Residential / Group Housing · 4 buildings · 368 unitsRERA P52100026219

Anp Memento

Deedo IDDP-PUN-RM9C

Completion was pushed back 4 months, to Jan 2027; no MahaRERA orders on record; 90% of its units are booked.

Wakad, Pune 411057 · Property rates in Wakad · by Five Star Construction Company, Five Star Construction Company

DeliveryExtended 4 moPromised Sep 2026 · now due Jan 2027RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales90% booked330 of 368 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Jan 2027

  • This projectRegistered 30 Aug 2020, completion promised 30 Sep 2026, revised to 30 Jan 2027.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

4 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100026219
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210002621930 Aug 202030 Sep 202630 Jan 2027Five Star Construction CompanyProject page
Documents271

1 document held by Deedo, 270 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPAN_FCC.PDF · uploaded 25 Aug 2020Source

Legal

  • Legal Title reportTitle Certifiacte 24 08 2020 Anp Deck 88.pdf · uploaded 25 Aug 2020Source
  • Legal Title reportTitle Opinion 24 08 2020 ANP DECK 88.pdf · uploaded 25 Aug 2020Source
  • Legal Title reportTitle Search 24 08 2020 Anp Deck 88.pdf · uploaded 25 Aug 2020Source
  • Declaration Form BForm B ANP Deck 88 24 Aug 2020.pdf · uploaded 25 Aug 2020Source
  • Declaration Form BForm B.pdf · uploaded 30 Jul 2021Source
  • OtherAPPLICATION FOR CORRECTION UNDER PROJECT.pdf · uploaded 3 Aug 2021Source
Show all 271 documentsShow fewer documents

Migrated

  • 1 PAN CardPAN_FCC.PDF · uploaded 25 Aug 2020Source
  • 1 Copy of the legal title reportTitle Certifiacte 24 08 2020 Anp Deck 88.pdf · uploaded 25 Aug 2020Source
  • 2 Copy of the legal title reportTitle Opinion 24 08 2020 ANP DECK 88.pdf · uploaded 25 Aug 2020Source
  • 3 Copy of the legal title reportTitle Search 24 08 2020 Anp Deck 88.pdf · uploaded 25 Aug 2020Source
  • 1 Details of encumbrancesEncumbrances 24 Aug 2020.pdf · uploaded 25 Aug 2020Source
  • 1 Copy of Layout Approval (in case of layout)IOD Layout ANP DECK 88 RERA Project AREA.pdf · uploaded 25 Aug 2020Source
  • 1 Building Plan Approval / NA Order for plotted developmentIOD Plan No 2 Section ANP DECK 88.pdf · uploaded 25 Aug 2020Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC IOD ANP DECK 88.pdf · uploaded 25 Aug 2020Source
  • 1 Declaration in FORM BForm B ANP Deck 88 24 Aug 2020.pdf · uploaded 25 Aug 2020Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate Form 1 dated 24-Aug-2020.pdf · uploaded 25 Aug 2020Source
  • 1 Proforma of Allotment letterProforma 25 Aug 2020.pdf · uploaded 25 Aug 2020Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Form 2 certificate 26-Aug-2020.pdf · uploaded 26 Aug 2020Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate 26 Aug 2020.pdf · uploaded 26 Aug 2020Source
  • 2 Copy of Layout Approval (in case of layout)1.pdf · uploaded 30 Jul 2021Source
  • 2 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 30 Jul 2021Source
  • 3 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 30 Jul 2021Source
  • 4 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 30 Jul 2021Source
  • 5 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 30 Jul 2021Source
  • 6 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 30 Jul 2021Source
  • 7 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 30 Jul 2021Source
  • 8 Building Plan Approval / NA Order for plotted development8.pdf · uploaded 30 Jul 2021Source
  • 9 Building Plan Approval / NA Order for plotted development9.pdf · uploaded 30 Jul 2021Source
  • 10 Building Plan Approval / NA Order for plotted development10.pdf · uploaded 30 Jul 2021Source
  • 11 Building Plan Approval / NA Order for plotted development11.pdf · uploaded 30 Jul 2021Source
  • 12 Building Plan Approval / NA Order for plotted development12.pdf · uploaded 30 Jul 2021Source
  • 13 Building Plan Approval / NA Order for plotted development13.pdf · uploaded 30 Jul 2021Source
  • 14 Building Plan Approval / NA Order for plotted development14.pdf · uploaded 30 Jul 2021Source
  • 15 Building Plan Approval / NA Order for plotted development15.pdf · uploaded 30 Jul 2021Source
  • 16 Building Plan Approval / NA Order for plotted development16.pdf · uploaded 30 Jul 2021Source
  • 2 Commencement Certificates / NA Order for plotted development0.pdf · uploaded 30 Jul 2021Source
  • 1 Declaration about Commencement Certificate0.pdf · uploaded 30 Jul 2021Source
  • 2 Declaration in FORM BForm B.pdf · uploaded 30 Jul 2021Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 ANP MEMENTO CA.pdf · uploaded 30 Jul 2021Source
  • 2 Proforma of Allotment letterAllotment letter ANP MEMENTO.pdf · uploaded 30 Jul 2021Source
  • 3 Proforma of Allotment letterRevised Undertaking for Allotment letter ANP MEMENTO.pdf · uploaded 30 Jul 2021Source
  • 2 Declaration about Commencement CertificateDECLRATION ABOUT COMMENCEMENT CERTIFICATE.pdf · uploaded 3 Aug 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM-2A OCT-2020 TO DEC-2020.pdf · uploaded 3 Aug 2021Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM- 2A ANP MEMENTO (JAN-21 TO MARCH-21).pdf · uploaded 3 Aug 2021Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM- 2A ANP MEMENTO (APRIL-21 TO JUNE-21).pdf · uploaded 3 Aug 2021Source
  • 1 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD-BOOKED INVENTORY.pdf · uploaded 3 Aug 2021Source
  • 2 Disclosure of sold/ booked inventoryAPPLICATION FOR CORRECTION UNDER PROJECT.pdf · uploaded 3 Aug 2021Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CORRECTED UDIN FORM 3.pdf · uploaded 3 Aug 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)DECLRATION FOR SUBMISSION OF FROM 5.pdf · uploaded 3 Aug 2021Source
  • 1 OtherAPPLICATION FOR CORRECTION UNDER PROJECT.pdf · uploaded 3 Aug 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)CORRECTED UDIN AND CA Certificate FORM 3.pdf · uploaded 5 Aug 2021Source
  • 17 Building Plan Approval / NA Order for plotted development1.pdf · uploaded 17 Feb 2022Source
  • 18 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 17 Feb 2022Source
  • 19 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 17 Feb 2022Source
  • 20 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 17 Feb 2022Source
  • 21 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 17 Feb 2022Source
  • 22 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 17 Feb 2022Source
  • 23 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 17 Feb 2022Source
  • 24 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 17 Feb 2022Source
  • 25 Building Plan Approval / NA Order for plotted development8.pdf · uploaded 17 Feb 2022Source
  • 26 Building Plan Approval / NA Order for plotted development9.pdf · uploaded 17 Feb 2022Source
  • 27 Building Plan Approval / NA Order for plotted development10.pdf · uploaded 17 Feb 2022Source
  • 28 Building Plan Approval / NA Order for plotted development11.pdf · uploaded 17 Feb 2022Source
  • 29 Building Plan Approval / NA Order for plotted development12.pdf · uploaded 17 Feb 2022Source
  • 30 Building Plan Approval / NA Order for plotted development13.pdf · uploaded 17 Feb 2022Source
  • 31 Building Plan Approval / NA Order for plotted development14.pdf · uploaded 17 Feb 2022Source
  • 32 Building Plan Approval / NA Order for plotted development15.pdf · uploaded 17 Feb 2022Source
  • 33 Building Plan Approval / NA Order for plotted development16.pdf · uploaded 17 Feb 2022Source
  • 3 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 17 Feb 2022Source
  • 2 Details of encumbrancesKOTAK ENCUMBRANCE DETAILS.pdf · uploaded 4 Mar 2022Source
  • 3 Copy of Layout Approval (in case of layout)1.pdf · uploaded 27 May 2022Source
  • 34 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 27 May 2022Source
  • 35 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 27 May 2022Source
  • 36 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 27 May 2022Source
  • 37 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 27 May 2022Source
  • 38 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 27 May 2022Source
  • 39 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 27 May 2022Source
  • 40 Building Plan Approval / NA Order for plotted development8.pdf · uploaded 27 May 2022Source
  • 41 Building Plan Approval / NA Order for plotted development9.pdf · uploaded 27 May 2022Source
  • 42 Building Plan Approval / NA Order for plotted development10.pdf · uploaded 27 May 2022Source
  • 43 Building Plan Approval / NA Order for plotted development11.pdf · uploaded 27 May 2022Source
  • 44 Building Plan Approval / NA Order for plotted development12.pdf · uploaded 27 May 2022Source
  • 45 Building Plan Approval / NA Order for plotted development13.pdf · uploaded 27 May 2022Source
  • 46 Building Plan Approval / NA Order for plotted development14.pdf · uploaded 27 May 2022Source
  • 47 Building Plan Approval / NA Order for plotted development15.pdf · uploaded 27 May 2022Source
  • 48 Building Plan Approval / NA Order for plotted development16.pdf · uploaded 27 May 2022Source
  • 4 Commencement Certificates / NA Order for plotted developmentcc.pdf · uploaded 27 May 2022Source
  • 4 Copy of Layout Approval (in case of layout)1.pdf · uploaded 26 Dec 2022Source
  • 49 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 26 Dec 2022Source
  • 50 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 26 Dec 2022Source
  • 51 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 26 Dec 2022Source
  • 52 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 26 Dec 2022Source
  • 53 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 26 Dec 2022Source
  • 54 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 26 Dec 2022Source
  • 55 Building Plan Approval / NA Order for plotted development8.pdf · uploaded 26 Dec 2022Source
  • 56 Building Plan Approval / NA Order for plotted development9.pdf · uploaded 26 Dec 2022Source
