Tower - One 52
Deedo IDDP-PUN-RZJTCompletion was pushed back 4 months, to Apr 2028; no MahaRERA orders on record; 0% of its units are booked.
Hadapsar, Pune 411013 · Property rates in Hadapsar · by Anu Constructions
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2028
- This projectRegistered 17 Jan 2022, completion promised 20 Dec 2027, revised to 20 Apr 2028.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Nov 2024 | A 1 | Mortgage | 26,064 sq ft | View Mortgage, Nov 2024 | |
| Apr 2023 | A 1 | Mortgage | 26,064 sq ft | View Mortgage, Apr 2023 |
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100032655
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100032655 | 17 Jan 2022 | 20 Dec 2027 | 20 Apr 2028 | Anu Constructions | Project page |
Documents167
2 documents held by Deedo, 165 filings listed on MahaRERA's project page
Other
- OtherDate not statedView
Finance
- PAN CardPAN Card.pdf · uploaded 30 Dec 2021Source
Legal
- Declaration Form BForm B Promoter.pdf · uploaded 18 Dec 2021Source
- Legal Title report1 Legal Title Report Form A.pdf · uploaded 3 Jan 2022Source
- Legal Title report2 Legal Title Report Annexure 1.pdf · uploaded 3 Jan 2022Source
- Legal Title report3 Legal Title Report Annexure 2-1-5.pdf · uploaded 3 Jan 2022Source
- Legal Title report4 Legal Title Report Annexure 2-6-9.pdf · uploaded 3 Jan 2022Source
Show all 167 documentsShow fewer documents
Legal
- Legal Title report5 Legal Title Report Annexure 3-1-5.pdf · uploaded 3 Jan 2022Source
- Legal Title report6 Legal Title Report Annexure 3-6-11.pdf · uploaded 3 Jan 2022Source
- Legal Title report7 Legal Title Report Annexure 4.pdf · uploaded 3 Jan 2022Source
- Legal Title report8 Legal Title Report Annexure 5.pdf · uploaded 3 Jan 2022Source
- Legal Title report9 Legal Title Report Annexure 6.pdf · uploaded 3 Jan 2022Source
Migrated
- 1 Details of encumbrancesNo Encumberance Letter.pdf · uploaded 18 Dec 2021Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 18 Dec 2021Source
- 1 Declaration about Commencement CertificateDeclaration about CC.pdf · uploaded 18 Dec 2021Source
- 1 Declaration in FORM BForm B Promoter.pdf · uploaded 18 Dec 2021Source
- 1 Proforma of Allotment letterAllotment Letter.pdf · uploaded 18 Dec 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 MahaRERA Awaited Anu Cons dated 30 Nov 2021.pdf · uploaded 20 Dec 2021Source
- 1 PAN CardPAN Card.pdf · uploaded 30 Dec 2021Source
- 1 Copy of Layout Approval (in case of layout)1 Layout Plan.pdf · uploaded 30 Dec 2021Source
- 1 Building Plan Approval / NA Order for plotted development2 Building Plan.pdf · uploaded 30 Dec 2021Source
- 2 Building Plan Approval / NA Order for plotted development3 Building Plan.pdf · uploaded 30 Dec 2021Source
- 3 Building Plan Approval / NA Order for plotted development4 Building Plan.pdf · uploaded 30 Dec 2021Source
- 4 Building Plan Approval / NA Order for plotted development5 Building Plan.pdf · uploaded 30 Dec 2021Source
- 5 Building Plan Approval / NA Order for plotted development6 Building Plan.pdf · uploaded 30 Dec 2021Source
- 6 Building Plan Approval / NA Order for plotted development7 Building Plan.pdf · uploaded 30 Dec 2021Source
- 7 Building Plan Approval / NA Order for plotted development8 Building Plan.pdf · uploaded 30 Dec 2021Source
- 8 Building Plan Approval / NA Order for plotted development9 Building Plan.pdf · uploaded 30 Dec 2021Source
- 9 Building Plan Approval / NA Order for plotted development10 Building Plan.pdf · uploaded 30 Dec 2021Source
- 10 Building Plan Approval / NA Order for plotted development11 Building Plan.pdf · uploaded 30 Dec 2021Source
- 2 Proforma of Allotment letterAgreement To Sale RERA Draft.pdf · uploaded 30 Dec 2021Source
- 1 Copy of the legal title report1 Legal Title Report Form A.pdf · uploaded 3 Jan 2022Source
- 2 Copy of the legal title report2 Legal Title Report Annexure 1.pdf · uploaded 3 Jan 2022Source
- 3 Copy of the legal title report3 Legal Title Report Annexure 2-1-5.pdf · uploaded 3 Jan 2022Source
- 4 Copy of the legal title report4 Legal Title Report Annexure 2-6-9.pdf · uploaded 3 Jan 2022Source
- 5 Copy of the legal title report5 Legal Title Report Annexure 3-1-5.pdf · uploaded 3 Jan 2022Source
- 6 Copy of the legal title report6 Legal Title Report Annexure 3-6-11.pdf · uploaded 3 Jan 2022Source
- 7 Copy of the legal title report7 Legal Title Report Annexure 4.pdf · uploaded 3 Jan 2022Source
- 8 Copy of the legal title report8 Legal Title Report Annexure 5.pdf · uploaded 3 Jan 2022Source
- 9 Copy of the legal title report9 Legal Title Report Annexure 6.pdf · uploaded 3 Jan 2022Source
- 1 CERSAI detailsCERSAI_Search_Report_200226948537_For_Asset_Based_Search_30_12_2021_15_18_56_766.pdf · uploaded 3 Jan 2022Source
- 2 Commencement Certificates / NA Order for plotted developmentLatest CC.pdf · uploaded 1 Feb 2023Source
- 2 Copy of Layout Approval (in case of layout)Approval Layout Page 1.pdf · uploaded 28 Feb 2023Source
- 3 Copy of Layout Approval (in case of layout)Approval Layout Page 2.pdf · uploaded 28 Feb 2023Source
- 11 Building Plan Approval / NA Order for plotted developmentBuilding pg1.pdf · uploaded 28 Feb 2023Source
- 12 Building Plan Approval / NA Order for plotted developmentBuilding pg2.pdf · uploaded 28 Feb 2023Source
- 13 Building Plan Approval / NA Order for plotted developmentBuilding pg3.pdf · uploaded 28 Feb 2023Source
- 14 Building Plan Approval / NA Order for plotted developmentBuilding pg4.pdf · uploaded 28 Feb 2023Source
- 15 Building Plan Approval / NA Order for plotted developmentBuilding pg5.pdf · uploaded 28 Feb 2023Source
- 16 Building Plan Approval / NA Order for plotted developmentBuilding pg6.pdf · uploaded 28 Feb 2023Source
- 17 Building Plan Approval / NA Order for plotted developmentBuilding pg7.pdf · uploaded 28 Feb 2023Source
- 18 Building Plan Approval / NA Order for plotted developmentBuilding pg8.pdf · uploaded 28 Feb 2023Source
- 19 Building Plan Approval / NA Order for plotted developmentBuilding pg9.pdf · uploaded 28 Feb 2023Source
- 20 Building Plan Approval / NA Order for plotted developmentBuilding pg10.pdf · uploaded 28 Feb 2023Source
- 21 Building Plan Approval / NA Order for plotted developmentBuilding pg11.pdf · uploaded 28 Feb 2023Source
- 22 Building Plan Approval / NA Order for plotted developmentBuilding pg12.pdf · uploaded 28 Feb 2023Source
- 23 Building Plan Approval / NA Order for plotted developmentBuilding pg13.pdf · uploaded 28 Feb 2023Source
- 24 Building Plan Approval / NA Order for plotted developmentBuilding pg14.pdf · uploaded 28 Feb 2023Source
- 2 Declaration about Commencement CertificateCC.pdf · uploaded 28 Feb 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)CA form 5.pdf · uploaded 28 Feb 2023Source
