BHK26.6 sq m · 286 sq ft44
Building 11 Wing P1 BHK27.11 sq m · 292 sq ft44
Building 11 Wing P1 BHK27.93 sq m · 301 sq ft22
Building 11 Wing P1 BHK28.72 sq m · 309 sq ft43
Building 11 Wing P1 BHK31.39 sq m · 338 sq ft43
Building 11 Wing P1 BHK31.4 sq m · 338 sq ft10
Building 11 Wing P1BHK27.92 sq m · 301 sq ft87
Building 11 Wing P2 BHK36.08 sq m · 388 sq ft43
Building 11 Wing P2 BHK38.8 sq m · 418 sq ft11
Building 11 Wing P2BHK38.66 sq m · 416 sq ft44
Building 2 Wing C1BHK28.22 sq m · 304 sq ft122
Building 2 Wing C1BHK32.35 sq m · 348 sq ft120
Building 2 Wing C1RK20.65 sq m · 222 sq ft60
Building 2 Wing C1RK21.82 sq m · 235 sq ft60
Building 2 Wing C2BHK45.13 sq m · 486 sq ft61
Building 2 Wing C2BHK46.13 sq m · 497 sq ft60
Building 3 Wing D And E1 BHK26.6 sq m · 286 sq ft205
Building 3 Wing D And E1 BHK26.62 sq m · 287 sq ft44
Building 3 Wing D And E1 BHK27.91 sq m · 300 sq ft40
Building 3 Wing D And E1BHK25.33 sq m · 273 sq ft50
Building 3 Wing D And E1BHK27.68 sq m · 298 sq ft10
Building 3 Wing D And E1 RK19.02 sq m · 205 sq ft128
Building 3 Wing D And E1 RK21.26 sq m · 229 sq ft41
Building 3 Wing D And E1RK18.91 sq m · 204 sq ft30
Building 3 Wing D And E1RK21.14 sq m · 228 sq ft10
Building 4 Wing F And G1 BHK26.24 sq m · 282 sq ft10
Building 4 Wing F And G1 BHK26.56 sq m · 286 sq ft22
Building 4 Wing F And G1 BHK26.6 sq m · 286 sq ft153
Building 4 Wing F And G1 BHK26.61 sq m · 286 sq ft60
Building 4 Wing F And G1BHK26.2 sq m · 282 sq ft21
Building 4 Wing F And G1BHK26.21 sq m · 282 sq ft31
Building 4 Wing F And G1BHK26.62 sq m · 287 sq ft52
Building 4 Wing F And G1BHK27.06 sq m · 291 sq ft32
Building 4 Wing F And G1BHK27.17 sq m · 292 sq ft32
Building 4 Wing F And G1BHK27.18 sq m · 293 sq ft11
Building 4 Wing F And G1BHK27.35 sq m · 294 sq ft21
Building 4 Wing F And G1BHK27.68 sq m · 298 sq ft21
Building 4 Wing F And G1BHK27.89 sq m · 300 sq ft32
Building 4 Wing F And G1BHK27.92 sq m · 301 sq ft31
Building 4 Wing F And G1BHK28.45 sq m · 306 sq ft22
Building 4 Wing F And G1RK19.02 sq m · 205 sq ft2019
Building 4 Wing F And G1RK21.26 sq m · 229 sq ft53
Building 5 Wing H1 BHK27.01 sq m · 291 sq ft40
Building 5 Wing H1 BHK27.51 sq m · 296 sq ft43
Building 5 Wing H1BHK26.6 sq m · 286 sq ft84
Building 5 Wing H1BHK26.62 sq m · 287 sq ft22
Building 5 Wing H1 RK19.02 sq m · 205 sq ft1212
Building 5 Wing H1RK19.47 sq m · 210 sq ft43
Building 6 Wing I And J1 BHK26.94 sq m · 290 sq ft86
Building 6 Wing I And J1 BHK27.36 sq m · 295 sq ft55
Building 6 Wing I And J1 BHK31.99 sq m · 344 sq ft11
Building 6 Wing I And J1BHK27.35 sq m · 294 sq ft2415
Building 6 Wing I And J1 RK19.02 sq m · 205 sq ft88
Building 6 Wing I And J2 BHK36.7 sq m · 395 sq ft44
Building 7 Wing K1 BHK26.6 sq m · 286 sq ft86
Building 7 Wing K1 BHK26.62 sq m · 287 sq ft22
Building 7 Wing K1 BHK27.35 sq m · 294 sq ft22
Building 7 Wing K1 BHK27.37 sq m · 295 sq ft11
Building 7 Wing K1 BHK27.39 sq m · 295 sq ft42
Building 7 Wing K1 BHK27.88 sq m · 300 sq ft21
Building 7 Wing K1 BHK27.9 sq m · 300 sq ft44
Building 7 Wing K1 BHK28.8 sq m · 310 sq ft43
Building 7 Wing K1 BHK28.86 sq m · 311 sq ft11
Building 7 Wing K1 RK19.02 sq m · 205 sq ft66
Building 7 Wing K1 RK19.45 sq m · 209 sq ft22
Building 8 Wing L1 BHK26.6 sq m · 286 sq ft86
Building 8 Wing L1 BHK26.62 sq m · 287 sq ft22
Building 8 Wing L1 BHK27.35 sq m · 294 sq ft44
Building 8 Wing L1 BHK27.37 sq m · 295 sq ft22
Building 8 Wing L1 BHK27.39 sq m · 295 sq ft43
Building 8 Wing L1 BHK27.88 sq m · 300 sq ft43
Building 8 Wing L1 BHK27.9 sq m · 300 sq ft44
Building 8 Wing L1 BHK28.8 sq m · 310 sq ft86
Building 8 Wing L1 BHK28.86 sq m · 311 sq ft22
Building 9 Wing M And N1 BHK26.02 sq m · 280 sq ft44
Building 9 Wing M And N1 BHK26.13 sq m · 281 sq ft88
Building 9 Wing M And N1 BHK26.8 sq m · 288 sq ft44
Building 9 Wing M And N1 RK19.02 sq m · 205 sq ft2020
Building 9 Wing M And N1 RK20.96 sq m · 226 sq ft44
Building 9 Wing M And NShop8.42 sq m · 91 sq ft11
Building 9 Wing M And NShop9.67 sq m · 104 sq ft22
Building 9 Wing M And NShop10.33 sq m · 111 sq ft22
Building 9 Wing M And NShop11.54 sq m · 124 sq ft22
Building 9 Wing M And NShop14.62 sq m · 157 sq ft55

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals6

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectRaisingh Ahuja—
ArchitectRaisingh Ahuja & Associates—
Chartered accountantDarshan Pankaj Thakkar—
Chartered accountantPBG & Associates—
EngineerAtul Kudtarkar—
EngineerAtul Kudtarkar & Associates—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Pashane

All 34 projects in Pashane · Compare Deepjyoti City with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology