Others · 13 buildings · 1,610 unitsRERA P52100052996 +3

Sai Nagari

Deedo IDDP-PUN-RQ5N

Completion was pushed back 4 months, to Apr 2031; no MahaRERA orders on record; 6% of its units are booked.

Katraj, Pune 411046 · Property rates in Katraj · by Saikedareshwar Developers Llp

DeliveryExtended 4 moPromised Dec 2030 · now due Apr 2031RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales6% booked103 of 1,610 units · as the promoter reported to MahaRERAPrice₹5,110 /sq ft17% below Katraj · 8 registered sales

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Apr 2031

  • P52100052996Registered 10 Oct 2023, completion promised 28 May 2029, revised to 28 Sep 2029.
  • P52100052977Registered 10 Oct 2023, completion promised 28 May 2029, revised to 28 Sep 2029.
  • P52100078517Registered 19 Dec 2024, completion promised 31 Dec 2029, revised to 30 Apr 2030.
  • PM1264042502917Registered 18 Mar 2026, completion promised 31 Dec 2030, revised to 30 Apr 2031.

No extension certificate on record.

4 registrations · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

All 27 deeds →
Latest registered deeds in this project
MonthFlatKindAreaPriceRecord
Oct 2024Main building · 301Resale325 sq ftView Resale, Oct 2024
Jul 2024Main building · 301Primary sale325 sq ftView Primary sale, Jul 2024
Dec 2023Main building · 401Primary sale300 sq ftView Primary sale, Dec 2023
Nov 2023Main building · 303Primary sale334 sq ftView Primary sale, Nov 2023
Mar 2023Main building · 202Primary sale308 sq ftView Primary sale, Mar 2023
Mar 2023Main building · 402Primary sale308 sq ftView Primary sale, Mar 2023
May 202603 Building C · 34Rental—View Rental, May 2026
Apr 202602 Building B · 7Rental—View Rental, Apr 2026
Feb 2026Building I · 1105Mortgage—View Mortgage, Feb 2026
Nov 2025Unit 1Rental—View Rental, Nov 2025

13 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrations4
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210005299610 Oct 202328 May 202928 Sep 2029Saikedareshwar Developers LLPProject page
P5210005297710 Oct 202328 May 202928 Sep 2029Saikedareshwar Developers LLPProject page
P5210007851719 Dec 202431 Dec 202930 Apr 2030Saikedareshwar Developers LLPProject page
PM126404250291718 Mar 202631 Dec 203030 Apr 2031Saikedareshwar Developers LLPProject page
Documents335

4 documents held by Deedo, 331 filings listed on MahaRERA's project page

Registration certificate (4)

  • Registration certificateP52100052996 · 22 May 2024ViewSource
  • Registration certificateP52100052977 · 25 May 2024ViewSource
  • Registration certificateP52100078517 · 19 Dec 2024ViewSource
  • Registration certificatePM1264042502917 · 18 Mar 2026ViewSource

Finance

  • PAN CardP52100052996 · PAN CARD SAI KEDARESHWAR.pdf · uploaded 28 Jul 2023Source
  • PAN CardP52100052977 · PAN CARD SAI KEDARESHWAR.pdf · uploaded 9 Aug 2023Source
  • PAN CardP52100078517 · 1 PAN Card.pdf · uploaded 13 Jun 2024Source
  • Other – FinanceP52100078517 · Declaration- Form 3.pdf · uploaded 10 Dec 2024Source
Show all 335 documentsShow fewer documents

Finance

  • Other – FinanceP52100052996 · Declaration Form 5.pdf · uploaded 9 May 2025Source
  • Other – FinanceP52100052996 · Declaration Form 5.pdf · uploaded 9 May 2025Source
  • Other – FinanceP52100052996 · Declaration Form 5.pdf · uploaded 9 May 2025Source
  • Other – FinanceP52100052977 · Declaration Form 5 (1).pdf · uploaded 9 May 2025Source
  • PAN CardPM1264042502917 · PAN CARD SAI KEDARESHWAR.pdf · uploaded 16 Jul 2025Source
  • OthersPM1264042502917 · CERSAI Declaration.pdf · uploaded 16 Jul 2025Source
  • OthersPM1264042502917 · Encumbrance To Finance.pdf · uploaded 16 Jul 2025Source
  • OthersPM1264042502917 · Declaretion.pdf · uploaded 13 Dec 2025Source
  • OthersPM1264042502917 · Architech Calculation .pdf · uploaded 13 Dec 2025Source

Legal

  • Legal Title reportP52100052996 · Title Report DNYANESH NAVALE 27-09-2023.pdf · uploaded 28 Jul 2023Source
  • Declaration Form BP52100052996 · Form B_ Phase I.pdf · uploaded 28 Jul 2023Source
  • Legal Title reportP52100052977 · Search Report _ As per RERA.pdf · uploaded 9 Aug 2023Source
  • Declaration Form BP52100052977 · Form B _ Phase II.pdf · uploaded 9 Aug 2023Source
  • Other – LegalP52100052996 · Self Declaration Phase I.pdf · uploaded 6 Feb 2024Source
  • Legal Title reportP52100078517 · Title Report rera _compressed.pdf · uploaded 13 Jun 2024Source
  • Declaration Form BP52100078517 · Form B- Promoter.pdf · uploaded 13 Jun 2024Source
  • OthersPM1264042502917 · Annexure A - Disclosure of Interest - Vishal Pawar.pdf · uploaded 16 Jul 2025Source
  • Declaration Form BPM1264042502917 · 1_AGR To Sale.pdf · uploaded 16 Jul 2025Source
  • Declaration Form BPM1264042502917 · 2_AGR To Sale.pdf · uploaded 16 Jul 2025Source
  • Declaration Form BPM1264042502917 · 3_AGR To Sale.pdf · uploaded 16 Jul 2025Source
  • OthersPM1264042502917 · Annexure A - Disclosure of Interest - Vivek Pawar.pdf · uploaded 15 Sep 2025Source
  • Declaration Form BPM1264042502917 · Form B.pdf · uploaded 15 Sep 2025Source
  • OthersPM1264042502917 · Encumbrance To Legal.pdf · uploaded 2 Dec 2025Source
  • OthersPM1264042502917 · CC Verification Letter by MHADA.pdf · uploaded 2 Dec 2025Source
  • OthersPM1264042502917 · 1_Sale Deed Plot C scan.pdf · uploaded 2 Dec 2025Source
  • OthersPM1264042502917 · 2_Sale Deed Plot C scan.pdf · uploaded 2 Dec 2025Source
  • OthersPM1264042502917 · 3_Sale Deed Plot C scan.pdf · uploaded 2 Dec 2025Source
  • Declaration Form BPM1264042502917 · 1_Sale Deed Plot C scan.pdf · uploaded 2 Dec 2025Source
  • Declaration Form BPM1264042502917 · 2_Sale Deed Plot C scan.pdf · uploaded 2 Dec 2025Source
  • Declaration Form BPM1264042502917 · 3_Sale Deed Plot C scan.pdf · uploaded 2 Dec 2025Source
  • Declaration Form BPM1264042502917 · 1_AGR To Sale Plot B 16021-2023.pdf · uploaded 2 Dec 2025Source
  • Declaration Form BPM1264042502917 · 2_AGR To Sale Plot B 16021-2023.pdf · uploaded 2 Dec 2025Source
  • Declaration Form BPM1264042502917 · 3_AGR To Sale Plot B 16021-2023.pdf · uploaded 2 Dec 2025Source
  • Declaration Form BPM1264042502917 · 4_AGR To Sale Plot B 16021-2023.pdf · uploaded 2 Dec 2025Source
  • Declaration Form BPM1264042502917 · 1_AGR To Sale Plot A 16019-23.pdf · uploaded 2 Dec 2025Source
  • Declaration Form BPM1264042502917 · 2_AGR To Sale Plot A 16019-23.pdf · uploaded 2 Dec 2025Source
  • Declaration Form BPM1264042502917 · 3_AGR To Sale Plot A 16019-23.pdf · uploaded 2 Dec 2025Source
  • Declaration Form BPM1264042502917 · 4_AGR To Sale Plot A 16019-23.pdf · uploaded 2 Dec 2025Source
  • Declaration Form BPM1264042502917 · 5_AGR To Sale Plot A 16019-23.pdf · uploaded 2 Dec 2025Source
  • OthersPM1264042502917 · Satbara 7-12 .pdf · uploaded 1 Jan 2026Source
  • OthersPM1264042502917 · 8-2 Satbara .pdf · uploaded 1 Jan 2026Source
  • Declaration Form BPM1264042502917 · Sale Deed - Plot A 16008-2024_compressed (2).pdf · uploaded 1 Jan 2026Source
  • Declaration Form BPM1264042502917 · Sale Deed - Plot B 16011-2024 .pdf · uploaded 1 Jan 2026Source
  • OthersPM1264042502917 · declaration cum affidavit.pdf · uploaded 30 Jan 2026Source
  • OthersPM1264042502917 · Declaration cum Undertaking.pdf · uploaded 1 Feb 2026Source
  • OthersPM1264042502917 · Declaretion of past experience .pdf · uploaded 2 Mar 2026Source
  • Declaration Form BPM1264042502917 · Legal Title Report .pdf · uploaded 4 Mar 2026Source