  • 57 Building Plan Approval / NA Order for plotted development10.pdf · uploaded 26 Dec 2022Source
  • 58 Building Plan Approval / NA Order for plotted development11.pdf · uploaded 26 Dec 2022Source
  • 59 Building Plan Approval / NA Order for plotted development12.pdf · uploaded 26 Dec 2022Source
  • 60 Building Plan Approval / NA Order for plotted development13.pdf · uploaded 26 Dec 2022Source
  • 61 Building Plan Approval / NA Order for plotted development14.pdf · uploaded 26 Dec 2022Source
  • 62 Building Plan Approval / NA Order for plotted development15.pdf · uploaded 26 Dec 2022Source
  • 63 Building Plan Approval / NA Order for plotted development16.pdf · uploaded 26 Dec 2022Source
  • 64 Building Plan Approval / NA Order for plotted development17.pdf · uploaded 26 Dec 2022Source
  • 5 Commencement Certificates / NA Order for plotted developmentCC 21122022.pdf · uploaded 26 Dec 2022Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 (OCT 21 - DEC 21).pdf · uploaded 18 Feb 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 (MAR 22).pdf · uploaded 18 Feb 2023Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 (APR- JUN 22).pdf · uploaded 18 Feb 2023Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 (JULY - SEPT 22).pdf · uploaded 18 Feb 2023Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5 (MAR 21).pdf · uploaded 18 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5 (MAR 22).pdf · uploaded 18 Feb 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 FORM 2 (JUL - SEP 21).pdf · uploaded 24 Feb 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)3 FORM 2 (OCT - DEC 21).pdf · uploaded 24 Feb 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)4 FORM 2 (JAN - MAR 22).pdf · uploaded 24 Feb 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)5 FORM 2 (APR- JUN 22).pdf · uploaded 24 Feb 2023Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)6 FORM 2 (JULY - SEPT 22).pdf · uploaded 24 Feb 2023Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)7 FORM 2 (OCT- DEC 22).pdf · uploaded 24 Feb 2023Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)1 Form 2 upto 28 07 21.pdf · uploaded 24 Feb 2023Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 OCT To DEC 22.pdf · uploaded 24 Feb 2023Source
  • 3 Details of encumbrancesENCUMBRANCE DETAILS.pdf · uploaded 17 Aug 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ANP MEMENTO - ARCHITECT CERTIFICATE (10-04-2023)compressed.pdf · uploaded 5 Oct 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)ANP MEMENTO - ARCHITECT CERTIFICATE (29-07-2023)compressed.pdf · uploaded 5 Oct 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 ANP MEMENTO 01-04-2022 To 31-03-2023.pdf · uploaded 20 Oct 2023Source
  • 1 Details of encumbrancesRelease Deed-kotak mahindra bank.pdf · uploaded 11 Jan 2025Source
  • 1 Proforma of Agreement for saleDraft copy of Agreement To Sale.pdf · uploaded 24 Jan 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)11 FORM 3 - ANP MEMENTO 30-09-2023.pdf · uploaded 27 Jan 2025Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)16 FORM 3- ANP MEMENTO 31-12-2024.pdf · uploaded 27 Jan 2025Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)15 FORM 3 - ANP MEMENTO 30-09-2024.pdf · uploaded 27 Jan 2025Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)14 FORM 3 - ANP MEMENTO 30-06-2024.pdf · uploaded 27 Jan 2025Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)13 FORM 3- ANP MEMENTO 31-03-2024.pdf · uploaded 27 Jan 2025Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)12 FORM 3- ANP MEMENTO 31-12-2023.pdf · uploaded 27 Jan 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)10 FORM 3 - ANP MEMENTO 30-06-2023.pdf · uploaded 27 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)9 FORM 3 - ANP MEMENTO 31-03-2023.pdf · uploaded 27 Jan 2025Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)6 FORM 2- ANP MEMENTO 30-06-2024.pdf · uploaded 27 Jan 2025Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)8 FORM 2 - ANP MEMENTO 31-12-2024.pdf · uploaded 27 Jan 2025Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)7 FORM 2 - ANP MEMENTO 30-09-2024.pdf · uploaded 27 Jan 2025Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)5 FORM 2- ANP MEMENTO 31-03-2024.pdf · uploaded 27 Jan 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)3 FORM 2 - ANP MEMENTO 30-09-2023.pdf · uploaded 27 Jan 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 FORM 2- ANP MEMENTO 30-06-2023.pdf · uploaded 27 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)1 FORM 2 - ANP MEMENTO 31-03-2023.pdf · uploaded 27 Jan 2025Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)4 FORM 2- ANP MEMENTO 31-12-2023.pdf · uploaded 27 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryDISCOLSURE OF SOLD.pdf · uploaded 27 Jan 2025Source
