Sai Nagari
Deedo IDDP-PUN-RQ5NCompletion was pushed back 4 months, to Apr 2031; no MahaRERA orders on record; 6% of its units are booked.
Katraj, Pune 411046 · Property rates in Katraj · by Saikedareshwar Developers Llp
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2031
- P52100052996Registered 10 Oct 2023, completion promised 28 May 2029, revised to 28 Sep 2029.
- P52100052977Registered 10 Oct 2023, completion promised 28 May 2029, revised to 28 Sep 2029.
- P52100078517Registered 19 Dec 2024, completion promised 31 Dec 2029, revised to 30 Apr 2030.
- PM1264042502917Registered 18 Mar 2026, completion promised 31 Dec 2030, revised to 30 Apr 2031.
No extension certificate on record.
4 registrations · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
- Resale · Oct 2024
- Primary sale · Jul 2024
- Primary sale · Dec 2023
- Primary sale · Nov 2023
- Primary sale · Mar 2023
- Primary sale · Mar 2023
- Rental · May 2026
- Rental · Apr 2026
- Mortgage · Feb 2026No amount
- Rental · Nov 2025
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Oct 2024 | Main building · 301 | Resale | 325 sq ft | View Resale, Oct 2024 | |
| Jul 2024 | Main building · 301 | Primary sale | 325 sq ft | View Primary sale, Jul 2024 | |
| Dec 2023 | Main building · 401 | Primary sale | 300 sq ft | View Primary sale, Dec 2023 | |
| Nov 2023 | Main building · 303 | Primary sale | 334 sq ft | View Primary sale, Nov 2023 | |
| Mar 2023 | Main building · 202 | Primary sale | 308 sq ft | View Primary sale, Mar 2023 | |
| Mar 2023 | Main building · 402 | Primary sale | 308 sq ft | View Primary sale, Mar 2023 | |
| May 2026 | 03 Building C · 34 | Rental | — | View Rental, May 2026 | |
| Apr 2026 | 02 Building B · 7 | Rental | — | View Rental, Apr 2026 | |
| Feb 2026 | Building I · 1105 | Mortgage | — | View Mortgage, Feb 2026 | |
| Nov 2025 | Unit 1 | Rental | — | View Rental, Nov 2025 |
13 buildings
Open a building to see every flat, floor by floor.
- 01 Building A18 floors · 158 units1% booked
- 02 Building B18 floors · 22 units0% booked
- 03 Building C18 floors · 28 units0% booked
- 04 Building D13 floors · 167 units27% booked
- 05 Building E13 floors · 166 units34% booked
- 06 Building F13 floors · 49 units0% booked
- Building I15 floors · 231 units59% booked
- Building J11 floors · 226 units53% booked
- Building K14 floors · 176 units0% booked
- Building L14 floors · 138 units0% booked
- Building M14 floors · 138 units0% booked
- Building N9 floors · 111 units0% booked
- Main buildingSize not on record
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrations4
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100052996 | 10 Oct 2023 | 28 May 2029 | 28 Sep 2029 | Saikedareshwar Developers LLP | Project page |
| P52100052977 | 10 Oct 2023 | 28 May 2029 | 28 Sep 2029 | Saikedareshwar Developers LLP | Project page |
| P52100078517 | 19 Dec 2024 | 31 Dec 2029 | 30 Apr 2030 | Saikedareshwar Developers LLP | Project page |
| PM1264042502917 | 18 Mar 2026 | 31 Dec 2030 | 30 Apr 2031 | Saikedareshwar Developers LLP | Project page |
Documents335
4 documents held by Deedo, 331 filings listed on MahaRERA's project page
Registration certificate (4)
Finance
- PAN CardP52100052996 · PAN CARD SAI KEDARESHWAR.pdf · uploaded 28 Jul 2023Source
- PAN CardP52100052977 · PAN CARD SAI KEDARESHWAR.pdf · uploaded 9 Aug 2023Source
- PAN CardP52100078517 · 1 PAN Card.pdf · uploaded 13 Jun 2024Source
- Other – FinanceP52100078517 · Declaration- Form 3.pdf · uploaded 10 Dec 2024Source
Show all 335 documentsShow fewer documents
Finance
- Other – FinanceP52100052996 · Declaration Form 5.pdf · uploaded 9 May 2025Source
- Other – FinanceP52100052996 · Declaration Form 5.pdf · uploaded 9 May 2025Source
- Other – FinanceP52100052996 · Declaration Form 5.pdf · uploaded 9 May 2025Source
- Other – FinanceP52100052977 · Declaration Form 5 (1).pdf · uploaded 9 May 2025Source
- PAN CardPM1264042502917 · PAN CARD SAI KEDARESHWAR.pdf · uploaded 16 Jul 2025Source
- OthersPM1264042502917 · CERSAI Declaration.pdf · uploaded 16 Jul 2025Source
- OthersPM1264042502917 · Encumbrance To Finance.pdf · uploaded 16 Jul 2025Source
- OthersPM1264042502917 · Declaretion.pdf · uploaded 13 Dec 2025Source
- OthersPM1264042502917 · Architech Calculation .pdf · uploaded 13 Dec 2025Source
Legal
- Legal Title reportP52100052996 · Title Report DNYANESH NAVALE 27-09-2023.pdf · uploaded 28 Jul 2023Source
- Declaration Form BP52100052996 · Form B_ Phase I.pdf · uploaded 28 Jul 2023Source
- Legal Title reportP52100052977 · Search Report _ As per RERA.pdf · uploaded 9 Aug 2023Source
- Declaration Form BP52100052977 · Form B _ Phase II.pdf · uploaded 9 Aug 2023Source
- Other – LegalP52100052996 · Self Declaration Phase I.pdf · uploaded 6 Feb 2024Source
- Legal Title reportP52100078517 · Title Report rera _compressed.pdf · uploaded 13 Jun 2024Source
- Declaration Form BP52100078517 · Form B- Promoter.pdf · uploaded 13 Jun 2024Source
- OthersPM1264042502917 · Annexure A - Disclosure of Interest - Vishal Pawar.pdf · uploaded 16 Jul 2025Source
- Declaration Form BPM1264042502917 · 1_AGR To Sale.pdf · uploaded 16 Jul 2025Source
- Declaration Form BPM1264042502917 · 2_AGR To Sale.pdf · uploaded 16 Jul 2025Source
- Declaration Form BPM1264042502917 · 3_AGR To Sale.pdf · uploaded 16 Jul 2025Source
- OthersPM1264042502917 · Annexure A - Disclosure of Interest - Vivek Pawar.pdf · uploaded 15 Sep 2025Source
- Declaration Form BPM1264042502917 · Form B.pdf · uploaded 15 Sep 2025Source
- OthersPM1264042502917 · Encumbrance To Legal.pdf · uploaded 2 Dec 2025Source
- OthersPM1264042502917 · CC Verification Letter by MHADA.pdf · uploaded 2 Dec 2025Source
- OthersPM1264042502917 · 1_Sale Deed Plot C scan.pdf · uploaded 2 Dec 2025Source
- OthersPM1264042502917 · 2_Sale Deed Plot C scan.pdf · uploaded 2 Dec 2025Source
- OthersPM1264042502917 · 3_Sale Deed Plot C scan.pdf · uploaded 2 Dec 2025Source
- Declaration Form BPM1264042502917 · 1_Sale Deed Plot C scan.pdf · uploaded 2 Dec 2025Source
- Declaration Form BPM1264042502917 · 2_Sale Deed Plot C scan.pdf · uploaded 2 Dec 2025Source
- Declaration Form BPM1264042502917 · 3_Sale Deed Plot C scan.pdf · uploaded 2 Dec 2025Source
- Declaration Form BPM1264042502917 · 1_AGR To Sale Plot B 16021-2023.pdf · uploaded 2 Dec 2025Source
- Declaration Form BPM1264042502917 · 2_AGR To Sale Plot B 16021-2023.pdf · uploaded 2 Dec 2025Source
- Declaration Form BPM1264042502917 · 3_AGR To Sale Plot B 16021-2023.pdf · uploaded 2 Dec 2025Source
- Declaration Form BPM1264042502917 · 4_AGR To Sale Plot B 16021-2023.pdf · uploaded 2 Dec 2025Source
- Declaration Form BPM1264042502917 · 1_AGR To Sale Plot A 16019-23.pdf · uploaded 2 Dec 2025Source
- Declaration Form BPM1264042502917 · 2_AGR To Sale Plot A 16019-23.pdf · uploaded 2 Dec 2025Source
- Declaration Form BPM1264042502917 · 3_AGR To Sale Plot A 16019-23.pdf · uploaded 2 Dec 2025Source
- Declaration Form BPM1264042502917 · 4_AGR To Sale Plot A 16019-23.pdf · uploaded 2 Dec 2025Source
- Declaration Form BPM1264042502917 · 5_AGR To Sale Plot A 16019-23.pdf · uploaded 2 Dec 2025Source
- OthersPM1264042502917 · Satbara 7-12 .pdf · uploaded 1 Jan 2026Source
- OthersPM1264042502917 · 8-2 Satbara .pdf · uploaded 1 Jan 2026Source
- Declaration Form BPM1264042502917 · Sale Deed - Plot A 16008-2024_compressed (2).pdf · uploaded 1 Jan 2026Source
- Declaration Form BPM1264042502917 · Sale Deed - Plot B 16011-2024 .pdf · uploaded 1 Jan 2026Source
- OthersPM1264042502917 · declaration cum affidavit.pdf · uploaded 30 Jan 2026Source
- OthersPM1264042502917 · Declaration cum Undertaking.pdf · uploaded 1 Feb 2026Source
- OthersPM1264042502917 · Declaretion of past experience .pdf · uploaded 2 Mar 2026Source
- Declaration Form BPM1264042502917 · Legal Title Report .pdf · uploaded 4 Mar 2026Source
Migrated
- 1 PAN CardP52100052996 · PAN CARD SAI KEDARESHWAR.pdf · uploaded 28 Jul 2023Source
- 1 Copy of the legal title reportP52100052996 · Title Report DNYANESH NAVALE 27-09-2023.pdf · uploaded 28 Jul 2023Source
- 1 a Details of encumbrances concerned to FinanceP52100052996 · Encumbrace to Finance and Legal.pdf · uploaded 28 Jul 2023Source
- 1 b Details of encumbrances concerned to LegalP52100052996 · Encumbrace to Finance and Legal.pdf · uploaded 28 Jul 2023Source
- 1 Copy of Layout Approval (in case of layout)P52100052996 · Sai nagari Lay Out All Blgs Sanction-1-14_compressed.pdf · uploaded 28 Jul 2023Source
- 2 Copy of Layout Approval (in case of layout)P52100052996 · Phase I ABC Floor Plan 1 Sanction-3-14_compressed.pdf · uploaded 28 Jul 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100052996 · sai nagari Building Plan Phase I.pdf · uploaded 28 Jul 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100052996 · sai nagari plinth cc.pdf · uploaded 28 Jul 2023Source
- 1 Declaration about Commencement CertificateP52100052996 · Declaration to CC.pdf · uploaded 28 Jul 2023Source
- 1 Declaration in FORM BP52100052996 · Form B_ Phase I.pdf · uploaded 28 Jul 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052996 · Form I - Architect Certificate.pdf · uploaded 28 Jul 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052996 · Form 2 - Phase I.pdf · uploaded 28 Jul 2023Source
- 1 CERSAI detailsP52100052996 · Self Declaration Cersai_ New.pdf · uploaded 28 Jul 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP52100052996 · Disclouser of interest in other project.pdf · uploaded 28 Jul 2023Source
- 1 Proforma of Allotment letterP52100052996 · Allotment Letter.pdf · uploaded 28 Jul 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100052996 · Declaration of Seperate bank Account.pdf · uploaded 28 Jul 2023Source
- 1 Deviation Report with respect to Allotment letterP52100052996 · Deviation Report - Allotment.pdf · uploaded 28 Jul 2023Source
- 1 Deviation Report with respect to model copy of AgreementP52100052996 · Deviation Report - Agreement - No Deviation 1.pdf · uploaded 28 Jul 2023Source
- 1 PAN CardP52100052977 · PAN CARD SAI KEDARESHWAR.pdf · uploaded 9 Aug 2023Source
- 1 Copy of the legal title reportP52100052977 · Search Report _ As per RERA.pdf · uploaded 9 Aug 2023Source
- 1 a Details of encumbrances concerned to FinanceP52100052977 · Declaration about legal and finance.pdf · uploaded 9 Aug 2023Source
- 1 b Details of encumbrances concerned to LegalP52100052977 · Declaration about legal and finance.pdf · uploaded 9 Aug 2023Source
- 1 Copy of Layout Approval (in case of layout)P52100052977 · Sai nagari Lay Out All Blgs Sanction-1-14_compressed.pdf · uploaded 9 Aug 2023Source
- 2 Copy of Layout Approval (in case of layout)P52100052977 · Phase II D Blg Floor Plan Sanction-7-14_compressed.pdf · uploaded 9 Aug 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100052977 · sai nagari Phase II _ Building plan D_compressed.pdf · uploaded 9 Aug 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100052977 · sai nagari plinth cc.pdf · uploaded 9 Aug 2023Source
- 1 Declaration about Commencement CertificateP52100052977 · Declaration about CC.pdf · uploaded 9 Aug 2023Source
- 1 Declaration in FORM BP52100052977 · Form B _ Phase II.pdf · uploaded 9 Aug 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052977 · Form I - Architect Certifacte.pdf · uploaded 9 Aug 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052977 · Form 2 Engineer Certificate.pdf · uploaded 9 Aug 2023Source
- 1 CERSAI detailsP52100052977 · CERSAI Declaration.pdf · uploaded 9 Aug 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052977 · Form-3 Phase II.pdf · uploaded 9 Aug 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP52100052977 · Declaration - interest in other project.pdf · uploaded 9 Aug 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100052977 · Phase II Rera Bank Ac.pdf · uploaded 9 Aug 2023Source
- 1 Deviation Report with respect to Allotment letterP52100052977 · Deviation Allotment Letter.pdf · uploaded 9 Aug 2023Source
- 1 Deviation Report with respect to model copy of AgreementP52100052977 · Deviation Report Agreement.pdf · uploaded 9 Aug 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100052977 · sai nagari Phase II _ Building plan E_compressed.pdf · uploaded 29 Aug 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentP52100052977 · sai nagari Phase II _ Building plan F_compressed.pdf · uploaded 29 Aug 2023Source
- 3 Copy of Layout Approval (in case of layout)P52100052996 · Phase I ABC Floor Plan 2 sanction-4-14_compressed.pdf · uploaded 2 Sep 2023Source
- 4 Copy of Layout Approval (in case of layout)P52100052996 · Building A Floor Plan Sanction-5-14_compressed.pdf · uploaded 2 Sep 2023Source
- 3 Copy of Layout Approval (in case of layout)P52100052977 · Phase II E Blg Floor Plan Sanction-9-14_compressed.pdf · uploaded 2 Sep 2023Source
- 4 Copy of Layout Approval (in case of layout)P52100052977 · Phase II F blg Floor Plan Sanction-11-14_compressed.pdf · uploaded 2 Sep 2023Source
- 1 Proforma of Agreement for saleP52100052977 · AGR TO SALE PHASE II.pdf · uploaded 4 Sep 2023Source
- 1 Proforma of Allotment letterP52100052977 · Porfoma of Allotment Letter.pdf · uploaded 4 Sep 2023Source
- 1 Proforma of Agreement for saleP52100052996 · Agreement - Phase I.pdf · uploaded 11 Sep 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsP52100052996 · Vivek_Discloser of interest in Project.pdf · uploaded 15 Sep 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsP52100052977 · Vivek_Discloser of interest in Project.pdf · uploaded 15 Sep 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052996 · Phase 1 new form 3.pdf · uploaded 27 Sep 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052996 · Form 1 - Phase I.pdf · uploaded 6 Feb 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052996 · Form 2 Engineer Certificate Phase I.pdf · uploaded 6 Feb 2024Source
- 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100052996 · Declaration Separate Bank Account Phase I.pdf · uploaded 6 Feb 2024Source
- 1 Other – LegalP52100052996 · Self Declaration Phase I.pdf · uploaded 6 Feb 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052977 · Form 1 - Phase II.pdf · uploaded 6 Feb 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052977 · Form 2 Engineer Certificate Phase II.pdf · uploaded 6 Feb 2024Source
- 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100052977 · Declaration Separate Bank Account Phase II.pdf · uploaded 6 Feb 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentP52100052996 · Commencement Certificate- Sai Nagari.pdf · uploaded 7 Feb 2024Source
- 1 Disclosure of sold/ booked inventoryP52100052996 · Unsold A Bldg.pdf · uploaded 7 Feb 2024Source
- 2 Disclosure of sold/ booked inventoryP52100052996 · Unsold B Bldg.pdf · uploaded 7 Feb 2024Source
- 3 Disclosure of sold/ booked inventoryP52100052996 · Unslod C Bldg.pdf · uploaded 7 Feb 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052996 · Self Declaration- I No Withdrawal.pdf · uploaded 7 Feb 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052996 · Form 3 ABC Blg.pdf · uploaded 7 Feb 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentP52100052977 · Commencement Certificate- Sai Nagari.pdf · uploaded 7 Feb 2024Source
- 1 Disclosure of sold/ booked inventoryP52100052977 · Unslod D Bldg.pdf · uploaded 7 Feb 2024Source
- 2 Disclosure of sold/ booked inventoryP52100052977 · Unslod E Bldg.pdf · uploaded 7 Feb 2024Source
- 3 Disclosure of sold/ booked inventoryP52100052977 · Unsold F Bldg.pdf · uploaded 7 Feb 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052977 · Self Declaration- II No Withdrawal.pdf · uploaded 7 Feb 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052977 · Form 2 Engineer Certificate Phase II.pdf · uploaded 7 Feb 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052977 · Form 3 DEF Blg.pdf · uploaded 7 Feb 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052996 · Form 3 - CA Phase I.pdf · uploaded 23 Mar 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052977 · Form-3 CA- Phase III.pdf · uploaded 23 Mar 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052977 · Form 3 - Phase-II Sai Nagari.pdf · uploaded 2 Apr 2024Source
- 2 CERSAI detailsP52100052996 · PHASE-I.pdf · uploaded 26 Apr 2024Source
- 2 CERSAI detailsP52100052977 · PHASE-II.pdf · uploaded 26 Apr 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052977 · Form 3 RERA April.pdf · uploaded 14 May 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100078517 · PLINTH CC.pdf · uploaded 5 Jun 2024Source
- 1 PAN CardP52100078517 · 1 PAN Card.pdf · uploaded 13 Jun 2024Source
- 1 Copy of the legal title reportP52100078517 · Title Report rera _compressed.pdf · uploaded 13 Jun 2024Source
- 1 a Details of encumbrances concerned to FinanceP52100078517 · Encumbrance Finance and Legal Merged.pdf · uploaded 13 Jun 2024Source
- 1 Declaration in FORM BP52100078517 · Form B- Promoter.pdf · uploaded 13 Jun 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100078517 · Architect certificate- Form 1.pdf · uploaded 13 Jun 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100078517 · Form 3 Sai Nagari Phase IV.pdf · uploaded 13 Jun 2024Source
- 1 Declaration about Commencement CertificateP52100078517 · Declaration of CC- New Sai Nagari Phse 4.pdf · uploaded 13 Jun 2024Source
- 1 CERSAI detailsP52100078517 · Cersai Report.pdf · uploaded 13 Jun 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100078517 · Form A.pdf · uploaded 13 Jun 2024Source
- 1 b Details of encumbrances concerned to LegalP52100078517 · Encumbrance Finance and Legal Merged.pdf · uploaded 13 Jun 2024Source
- 1 Proforma of Agreement for saleP52100078517 · AGREEMENT TO SALE -Phase IV.pdf · uploaded 13 Jun 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP52100078517 · Disclosure of Interest- Ann A.pdf · uploaded 13 Jun 2024Source
- 1 Copy of Layout Approval (in case of layout)P52100078517 · 1-22_compressed.pdf · uploaded 18 Jun 2024Source
- 1 Proforma of Allotment letterP52100078517 · Allotment Letter- Revised.pdf · uploaded 18 Jun 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100078517 · Form- 2 Engineer Certificate.pdf · uploaded 18 Jun 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100078517 · 20-22_compressed.pdf · uploaded 18 Jun 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100078517 · 18-22_compressed.pdf · uploaded 18 Jun 2024Source
- 1 Deviation Report with respect to Allotment letterP52100078517 · Deviation Report- Allotment Letter.pdf · uploaded 18 Jun 2024Source
- 1 Deviation Report with respect to model copy of AgreementP52100078517 · Deviation Report- Agreement for Sale.pdf · uploaded 18 Jun 2024Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsP52100078517 · Ann A- Disclosure of interest- Vivek Pawar.pdf · uploaded 18 Jun 2024Source
- 1 Other – TechnicalP52100078517 · Annexure- A- One Plot One Registration.pdf · uploaded 2 Jul 2024Source
- 2 Copy of Layout Approval (in case of layout)P52100078517 · Plan_1-22_compressed.pdf · uploaded 5 Jul 2024Source
- 2 Other – TechnicalP52100078517 · Declaration of Plot Area.pdf · uploaded 16 Jul 2024Source
- 1 Other – FinanceP52100078517 · Declaration- Form 3.pdf · uploaded 10 Dec 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052996 · Form 3_compressed.pdf · uploaded 10 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052996 · Form 2.pdf · uploaded 10 Feb 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100052996 · Form-5.pdf · uploaded 10 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052977 · Form 3_compressed.pdf · uploaded 10 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052977 · Form 2.pdf · uploaded 10 Feb 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100052977 · Form 5.pdf · uploaded 10 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052996 · form 1 Phase 1.pdf · uploaded 11 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100052996 · FORM 2A Phase 1.pdf · uploaded 11 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052977 · form 1 Phase 2.pdf · uploaded 11 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100052977 · FORM 2A Phase 2.pdf · uploaded 11 Feb 2025Source
- 1 Disclosure of sold/ booked inventoryP52100052977 · Phase-II -Sold Unsold_11zon.pdf · uploaded 19 Feb 2025Source
- 1 Disclosure of sold/ booked inventoryP52100052996 · P-I_Sold Unsold.pdf · uploaded 22 Feb 2025Source
- 1 CERSAI detailsP52100052996 · Cersai Declaration Phase 1.pdf · uploaded 22 Feb 2025Source
- 1 CERSAI detailsP52100052977 · Cersai Declaration Phase 2.pdf · uploaded 22 Feb 2025Source
- 1 a Details of encumbrances concerned to FinanceP52100052996 · Declaration Of Finance and Legal p-1.pdf · uploaded 24 Feb 2025Source
- 1 b Details of encumbrances concerned to LegalP52100052996 · Declaration Of Finance and Legal p-1.pdf · uploaded 24 Feb 2025Source
- 1 a Details of encumbrances concerned to FinanceP52100052977 · Declaration Of Finance and Legal p-2.pdf · uploaded 24 Feb 2025Source
- 1 b Details of encumbrances concerned to LegalP52100052977 · Declaration Of Finance and Legal p-2.pdf · uploaded 24 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052996 · Form-1 20-04-2024.pdf · uploaded 25 Mar 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052996 · Form-1 20-07-2024.pdf · uploaded 25 Mar 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052996 · Form-1-20-10-2024.pdf · uploaded 25 Mar 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052996 · Form-1-20-01-2025.pdf · uploaded 25 Mar 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052996 · Form-2 20-04-2024.pdf · uploaded 25 Mar 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052996 · Form-2-20-07-2024.pdf · uploaded 25 Mar 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052996 · Form-2 20-10-2024.pdf · uploaded 25 Mar 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052996 · Form-2 20-01-2025.pdf · uploaded 25 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052996 · p-1 Form 1.pdf · uploaded 8 May 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052996 · P-1 fORM 3 (1)_compressed (1).pdf · uploaded 8 May 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052996 · p-1 Form 2.pdf · uploaded 8 May 2025Source
- 1 Other – FinanceP52100052996 · Declaration Form 5.pdf · uploaded 9 May 2025Source
- 2 Other – FinanceP52100052996 · Declaration Form 5.pdf · uploaded 9 May 2025Source
- 3 Other – FinanceP52100052996 · Declaration Form 5.pdf · uploaded 9 May 2025Source
- 1 Other – FinanceP52100052977 · Declaration Form 5 (1).pdf · uploaded 9 May 2025Source
- 1 Copy of Layout Approval (in case of layout)P52100052996 · Layout.pdf · uploaded 23 May 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100052996 · CC.pdf · uploaded 23 May 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100052996 · 03-31 (1).pdf · uploaded 23 May 2025Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100052996 · 04-31 (1).pdf · uploaded 23 May 2025Source
- 3 Building Plan Approval / NA Order for plotted developmentP52100052996 · 05-31 (1).pdf · uploaded 23 May 2025Source
- 4 Building Plan Approval / NA Order for plotted developmentP52100052996 · 06-31_compressed (1).pdf · uploaded 23 May 2025Source
- 5 Building Plan Approval / NA Order for plotted developmentP52100052996 · 07-31_compressed (1).pdf · uploaded 23 May 2025Source
- 6 Building Plan Approval / NA Order for plotted developmentP52100052996 · 08-31_compressed (1).pdf · uploaded 23 May 2025Source
- 1 Copy of Layout Approval (in case of layout)P52100052977 · Layout 2025.pdf · uploaded 23 May 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100052977 · CC.pdf · uploaded 23 May 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100052977 · 11-31_compressed.pdf · uploaded 23 May 2025Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100052977 · 13-31_compressed.pdf · uploaded 23 May 2025Source
- 3 Building Plan Approval / NA Order for plotted developmentP52100052977 · 15-31_compressed (3).pdf · uploaded 23 May 2025Source
- Form 1P52100052977 · 31-03-2025 P-2.pdf · uploaded 28 May 2025Source
- Form 2P52100052977 · 31-03-2025 P-2 F-2.pdf · uploaded 28 May 2025Source
- Form 3P52100052977 · 31-03-2025 P-2 F-3.pdf · uploaded 28 May 2025Source
- Form 1P52100052977 · 31-12-2024 P-2.pdf · uploaded 28 May 2025Source
- Form 2P52100052977 · 31-12-2024 P-2 F-2.pdf · uploaded 28 May 2025Source
- Form 3P52100052977 · 31-12-2024 P-2 F-3.pdf · uploaded 28 May 2025Source
- Form 3P52100078517 · 31-03-2025 P-4 F-3.pdf · uploaded 17 Jul 2025Source
- Disclosure of Sold and Booked InventoryP52100078517 · P-IV Sold Unsold.pdf · uploaded 17 Jul 2025Source
- Form 2P52100078517 · 31-03-2025 P-4 F-2.pdf · uploaded 17 Jul 2025Source
- Form 1P52100078517 · 31-03-2025 P-4 F-1.pdf · uploaded 17 Jul 2025Source
- Form 1P52100052996 · P-1 Form 1 30-06-2025.pdf · uploaded 29 Jul 2025Source
- Form 2P52100052996 · P-1 Form 2 30-06-2025.pdf · uploaded 29 Jul 2025Source
- Form 3P52100052996 · P-1 Form 3 30-06-2025.pdf · uploaded 29 Jul 2025Source
- Disclosure of Sold and Booked InventoryP52100052996 · P-1 sold unsold 30-06-2025.pdf · uploaded 29 Jul 2025Source
- Form 1P52100052977 · P-2 Form 1 30-06-2025.pdf · uploaded 29 Jul 2025Source
- Form 2P52100052977 · p-2 Form 2 30-06-2025.pdf · uploaded 29 Jul 2025Source
- Form 3P52100052977 · p-2 Form 3 30-06-2025.pdf · uploaded 29 Jul 2025Source
- Disclosure of Sold and Booked InventoryP52100052977 · P-2 Shop & Flats Sold Unsold 30-06-2025.pdf · uploaded 29 Jul 2025Source
- Form 1P52100078517 · P-4 Form 1 30-06-2025.pdf · uploaded 29 Jul 2025Source
- Form 2P52100078517 · P-4 Form 2 30-06-2025.pdf · uploaded 29 Jul 2025Source
- Form 3P52100078517 · P-4 Form 3 30-06-2025.pdf · uploaded 29 Jul 2025Source
- Disclosure of Sold and Booked InventoryP52100078517 · P-4 sold unsold 30-06-2025.pdf · uploaded 29 Jul 2025Source
- Form 1P52100052996 · Form 1 Phase 1.pdf · uploaded 20 Oct 2025Source
- Form 2P52100052996 · Form 2 Phase 1.pdf · uploaded 20 Oct 2025Source
- Form 3P52100052996 · Form 3 Phase 1_compressed (1).pdf · uploaded 20 Oct 2025Source
- Disclosure of Sold and Booked InventoryP52100052996 · Sold Unsold Phase 1.pdf · uploaded 20 Oct 2025Source
- Form 1P52100052977 · Form 1 Phase 2.pdf · uploaded 20 Oct 2025Source
- Form 2P52100052977 · Form 2 Phase 2.pdf · uploaded 20 Oct 2025Source
- Form 3P52100052977 · Form 3 Phase 2_compressed.pdf · uploaded 20 Oct 2025Source
- Disclosure of Sold and Booked InventoryP52100052977 · Sold Unsold Phase 2.pdf · uploaded 20 Oct 2025Source
- Form 1P52100078517 · Form 1 Phase 4.pdf · uploaded 20 Oct 2025Source
- Form 2P52100078517 · Form 2 Phase 4.pdf · uploaded 20 Oct 2025Source
- Form 3P52100078517 · Form 3 Phase 4.pdf · uploaded 20 Oct 2025Source
- Disclosure of Sold and Booked InventoryP52100078517 · Sold Unsold Phase 4.pdf · uploaded 20 Oct 2025Source
- Form 1P52100052996 · Form 1 Ph 1.pdf · uploaded 20 Jan 2026Source
- Form 2P52100052996 · Form 2 Ph 1.pdf · uploaded 20 Jan 2026Source
- Form 3P52100052996 · Form III Ph 1.pdf · uploaded 20 Jan 2026Source
- Disclosure of Sold and Booked InventoryP52100052996 · Sold Unsold Ph 1.pdf · uploaded 20 Jan 2026Source
- Form 1P52100052977 · Form 1 Ph II.pdf · uploaded 20 Jan 2026Source
- Form 2P52100052977 · Form 2 Ph 2.pdf · uploaded 20 Jan 2026Source
- Form 3P52100052977 · Form III Ph 2.pdf · uploaded 20 Jan 2026Source
- Disclosure of Sold and Booked InventoryP52100052977 · Sold Unsold Ph 2.pdf · uploaded 20 Jan 2026Source
- Form 1P52100078517 · Form 1 Ph IV.pdf · uploaded 20 Jan 2026Source
- Form 2P52100078517 · Form 2 Ph 4.pdf · uploaded 20 Jan 2026Source
- Form 3P52100078517 · Form III Ph 4.pdf · uploaded 20 Jan 2026Source
- Disclosure of Sold and Booked InventoryP52100078517 · Sold Unsold Ph 4.pdf · uploaded 20 Jan 2026Source
- Form 1P52100052996 · Form 1 Phase I Q4.pdf · uploaded 24 Apr 2026Source
- Form 2P52100052996 · Form 2 Phase I Q4.pdf · uploaded 24 Apr 2026Source
- Form 3P52100052996 · Form 3 Phase I Q4.pdf · uploaded 24 Apr 2026Source
- Disclosure of Sold and Booked InventoryP52100052996 · Phase I Sold Unsold Inventory.pdf · uploaded 24 Apr 2026Source
- Form 1P52100052977 · Form 1 Phase II Q4.pdf · uploaded 24 Apr 2026Source
- Form 2P52100052977 · Form 2 Phase II Q4.pdf · uploaded 24 Apr 2026Source