Migrated

  • 1 PAN CardP52100052996 · PAN CARD SAI KEDARESHWAR.pdf · uploaded 28 Jul 2023Source
  • 1 Copy of the legal title reportP52100052996 · Title Report DNYANESH NAVALE 27-09-2023.pdf · uploaded 28 Jul 2023Source
  • 1 a Details of encumbrances concerned to FinanceP52100052996 · Encumbrace to Finance and Legal.pdf · uploaded 28 Jul 2023Source
  • 1 b Details of encumbrances concerned to LegalP52100052996 · Encumbrace to Finance and Legal.pdf · uploaded 28 Jul 2023Source
  • 1 Copy of Layout Approval (in case of layout)P52100052996 · Sai nagari Lay Out All Blgs Sanction-1-14_compressed.pdf · uploaded 28 Jul 2023Source
  • 2 Copy of Layout Approval (in case of layout)P52100052996 · Phase I ABC Floor Plan 1 Sanction-3-14_compressed.pdf · uploaded 28 Jul 2023Source
  • 1 Building Plan Approval / NA Order for plotted developmentP52100052996 · sai nagari Building Plan Phase I.pdf · uploaded 28 Jul 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52100052996 · sai nagari plinth cc.pdf · uploaded 28 Jul 2023Source
  • 1 Declaration about Commencement CertificateP52100052996 · Declaration to CC.pdf · uploaded 28 Jul 2023Source
  • 1 Declaration in FORM BP52100052996 · Form B_ Phase I.pdf · uploaded 28 Jul 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052996 · Form I - Architect Certificate.pdf · uploaded 28 Jul 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052996 · Form 2 - Phase I.pdf · uploaded 28 Jul 2023Source
  • 1 CERSAI detailsP52100052996 · Self Declaration Cersai_ New.pdf · uploaded 28 Jul 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsP52100052996 · Disclouser of interest in other project.pdf · uploaded 28 Jul 2023Source
  • 1 Proforma of Allotment letterP52100052996 · Allotment Letter.pdf · uploaded 28 Jul 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100052996 · Declaration of Seperate bank Account.pdf · uploaded 28 Jul 2023Source
  • 1 Deviation Report with respect to Allotment letterP52100052996 · Deviation Report - Allotment.pdf · uploaded 28 Jul 2023Source
  • 1 Deviation Report with respect to model copy of AgreementP52100052996 · Deviation Report - Agreement - No Deviation 1.pdf · uploaded 28 Jul 2023Source
  • 1 PAN CardP52100052977 · PAN CARD SAI KEDARESHWAR.pdf · uploaded 9 Aug 2023Source
  • 1 Copy of the legal title reportP52100052977 · Search Report _ As per RERA.pdf · uploaded 9 Aug 2023Source
  • 1 a Details of encumbrances concerned to FinanceP52100052977 · Declaration about legal and finance.pdf · uploaded 9 Aug 2023Source
  • 1 b Details of encumbrances concerned to LegalP52100052977 · Declaration about legal and finance.pdf · uploaded 9 Aug 2023Source
  • 1 Copy of Layout Approval (in case of layout)P52100052977 · Sai nagari Lay Out All Blgs Sanction-1-14_compressed.pdf · uploaded 9 Aug 2023Source
  • 2 Copy of Layout Approval (in case of layout)P52100052977 · Phase II D Blg Floor Plan Sanction-7-14_compressed.pdf · uploaded 9 Aug 2023Source
  • 1 Building Plan Approval / NA Order for plotted developmentP52100052977 · sai nagari Phase II _ Building plan D_compressed.pdf · uploaded 9 Aug 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52100052977 · sai nagari plinth cc.pdf · uploaded 9 Aug 2023Source
  • 1 Declaration about Commencement CertificateP52100052977 · Declaration about CC.pdf · uploaded 9 Aug 2023Source
  • 1 Declaration in FORM BP52100052977 · Form B _ Phase II.pdf · uploaded 9 Aug 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052977 · Form I - Architect Certifacte.pdf · uploaded 9 Aug 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052977 · Form 2 Engineer Certificate.pdf · uploaded 9 Aug 2023Source
  • 1 CERSAI detailsP52100052977 · CERSAI Declaration.pdf · uploaded 9 Aug 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052977 · Form-3 Phase II.pdf · uploaded 9 Aug 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsP52100052977 · Declaration - interest in other project.pdf · uploaded 9 Aug 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100052977 · Phase II Rera Bank Ac.pdf · uploaded 9 Aug 2023Source
  • 1 Deviation Report with respect to Allotment letterP52100052977 · Deviation Allotment Letter.pdf · uploaded 9 Aug 2023Source
  • 1 Deviation Report with respect to model copy of AgreementP52100052977 · Deviation Report Agreement.pdf · uploaded 9 Aug 2023Source
  • 2 Building Plan Approval / NA Order for plotted developmentP52100052977 · sai nagari Phase II _ Building plan E_compressed.pdf · uploaded 29 Aug 2023Source
  • 3 Building Plan Approval / NA Order for plotted developmentP52100052977 · sai nagari Phase II _ Building plan F_compressed.pdf · uploaded 29 Aug 2023Source
  • 3 Copy of Layout Approval (in case of layout)P52100052996 · Phase I ABC Floor Plan 2 sanction-4-14_compressed.pdf · uploaded 2 Sep 2023Source
  • 4 Copy of Layout Approval (in case of layout)P52100052996 · Building A Floor Plan Sanction-5-14_compressed.pdf · uploaded 2 Sep 2023Source
  • 3 Copy of Layout Approval (in case of layout)P52100052977 · Phase II E Blg Floor Plan Sanction-9-14_compressed.pdf · uploaded 2 Sep 2023Source
  • 4 Copy of Layout Approval (in case of layout)P52100052977 · Phase II F blg Floor Plan Sanction-11-14_compressed.pdf · uploaded 2 Sep 2023Source
  • 1 Proforma of Agreement for saleP52100052977 · AGR TO SALE PHASE II.pdf · uploaded 4 Sep 2023Source
  • 1 Proforma of Allotment letterP52100052977 · Porfoma of Allotment Letter.pdf · uploaded 4 Sep 2023Source
  • 1 Proforma of Agreement for saleP52100052996 · Agreement - Phase I.pdf · uploaded 11 Sep 2023Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsP52100052996 · Vivek_Discloser of interest in Project.pdf · uploaded 15 Sep 2023Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsP52100052977 · Vivek_Discloser of interest in Project.pdf · uploaded 15 Sep 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052996 · Phase 1 new form 3.pdf · uploaded 27 Sep 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052996 · Form 1 - Phase I.pdf · uploaded 6 Feb 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052996 · Form 2 Engineer Certificate Phase I.pdf · uploaded 6 Feb 2024Source
  • 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100052996 · Declaration Separate Bank Account Phase I.pdf · uploaded 6 Feb 2024Source
  • 1 Other – LegalP52100052996 · Self Declaration Phase I.pdf · uploaded 6 Feb 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052977 · Form 1 - Phase II.pdf · uploaded 6 Feb 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052977 · Form 2 Engineer Certificate Phase II.pdf · uploaded 6 Feb 2024Source
  • 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100052977 · Declaration Separate Bank Account Phase II.pdf · uploaded 6 Feb 2024Source
  • 2 Commencement Certificates / NA Order for plotted developmentP52100052996 · Commencement Certificate- Sai Nagari.pdf · uploaded 7 Feb 2024Source
  • 1 Disclosure of sold/ booked inventoryP52100052996 · Unsold A Bldg.pdf · uploaded 7 Feb 2024Source
  • 2 Disclosure of sold/ booked inventoryP52100052996 · Unsold B Bldg.pdf · uploaded 7 Feb 2024Source
  • 3 Disclosure of sold/ booked inventoryP52100052996 · Unslod C Bldg.pdf · uploaded 7 Feb 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052996 · Self Declaration- I No Withdrawal.pdf · uploaded 7 Feb 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052996 · Form 3 ABC Blg.pdf · uploaded 7 Feb 2024Source
  • 2 Commencement Certificates / NA Order for plotted developmentP52100052977 · Commencement Certificate- Sai Nagari.pdf · uploaded 7 Feb 2024Source