  • 1 Declaration about Commencement CertificateDECLARATION ABOUT CC.pdf · uploaded 27 Jan 2025Source
  • 1 Declaration about all RERA Designated Bank Accounts (Format A)DECLARATION ABOUT SEPARATE BANK ACOUNT.pdf · uploaded 27 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q4 2023 24 ARCHITECT CERTIFICATE 15 04 2024.pdf · uploaded 14 Feb 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q 3-2023-24 ARCHITECT CERTIFICATE - 15 01 2024.pdf · uploaded 14 Feb 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q1- 2024-25 ARCHITECT CERTIFICATE - 15 07 2024.pdf · uploaded 14 Feb 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q2-2024-25 ARCHITECT CERTIFICATE - 15 10 2024.pdf · uploaded 14 Feb 2025Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q3-2024-25 ARCHITECT CERTIFICATE - 15 01 2025.pdf · uploaded 14 Feb 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM-2A 2021-2022.pdf · uploaded 17 Feb 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM-2A (2022-2023).pdf · uploaded 17 Feb 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM-2A (2023-2024).pdf · uploaded 17 Feb 2025Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 Q2 FY 23 24 15 10 2023.pdf · uploaded 20 Feb 2025Source
  • 8 Disclosure of sold/ booked inventory7 31-12-2023.pdf · uploaded 21 Feb 2025Source
  • 11 Disclosure of sold/ booked inventory10 30-09-2024.pdf · uploaded 21 Feb 2025Source
  • 10 Disclosure of sold/ booked inventory9 30-06-2024.pdf · uploaded 21 Feb 2025Source
  • 9 Disclosure of sold/ booked inventory8 31-03-2024.pdf · uploaded 21 Feb 2025Source
  • 7 Disclosure of sold/ booked inventory6 30-09-2023.pdf · uploaded 21 Feb 2025Source
  • 6 Disclosure of sold/ booked inventory5 30-06-2023.pdf · uploaded 21 Feb 2025Source
  • 5 Disclosure of sold/ booked inventory4 31-03-2023.pdf · uploaded 21 Feb 2025Source
  • 4 Disclosure of sold/ booked inventory3 31-12-2022.pdf · uploaded 21 Feb 2025Source
  • 3 Disclosure of sold/ booked inventory2 30-09-2022.pdf · uploaded 21 Feb 2025Source
  • 2 Disclosure of sold/ booked inventory1 30-06-2022.pdf · uploaded 21 Feb 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 - ANP MEMENTO 2023-2024.pdf · uploaded 21 Feb 2025Source
  • Form 1Form 1.pdf · uploaded 20 Jul 2025Source
  • Form 2FOrm 2.pdf · uploaded 20 Jul 2025Source
  • Form 3FOrm 3.pdf · uploaded 20 Jul 2025Source
  • Disclosure of Sold and Booked InventorySOld circular.pdf · uploaded 20 Jul 2025Source
  • Withdrawal Update Form 1FORM 1 - ANP MEMENTO 30-07-2025 (1).pdf · uploaded 26 Aug 2025Source
  • Withdrawal Update Form 2Form 2 Memento.pdf · uploaded 26 Aug 2025Source
  • Withdrawal Update Form 3FORM 3 - ANP MEMENTO.pdf · uploaded 26 Aug 2025Source
  • Withdrawal Update Form 1FORM 1 - ANP MEMENTO.pdf · uploaded 4 Dec 2025Source
  • Withdrawal Update Form 2FORM 2 - ANP MEMENTO.pdf · uploaded 4 Dec 2025Source
  • Withdrawal Update Form 3FORM 3 - ANP MEMENTO.pdf · uploaded 4 Dec 2025Source
  • Form 5 (FY 2024-2025)FORM 5 - ANP MEMENTO.pdf · uploaded 16 Dec 2025Source
  • Withdrawal Update Form 1FORM 1 - ANP MEMENTO.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 2FORM 2 - ANP MEMENTO.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 3FORM 3 - ANP MEMENTO.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 18 May 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 18 May 2026Source
  • Withdrawal Update Form 3Form 3..pdf · uploaded 18 May 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 15 Jul 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 15 Jul 2026Source
  • Withdrawal Update Form 3Form 3 Final.pdf · uploaded 15 Jul 2026Source