- Form 3P52100052977 · Form 3 Phase II Q4.pdf · uploaded 24 Apr 2026Source
- Disclosure of Sold and Booked InventoryP52100052977 · Phase II Sold Unsold Inventory.pdf · uploaded 24 Apr 2026Source
- Form 1P52100078517 · Form 1 Phase IV Q4.pdf · uploaded 24 Apr 2026Source
- Form 2P52100078517 · Form 2 Phase IV Q4.pdf · uploaded 24 Apr 2026Source
- Form 3P52100078517 · Form 3 Phase IV Q4.pdf · uploaded 24 Apr 2026Source
- Disclosure of Sold and Booked InventoryP52100078517 · Phase IV Sold Unsold Inventory.pdf · uploaded 24 Apr 2026Source
- Form 1P52100052996 · PHASE 1.pdf · uploaded 20 Jul 2026Source
- Form 2P52100052996 · Form 2 Ph 1.pdf · uploaded 20 Jul 2026Source
- Form 3P52100052996 · Form 3 Ph 1 (2).pdf · uploaded 20 Jul 2026Source
- Disclosure of Sold and Booked InventoryP52100052996 · Sold Unsold Ph 1.pdf · uploaded 20 Jul 2026Source
- OthersP52100052996 · Form 5 Ph 1.pdf · uploaded 20 Jul 2026Source
- Form 1P52100052977 · PHASE 2.pdf · uploaded 20 Jul 2026Source
- Form 2P52100052977 · Form 2 Ph 2.pdf · uploaded 20 Jul 2026Source
- Form 3P52100052977 · Form 3 Ph 2.pdf · uploaded 20 Jul 2026Source
- Disclosure of Sold and Booked InventoryP52100052977 · Sold Unsold Ph 2.pdf · uploaded 20 Jul 2026Source
- OthersP52100052977 · Form 5 Ph 2.pdf · uploaded 20 Jul 2026Source
- Form 1P52100078517 · PHASE 3.pdf · uploaded 20 Jul 2026Source
- Form 2P52100078517 · Form 2 Ph 3.pdf · uploaded 20 Jul 2026Source
- Form 3P52100078517 · Form 3 Ph 3.pdf · uploaded 20 Jul 2026Source
- Disclosure of Sold and Booked InventoryP52100078517 · Sold Unsold Ph 3.pdf · uploaded 20 Jul 2026Source
- OthersP52100078517 · Form 5 Ph 3.pdf · uploaded 20 Jul 2026Source
Technical
- DocumentP52100052996 · Sai nagari Lay Out All Blgs Sanction-1-14_compressed.pdf · uploaded 28 Jul 2023Source
- DocumentP52100052996 · Phase I ABC Floor Plan 1 Sanction-3-14_compressed.pdf · uploaded 28 Jul 2023Source
- DocumentP52100052996 · sai nagari Building Plan Phase I.pdf · uploaded 28 Jul 2023Source
- DocumentP52100052977 · Sai nagari Lay Out All Blgs Sanction-1-14_compressed.pdf · uploaded 9 Aug 2023Source
- DocumentP52100052977 · Phase II D Blg Floor Plan Sanction-7-14_compressed.pdf · uploaded 9 Aug 2023Source
- DocumentP52100052977 · sai nagari Phase II _ Building plan D_compressed.pdf · uploaded 9 Aug 2023Source
- DocumentP52100052977 · sai nagari Phase II _ Building plan E_compressed.pdf · uploaded 29 Aug 2023Source
- DocumentP52100052977 · sai nagari Phase II _ Building plan F_compressed.pdf · uploaded 29 Aug 2023Source
- DocumentP52100052996 · Phase I ABC Floor Plan 2 sanction-4-14_compressed.pdf · uploaded 2 Sep 2023Source
- DocumentP52100052996 · Building A Floor Plan Sanction-5-14_compressed.pdf · uploaded 2 Sep 2023Source
- DocumentP52100052977 · Phase II E Blg Floor Plan Sanction-9-14_compressed.pdf · uploaded 2 Sep 2023Source
- DocumentP52100052977 · Phase II F blg Floor Plan Sanction-11-14_compressed.pdf · uploaded 2 Sep 2023Source
- DocumentP52100078517 · 20-22_compressed.pdf · uploaded 18 Jun 2024Source
- DocumentP52100078517 · 18-22_compressed.pdf · uploaded 18 Jun 2024Source
- DocumentP52100078517 · 1-22_compressed.pdf · uploaded 18 Jun 2024Source
- Other – TechnicalP52100078517 · Annexure- A- One Plot One Registration.pdf · uploaded 2 Jul 2024Source
- DocumentP52100078517 · Plan_1-22_compressed.pdf · uploaded 5 Jul 2024Source
- Other – TechnicalP52100078517 · Declaration of Plot Area.pdf · uploaded 16 Jul 2024Source
- DocumentP52100052996 · Layout.pdf · uploaded 23 May 2025Source
- DocumentP52100052996 · 03-31 (1).pdf · uploaded 23 May 2025Source
- DocumentP52100052996 · 04-31 (1).pdf · uploaded 23 May 2025Source
- DocumentP52100052996 · 05-31 (1).pdf · uploaded 23 May 2025Source
- DocumentP52100052996 · 06-31_compressed (1).pdf · uploaded 23 May 2025Source
- DocumentP52100052996 · 07-31_compressed (1).pdf · uploaded 23 May 2025Source
- DocumentP52100052996 · 08-31_compressed (1).pdf · uploaded 23 May 2025Source
- DocumentP52100052977 · Layout 2025.pdf · uploaded 23 May 2025Source
- DocumentP52100052977 · 11-31_compressed.pdf · uploaded 23 May 2025Source
- DocumentP52100052977 · 13-31_compressed.pdf · uploaded 23 May 2025Source
- DocumentP52100052977 · 15-31_compressed (3).pdf · uploaded 23 May 2025Source
- DocumentPM1264042502917 · Annexure A - Order 50.pdf · uploaded 16 Jul 2025Source
- OthersPM1264042502917 · Format D - Declaration About Commenecment.pdf · uploaded 16 Jul 2025Source
- DocumentPM1264042502917 · Layout Plan 01-31.pdf · uploaded 15 Sep 2025Source
- DocumentPM1264042502917 · Building Plan 23-31.pdf · uploaded 15 Sep 2025Source
- DocumentPM1264042502917 · Building Plan 24-31.pdf · uploaded 15 Sep 2025Source
- DocumentPM1264042502917 · Building Plan 25-31.pdf · uploaded 15 Sep 2025Source
- DocumentPM1264042502917 · Building Plan 26-31.pdf · uploaded 15 Sep 2025Source
- DocumentPM1264042502917 · Building Plan 27-31.pdf · uploaded 15 Sep 2025Source
- DocumentPM1264042502917 · Building Plan 28-31.pdf · uploaded 15 Sep 2025Source
- OthersPM1264042502917 · CC Verification e-mail.pdf · uploaded 30 Dec 2025Source
- OthersPM1264042502917 · Architech Calculation plot area.pdf · uploaded 1 Jan 2026Source
- OthersPM1264042502917 · Declaration cum Undertaking.pdf · uploaded 1 Feb 2026Source
- OthersPM1264042502917 · Declaration.pdf · uploaded 2 Feb 2026Source
Technical (Architect)
- DocumentP52100052996 · Form 1 - Phase I.pdf · uploaded 6 Feb 2024Source
- DocumentP52100052977 · Form 1 - Phase II.pdf · uploaded 6 Feb 2024Source
- DocumentP52100078517 · Architect certificate- Form 1.pdf · uploaded 13 Jun 2024Source