  • 1 Disclosure of sold/ booked inventoryP52100052977 · Unslod D Bldg.pdf · uploaded 7 Feb 2024Source
  • 2 Disclosure of sold/ booked inventoryP52100052977 · Unslod E Bldg.pdf · uploaded 7 Feb 2024Source
  • 3 Disclosure of sold/ booked inventoryP52100052977 · Unsold F Bldg.pdf · uploaded 7 Feb 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052977 · Self Declaration- II No Withdrawal.pdf · uploaded 7 Feb 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052977 · Form 2 Engineer Certificate Phase II.pdf · uploaded 7 Feb 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052977 · Form 3 DEF Blg.pdf · uploaded 7 Feb 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052996 · Form 3 - CA Phase I.pdf · uploaded 23 Mar 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052977 · Form-3 CA- Phase III.pdf · uploaded 23 Mar 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052977 · Form 3 - Phase-II Sai Nagari.pdf · uploaded 2 Apr 2024Source
  • 2 CERSAI detailsP52100052996 · PHASE-I.pdf · uploaded 26 Apr 2024Source
  • 2 CERSAI detailsP52100052977 · PHASE-II.pdf · uploaded 26 Apr 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052977 · Form 3 RERA April.pdf · uploaded 14 May 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52100078517 · PLINTH CC.pdf · uploaded 5 Jun 2024Source
  • 1 PAN CardP52100078517 · 1 PAN Card.pdf · uploaded 13 Jun 2024Source
  • 1 Copy of the legal title reportP52100078517 · Title Report rera _compressed.pdf · uploaded 13 Jun 2024Source
  • 1 a Details of encumbrances concerned to FinanceP52100078517 · Encumbrance Finance and Legal Merged.pdf · uploaded 13 Jun 2024Source
  • 1 Declaration in FORM BP52100078517 · Form B- Promoter.pdf · uploaded 13 Jun 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100078517 · Architect certificate- Form 1.pdf · uploaded 13 Jun 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100078517 · Form 3 Sai Nagari Phase IV.pdf · uploaded 13 Jun 2024Source
  • 1 Declaration about Commencement CertificateP52100078517 · Declaration of CC- New Sai Nagari Phse 4.pdf · uploaded 13 Jun 2024Source
  • 1 CERSAI detailsP52100078517 · Cersai Report.pdf · uploaded 13 Jun 2024Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100078517 · Form A.pdf · uploaded 13 Jun 2024Source
  • 1 b Details of encumbrances concerned to LegalP52100078517 · Encumbrance Finance and Legal Merged.pdf · uploaded 13 Jun 2024Source
  • 1 Proforma of Agreement for saleP52100078517 · AGREEMENT TO SALE -Phase IV.pdf · uploaded 13 Jun 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsP52100078517 · Disclosure of Interest- Ann A.pdf · uploaded 13 Jun 2024Source
  • 1 Copy of Layout Approval (in case of layout)P52100078517 · 1-22_compressed.pdf · uploaded 18 Jun 2024Source
  • 1 Proforma of Allotment letterP52100078517 · Allotment Letter- Revised.pdf · uploaded 18 Jun 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100078517 · Form- 2 Engineer Certificate.pdf · uploaded 18 Jun 2024Source
  • 2 Building Plan Approval / NA Order for plotted developmentP52100078517 · 20-22_compressed.pdf · uploaded 18 Jun 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentP52100078517 · 18-22_compressed.pdf · uploaded 18 Jun 2024Source
  • 1 Deviation Report with respect to Allotment letterP52100078517 · Deviation Report- Allotment Letter.pdf · uploaded 18 Jun 2024Source
  • 1 Deviation Report with respect to model copy of AgreementP52100078517 · Deviation Report- Agreement for Sale.pdf · uploaded 18 Jun 2024Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsP52100078517 · Ann A- Disclosure of interest- Vivek Pawar.pdf · uploaded 18 Jun 2024Source
  • 1 Other – TechnicalP52100078517 · Annexure- A- One Plot One Registration.pdf · uploaded 2 Jul 2024Source
  • 2 Copy of Layout Approval (in case of layout)P52100078517 · Plan_1-22_compressed.pdf · uploaded 5 Jul 2024Source
  • 2 Other – TechnicalP52100078517 · Declaration of Plot Area.pdf · uploaded 16 Jul 2024Source
  • 1 Other – FinanceP52100078517 · Declaration- Form 3.pdf · uploaded 10 Dec 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052996 · Form 3_compressed.pdf · uploaded 10 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052996 · Form 2.pdf · uploaded 10 Feb 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100052996 · Form-5.pdf · uploaded 10 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052977 · Form 3_compressed.pdf · uploaded 10 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052977 · Form 2.pdf · uploaded 10 Feb 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100052977 · Form 5.pdf · uploaded 10 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052996 · form 1 Phase 1.pdf · uploaded 11 Feb 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100052996 · FORM 2A Phase 1.pdf · uploaded 11 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052977 · form 1 Phase 2.pdf · uploaded 11 Feb 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100052977 · FORM 2A Phase 2.pdf · uploaded 11 Feb 2025Source
  • 1 Disclosure of sold/ booked inventoryP52100052977 · Phase-II -Sold Unsold_11zon.pdf · uploaded 19 Feb 2025Source
  • 1 Disclosure of sold/ booked inventoryP52100052996 · P-I_Sold Unsold.pdf · uploaded 22 Feb 2025Source
  • 1 CERSAI detailsP52100052996 · Cersai Declaration Phase 1.pdf · uploaded 22 Feb 2025Source
  • 1 CERSAI detailsP52100052977 · Cersai Declaration Phase 2.pdf · uploaded 22 Feb 2025Source
  • 1 a Details of encumbrances concerned to FinanceP52100052996 · Declaration Of Finance and Legal p-1.pdf · uploaded 24 Feb 2025Source
  • 1 b Details of encumbrances concerned to LegalP52100052996 · Declaration Of Finance and Legal p-1.pdf · uploaded 24 Feb 2025Source
  • 1 a Details of encumbrances concerned to FinanceP52100052977 · Declaration Of Finance and Legal p-2.pdf · uploaded 24 Feb 2025Source
  • 1 b Details of encumbrances concerned to LegalP52100052977 · Declaration Of Finance and Legal p-2.pdf · uploaded 24 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052996 · Form-1 20-04-2024.pdf · uploaded 25 Mar 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052996 · Form-1 20-07-2024.pdf · uploaded 25 Mar 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052996 · Form-1-20-10-2024.pdf · uploaded 25 Mar 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052996 · Form-1-20-01-2025.pdf · uploaded 25 Mar 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052996 · Form-2 20-04-2024.pdf · uploaded 25 Mar 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052996 · Form-2-20-07-2024.pdf · uploaded 25 Mar 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052996 · Form-2 20-10-2024.pdf · uploaded 25 Mar 2025Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052996 · Form-2 20-01-2025.pdf · uploaded 25 Mar 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052996 · p-1 Form 1.pdf · uploaded 8 May 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052996 · P-1 fORM 3 (1)_compressed (1).pdf · uploaded 8 May 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052996 · p-1 Form 2.pdf · uploaded 8 May 2025Source
  • 1 Other – FinanceP52100052996 · Declaration Form 5.pdf · uploaded 9 May 2025Source
  • 2 Other – FinanceP52100052996 · Declaration Form 5.pdf · uploaded 9 May 2025Source
  • 3 Other – FinanceP52100052996 · Declaration Form 5.pdf · uploaded 9 May 2025Source
  • 1 Other – FinanceP52100052977 · Declaration Form 5 (1).pdf · uploaded 9 May 2025Source
  • 1 Copy of Layout Approval (in case of layout)P52100052996 · Layout.pdf · uploaded 23 May 2025Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52100052996 · CC.pdf · uploaded 23 May 2025Source
  • 1 Building Plan Approval / NA Order for plotted developmentP52100052996 · 03-31 (1).pdf · uploaded 23 May 2025Source
  • 2 Building Plan Approval / NA Order for plotted developmentP52100052996 · 04-31 (1).pdf · uploaded 23 May 2025Source
  • 3 Building Plan Approval / NA Order for plotted developmentP52100052996 · 05-31 (1).pdf · uploaded 23 May 2025Source
  • 4 Building Plan Approval / NA Order for plotted developmentP52100052996 · 06-31_compressed (1).pdf · uploaded 23 May 2025Source
  • 5 Building Plan Approval / NA Order for plotted developmentP52100052996 · 07-31_compressed (1).pdf · uploaded 23 May 2025Source
  • 6 Building Plan Approval / NA Order for plotted developmentP52100052996 · 08-31_compressed (1).pdf · uploaded 23 May 2025Source
  • 1 Copy of Layout Approval (in case of layout)P52100052977 · Layout 2025.pdf · uploaded 23 May 2025Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52100052977 · CC.pdf · uploaded 23 May 2025Source
  • 1 Building Plan Approval / NA Order for plotted developmentP52100052977 · 11-31_compressed.pdf · uploaded 23 May 2025Source
  • 2 Building Plan Approval / NA Order for plotted developmentP52100052977 · 13-31_compressed.pdf · uploaded 23 May 2025Source
  • 3 Building Plan Approval / NA Order for plotted developmentP52100052977 · 15-31_compressed (3).pdf · uploaded 23 May 2025Source
  • Form 1P52100052977 · 31-03-2025 P-2.pdf · uploaded 28 May 2025Source
  • Form 2P52100052977 · 31-03-2025 P-2 F-2.pdf · uploaded 28 May 2025Source
  • Form 3P52100052977 · 31-03-2025 P-2 F-3.pdf · uploaded 28 May 2025Source
  • Form 1P52100052977 · 31-12-2024 P-2.pdf · uploaded 28 May 2025Source
  • Form 2P52100052977 · 31-12-2024 P-2 F-2.pdf · uploaded 28 May 2025Source
  • Form 3P52100052977 · 31-12-2024 P-2 F-3.pdf · uploaded 28 May 2025Source
  • Form 3P52100078517 · 31-03-2025 P-4 F-3.pdf · uploaded 17 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100078517 · P-IV Sold Unsold.pdf · uploaded 17 Jul 2025Source
  • Form 2P52100078517 · 31-03-2025 P-4 F-2.pdf · uploaded 17 Jul 2025Source
  • Form 1P52100078517 · 31-03-2025 P-4 F-1.pdf · uploaded 17 Jul 2025Source
  • Form 1P52100052996 · P-1 Form 1 30-06-2025.pdf · uploaded 29 Jul 2025Source
  • Form 2P52100052996 · P-1 Form 2 30-06-2025.pdf · uploaded 29 Jul 2025Source
  • Form 3P52100052996 · P-1 Form 3 30-06-2025.pdf · uploaded 29 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100052996 · P-1 sold unsold 30-06-2025.pdf · uploaded 29 Jul 2025Source
  • Form 1P52100052977 · P-2 Form 1 30-06-2025.pdf · uploaded 29 Jul 2025Source
  • Form 2P52100052977 · p-2 Form 2 30-06-2025.pdf · uploaded 29 Jul 2025Source
  • Form 3P52100052977 · p-2 Form 3 30-06-2025.pdf · uploaded 29 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100052977 · P-2 Shop & Flats Sold Unsold 30-06-2025.pdf · uploaded 29 Jul 2025Source
  • Form 1P52100078517 · P-4 Form 1 30-06-2025.pdf · uploaded 29 Jul 2025Source
  • Form 2P52100078517 · P-4 Form 2 30-06-2025.pdf · uploaded 29 Jul 2025Source
  • Form 3P52100078517 · P-4 Form 3 30-06-2025.pdf · uploaded 29 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100078517 · P-4 sold unsold 30-06-2025.pdf · uploaded 29 Jul 2025Source
  • Form 1P52100052996 · Form 1 Phase 1.pdf · uploaded 20 Oct 2025Source
  • Form 2P52100052996 · Form 2 Phase 1.pdf · uploaded 20 Oct 2025Source
  • Form 3P52100052996 · Form 3 Phase 1_compressed (1).pdf · uploaded 20 Oct 2025Source
  • Disclosure of Sold and Booked InventoryP52100052996 · Sold Unsold Phase 1.pdf · uploaded 20 Oct 2025Source
  • Form 1P52100052977 · Form 1 Phase 2.pdf · uploaded 20 Oct 2025Source
  • Form 2P52100052977 · Form 2 Phase 2.pdf · uploaded 20 Oct 2025Source
  • Form 3P52100052977 · Form 3 Phase 2_compressed.pdf · uploaded 20 Oct 2025Source
  • Disclosure of Sold and Booked InventoryP52100052977 · Sold Unsold Phase 2.pdf · uploaded 20 Oct 2025Source
  • Form 1P52100078517 · Form 1 Phase 4.pdf · uploaded 20 Oct 2025Source
  • Form 2P52100078517 · Form 2 Phase 4.pdf · uploaded 20 Oct 2025Source
  • Form 3P52100078517 · Form 3 Phase 4.pdf · uploaded 20 Oct 2025Source
  • Disclosure of Sold and Booked InventoryP52100078517 · Sold Unsold Phase 4.pdf · uploaded 20 Oct 2025Source
  • Form 1P52100052996 · Form 1 Ph 1.pdf · uploaded 20 Jan 2026Source
  • Form 2P52100052996 · Form 2 Ph 1.pdf · uploaded 20 Jan 2026Source
  • Form 3P52100052996 · Form III Ph 1.pdf · uploaded 20 Jan 2026Source
  • Disclosure of Sold and Booked InventoryP52100052996 · Sold Unsold Ph 1.pdf · uploaded 20 Jan 2026Source
  • Form 1P52100052977 · Form 1 Ph II.pdf · uploaded 20 Jan 2026Source
  • Form 2P52100052977 · Form 2 Ph 2.pdf · uploaded 20 Jan 2026Source
  • Form 3P52100052977 · Form III Ph 2.pdf · uploaded 20 Jan 2026Source
  • Disclosure of Sold and Booked InventoryP52100052977 · Sold Unsold Ph 2.pdf · uploaded 20 Jan 2026Source
  • Form 1P52100078517 · Form 1 Ph IV.pdf · uploaded 20 Jan 2026Source
  • Form 2P52100078517 · Form 2 Ph 4.pdf · uploaded 20 Jan 2026Source
  • Form 3P52100078517 · Form III Ph 4.pdf · uploaded 20 Jan 2026Source
  • Disclosure of Sold and Booked InventoryP52100078517 · Sold Unsold Ph 4.pdf · uploaded 20 Jan 2026Source
  • Form 1P52100052996 · Form 1 Phase I Q4.pdf · uploaded 24 Apr 2026Source
  • Form 2P52100052996 · Form 2 Phase I Q4.pdf · uploaded 24 Apr 2026Source
  • Form 3P52100052996 · Form 3 Phase I Q4.pdf · uploaded 24 Apr 2026Source
  • Disclosure of Sold and Booked InventoryP52100052996 · Phase I Sold Unsold Inventory.pdf · uploaded 24 Apr 2026Source
  • Form 1P52100052977 · Form 1 Phase II Q4.pdf · uploaded 24 Apr 2026Source
  • Form 2P52100052977 · Form 2 Phase II Q4.pdf · uploaded 24 Apr 2026Source
  • Form 3P52100052977 · Form 3 Phase II Q4.pdf · uploaded 24 Apr 2026Source
  • Disclosure of Sold and Booked InventoryP52100052977 · Phase II Sold Unsold Inventory.pdf · uploaded 24 Apr 2026Source
  • Form 1P52100078517 · Form 1 Phase IV Q4.pdf · uploaded 24 Apr 2026Source
  • Form 2P52100078517 · Form 2 Phase IV Q4.pdf · uploaded 24 Apr 2026Source
  • Form 3P52100078517 · Form 3 Phase IV Q4.pdf · uploaded 24 Apr 2026Source
  • Disclosure of Sold and Booked InventoryP52100078517 · Phase IV Sold Unsold Inventory.pdf · uploaded 24 Apr 2026Source
  • Form 1P52100052996 · PHASE 1.pdf · uploaded 20 Jul 2026Source
  • Form 2P52100052996 · Form 2 Ph 1.pdf · uploaded 20 Jul 2026Source
  • Form 3P52100052996 · Form 3 Ph 1 (2).pdf · uploaded 20 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP52100052996 · Sold Unsold Ph 1.pdf · uploaded 20 Jul 2026Source
  • OthersP52100052996 · Form 5 Ph 1.pdf · uploaded 20 Jul 2026Source
  • Form 1P52100052977 · PHASE 2.pdf · uploaded 20 Jul 2026Source
  • Form 2P52100052977 · Form 2 Ph 2.pdf · uploaded 20 Jul 2026Source
  • Form 3P52100052977 · Form 3 Ph 2.pdf · uploaded 20 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP52100052977 · Sold Unsold Ph 2.pdf · uploaded 20 Jul 2026Source
  • OthersP52100052977 · Form 5 Ph 2.pdf · uploaded 20 Jul 2026Source
  • Form 1P52100078517 · PHASE 3.pdf · uploaded 20 Jul 2026Source
  • Form 2P52100078517 · Form 2 Ph 3.pdf · uploaded 20 Jul 2026Source
  • Form 3P52100078517 · Form 3 Ph 3.pdf · uploaded 20 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP52100078517 · Sold Unsold Ph 3.pdf · uploaded 20 Jul 2026Source
  • OthersP52100078517 · Form 5 Ph 3.pdf · uploaded 20 Jul 2026Source