Technical

  • DocumentIOD Layout ANP DECK 88 RERA Project AREA.pdf · uploaded 25 Aug 2020Source
  • DocumentIOD Plan No 2 Section ANP DECK 88.pdf · uploaded 25 Aug 2020Source
  • Document1.pdf · uploaded 30 Jul 2021Source
  • Document2.pdf · uploaded 30 Jul 2021Source
  • Document3.pdf · uploaded 30 Jul 2021Source
  • Document4.pdf · uploaded 30 Jul 2021Source
  • Document5.pdf · uploaded 30 Jul 2021Source
  • Document6.pdf · uploaded 30 Jul 2021Source
  • Document7.pdf · uploaded 30 Jul 2021Source
  • Document8.pdf · uploaded 30 Jul 2021Source
  • Document9.pdf · uploaded 30 Jul 2021Source
  • Document10.pdf · uploaded 30 Jul 2021Source
  • Document11.pdf · uploaded 30 Jul 2021Source
  • Document12.pdf · uploaded 30 Jul 2021Source
  • Document13.pdf · uploaded 30 Jul 2021Source
  • Document14.pdf · uploaded 30 Jul 2021Source
  • Document15.pdf · uploaded 30 Jul 2021Source
  • Document16.pdf · uploaded 30 Jul 2021Source
  • Document1.pdf · uploaded 17 Feb 2022Source
  • Document2.pdf · uploaded 17 Feb 2022Source
  • Document3.pdf · uploaded 17 Feb 2022Source
  • Document4.pdf · uploaded 17 Feb 2022Source
  • Document4.pdf · uploaded 17 Feb 2022Source
  • Document5.pdf · uploaded 17 Feb 2022Source
  • Document6.pdf · uploaded 17 Feb 2022Source
  • Document7.pdf · uploaded 17 Feb 2022Source
  • Document8.pdf · uploaded 17 Feb 2022Source
  • Document9.pdf · uploaded 17 Feb 2022Source
  • Document10.pdf · uploaded 17 Feb 2022Source
  • Document11.pdf · uploaded 17 Feb 2022Source
  • Document12.pdf · uploaded 17 Feb 2022Source
  • Document13.pdf · uploaded 17 Feb 2022Source
  • Document14.pdf · uploaded 17 Feb 2022Source
  • Document15.pdf · uploaded 17 Feb 2022Source
  • Document16.pdf · uploaded 17 Feb 2022Source
  • Document1.pdf · uploaded 27 May 2022Source
  • Document2.pdf · uploaded 27 May 2022Source
  • Document3.pdf · uploaded 27 May 2022Source
  • Document4.pdf · uploaded 27 May 2022Source
  • Document5.pdf · uploaded 27 May 2022Source
  • Document6.pdf · uploaded 27 May 2022Source
  • Document7.pdf · uploaded 27 May 2022Source
  • Document8.pdf · uploaded 27 May 2022Source
  • Document9.pdf · uploaded 27 May 2022Source
  • Document10.pdf · uploaded 27 May 2022Source
  • Document11.pdf · uploaded 27 May 2022Source
  • Document12.pdf · uploaded 27 May 2022Source
  • Document13.pdf · uploaded 27 May 2022Source
  • Document14.pdf · uploaded 27 May 2022Source
  • Document15.pdf · uploaded 27 May 2022Source
  • Document16.pdf · uploaded 27 May 2022Source
  • Document1.pdf · uploaded 26 Dec 2022Source
  • Document2.pdf · uploaded 26 Dec 2022Source
  • Document3.pdf · uploaded 26 Dec 2022Source
  • Document4.pdf · uploaded 26 Dec 2022Source
  • Document5.pdf · uploaded 26 Dec 2022Source
  • Document6.pdf · uploaded 26 Dec 2022Source
  • Document7.pdf · uploaded 26 Dec 2022Source
  • Document8.pdf · uploaded 26 Dec 2022Source
  • Document9.pdf · uploaded 26 Dec 2022Source
  • Document10.pdf · uploaded 26 Dec 2022Source
  • Document11.pdf · uploaded 26 Dec 2022Source
  • Document12.pdf · uploaded 26 Dec 2022Source
  • Document13.pdf · uploaded 26 Dec 2022Source
  • Document14.pdf · uploaded 26 Dec 2022Source
  • Document15.pdf · uploaded 26 Dec 2022Source
  • Document16.pdf · uploaded 26 Dec 2022Source
  • Document17.pdf · uploaded 26 Dec 2022Source
  • OthersB and D Part OC.pdf · uploaded 31 Oct 2025Source

Technical (Architect)

  • DocumentQ4 2023 24 ARCHITECT CERTIFICATE 15 04 2024.pdf · uploaded 14 Feb 2025Source
  • DocumentQ 3-2023-24 ARCHITECT CERTIFICATE - 15 01 2024.pdf · uploaded 14 Feb 2025Source
  • DocumentQ1- 2024-25 ARCHITECT CERTIFICATE - 15 07 2024.pdf · uploaded 14 Feb 2025Source
  • DocumentQ2-2024-25 ARCHITECT CERTIFICATE - 15 10 2024.pdf · uploaded 14 Feb 2025Source
  • DocumentQ3-2024-25 ARCHITECT CERTIFICATE - 15 01 2025.pdf · uploaded 14 Feb 2025Source
  • DocumentFORM 1 Q2 FY 23 24 15 10 2023.pdf · uploaded 20 Feb 2025Source
  • DocumentForm 1.pdf · uploaded 18 May 2026Source