- DocumentP52100052996 · form 1 Phase 1.pdf · uploaded 11 Feb 2025Source
- DocumentP52100052977 · form 1 Phase 2.pdf · uploaded 11 Feb 2025Source
- DocumentP52100052996 · Form-1 20-04-2024.pdf · uploaded 25 Mar 2025Source
- DocumentP52100052996 · Form-1 20-07-2024.pdf · uploaded 25 Mar 2025Source
- DocumentP52100052996 · Form-1-20-10-2024.pdf · uploaded 25 Mar 2025Source
- DocumentP52100052996 · Form-1-20-01-2025.pdf · uploaded 25 Mar 2025Source
- DocumentP52100052996 · p-1 Form 1.pdf · uploaded 8 May 2025Source
Technical (Engineer)
- DocumentP52100052996 · Form 2 Engineer Certificate Phase I.pdf · uploaded 6 Feb 2024Source
- DocumentP52100052977 · Form 2 Engineer Certificate Phase II.pdf · uploaded 6 Feb 2024Source
- DocumentP52100078517 · Form- 2 Engineer Certificate.pdf · uploaded 18 Jun 2024Source
- DocumentP52100052996 · Form 2.pdf · uploaded 10 Feb 2025Source
- DocumentP52100052977 · Form 2.pdf · uploaded 10 Feb 2025Source
- DocumentP52100052996 · Form-2 20-04-2024.pdf · uploaded 25 Mar 2025Source
- DocumentP52100052996 · Form-2-20-07-2024.pdf · uploaded 25 Mar 2025Source
- DocumentP52100052996 · Form-2 20-10-2024.pdf · uploaded 25 Mar 2025Source
- DocumentP52100052996 · Form-2 20-01-2025.pdf · uploaded 25 Mar 2025Source
- DocumentP52100052996 · p-1 Form 2.pdf · uploaded 8 May 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 7/1, 7/1
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Phases
- 4
- Unit types
- 1BHK, 2BHK, Shop, —1,610 units in all
- Address
- 7/1 & 8/2, Gujarnimbalkarwadi, GujarnimbalkarwadiPIN 411046
- Village
- Katraj, Haveli taluka
- Location
- 18.43747, 73.87136
- Land area for this project
- 3,625 sq m (39,019 sq ft)
- Permissible built-up area
- 14,323 sq m (1,54,171 sq ft)
- Sanctioned built-up area
- 14,323 sq m (1,54,171 sq ft)
- Recreational open space
- 1,845 sq m (19,855 sq ft)
- Designated bank account
- 85
- Developed in phases
- Yes
- Also registered as
- Sai Nagari Phase I, Sai Nagari Phase II, Sai Nagari Phase IV, SAI NAGARI Phase V, Sangharsh, संघर्ष
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
7/1 & 8/2, Gujarnimbalkarwadi
Boundaries
- North
- S No 8 5
- South
- Dry Nala
- East
- Remaining Land of S No 7
- West
- S No 7 2
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking1,610 units
103 of 1,610 units booked (6%), as the promoter reported to MahaRERA
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P52100052996 | 01 Building A | 1BHK | 32.13 sq m · 346 sq ft | 86 | 1 |
| P52100052996 | 01 Building A | 2BHK | 49.52 sq m · 533 sq ft | 44 | 1 |
| P52100052996 | 01 Building A | Shop | 12.6 sq m · 136 sq ft | 2 | 0 |
| P52100052996 | 01 Building A | Shop | 17.22 sq m · 185 sq ft | 1 | 0 |
| P52100052996 | 01 Building A | Shop | 19.05 sq m · 205 sq ft | 1 | 0 |
| P52100052996 | 01 Building A | Shop | 20.07 sq m · 216 sq ft | 2 | 0 |
| P52100052996 | 01 Building A | Shop | 21.5 sq m · 231 sq ft | 1 | 0 |
| P52100052996 | 01 Building A | Shop | 21.51 sq m · 232 sq ft | 1 | 0 |
Show all 83 unit rowsShow fewer unit rows
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P52100052996 | 01 Building A | Shop | 24.62 sq m · 265 sq ft | 1 | 0 |
| P52100052996 | 01 Building A | Shop | 25.23 sq m · 272 sq ft | 2 | 0 |
| P52100052996 | 01 Building A | Shop | 26.38 sq m · 284 sq ft | 2 | 0 |
| P52100052996 | 01 Building A | Shop | 29.2 sq m · 314 sq ft | 1 | 0 |
| P52100052996 | 01 Building A | Shop | 31.08 sq m · 335 sq ft | 2 | 0 |
| P52100052996 | 01 Building A | Shop | 32.12 sq m · 346 sq ft | 1 | 0 |
| P52100052996 | 01 Building A | Shop | 32.88 sq m · 354 sq ft | 2 | 0 |
| P52100052996 | 01 Building A | Shop | 37.8 sq m · 407 sq ft | 1 | 0 |
| P52100052996 | 01 Building A | Shop | 38.13 sq m · 410 sq ft | 2 | 0 |
| P52100052996 | 01 Building A | Shop | 38.4 sq m · 413 sq ft | 2 | 0 |
| P52100052996 | 01 Building A | Shop | 41.92 sq m · 451 sq ft | 1 | 0 |
| P52100052996 | 01 Building A | Shop | 42.34 sq m · 456 sq ft | 1 | 0 |
| P52100052996 | 01 Building A | Shop | 57.78 sq m · 622 sq ft | 1 | 0 |
| P52100052996 | 01 Building A | Shop | 75.44 sq m · 812 sq ft | 1 | 0 |
| P52100052996 | 02 Building B | Shop | 12.6 sq m · 136 sq ft | 1 | 0 |
| P52100052996 | 02 Building B | Shop | 17.22 sq m · 185 sq ft | 2 | 0 |
| P52100052996 | 02 Building B | Shop | 20.07 sq m · 216 sq ft | 1 | 0 |
| P52100052996 | 02 Building B | Shop | 21.66 sq m · 233 sq ft | 1 | 0 |
| P52100052996 | 02 Building B | Shop | 21.71 sq m · 234 sq ft | 1 | 0 |
| P52100052996 | 02 Building B | Shop | 23.59 sq m · 254 sq ft | 1 | 0 |
| P52100052996 | 02 Building B | Shop | 24.62 sq m · 265 sq ft | 2 | 0 |
| P52100052996 | 02 Building B | Shop | 25.22 sq m · 271 sq ft | 1 | 0 |
| P52100052996 | 02 Building B | Shop | 26.33 sq m · 283 sq ft | 1 | 0 |
| P52100052996 | 02 Building B | Shop | 26.38 sq m · 284 sq ft | 1 | 0 |
| P52100052996 | 02 Building B | Shop | 27.19 sq m · 293 sq ft | 1 | 0 |
| P52100052996 | 02 Building B | Shop | 27.44 sq m · 295 sq ft | 1 | 0 |
| P52100052996 | 02 Building B | Shop | 31.08 sq m · 335 sq ft | 1 | 0 |
| P52100052996 | 02 Building B | Shop | 31.23 sq m · 336 sq ft | 1 | 0 |
| P52100052996 | 02 Building B | Shop | 37.4 sq m · 403 sq ft | 2 | 0 |
| P52100052996 | 02 Building B | Shop | 38.13 sq m · 410 sq ft | 1 | 0 |
| P52100052996 | 02 Building B | Shop | 42.34 sq m · 456 sq ft | 1 | 0 |
| P52100052996 | 02 Building B | Shop | 75.44 sq m · 812 sq ft | 2 | 0 |
| P52100052996 | 03 Building C | Shop | 12.6 sq m · 136 sq ft | 2 | 0 |
| P52100052996 | 03 Building C | Shop | 17.22 sq m · 185 sq ft | 1 | 0 |
| P52100052996 | 03 Building C | Shop | 19.05 sq m · 205 sq ft | 1 | 0 |
| P52100052996 | 03 Building C | Shop | 20.07 sq m · 216 sq ft | 2 | 0 |
| P52100052996 | 03 Building C | Shop | 21.5 sq m · 231 sq ft | 1 | 0 |
| P52100052996 | 03 Building C | Shop | 21.51 sq m · 232 sq ft | 1 | 0 |
| P52100052996 | 03 Building C | Shop | 24.62 sq m · 265 sq ft | 1 | 0 |
| P52100052996 | 03 Building C | Shop | 25.23 sq m · 272 sq ft | 2 | 0 |
| P52100052996 | 03 Building C | Shop | 26.38 sq m · 284 sq ft | 2 | 0 |
| P52100052996 | 03 Building C | Shop | 29.2 sq m · 314 sq ft | 1 | 0 |
| P52100052996 | 03 Building C | Shop | 31.08 sq m · 335 sq ft | 2 | 0 |
| P52100052996 | 03 Building C | Shop | 32.12 sq m · 346 sq ft | 1 | 0 |
| P52100052996 | 03 Building C | Shop | 32.88 sq m · 354 sq ft | 2 | 0 |
| P52100052996 | 03 Building C | Shop | 37.8 sq m · 407 sq ft | 1 | 0 |
| P52100052996 | 03 Building C | Shop | 38.13 sq m · 410 sq ft | 2 | 0 |
| P52100052996 | 03 Building C | Shop | 38.4 sq m · 413 sq ft | 2 | 0 |
| P52100052996 | 03 Building C | Shop | 41.92 sq m · 451 sq ft | 1 | 0 |
| P52100052996 | 03 Building C | Shop | 42.34 sq m · 456 sq ft | 1 | 0 |
| P52100052996 | 03 Building C | Shop | 57.78 sq m · 622 sq ft | 1 | 0 |
| P52100052996 | 03 Building C | Shop | 75.44 sq m · 812 sq ft | 1 | 0 |
| P52100052977 | 04 Building D | 1BHK | 27.72 sq m · 298 sq ft | 128 | 45 |
| P52100052977 | 04 Building D | 2BHK | 48.91 sq m · 526 sq ft | 26 | 0 |
| P52100052977 | 04 Building D | Shop | 19.85 sq m · 214 sq ft | 5 | 0 |
| P52100052977 | 04 Building D | Shop | 20.5 sq m · 221 sq ft | 1 | 0 |
| P52100052977 | 04 Building D | Shop | 20.88 sq m · 225 sq ft | 5 | 0 |
| P52100052977 | 04 Building D | Shop | 21.2 sq m · 228 sq ft | 1 | 0 |
| P52100052977 | 04 Building D | Shop | 22.83 sq m · 246 sq ft | 1 | 0 |
| P52100052977 | 05 Building E | 1BHK | 27.72 sq m · 298 sq ft | 154 | 56 |
| P52100052977 | 05 Building E | Shop | 19.85 sq m · 214 sq ft | 6 | 0 |
| P52100052977 | 05 Building E | Shop | 20.88 sq m · 225 sq ft | 6 | 0 |
| P52100052977 | 06 Building F | 1BHK | 27.72 sq m · 298 sq ft | 30 | 0 |
| P52100052977 | 06 Building F | 2BHK | 48.91 sq m · 526 sq ft | 6 | 0 |
| P52100052977 | 06 Building F | Shop | 19.85 sq m · 214 sq ft | 5 | 0 |
| P52100052977 | 06 Building F | Shop | 20.5 sq m · 221 sq ft | 1 | 0 |
| P52100052977 | 06 Building F | Shop | 20.88 sq m · 225 sq ft | 5 | 0 |
| P52100052977 | 06 Building F | Shop | 21.2 sq m · 228 sq ft | 1 | 0 |
| P52100052977 | 06 Building F | Shop | 22.83 sq m · 246 sq ft | 1 | 0 |
| P52100078517 | Building I | — | — | 231 | — |
| P52100078517 | Building J | — | — | 226 | — |
| PM1264042502917 | Building K | — | — | 176 | — |
| PM1264042502917 | Building L | — | — | 138 | — |
| PM1264042502917 | Building M | — | — | 138 | — |
| PM1264042502917 | Building N | — | — | 111 | — |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals22
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Architect | Amruta Deshpande | — | P52100052996 |
| Architect | Amruta Deshpande | — | P52100052977 |
| Architect | Amruta Deshpande | — | PM1264042502917 |
| Architect | Amruta Deshpande | — | P52100078517 |
| Architect | Anuja B Raykar | — | P52100078517 |
| Chartered accountant | Ankita P Jain & Co | — | P52100078517 |
| Chartered accountant | Durgesh v Vyawahare | — | P52100052996 |
| Chartered accountant | Durgesh v Vyawahare | — | P52100078517 |
Show all 22 professionalsShow fewer professionals
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Chartered accountant | Durgesh V Vyawahare | — | PM1264042502917 |
| Chartered accountant | Durgesh V Vyawahare | — | P52100052977 |
| Chartered accountant | Mayank Kriplani | — | P52100078517 |
| Chartered accountant | Mayank Kriplani | — | P52100052996 |
| Chartered accountant | Mayank Kriplani | — | P52100052977 |
| Chartered accountant | Pranal p Thakare | — | P52100078517 |
| Chartered accountant | Pranal p Thakare | — | PM1264042502917 |
| Chartered accountant | Pranal P Thakare | — | P52100052977 |
| Chartered accountant | Pranal P Thakare | — | P52100052996 |
| Engineer | Akash Pawar | — | P52100052996 |
| Engineer | Akash Pawar | — | P52100052977 |
| Engineer | Akash Pawar | — | P52100078517 |
| Engineer | Akash Pawar | — | PM1264042502917 |
| Engineer | Mr Akash Manohar Pawar | — | P52100078517 |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Katraj
- PrernaRERA PM1260002602596
- Shivam Residency₹5,960 a sq ft
- Yashraj SanskrutiRERA PM1260002602407
- The VantageRERA PC1260002502684
- Infinity StudioRERA PM1260002501807
- Habitat Spring₹6,570 a sq ft
- Krishna Residency₹4,270 a sq ft
- Vrindavan₹5,350 a sq ft
All 2,149 projects in Katraj · Compare Sai Nagari with another project
Sai Nagari in numbers
Registered deals, summarised
Deedo has 29 registered documents at Sai Nagari, from Aug 2019 to Sep 2026: 8 sales, 13 leave and licence agreements, 6 mortgages. The median registered sale since Aug 2019 works out to about ₹5,100 per sq ft, at a median of ₹16 L a deal; 13% of sales were resales.
- What is the price per sq ft at Sai Nagari?
- The median registered sale since Aug 2019 works out to about ₹5,100 per sq ft, at a median of ₹16 L a deal; 13% of sales were resales.
- How many properties have been sold at Sai Nagari?
- 8 sales are registered at Sai Nagari, 1 of them a resale.
- Are properties at Sai Nagari rented out?
- Yes: 13 leave and licence agreements are registered at Sai Nagari, at a median rent since Aug 2019 of about ₹14,000 a month with a deposit of about ₹17,000.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Sai Nagari by Deedo, last updated with deals registered in Sep 2026.
Latest deal · Resale · Oct 2024
Under ₹25 L