- 1 Disclosure of sold/ booked inventoryDisclosure of sold,booked inventory.pdf · uploaded 1 Mar 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 Architect certificate.pdf · uploaded 2 Mar 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Tower - One 52.pdf · uploaded 15 Sep 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Anu Construction F3 Sep 24_11zon.pdf · uploaded 27 Dec 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Anu Construction F5 2023-24.pdf · uploaded 27 Dec 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)2) Form-1 Anu Construction june22.pdf · uploaded 18 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)1) Form-1 Anu Construction Mar22.pdf · uploaded 18 Mar 2025Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)12) Form-1 Anu Construction Dec24.pdf · uploaded 18 Mar 2025Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)11) Form-1 Anu Construction Sep24.pdf · uploaded 18 Mar 2025Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)10) Form-1 Anu Construction June24.pdf · uploaded 18 Mar 2025Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)9) Form-1 Anu Construction Mar24.pdf · uploaded 18 Mar 2025Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)8) Form-1 Anu Construction Dec23.pdf · uploaded 18 Mar 2025Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)7) Form-1 Anu Construction Sep23.pdf · uploaded 18 Mar 2025Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)6) Form-1 Anu Construction june23.pdf · uploaded 18 Mar 2025Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)5) Form-1 Anu Construction Mar23.pdf · uploaded 18 Mar 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)4) Form-1 Anu Construction Dec22.pdf · uploaded 18 Mar 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)3) Form-1 Anu Construction Sep22.pdf · uploaded 18 Mar 2025Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Dec 2024_compressed.pdf · uploaded 20 Mar 2025Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)June 2024_compressed (1).pdf · uploaded 20 Mar 2025Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)March 2024_compressed (2).pdf · uploaded 20 Mar 2025Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Dec 2023_compressed (1).pdf · uploaded 20 Mar 2025Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)June 2023_compressed.pdf · uploaded 20 Mar 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Dec 2022_compressed.pdf · uploaded 20 Mar 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Sep 2022_compressed.pdf · uploaded 20 Mar 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)June 2022_compressed.pdf · uploaded 20 Mar 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)March 2022_compressed.pdf · uploaded 20 Mar 2025Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)March 2023_compressed.pdf · uploaded 20 Mar 2025Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)June 23.pdf · uploaded 20 Mar 2025Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Dec 24_compressed.pdf · uploaded 20 Mar 2025Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Sep 2024_compressed.pdf · uploaded 20 Mar 2025Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)June 2024_compressed.pdf · uploaded 20 Mar 2025Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)March 2024_compressed (1).pdf · uploaded 20 Mar 2025Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Dec 2023_compressed.pdf · uploaded 20 Mar 2025Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Sep 23.pdf · uploaded 20 Mar 2025Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Mar 23.pdf · uploaded 20 Mar 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Dec 22.pdf · uploaded 20 Mar 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Sep 22.pdf · uploaded 20 Mar 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)June 22.pdf · uploaded 20 Mar 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Mar 22.pdf · uploaded 20 Mar 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A_Anu Construction_March 2022_compressed.pdf · uploaded 21 Mar 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form -2A_Anu Construction_March 2023_compressed.pdf · uploaded 21 Mar 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A_Anu Construction_March 2024_compressed.pdf · uploaded 21 Mar 2025Source