Technical (Engineer)

  • Document1 FORM 2 - ANP MEMENTO 31-03-2023.pdf · uploaded 27 Jan 2025Source
  • Document2 FORM 2- ANP MEMENTO 30-06-2023.pdf · uploaded 27 Jan 2025Source
  • Document3 FORM 2 - ANP MEMENTO 30-09-2023.pdf · uploaded 27 Jan 2025Source
  • Document4 FORM 2- ANP MEMENTO 31-12-2023.pdf · uploaded 27 Jan 2025Source
  • Document5 FORM 2- ANP MEMENTO 31-03-2024.pdf · uploaded 27 Jan 2025Source
  • Document6 FORM 2- ANP MEMENTO 30-06-2024.pdf · uploaded 27 Jan 2025Source
  • Document7 FORM 2 - ANP MEMENTO 30-09-2024.pdf · uploaded 27 Jan 2025Source
  • Document8 FORM 2 - ANP MEMENTO 31-12-2024.pdf · uploaded 27 Jan 2025Source
  • DocumentForm 2.pdf · uploaded 18 May 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvals

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
3BHK, 2BHK368 units in all
Address
83/2B Part, 83/4, 87/1/2/B, 87/1/2/C, 88/1, 88/2, 88/3, 139/5A, Wakad-Hinjewadi 30 M. W. D. P. Road, S.No.83(P), 87(P), 88(P), 139(P) WakadPIN 411057
Village
Wakad, Mulshi taluka
Land area for this project
8,358 sq m (89,966 sq ft)
Permissible built-up area
43,000 sq m (4,62,848 sq ft)
Sanctioned built-up area
21,017 sq m (2,26,225 sq ft)
Recreational open space
783 sq m (8,428 sq ft)
Designated bank account
220
Developed in phases
Yes

Land as published on MahaRERA's project page

83/2B Part,83/4,87/1/2/B,87/1/2/C,88/1,88/2,88/3,139/5A

Boundaries

North
30 M Road and Remaining plot of layout
South
Nala
East
Royal Entrada Project by Five Star Construction Co
West
Survey no 83 part

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking368 units

330 of 368 units booked (90%), as the promoter reported to MahaRERA

3BHK · 184 units2BHK · 184 units
BuildingTypeCarpet areaUnitsBooked
A Building3BHK74.07 sq m · 797 sq ft40
A Building3BHK89.33 sq m · 962 sq ft4238
A Building3BHK92.92 sq m · 1,000 sq ft2222
A Building3BHK101.72 sq m · 1,095 sq ft2423
B Building3BHK78.71 sq m · 847 sq ft41
B Building3BHK89.32 sq m · 961 sq ft4242
B Building3BHK92.02 sq m · 990 sq ft1111
B Building3BHK92.92 sq m · 1,000 sq ft1111
Show all 21 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
B Building3BHK100.82 sq m · 1,085 sq ft1212
B Building3BHK101.72 sq m · 1,095 sq ft1212
C Building2BHK58.33 sq m · 628 sq ft20
C Building2BHK61.2 sq m · 659 sq ft4642
C Building2BHK64.06 sq m · 690 sq ft2314
C Building2BHK65.48 sq m · 705 sq ft21
C Building2BHK66.06 sq m · 711 sq ft96
C Building2BHK74.44 sq m · 801 sq ft107
D Building2BHK58.33 sq m · 628 sq ft20
D Building2BHK61.2 sq m · 659 sq ft4646
D Building2BHK65.48 sq m · 705 sq ft20
D Building2BHK66.06 sq m · 711 sq ft2020
D Building2BHK74.44 sq m · 801 sq ft2222

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals5

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSupa Associates—
Chartered accountantR D Kabra & Associates—
EngineerNilesh Joshi—
EngineerSachin Basweshar Gadave—
EngineerShrenik Upadhye—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Wakad

All 314 projects in Wakad · Compare Anp Memento with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology