30 Drive
Deedo IDDP-PUN-4F4JMahaRERA shows it completed, after its date was pushed back 6 months; no MahaRERA orders on record.
Kharadi, Pune 411001 · Property rates in Kharadi · by Duville Estates Private Limited · 29% of its projects kept the RERA date
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed, after its date was pushed back 6 months
- This projectRegistered 14 Dec 2021, completion promised 30 Nov 2023, revised to 6 May 2024.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
- Primary sale · Aug 2026
- Primary sale · Aug 2026
- Primary sale · Aug 2026
- Primary sale · Apr 2026
- Primary sale · Apr 2026
- Primary sale · Apr 2026
- Primary sale · Jan 2025
- Primary sale · Jun 2024
- Primary sale · Jun 2024
- Primary sale · Jun 2024
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Aug 2026 | Not on record | Primary sale | — | View Primary sale, Aug 2026 | |
| Aug 2026 | Not on record | Primary sale | — | View Primary sale, Aug 2026 | |
| Aug 2026 | Not on record | Primary sale | — | View Primary sale, Aug 2026 | |
| Apr 2026 | Not on record | Primary sale | — | View Primary sale, Apr 2026 | |
| Apr 2026 | Not on record | Primary sale | — | View Primary sale, Apr 2026 | |
| Apr 2026 | Not on record | Primary sale | — | View Primary sale, Apr 2026 | |
| Jan 2025 | 30 Drive | Primary sale | — | View Primary sale, Jan 2025 | |
| Jun 2024 | 30 Drive | Primary sale | — | View Primary sale, Jun 2024 | |
| Jun 2024 | 30 Drive | Primary sale | — | View Primary sale, Jun 2024 | |
| Jun 2024 | 30 Drive | Primary sale | — | View Primary sale, Jun 2024 |
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100032106
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100032106 | 14 Dec 2021 | 30 Nov 2023 | 6 May 2024 | Duville Estates Private Limited | Project page |
Documents106
3 documents held by Deedo, 103 filings listed on MahaRERA's project page
Other
- OtherDate not statedView
Finance
- PAN CardCompany PAN.pdf · uploaded 22 Nov 2021Source
Legal
- Declaration Form BDeclaration Form B_Revised.pdf · uploaded 22 Nov 2021Source
- Legal Title reportLegal Title Final 1.pdf · uploaded 26 Nov 2021Source
- Legal Title reportTitle report_Format A.pdf · uploaded 8 Dec 2021Source
- Declaration Form BLatest - Form B - Declaration.pdf · uploaded 3 Apr 2025Source
Show all 106 documentsShow fewer documents
Migrated
- 1 PAN CardCompany PAN.pdf · uploaded 22 Nov 2021Source
- 1 Details of encumbrancesEncumbrance certificate.pdf · uploaded 22 Nov 2021Source
- 1 Declaration about Commencement CertificateDeclaration About Commencement Certificate.pdf · uploaded 22 Nov 2021Source
- 1 Declaration in FORM BDeclaration Form B_Revised.pdf · uploaded 22 Nov 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Cert_compressed.pdf · uploaded 22 Nov 2021Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_RERA - Plot D_Revised.pdf · uploaded 22 Nov 2021Source
- 1 Copy of the legal title reportLegal Title Final 1.pdf · uploaded 26 Nov 2021Source
- 1 Copy of Layout Approval (in case of layout)01-02- (Layout).pdf · uploaded 26 Nov 2021Source
- 2 Copy of Layout Approval (in case of layout)01-02 - 2 - (Layout).pdf · uploaded 26 Nov 2021Source
- 1 Building Plan Approval / NA Order for plotted development02-02-1-Final.pdf · uploaded 26 Nov 2021Source
- 2 Building Plan Approval / NA Order for plotted development01-02-3 Final.pdf · uploaded 26 Nov 2021Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Cert.pdf · uploaded 26 Nov 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed.pdf · uploaded 26 Nov 2021Source
- 1 Proforma of Allotment letterDraft Agreement_Plot D.pdf · uploaded 1 Dec 2021Source
- 2 Proforma of Allotment letterAllotment_Letter Plot D.pdf · uploaded 1 Dec 2021Source
- 2 Copy of the legal title reportTitle report_Format A.pdf · uploaded 8 Dec 2021Source
- 1 CERSAI detailsCERSAI_Search_Report_200225720197.pdf · uploaded 11 Dec 2021Source
- 2 CERSAI detailsCERSAI_Search_Report_200225720212.pdf · uploaded 11 Dec 2021Source
- 3 CERSAI detailsLoan declaration.pdf · uploaded 11 Dec 2021Source
- 1 Disclosure of sold/ booked inventoryInventory Details - 31032022.pdf · uploaded 8 Apr 2022View
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Engineer's Certificate - 30 Drive - 31032022.pdf · uploaded 7 Jun 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A - Quality Assurance Certificate - 31032022.pdf · uploaded 7 Jun 2022Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - 30 Drive - Optimised.pdf · uploaded 7 Jun 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - 30 Drive - Jun 2022.pdf · uploaded 2 Sep 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - 30 Drive - June 2022.pdf · uploaded 2 Sep 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A - 30 Drive - Jun 2022.pdf · uploaded 2 Sep 2022Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - 30 Drive - Jun 2022.pdf · uploaded 2 Sep 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Plot D - 30 D.pdf · uploaded 30 Sep 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - 30 Drive - Jun 2022.pdf · uploaded 4 Nov 2022Source
- 2 Disclosure of sold/ booked inventoryInventory Details - 30062022.pdf · uploaded 4 Nov 2022Source
- 3 Disclosure of sold/ booked inventoryInventory Details - 30092022.pdf · uploaded 4 Nov 2022Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - 30 Drive - Sep 2022.pdf · uploaded 16 Nov 2022Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - 30 Drive - Sep 2022.pdf · uploaded 16 Nov 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A - 30 Drive - Sep 2022.pdf · uploaded 12 Dec 2022Source
- 4 Disclosure of sold/ booked inventoryInventory Details - 31122022.pdf · uploaded 12 Jan 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - 30 Drive - Dec 2022.pdf · uploaded 13 Jan 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - 30 Drive - Dec 2022.pdf · uploaded 18 Jan 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - 30 Drive - Dec 2022.pdf · uploaded 18 Jan 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A - 30 Drive - Dec 2022.pdf · uploaded 18 Jan 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - 30 Drive - Mar 2023 - Counter Signed.pdf · uploaded 21 Apr 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)6 Form 2 - 30 Drive - Mar 2023 - Counter Signed.pdf · uploaded 21 Apr 2023Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A - 30 Drive - Mar 2023 - Counter Signed.pdf · uploaded 21 Apr 2023Source
- 5 Disclosure of sold/ booked inventoryInventory Details - 31032023.pdf · uploaded 21 Apr 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 - 30 Drive-D - Mar 2023.pdf · uploaded 21 Apr 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)7 Form 2 - 30 Drive - Jun 2023.pdf · uploaded 21 Jul 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 - 30 Drive-D - June 2023.pdf · uploaded 21 Jul 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 - 30 Drive-D - June 2023.pdf · uploaded 21 Jul 2023Source
- 6 Disclosure of sold/ booked inventory6 Inventory Details - Jun 2023.pdf · uploaded 27 Jul 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - 30 Drive - Jun 2023.pdf · uploaded 8 Aug 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A - 30 Drive - Jun 2023.pdf · uploaded 8 Aug 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 - Plot 30 D - FY 2022-23.pdf · uploaded 30 Sep 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)8 Form 2 - 30 Drive - Sep 2023.pdf · uploaded 31 Oct 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form-2A - 30 Drive - Sep 2023.pdf · uploaded 31 Oct 2023Source
- 7 Disclosure of sold/ booked inventory7 Inventory Details - Sep 2023.pdf · uploaded 31 Oct 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - 30 Drive - Sep 2023.pdf · uploaded 31 Oct 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - 30 Drive - Sep 2023.pdf · uploaded 2 Nov 2023Source
- 8 Disclosure of sold/ booked inventory30Drive.pdf · uploaded 1 Feb 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Plot D.pdf · uploaded 12 Feb 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)9 Form 2 - 30 Drive - Dec 2023.pdf · uploaded 1 Mar 2024Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 - 30 Drive - Dec 2023.pdf · uploaded 1 Mar 2024Source
- 9 Disclosure of sold/ booked inventory30 Drive inv.pdf · uploaded 2 May 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)30 Drive Form 1.pdf · uploaded 9 May 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 30 Drive.pdf · uploaded 9 May 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A 30 Drive.pdf · uploaded 9 May 2024Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 30 D drive.pdf · uploaded 24 May 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Plot D Form 2.pdf · uploaded 7 Aug 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)PLot D Form 2A.pdf · uploaded 7 Aug 2024Source
- 10 Disclosure of sold/ booked inventory30 Drive inv.pdf · uploaded 7 Aug 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 - Plot 30 D - FY 2023-24.pdf · uploaded 10 Oct 2024Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentPlot D - Occupancy Certificate - Part 1.pdf · uploaded 6 Nov 2024Source
- 2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentPlot D - Occupancy Certificate - Part 2.pdf · uploaded 6 Nov 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 - 30 drive - Jun 2024.pdf · uploaded 12 Nov 2024Source
- 1 Disclosure of sold/ booked inventory30 Drive.pdf · uploaded 12 Nov 2024View
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form-2A - 30 Drive - Sep 2024.pdf · uploaded 14 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)30 DRIVE June 2024.pdf · uploaded 18 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)30 Drive September 2024.pdf · uploaded 18 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)30 DRIVE June 2024.pdf · uploaded 18 Nov 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)30 Drive September 2024.pdf · uploaded 18 Nov 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 30 Drive Sept2024.pdf · uploaded 19 Nov 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 30 Drive Sept2024.pdf · uploaded 19 Nov 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)30 Drive Form 3 Dec24.pdf · uploaded 21 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)30 Drive Form 2.pdf · uploaded 21 Feb 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 30 Drive.pdf · uploaded 21 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A 30 Drive.pdf · uploaded 21 Feb 2025Source
- 1 Disclosure of sold/ booked inventory30 Drive Sales Data.pdf · uploaded 19 Mar 2025View
- 1 Declaration in FORM BLatest - Form B - Declaration.pdf · uploaded 3 Apr 2025Source
Technical
Technical (Architect)
- Document30 Drive Form 1.pdf · uploaded 9 May 2024Source
- Document30 DRIVE June 2024.pdf · uploaded 18 Nov 2024Source
- Document30 Drive September 2024.pdf · uploaded 18 Nov 2024Source
- Document30 DRIVE June 2024.pdf · uploaded 18 Nov 2024Source
- Document30 Drive September 2024.pdf · uploaded 18 Nov 2024Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 17/1
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- Office space, Shop22 units in all
- Address
- 17/1, Ghorpadi, PunePIN 411001
- Village
- Kharadi
- Land area for this project
- 1,653 sq m (17,793 sq ft)
- Permissible built-up area
- 2,790 sq m (30,035 sq ft)
- Sanctioned built-up area
- 1,641 sq m (17,668 sq ft)
- Recreational open space
- 165 sq m (1,779 sq ft)
- Designated bank account
- 76
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
17/1
Boundaries
- North
- 30 Mtr Road
- South
- Nyati Emperia
- East
- Nyati Elysia
- West
- Baig Vasti
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking22 units
13 of 22 units booked (59%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Office space | 26.79 sq m · 288 sq ft | 1 | 0 |
| Office space | 26.82 sq m · 289 sq ft | 1 | 0 |
| Office space | 27.83 sq m · 300 sq ft | 1 | 0 |
| Office space | 30.34 sq m · 327 sq ft | 1 | 0 |
| Office space | 32.34 sq m · 348 sq ft | 1 | 1 |
| Office space | 32.46 sq m · 349 sq ft | 1 | 0 |
| Office space | 32.5 sq m · 350 sq ft | 1 | 0 |
| Office space | 32.51 sq m · 350 sq ft | 3 | 1 |
Show all 13 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Office space | 39.35 sq m · 424 sq ft | 1 | 0 |
| Office space | 42.45 sq m · 457 sq ft | 1 | 1 |
| Shop | 22.64 sq m · 244 sq ft | 2 | 2 |
| Shop | 23.08 sq m · 248 sq ft | 4 | 4 |
| Shop | 23.17 sq m · 249 sq ft | 4 | 4 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals3
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Kipa Architects | — |
| Chartered accountant | Dhirubhai Shah & Co LLP | — |
| Engineer | Pinnac Aecl Consultancy Pvt Td | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Kharadi
- Ganga Altus Building GRERA PC1260002602605
- The MonarchRERA PM1260002601832
- Venkatesh Vanaya - Wing – N (MHADA)- Phase - 8RERA PR1261012601751
- Venkatesh Vanaya₹13,040 a sq ft
- 48 Willow By OxyRERA PM1260002601164
- Zen KodeRERA PC1260002600251
- HemantRERA PR1260002600119
- Edition MRERA PC1260002502564
All 3,136 projects in Kharadi · Compare 30 Drive with another project
30 Drive in numbers
Registered deals, summarised
Deedo has 29 registered documents at 30 Drive, from Mar 2022 to Aug 2026: 20 sales, 7 leave and licence agreements, 2 mortgages.
- How many properties have been sold at 30 Drive?
- 20 sales are registered at 30 Drive.
- Are properties at 30 Drive rented out?
- Yes: 7 leave and licence agreements are registered at 30 Drive, at a median rent since Mar 2022 of about ₹28,000 a month with a deposit of about ₹1,00,000.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at 30 Drive by Deedo, last updated with deals registered in Aug 2026.
Latest deal · Primary sale · Aug 2026