- 1 Disclosure of sold/ booked inventoryMarch 22.pdf · uploaded 24 Mar 2025Source
- 2 Disclosure of sold/ booked inventorySep 22.pdf · uploaded 24 Mar 2025Source
- 3 Disclosure of sold/ booked inventoryJune 22.pdf · uploaded 24 Mar 2025Source
- 4 Disclosure of sold/ booked inventoryDec 22.pdf · uploaded 24 Mar 2025Source
- 5 Disclosure of sold/ booked inventoryMar 23.pdf · uploaded 24 Mar 2025Source
- 6 Disclosure of sold/ booked inventoryJune 23.pdf · uploaded 24 Mar 2025Source
- 7 Disclosure of sold/ booked inventorySep 23.pdf · uploaded 24 Mar 2025Source
- 8 Disclosure of sold/ booked inventoryDec 23.pdf · uploaded 24 Mar 2025Source
- 9 Disclosure of sold/ booked inventoryMar 24.pdf · uploaded 24 Mar 2025Source
- 10 Disclosure of sold/ booked inventoryJun 24.pdf · uploaded 24 Mar 2025Source
- 11 Disclosure of sold/ booked inventorySep 24.pdf · uploaded 24 Mar 2025Source
- 12 Disclosure of sold/ booked inventoryDec 24.pdf · uploaded 24 Mar 2025View
Technical
- Document1 Layout Plan.pdf · uploaded 30 Dec 2021Source
- Document3 Building Plan.pdf · uploaded 30 Dec 2021Source
- Document4 Building Plan.pdf · uploaded 30 Dec 2021Source
- Document5 Building Plan.pdf · uploaded 30 Dec 2021Source
- Document6 Building Plan.pdf · uploaded 30 Dec 2021Source
- Document7 Building Plan.pdf · uploaded 30 Dec 2021Source
- Document8 Building Plan.pdf · uploaded 30 Dec 2021Source
- Document9 Building Plan.pdf · uploaded 30 Dec 2021Source
- Document10 Building Plan.pdf · uploaded 30 Dec 2021Source
- Document11 Building Plan.pdf · uploaded 30 Dec 2021Source
- Document2 Building Plan.pdf · uploaded 30 Dec 2021Source
- DocumentApproval Layout Page 1.pdf · uploaded 28 Feb 2023Source
- DocumentApproval Layout Page 2.pdf · uploaded 28 Feb 2023Source
- DocumentBuilding pg1.pdf · uploaded 28 Feb 2023Source
- DocumentBuilding pg2.pdf · uploaded 28 Feb 2023Source
- DocumentBuilding pg3.pdf · uploaded 28 Feb 2023Source
- DocumentBuilding pg4.pdf · uploaded 28 Feb 2023Source
- DocumentBuilding pg5.pdf · uploaded 28 Feb 2023Source
- DocumentBuilding pg6.pdf · uploaded 28 Feb 2023Source
- DocumentBuilding pg7.pdf · uploaded 28 Feb 2023Source
- DocumentBuilding pg8.pdf · uploaded 28 Feb 2023Source
- DocumentBuilding pg9.pdf · uploaded 28 Feb 2023Source
- DocumentBuilding pg10.pdf · uploaded 28 Feb 2023Source
- DocumentBuilding pg11.pdf · uploaded 28 Feb 2023Source
- DocumentBuilding pg12.pdf · uploaded 28 Feb 2023Source
- DocumentBuilding pg13.pdf · uploaded 28 Feb 2023Source
- DocumentBuilding pg14.pdf · uploaded 28 Feb 2023Source
Technical (Architect)
- DocumentFORM 1 Architect certificate.pdf · uploaded 2 Mar 2023Source
- Document1) Form-1 Anu Construction Mar22.pdf · uploaded 18 Mar 2025Source
- Document2) Form-1 Anu Construction june22.pdf · uploaded 18 Mar 2025Source
- Document3) Form-1 Anu Construction Sep22.pdf · uploaded 18 Mar 2025Source
- Document4) Form-1 Anu Construction Dec22.pdf · uploaded 18 Mar 2025Source
- Document5) Form-1 Anu Construction Mar23.pdf · uploaded 18 Mar 2025Source
- Document6) Form-1 Anu Construction june23.pdf · uploaded 18 Mar 2025Source
- Document7) Form-1 Anu Construction Sep23.pdf · uploaded 18 Mar 2025Source
- Document8) Form-1 Anu Construction Dec23.pdf · uploaded 18 Mar 2025Source
- Document9) Form-1 Anu Construction Mar24.pdf · uploaded 18 Mar 2025Source
- Document10) Form-1 Anu Construction June24.pdf · uploaded 18 Mar 2025Source
- Document11) Form-1 Anu Construction Sep24.pdf · uploaded 18 Mar 2025Source
- Document12) Form-1 Anu Construction Dec24.pdf · uploaded 18 Mar 2025Source
Technical (Engineer)
- DocumentMar 22.pdf · uploaded 20 Mar 2025Source
- DocumentJune 22.pdf · uploaded 20 Mar 2025Source
- DocumentSep 22.pdf · uploaded 20 Mar 2025Source
- DocumentDec 22.pdf · uploaded 20 Mar 2025Source
- DocumentMar 23.pdf · uploaded 20 Mar 2025Source
- DocumentJune 23.pdf · uploaded 20 Mar 2025Source
- DocumentSep 23.pdf · uploaded 20 Mar 2025Source
- DocumentDec 2023_compressed.pdf · uploaded 20 Mar 2025Source
- DocumentMarch 2024_compressed (1).pdf · uploaded 20 Mar 2025Source
- DocumentJune 2024_compressed.pdf · uploaded 20 Mar 2025Source
- DocumentSep 2024_compressed.pdf · uploaded 20 Mar 2025Source
- DocumentDec 24_compressed.pdf · uploaded 20 Mar 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel CTS NO. 1706
As registered with MahaRERA and published on its project page
- Project type
- Commercial
- Status on MahaRERA
- Certificate Signed
- Unit types
- Office space, Shop48 units in all
- Address
- Cts No. 1706, Solapur Road, HadapsarPIN 411013
- Village
- Hadapsar, Haveli taluka
- Location
- 18.50396, 73.92137
- Land area for this project
- 2,381 sq m (25,632 sq ft)
- Permissible built-up area
- 11,340 sq m (1,22,059 sq ft)
- Sanctioned built-up area
- 6,115 sq m (65,817 sq ft)
- Recreational open space
- 0 sq m (0 sq ft)
- Designated bank account
- 171
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
CTS NO. 1706
Boundaries
- North
- Plot No 2
- South
- Solapur Road
- East
- By Hadapsar Canal
- West
- Plot No 1
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking48 units
0 of 48 units booked (0%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Office space | 47.22 sq m · 508 sq ft | 1 | 0 |
| Office space | 60.83 sq m · 655 sq ft | 6 | 0 |
| Office space | 64.4 sq m · 693 sq ft | 6 | 0 |
| Office space | 67.17 sq m · 723 sq ft | 6 | 0 |
| Office space | 70.74 sq m · 761 sq ft | 6 | 0 |
| Office space | 79.2 sq m · 853 sq ft | 4 | 0 |
| Office space | 79.22 sq m · 853 sq ft | 1 | 0 |
| Office space | 87.6 sq m · 943 sq ft | 1 | 0 |
Show all 17 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Office space | 90.41 sq m · 973 sq ft | 4 | 0 |
| Office space | 92.8 sq m · 999 sq ft | 1 | 0 |
| Office space | 94.46 sq m · 1,017 sq ft | 1 | 0 |
| Office space | 94.47 sq m · 1,017 sq ft | 3 | 0 |
| Office space | 102.7 sq m · 1,105 sq ft | 1 | 0 |
| Office space | 102.85 sq m · 1,107 sq ft | 4 | 0 |
| Office space | 129.11 sq m · 1,390 sq ft | 1 | 0 |
| Office space | 145.16 sq m · 1,562 sq ft | 1 | 0 |
| Shop | 313.55 sq m · 3,375 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals4
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Kanhekar Prakash | — |
| Chartered accountant | RSVA & Co. | — |
| Engineer | Vineet Deshmukh | — |
| Other | Anish Enterprises | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Hadapsar
- Palladio Presidential Towers Phase 1RERA PM1260002602526
- Dosti Greenscapes - Phase 5₹11,500 a sq ft
- Oxy BelamarRERA PM1260002601661
- Aastha HousingRERA PR1262022601204
- Gandharv Leela₹9,710 a sq ft
- Park Imperial Tower ARERA PR1261012600792
- Gandharv Gokulam₹11,900 a sq ft
- Euphoric BlossomRERA PR1260002600219
All 4,589 projects in Hadapsar · Compare Tower - One 52 with another project
Tower - One 52 in numbers
Registered deals, summarised
Deedo has 2 registered documents at Tower - One 52, from Apr 2023 to Nov 2024: 2 mortgages.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Tower - One 52 by Deedo, last updated with deals registered in Nov 2024.
Latest deal · Mortgage · Nov 2024
Exact price & Index II