Technical

  • DocumentP52100052996 · Sai nagari Lay Out All Blgs Sanction-1-14_compressed.pdf · uploaded 28 Jul 2023Source
  • DocumentP52100052996 · Phase I ABC Floor Plan 1 Sanction-3-14_compressed.pdf · uploaded 28 Jul 2023Source
  • DocumentP52100052996 · sai nagari Building Plan Phase I.pdf · uploaded 28 Jul 2023Source
  • DocumentP52100052977 · Sai nagari Lay Out All Blgs Sanction-1-14_compressed.pdf · uploaded 9 Aug 2023Source
  • DocumentP52100052977 · Phase II D Blg Floor Plan Sanction-7-14_compressed.pdf · uploaded 9 Aug 2023Source
  • DocumentP52100052977 · sai nagari Phase II _ Building plan D_compressed.pdf · uploaded 9 Aug 2023Source
  • DocumentP52100052977 · sai nagari Phase II _ Building plan E_compressed.pdf · uploaded 29 Aug 2023Source
  • DocumentP52100052977 · sai nagari Phase II _ Building plan F_compressed.pdf · uploaded 29 Aug 2023Source
  • DocumentP52100052996 · Phase I ABC Floor Plan 2 sanction-4-14_compressed.pdf · uploaded 2 Sep 2023Source
  • DocumentP52100052996 · Building A Floor Plan Sanction-5-14_compressed.pdf · uploaded 2 Sep 2023Source
  • DocumentP52100052977 · Phase II E Blg Floor Plan Sanction-9-14_compressed.pdf · uploaded 2 Sep 2023Source
  • DocumentP52100052977 · Phase II F blg Floor Plan Sanction-11-14_compressed.pdf · uploaded 2 Sep 2023Source
  • DocumentP52100078517 · 20-22_compressed.pdf · uploaded 18 Jun 2024Source
  • DocumentP52100078517 · 18-22_compressed.pdf · uploaded 18 Jun 2024Source
  • DocumentP52100078517 · 1-22_compressed.pdf · uploaded 18 Jun 2024Source
  • Other – TechnicalP52100078517 · Annexure- A- One Plot One Registration.pdf · uploaded 2 Jul 2024Source
  • DocumentP52100078517 · Plan_1-22_compressed.pdf · uploaded 5 Jul 2024Source
  • Other – TechnicalP52100078517 · Declaration of Plot Area.pdf · uploaded 16 Jul 2024Source
  • DocumentP52100052996 · Layout.pdf · uploaded 23 May 2025Source
  • DocumentP52100052996 · 03-31 (1).pdf · uploaded 23 May 2025Source
  • DocumentP52100052996 · 04-31 (1).pdf · uploaded 23 May 2025Source
  • DocumentP52100052996 · 05-31 (1).pdf · uploaded 23 May 2025Source
  • DocumentP52100052996 · 06-31_compressed (1).pdf · uploaded 23 May 2025Source
  • DocumentP52100052996 · 07-31_compressed (1).pdf · uploaded 23 May 2025Source
  • DocumentP52100052996 · 08-31_compressed (1).pdf · uploaded 23 May 2025Source
  • DocumentP52100052977 · Layout 2025.pdf · uploaded 23 May 2025Source
  • DocumentP52100052977 · 11-31_compressed.pdf · uploaded 23 May 2025Source
  • DocumentP52100052977 · 13-31_compressed.pdf · uploaded 23 May 2025Source
  • DocumentP52100052977 · 15-31_compressed (3).pdf · uploaded 23 May 2025Source
  • DocumentPM1264042502917 · Annexure A - Order 50.pdf · uploaded 16 Jul 2025Source
  • OthersPM1264042502917 · Format D - Declaration About Commenecment.pdf · uploaded 16 Jul 2025Source
  • DocumentPM1264042502917 · Layout Plan 01-31.pdf · uploaded 15 Sep 2025Source
  • DocumentPM1264042502917 · Building Plan 23-31.pdf · uploaded 15 Sep 2025Source
  • DocumentPM1264042502917 · Building Plan 24-31.pdf · uploaded 15 Sep 2025Source
  • DocumentPM1264042502917 · Building Plan 25-31.pdf · uploaded 15 Sep 2025Source
  • DocumentPM1264042502917 · Building Plan 26-31.pdf · uploaded 15 Sep 2025Source
  • DocumentPM1264042502917 · Building Plan 27-31.pdf · uploaded 15 Sep 2025Source
  • DocumentPM1264042502917 · Building Plan 28-31.pdf · uploaded 15 Sep 2025Source
  • OthersPM1264042502917 · CC Verification e-mail.pdf · uploaded 30 Dec 2025Source
  • OthersPM1264042502917 · Architech Calculation plot area.pdf · uploaded 1 Jan 2026Source
  • OthersPM1264042502917 · Declaration cum Undertaking.pdf · uploaded 1 Feb 2026Source
  • OthersPM1264042502917 · Declaration.pdf · uploaded 2 Feb 2026Source

Technical (Architect)

  • DocumentP52100052996 · Form 1 - Phase I.pdf · uploaded 6 Feb 2024Source
  • DocumentP52100052977 · Form 1 - Phase II.pdf · uploaded 6 Feb 2024Source
  • DocumentP52100078517 · Architect certificate- Form 1.pdf · uploaded 13 Jun 2024Source
  • DocumentP52100052996 · form 1 Phase 1.pdf · uploaded 11 Feb 2025Source
  • DocumentP52100052977 · form 1 Phase 2.pdf · uploaded 11 Feb 2025Source
  • DocumentP52100052996 · Form-1 20-04-2024.pdf · uploaded 25 Mar 2025Source
  • DocumentP52100052996 · Form-1 20-07-2024.pdf · uploaded 25 Mar 2025Source
  • DocumentP52100052996 · Form-1-20-10-2024.pdf · uploaded 25 Mar 2025Source
  • DocumentP52100052996 · Form-1-20-01-2025.pdf · uploaded 25 Mar 2025Source
  • DocumentP52100052996 · p-1 Form 1.pdf · uploaded 8 May 2025Source

Technical (Engineer)

  • DocumentP52100052996 · Form 2 Engineer Certificate Phase I.pdf · uploaded 6 Feb 2024Source
  • DocumentP52100052977 · Form 2 Engineer Certificate Phase II.pdf · uploaded 6 Feb 2024Source
  • DocumentP52100078517 · Form- 2 Engineer Certificate.pdf · uploaded 18 Jun 2024Source
  • DocumentP52100052996 · Form 2.pdf · uploaded 10 Feb 2025Source
  • DocumentP52100052977 · Form 2.pdf · uploaded 10 Feb 2025Source
  • DocumentP52100052996 · Form-2 20-04-2024.pdf · uploaded 25 Mar 2025Source
  • DocumentP52100052996 · Form-2-20-07-2024.pdf · uploaded 25 Mar 2025Source
  • DocumentP52100052996 · Form-2 20-10-2024.pdf · uploaded 25 Mar 2025Source
  • DocumentP52100052996 · Form-2 20-01-2025.pdf · uploaded 25 Mar 2025Source
  • DocumentP52100052996 · p-1 Form 2.pdf · uploaded 8 May 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 7/1, 7/1

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Phases
4
Unit types
1BHK, 2BHK, Shop, —1,610 units in all
Address
7/1 & 8/2, Gujarnimbalkarwadi, GujarnimbalkarwadiPIN 411046
Village
Katraj, Haveli taluka
Land area for this project
3,625 sq m (39,019 sq ft)
Permissible built-up area
14,323 sq m (1,54,171 sq ft)
Sanctioned built-up area
14,323 sq m (1,54,171 sq ft)
Recreational open space
1,845 sq m (19,855 sq ft)
Designated bank account
85
Developed in phases
Yes
Also registered as
Sai Nagari Phase I, Sai Nagari Phase II, Sai Nagari Phase IV, SAI NAGARI Phase V, Sangharsh, संघर्ष

Survey, CTS, gat or plot numbers

7/17/18/28/2 Gujar nimbalkarwadiS. No. 7/1

Land as published on MahaRERA's project page

7/1 & 8/2, Gujarnimbalkarwadi

Boundaries

North
S No 8 5
South
Dry Nala
East
Remaining Land of S No 7
West
S No 7 2

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking1,610 units

103 of 1,610 units booked (6%), as the promoter reported to MahaRERA

1BHK · 398 units2BHK · 76 unitsShop · 116 units— · 1,020 units
RERABuildingTypeCarpet areaUnitsBooked
P5210005299601 Building A1BHK32.13 sq m · 346 sq ft861
P5210005299601 Building A2BHK49.52 sq m · 533 sq ft441
P5210005299601 Building AShop12.6 sq m · 136 sq ft20
P5210005299601 Building AShop17.22 sq m · 185 sq ft10
P5210005299601 Building AShop19.05 sq m · 205 sq ft10
P5210005299601 Building AShop20.07 sq m · 216 sq ft20
P5210005299601 Building AShop21.5 sq m · 231 sq ft10
P5210005299601 Building AShop21.51 sq m · 232 sq ft10
Show all 83 unit rowsShow fewer unit rows
RERABuildingTypeCarpet areaUnitsBooked
P5210005299601 Building AShop24.62 sq m · 265 sq ft10
P5210005299601 Building AShop25.23 sq m · 272 sq ft20
P5210005299601 Building AShop26.38 sq m · 284 sq ft20
P5210005299601 Building AShop29.2 sq m · 314 sq ft10
P5210005299601 Building AShop31.08 sq m · 335 sq ft20
P5210005299601 Building AShop32.12 sq m · 346 sq ft10
P5210005299601 Building AShop32.88 sq m · 354 sq ft20
P5210005299601 Building AShop37.8 sq m · 407 sq ft10
P5210005299601 Building AShop38.13 sq m · 410 sq ft20
P5210005299601 Building AShop38.4 sq m · 413 sq ft20
P5210005299601 Building AShop41.92 sq m · 451 sq ft10
P5210005299601 Building AShop42.34 sq m · 456 sq ft10
P5210005299601 Building AShop57.78 sq m · 622 sq ft10
P5210005299601 Building AShop75.44 sq m · 812 sq ft10
P5210005299602 Building BShop12.6 sq m · 136 sq ft10
P5210005299602 Building BShop17.22 sq m · 185 sq ft20
P5210005299602 Building BShop20.07 sq m · 216 sq ft10
P5210005299602 Building BShop21.66 sq m · 233 sq ft10
P5210005299602 Building BShop21.71 sq m · 234 sq ft10
P5210005299602 Building BShop23.59 sq m · 254 sq ft10
P5210005299602 Building BShop24.62 sq m · 265 sq ft20
P5210005299602 Building BShop25.22 sq m · 271 sq ft10
P5210005299602 Building BShop26.33 sq m · 283 sq ft10
P5210005299602 Building BShop26.38 sq m · 284 sq ft10
P5210005299602 Building BShop27.19 sq m · 293 sq ft10
P5210005299602 Building BShop27.44 sq m · 295 sq ft10
P5210005299602 Building BShop31.08 sq m · 335 sq ft10
P5210005299602 Building BShop31.23 sq m · 336 sq ft10
P5210005299602 Building BShop37.4 sq m · 403 sq ft20
P5210005299602 Building BShop38.13 sq m · 410 sq ft10
P5210005299602 Building BShop42.34 sq m · 456 sq ft10
P5210005299602 Building BShop75.44 sq m · 812 sq ft20
P5210005299603 Building CShop12.6 sq m · 136 sq ft20
P5210005299603 Building CShop17.22 sq m · 185 sq ft10
P5210005299603 Building CShop19.05 sq m · 205 sq ft10
P5210005299603 Building CShop20.07 sq m · 216 sq ft20
P5210005299603 Building CShop21.5 sq m · 231 sq ft10
P5210005299603 Building CShop21.51 sq m · 232 sq ft10
P5210005299603 Building CShop24.62 sq m · 265 sq ft10
P5210005299603 Building CShop25.23 sq m · 272 sq ft20
P5210005299603 Building CShop26.38 sq m · 284 sq ft20
P5210005299603 Building CShop29.2 sq m · 314 sq ft10
P5210005299603 Building CShop31.08 sq m · 335 sq ft20
P5210005299603 Building CShop32.12 sq m · 346 sq ft10
P5210005299603 Building CShop32.88 sq m · 354 sq ft20
P5210005299603 Building CShop37.8 sq m · 407 sq ft10
P5210005299603 Building CShop38.13 sq m · 410 sq ft20
P5210005299603 Building CShop38.4 sq m · 413 sq ft20
P5210005299603 Building CShop41.92 sq m · 451 sq ft10
P5210005299603 Building CShop42.34 sq m · 456 sq ft10
P5210005299603 Building CShop57.78 sq m · 622 sq ft10
P5210005299603 Building CShop75.44 sq m · 812 sq ft10
P5210005297704 Building D1BHK27.72 sq m · 298 sq ft12845
P5210005297704 Building D2BHK48.91 sq m · 526 sq ft260
P5210005297704 Building DShop19.85 sq m · 214 sq ft50
P5210005297704 Building DShop20.5 sq m · 221 sq ft10
P5210005297704 Building DShop20.88 sq m · 225 sq ft50
P5210005297704 Building DShop21.2 sq m · 228 sq ft10
P5210005297704 Building DShop22.83 sq m · 246 sq ft10
P5210005297705 Building E1BHK27.72 sq m · 298 sq ft15456
P5210005297705 Building EShop19.85 sq m · 214 sq ft60
P5210005297705 Building EShop20.88 sq m · 225 sq ft60
P5210005297706 Building F1BHK27.72 sq m · 298 sq ft300
P5210005297706 Building F2BHK48.91 sq m · 526 sq ft60
P5210005297706 Building FShop19.85 sq m · 214 sq ft50
P5210005297706 Building FShop20.5 sq m · 221 sq ft10
P5210005297706 Building FShop20.88 sq m · 225 sq ft50
P5210005297706 Building FShop21.2 sq m · 228 sq ft10
P5210005297706 Building FShop22.83 sq m · 246 sq ft10
P52100078517Building I——231—
P52100078517Building J——226—
PM1264042502917Building K——176—
PM1264042502917Building L——138—
PM1264042502917Building M——138—
PM1264042502917Building N——111—

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals22

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.RERA
ArchitectAmruta Deshpande—P52100052996
ArchitectAmruta Deshpande—P52100052977
ArchitectAmruta Deshpande—PM1264042502917
ArchitectAmruta Deshpande—P52100078517
ArchitectAnuja B Raykar—P52100078517
Chartered accountantAnkita P Jain & Co—P52100078517
Chartered accountantDurgesh v Vyawahare—P52100052996
Chartered accountantDurgesh v Vyawahare—P52100078517
Show all 22 professionalsShow fewer professionals
RoleNameRegistration no.RERA
Chartered accountantDurgesh V Vyawahare—PM1264042502917
Chartered accountantDurgesh V Vyawahare—P52100052977
Chartered accountantMayank Kriplani—P52100078517
Chartered accountantMayank Kriplani—P52100052996
Chartered accountantMayank Kriplani—P52100052977
Chartered accountantPranal p Thakare—P52100078517
Chartered accountantPranal p Thakare—PM1264042502917
Chartered accountantPranal P Thakare—P52100052977
Chartered accountantPranal P Thakare—P52100052996
EngineerAkash Pawar—P52100052996
EngineerAkash Pawar—P52100052977
EngineerAkash Pawar—P52100078517
EngineerAkash Pawar—PM1264042502917
EngineerMr Akash Manohar Pawar—P52100078517

Source: MahaRERA project page. Contact details are not shown.

Other projects in Katraj

All 2,149 projects in Katraj · Compare Sai Nagari with another project

Sai Nagari in numbers

Registered deals, summarised

Deedo has 29 registered documents at Sai Nagari, from Aug 2019 to Sep 2026: 8 sales, 13 leave and licence agreements, 6 mortgages. The median registered sale since Aug 2019 works out to about ₹5,100 per sq ft, at a median of ₹16 L a deal; 13% of sales were resales.

What is the price per sq ft at Sai Nagari?
The median registered sale since Aug 2019 works out to about ₹5,100 per sq ft, at a median of ₹16 L a deal; 13% of sales were resales.
How many properties have been sold at Sai Nagari?
8 sales are registered at Sai Nagari, 1 of them a resale.
Are properties at Sai Nagari rented out?
Yes: 13 leave and licence agreements are registered at Sai Nagari, at a median rent since Aug 2019 of about ₹14,000 a month with a deposit of about ₹17,000.
Where does this data come from?
The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Sai Nagari by Deedo, last updated with deals registered in Sep 2026.

Latest deal · Resale · Oct 2024

Under ₹25 L

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · registered documents (Index II)Data through is when MahaRERA's project page was last read.Report a problemMethodology