Newton Homes Hadapsar
Deedo IDDP-PUN-5WZ1Completion was pushed back 3 months to Jul 2025, and that date has passed too; no MahaRERA orders on record.
Hadapsar, Pune 411028 · Property rates in Hadapsar · by Ravima Venture · 67% of its projects kept the RERA date
Buying a flat here?
See every deed registered on it.
Completion was pushed back 3 months to Jul 2025, and that date has passed too
- P52100016523Registered 21 May 2018, completion promised 30 Apr 2025, revised to 31 Jul 2025, and still not shown completed today.
- P52100016517Registered 21 May 2018, completion promised 30 Apr 2024.
1 extension certificate on record.
2 registrations · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
- Primary sale · Nov 2026
- Primary sale · Oct 2026
- Primary sale · Sep 2026
- Resale · Aug 2026
- Primary sale · Aug 2026
- Resale · Jul 2026
- Primary sale · Jul 2026
- Primary sale · Jul 2026
- Primary sale · Jul 2026
- Primary sale · Jul 2026
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Nov 2026 | Main building · 703 | Primary sale | 759 sq ft | View Primary sale, Nov 2026 | |
| Oct 2026 | Main building · 603 | Primary sale | 759 sq ft | View Primary sale, Oct 2026 | |
| Sep 2026 | B | Primary sale | 188 sq ft | View Primary sale, Sep 2026 | |
| Aug 2026 | C · 903 | Resale | 773 sq ft | View Resale, Aug 2026 | |
| Aug 2026 | Main building · 102 | Primary sale | 800 sq ft | View Primary sale, Aug 2026 | |
| Jul 2026 | C · 503 | Resale | 773 sq ft | View Resale, Jul 2026 | |
| Jul 2026 | Main building · 101 | Primary sale | 615 sq ft | View Primary sale, Jul 2026 | |
| Jul 2026 | C · 401 | Primary sale | 950 sq ft | View Primary sale, Jul 2026 | |
| Jul 2026 | C · 1303 | Primary sale | 773 sq ft | View Primary sale, Jul 2026 | |
| Jul 2026 | C · 1003 | Primary sale | 773 sq ft | View Primary sale, Jul 2026 |
8 buildings
Open a building to see every flat, floor by floor.
- B17 floors · 53 units75% booked
- B BuildingSize not on record100% booked
- C15 floors · 68 units44% booked
- Main buildingSize not on record
- Wing ASize not on record
- Wing BSize not on record
- Wing CSize not on record
- Wing DSize not on record
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrations2
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100016523 | 21 May 2018 | 30 Apr 2025 | 31 Jul 2025 | Ravima Venture | Project page |
| P52100016517 | 21 May 2018 | 30 Apr 2024 | 30 Apr 2024 | Ravima Venture | Project page |
Documents209
4 documents held by Deedo, 205 filings listed on MahaRERA's project page
Registration certificate (2)
Other
- OtherP52100016517 · Date not statedView
Finance
- PAN CardP52100016523 · PAN Ravima Venture.pdf · uploaded 14 Apr 2023Source
Show all 209 documentsShow fewer documents
Legal
Migrated
- 1 Copy of the legal title reportP52100016523 · Search and Title.pdf · uploaded 11 May 2018Source
- 1 Details of encumbrancesP52100016523 · Encumbrance.pdf · uploaded 11 May 2018Source
- 1 Copy of Layout Approval (in case of layout)P52100016523 · Layout.pdf · uploaded 11 May 2018Source
- 2 Copy of Layout Approval (in case of layout)P52100016523 · Layout-1.pdf · uploaded 11 May 2018Source
- 1 Building Plan Approval (IOD)P52100016523 · 14.pdf · uploaded 11 May 2018Source
- 2 Building Plan Approval (IOD)P52100016523 · 16.pdf · uploaded 11 May 2018Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100016523 · CC.pdf · uploaded 11 May 2018Source
- 1 Copy of the legal title reportP52100016517 · Search and Title.pdf · uploaded 11 May 2018Source
- 1 Details of encumbrancesP52100016517 · Encumbrance.pdf · uploaded 11 May 2018Source
- 1 Copy of Layout Approval (in case of layout)P52100016517 · Layout.pdf · uploaded 11 May 2018Source
- 2 Copy of Layout Approval (in case of layout)P52100016517 · Layout-1.pdf · uploaded 11 May 2018Source
- 1 Building Plan Approval (IOD)P52100016517 · 14.pdf · uploaded 11 May 2018Source
- 2 Building Plan Approval (IOD)P52100016517 · 16.pdf · uploaded 11 May 2018Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100016517 · CC.pdf · uploaded 11 May 2018Source
- 1 Certificates of CA (Form 3)P52100016523 · CA Form 3.pdf · uploaded 12 May 2018Source
- 1 Certificates of CA (Form 3)P52100016517 · CA Form 3.pdf · uploaded 12 May 2018Source
- 1 Declaration in FORM BP52100016523 · Form B.pdf · uploaded 15 May 2018Source
- 1 Proforma of Allotment letterP52100016523 · Allotment Letter-Ravima phase 3.pdf · uploaded 15 May 2018Source
- 2 Proforma of Allotment letterP52100016523 · Offer Letter.pdf · uploaded 15 May 2018Source
- 1 Declaration in FORM BP52100016517 · Form B.pdf · uploaded 15 May 2018Source
- 1 Proforma of Allotment letterP52100016517 · Allotment Letter-Ravima phase 2.pdf · uploaded 15 May 2018Source
- 2 Proforma of Allotment letterP52100016517 · Draft Agreement.pdf · uploaded 15 May 2018Source
- 3 Proforma of Allotment letterP52100016517 · Offer Letter.pdf · uploaded 15 May 2018Source
- 2 Commencement Certificates / NA Order for plotted developmentP52100016523 · CC-1.pdf · uploaded 16 May 2018Source
- 3 Proforma of Allotment letterP52100016523 · Draft Agreement.pdf · uploaded 16 May 2018Source
- 2 Commencement Certificates / NA Order for plotted developmentP52100016517 · CC-1.pdf · uploaded 16 May 2018Source
- 3 Copy of Layout Approval (in case of layout)P52100016517 · Layout.pdf · uploaded 14 May 2019Source
- 3 Copy of Layout Approval (in case of layout)P52100016523 · Layout.pdf · uploaded 18 May 2019Source
- 3 Commencement Certificates / NA Order for plotted developmentP52100016523 · CC New.pdf · uploaded 18 May 2019Source
- 3 Commencement Certificates / NA Order for plotted developmentP52100016517 · CC New.pdf · uploaded 18 May 2019Source
- 3 Building Plan Approval (IOD)P52100016517 · 6 B.pdf · uploaded 6 Nov 2019Source
- 4 Building Plan Approval (IOD)P52100016517 · 7 B.pdf · uploaded 6 Nov 2019Source
- 5 Building Plan Approval (IOD)P52100016517 · 3- Commercial.pdf · uploaded 23 Sep 2020Source
- 1 Disclosure of sold/ booked inventoryP52100016517 · Sold or Booked List.pdf · uploaded 27 May 2021Source
- 1 Disclosure of sold/ booked inventoryP52100016523 · Sold or Booked List.pdf · uploaded 17 Jun 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)P52100016517 · Form5_RavimaVenture_Phase2.pdf · uploaded 1 Jul 2021Source
- 6 Building Plan Approval (IOD)P52100016517 · B Wing.pdf · uploaded 5 Aug 2021Source
- 7 Building Plan Approval (IOD)P52100016517 · Shops and Offices.pdf · uploaded 5 Aug 2021Source
- 4 Commencement Certificates / NA Order for plotted developmentP52100016517 · CC.pdf · uploaded 5 Aug 2021Source
- 1 Declaration about Commencement CertificateP52100016517 · Declaration Abount CC.pdf · uploaded 5 Aug 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100016523 · Architect Certificate Phase- III.pdf · uploaded 12 Aug 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100016523 · Quality Assurance FY 2020-21.pdf · uploaded 12 Aug 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100016517 · Architect Certificate Phase- II.pdf · uploaded 12 Aug 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100016517 · Quality Assurance FY 2020-21.pdf · uploaded 12 Aug 2021Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100016523 · Engineers Certificate Form 2.pdf · uploaded 14 Aug 2021Source
- 2 Certificates of CA (Form 3)P52100016523 · Form 3 for Registration Phase 3.pdf · uploaded 14 Aug 2021Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100016517 · Engineers Certificate Form 2.pdf · uploaded 14 Aug 2021Source
- 2 Certificates of CA (Form 3)P52100016517 · Form 3 for Registration Phase 2.pdf · uploaded 14 Aug 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)P52100016523 · Form 5 P3 Ravima Ven FY 18-19.pdf · uploaded 1 Oct 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P52100016523 · Form 5 P3 Ravima Ven FY 19-20.pdf · uploaded 1 Oct 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100016523 · Form 5 P3 Ravima Ven FY 20-21.pdf · uploaded 1 Oct 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P52100016517 · RAVIMA VENTURE FORM NO 5 P2 FY2019_20.pdf · uploaded 6 Oct 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100016517 · FORM 5 RAVIMA VENTURE PHASE II.pdf · uploaded 6 Oct 2021Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100016523 · Form 1.pdf · uploaded 7 Oct 2021Source
- 3 Certificates of CA (Form 3)P52100016523 · Ravima newton homes phase 3.pdf · uploaded 7 Oct 2021Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100016517 · Form 1.pdf · uploaded 7 Oct 2021Source
- 3 Certificates of CA (Form 3)P52100016517 · Ravima newton homes phase 2_compressed.pdf · uploaded 7 Oct 2021Source
- 4 Certificates of CA (Form 3)P52100016523 · Form 3 Phase 3 Dec 2021.pdf · uploaded 8 Jan 2022Source
- 4 Certificates of CA (Form 3)P52100016517 · RAVIMA VENTURES PHASE 2 FORM 3 Q3.pdf · uploaded 8 Jan 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100016517 · Architect Certificate.pdf · uploaded 28 Feb 2022Source
- 1 CERSAI detailsP52100016523 · CERSAI Search Report.pdf · uploaded 15 Apr 2022Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100016523 · Form 2 Phase I Oct.pdf · uploaded 21 Apr 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100016523 · Form 2 Phase III Oct.pdf · uploaded 21 Apr 2022Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100016523 · Form 2 Phase III January.pdf · uploaded 21 Apr 2022Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100016517 · Form 2 Phase I Oct.pdf · uploaded 21 Apr 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100016517 · Form 2 Phase I January.pdf · uploaded 21 Apr 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100016523 · Architect Certificate April.pdf · uploaded 3 May 2022Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100016517 · Architect Certificate April.pdf · uploaded 3 May 2022Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100016523 · Engg certificate C wing.pdf · uploaded 9 Jul 2022Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100016523 · Quality assurance C wing.pdf · uploaded 9 Jul 2022Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100016517 · Engg certificate B building.pdf · uploaded 9 Jul 2022Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100016517 · Quality assurance B wing.pdf · uploaded 9 Jul 2022Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100016517 · Architect Cetrificate.pdf · uploaded 16 Jul 2022Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP52100016517 · Completion Cetrificate.pdf · uploaded 29 Sep 2022Source
- 2 Disclosure of sold/ booked inventoryP52100016523 · Sold Sep 21.pdf · uploaded 1 Oct 2022Source
- 3 Disclosure of sold/ booked inventoryP52100016523 · Sold Sep 21.pdf · uploaded 1 Oct 2022Source
- 4 Disclosure of sold/ booked inventoryP52100016523 · Sold Feb 22.pdf · uploaded 1 Oct 2022Source
- 5 Disclosure of sold/ booked inventoryP52100016523 · Sold June 22.pdf · uploaded 1 Oct 2022Source
- 6 Disclosure of sold/ booked inventoryP52100016523 · Sold Sep 22.pdf · uploaded 1 Oct 2022Source
- 2 Disclosure of sold/ booked inventoryP52100016517 · Sold Sep 21.pdf · uploaded 1 Oct 2022Source
- 3 Disclosure of sold/ booked inventoryP52100016517 · Sold Unsold List.pdf · uploaded 1 Oct 2022Source
- 4 Disclosure of sold/ booked inventoryP52100016517 · Sold June 22.pdf · uploaded 1 Oct 2022Source
- 5 Disclosure of sold/ booked inventoryP52100016517 · Sold Sep 22.pdf · uploaded 1 Oct 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100016523 · Newton Homes C Building Form 5 FY 21-22.pdf · uploaded 17 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100016517 · Newton Homes B Building Form 5 FY 21-22.pdf · uploaded 17 Jan 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100016523 · Form 2 Phase III-Q3.pdf · uploaded 2 Feb 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100016523 · Form 2 Phase III-Q4.pdf · uploaded 2 Feb 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100016523 · Form 2 Phase III- Q1.pdf · uploaded 2 Feb 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100016523 · QA Phase II Q2.pdf · uploaded 2 Feb 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100016523 · Form 2 Phase II- Q3.pdf · uploaded 2 Feb 2023Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100016523 · QA Phase III Q3.pdf · uploaded 2 Feb 2023Source
- 7 Disclosure of sold/ booked inventoryP52100016523 · NH Phase II Sold.pdf · uploaded 2 Feb 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100016517 · Form 2 Phase II- Q1.pdf · uploaded 2 Feb 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100016517 · Form 2 Phase II- Q3.pdf · uploaded 2 Feb 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100016517 · Form 2 Phase II Oct.pdf · uploaded 2 Feb 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100016517 · Form 2 Phase II- Q1.pdf · uploaded 2 Feb 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100016517 · QA Phase II Q2.pdf · uploaded 2 Feb 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100016517 · QA Phase II Q3.pdf · uploaded 2 Feb 2023Source
- 6 Disclosure of sold/ booked inventoryP52100016517 · NH Phase II Sold.pdf · uploaded 2 Feb 2023View
- 3 Architect’s Certificate on Completion of Project (Form 4)P52100016517 · Form 4 Architect.pdf · uploaded 2 Feb 2023Source
- 4 Architect’s Certificate on Completion of Project (Form 4)P52100016517 · Form 4.pdf · uploaded 6 Feb 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100016523 · Form 1 Phase III-Q2.pdf · uploaded 18 Feb 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100016523 · Form 1 Phase III-Q3.pdf · uploaded 18 Feb 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100016523 · Form 2 Q2 2022-23.pdf · uploaded 23 Feb 2023Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100016523 · Form 2 Q3 2022-23.pdf · uploaded 23 Feb 2023Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P52100016517 · Society Formation.pdf · uploaded 6 Apr 2023Source
- 1 PAN CardP52100016523 · PAN Ravima Venture.pdf · uploaded 14 Apr 2023Source
- 4 Commencement Certificates / NA Order for plotted developmentP52100016523 · CC-2023.pdf · uploaded 14 Apr 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100016523 · Form 1 Phase III- Q4 22-23.pdf · uploaded 17 Apr 2023Source
- 4 Copy of Layout Approval (in case of layout)P52100016523 · Layout.pdf · uploaded 20 Apr 2023Source
- 3 Building Plan Approval (IOD)P52100016523 · Shop and Office.pdf · uploaded 20 Apr 2023Source
- 4 Building Plan Approval (IOD)P52100016523 · C Wing.pdf · uploaded 20 Apr 2023Source
- 8 Disclosure of sold/ booked inventoryP52100016523 · NH Phase III Sold.pdf · uploaded 20 Apr 2023Source
- 9 Disclosure of sold/ booked inventoryP52100016523 · Sold March-23.pdf · uploaded 20 Apr 2023Source
- 1 Declaration about Commencement CertificateP52100016523 · Decelaration Abount CC.pdf · uploaded 22 Apr 2023Source
- 2 Declaration about Commencement CertificateP52100016523 · Decelaration Abount CC.pdf · uploaded 22 Apr 2023Source
- 5 Building Plan Approval (IOD)P52100016523 · C Wing New.pdf · uploaded 27 Apr 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100016523 · QA NH Phase III-Q4.pdf · uploaded 10 Jul 2023Source
- 10 Disclosure of sold/ booked inventoryP52100016523 · Sold NH-Q1.pdf · uploaded 10 Jul 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100016523 · Form 1 Q1 2023-24.pdf · uploaded 20 Jul 2023Source
- 5 Certificates of CA (Form 3)P52100016523 · Form 3 Q4 2021-22.pdf · uploaded 21 Jul 2023Source
- 6 Certificates of CA (Form 3)P52100016523 · Form 3 Q1 2022-23.pdf · uploaded 21 Jul 2023Source
- 7 Certificates of CA (Form 3)P52100016523 · Form 3 Q2 2022-23.pdf · uploaded 21 Jul 2023Source
- 8 Certificates of CA (Form 3)P52100016523 · Form 3 Q3 2022-23.pdf · uploaded 21 Jul 2023Source
- 9 Certificates of CA (Form 3)P52100016523 · Form 3 Q4 2022-23.pdf · uploaded 21 Jul 2023Source
- 11 Disclosure of sold/ booked inventoryP52100016523 · Sold Q2 2023-24.pdf · uploaded 6 Oct 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100016523 · Form 1 Q2 2023-24.pdf · uploaded 7 Oct 2023Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100016523 · Form 2 Q4 2022-23.pdf · uploaded 12 Oct 2023Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100016523 · Form 2 Q1 2023-24.pdf · uploaded 12 Oct 2023Source
- 10 Certificates of CA (Form 3)P52100016523 · Form 3 Q1 2023-24.pdf · uploaded 12 Oct 2023Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100016523 · Form 2 Q2 2023-24.pdf · uploaded 20 Oct 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100016523 · QA NH Phase III-Q1.pdf · uploaded 20 Oct 2023Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100016523 · QA Form 2A Q2 2023-24.pdf · uploaded 20 Oct 2023Source
- 11 Certificates of CA (Form 3)P52100016523 · Form 3 Q2 2023-24.pdf · uploaded 20 Oct 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100016523 · Form 5- 2022-23.pdf · uploaded 1 Dec 2023Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100016523 · Form 1 Q3 RV.pdf · uploaded 17 Jan 2024Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100016523 · Form 2 Q3 RV.pdf · uploaded 17 Jan 2024Source
- 12 Disclosure of sold/ booked inventoryP52100016523 · Sold Q3-RV.pdf · uploaded 17 Jan 2024Source
- 12 Certificates of CA (Form 3)P52100016523 · Form 3 Q3 RV.pdf · uploaded 17 Jan 2024Source
- 13 Disclosure of sold/ booked inventoryP52100016523 · Sold Q4-2023-24.pdf · uploaded 18 Apr 2024Source
- 13 Certificates of CA (Form 3)P52100016523 · Form 3 Q4-2023-24.pdf · uploaded 18 Apr 2024Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100016523 · Form 1 Q4 2023-24.pdf · uploaded 19 Apr 2024Source
- 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100016523 · Form 2 Q4 2023-24.pdf · uploaded 22 Apr 2024Source
- 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100016523 · Form 2 Phase III-Q1 2024-25.pdf · uploaded 17 Jul 2024Source
- 14 Disclosure of sold/ booked inventoryP52100016523 · Sold Q1 2024-25.pdf · uploaded 17 Jul 2024Source
- 14 Certificates of CA (Form 3)P52100016523 · Form 3 Q1 2024-25.pdf · uploaded 17 Jul 2024Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100016523 · Form 1 Q1 2024-25.pdf · uploaded 18 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100016523 · QA Form 2A- FY-2023-24.pdf · uploaded 1 Aug 2024Source
- 2 Certificates of CA (Form 3)P52100016523 · CA Foem 3 Q2.pdf · uploaded 19 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryP52100016523 · Sold_0001.pdf · uploaded 19 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100016523 · Form 1 Q2 2024-25.pdf · uploaded 24 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100016523 · Form 5-2023-24.pdf · uploaded 29 Oct 2024Source
- 1 Certificates of CA (Form 3)P52100016523 · Form 3 Q3-2024-25.pdf · uploaded 21 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100016523 · Form 2 Phase III-Q3 2024-25.pdf · uploaded 21 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100016523 · Sold Q3-2024-25.pdf · uploaded 21 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100016523 · Form 1 Q3-2024-25.pdf · uploaded 22 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100016523 · Form 1 Q4 2024-25.pdf · uploaded 19 Apr 2025Source
- 1 Certificates of CA (Form 3)P52100016523 · Form 3 Q4 2024-25.pdf · uploaded 19 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100016523 · Form 2 Q4 2024-25.pdf · uploaded 19 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryP52100016523 · Sold Q4 2024-25.pdf · uploaded 19 Apr 2025Source
- 1 Proforma of Agreement for saleP52100016523 · Draft Agreement.pdf · uploaded 19 Apr 2025Source
- 1 Declaration in FORM BP52100016523 · Form B New.pdf · uploaded 16 May 2025Source
- 1 Certificates of CA (Form 3)P52100016523 · Form B New.pdf · uploaded 16 May 2025Source
- 2 Certificates of CA (Form 3)P52100016523 · From 3 Q4.pdf · uploaded 16 May 2025Source
- 1 Disclosure of sold/ booked inventoryP52100016523 · Sold Q4 2024-25 New.pdf · uploaded 16 May 2025Source
- Withdrawal Update Form 1P52100016523 · Form 1 Q1 2025-26.pdf · uploaded 31 Jan 2026Source
- Withdrawal Update Form 1P52100016523 · Form 1 Q1 2025-26.pdf · uploaded 31 Jan 2026Source
- Withdrawal Update Form 2P52100016523 · Form 2 Q1 2025-26.pdf · uploaded 31 Jan 2026Source
- Withdrawal Update Form 2P52100016523 · Form 2 Q1 2025-26.pdf · uploaded 31 Jan 2026Source
- Withdrawal Update Form 3P52100016523 · Form 3.pdf · uploaded 31 Jan 2026Source
- Withdrawal Update Form 3P52100016523 · Form 3.pdf · uploaded 31 Jan 2026Source
Technical
- DocumentP52100016523 · 14.pdf · uploaded 11 May 2018Source
- DocumentP52100016523 · 16.pdf · uploaded 11 May 2018Source
- DocumentP52100016523 · Layout.pdf · uploaded 11 May 2018Source
- DocumentP52100016523 · Layout-1.pdf · uploaded 11 May 2018Source
- DocumentP52100016517 · 14.pdf · uploaded 11 May 2018Source
- DocumentP52100016517 · 16.pdf · uploaded 11 May 2018Source
- DocumentP52100016517 · Layout.pdf · uploaded 11 May 2018Source
- DocumentP52100016517 · Layout-1.pdf · uploaded 11 May 2018Source
- DocumentP52100016517 · Layout.pdf · uploaded 14 May 2019Source
- DocumentP52100016523 · Layout.pdf · uploaded 18 May 2019Source
- DocumentP52100016517 · 6 B.pdf · uploaded 6 Nov 2019Source
- DocumentP52100016517 · 7 B.pdf · uploaded 6 Nov 2019Source
- DocumentP52100016517 · 3- Commercial.pdf · uploaded 23 Sep 2020Source
- DocumentP52100016517 · B Wing.pdf · uploaded 5 Aug 2021Source
- DocumentP52100016517 · Shops and Offices.pdf · uploaded 5 Aug 2021Source
- DocumentP52100016523 · Layout.pdf · uploaded 20 Apr 2023Source
- DocumentP52100016523 · Shop and Office.pdf · uploaded 20 Apr 2023Source
- DocumentP52100016523 · C Wing.pdf · uploaded 20 Apr 2023Source
- DocumentP52100016523 · C Wing New.pdf · uploaded 27 Apr 2023Source
Technical (Architect)
- DocumentP52100016517 · Architect Cetrificate.pdf · uploaded 16 Jul 2022Source
- DocumentP52100016523 · Form 1 Q2 2024-25.pdf · uploaded 24 Oct 2024Source
- DocumentP52100016523 · Form 1 Q3-2024-25.pdf · uploaded 22 Jan 2025Source
- DocumentP52100016523 · Form 1 Q4 2024-25.pdf · uploaded 19 Apr 2025Source
- DocumentP52100016523 · Form 1 Q1 2025-26.pdf · uploaded 31 Jan 2026Source
Technical (Engineer)
- DocumentP52100016517 · Form 2 Phase II- Q1.pdf · uploaded 2 Feb 2023Source
- DocumentP52100016523 · Form 2 Phase III-Q3 2024-25.pdf · uploaded 21 Jan 2025Source
- DocumentP52100016523 · Form 2 Q4 2024-25.pdf · uploaded 19 Apr 2025Source
- DocumentP52100016523 · Form 2 Q1 2025-26.pdf · uploaded 31 Jan 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 166/2/3/4/4B/5
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Phases
- 2
- Unit types
- 1BHK, 2BHK, Office space, Shop, 1RK, 2.5 BHK, 3BHK121 units in all
- Address
- 166/2/3/4/4B/5, Malawadi Road, HadapsarPIN 411028
- Village
- Hadapsar, Haveli taluka
- Land area for this project
- 4,950 sq m (53,281 sq ft)
- Permissible built-up area
- 3,600 sq m (38,750 sq ft)
- Sanctioned built-up area
- 373 sq m (4,015 sq ft)
- Recreational open space
- 354 sq m (3,808 sq ft)
- Developed in phases
- No
- Also registered as
- Newton Homes Hadapsar Phase III, Newton Homes Hadapsar Phase II, येणा-या न्यूटन होम्स हडपसर फेज, न्युटन होम्स हडपसर, न्युटन होम्स हडपसर फेज, न्यूटन होम्स हडपसर नियर रुणवाल सेगुल्ल फेज, न्यूटन होम्स हडपसर फेज, Nyutan Homs Hadapasar, Nyutan Homs Hadapasar Fej, Nyutan Homs Hadapasar Niyar Runaval Segull Fej, Yena-Ya Nyutan Homs Hadapasar Fej, Nyutan Homes Hadapasar, Nyutan Homes Hadapasar Niyar Runaval Segull Phase, Nyutan Homes Hadapasar Phase, Yena-Ya Nyutan Homes Hadapasar Phase
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
166/2/3/4/4B/5
Boundaries
- North
- Hiss No 1 and 24 Mtr DP Road
- South
- Hissa No 6
- East
- Hissa No 5 Part
- West
- Sr No 236 and 12 Mtr DP Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking121 units
70 of 121 units booked (58%), as the promoter reported to MahaRERA
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P52100016517 | B | 1BHK | 36.34 sq m · 391 sq ft | 1 | 1 |
| P52100016517 | B | 2BHK | 56.79 sq m · 611 sq ft | 43 | 34 |
| P52100016517 | B | Office space | 16.8 sq m · 181 sq ft | 1 | 0 |
| P52100016517 | B | Office space | 17 sq m · 183 sq ft | 1 | 0 |
| P52100016517 | B | Office space | 17.45 sq m · 188 sq ft | 1 | 0 |
| P52100016517 | B | Office space | 17.48 sq m · 188 sq ft | 1 | 0 |
| P52100016517 | B | Office space | 17.69 sq m · 190 sq ft | 1 | 1 |
| P52100016517 | B | Office space | 25.21 sq m · 271 sq ft | 1 | 1 |
Show all 33 unit rowsShow fewer unit rows
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P52100016517 | B | Office space | 25.94 sq m · 279 sq ft | 1 | 1 |
| P52100016517 | B | Shop | 41.8 sq m · 450 sq ft | 2 | 2 |
| P52100016523 | C | 1RK | 27.81 sq m · 299 sq ft | 1 | 0 |
| P52100016523 | C | 1RK | 30.45 sq m · 328 sq ft | 1 | 1 |
| P52100016523 | C | 2.5 BHK | 68.9 sq m · 742 sq ft | 1 | 0 |
| P52100016523 | C | 2BHK | 59.73 sq m · 643 sq ft | 13 | 13 |
| P52100016523 | C | 3BHK | 71.84 sq m · 773 sq ft | 13 | 1 |
| P52100016523 | C | 3BHK | 73.28 sq m · 789 sq ft | 13 | 8 |
| P52100016523 | C | 3BHK | 88.26 sq m · 950 sq ft | 10 | 2 |
| P52100016523 | C | Office space | 15.35 sq m · 165 sq ft | 1 | 0 |
| P52100016523 | C | Office space | 15.72 sq m · 169 sq ft | 1 | 0 |
| P52100016523 | C | Office space | 16.8 sq m · 181 sq ft | 1 | 0 |
| P52100016523 | C | Office space | 17.05 sq m · 184 sq ft | 1 | 0 |
| P52100016523 | C | Office space | 17.44 sq m · 188 sq ft | 1 | 0 |
| P52100016523 | C | Office space | 17.49 sq m · 188 sq ft | 1 | 0 |
| P52100016523 | C | Office space | 25.77 sq m · 277 sq ft | 1 | 1 |
| P52100016523 | C | Office space | 37.47 sq m · 403 sq ft | 1 | 0 |
| P52100016523 | C | Office space | 57.46 sq m · 618 sq ft | 1 | 0 |
| P52100016523 | C | Office space | 59.19 sq m · 637 sq ft | 1 | 1 |
| P52100016523 | C | Shop | 26.61 sq m · 286 sq ft | 1 | 1 |
| P52100016523 | C | Shop | 27.12 sq m · 292 sq ft | 1 | 1 |
| P52100016523 | C | Shop | 27.54 sq m · 296 sq ft | 1 | 1 |
| P52100016523 | C | Shop | 32.58 sq m · 351 sq ft | 1 | 0 |
| P52100016523 | C | Shop | 52.29 sq m · 563 sq ft | 1 | 0 |
| P52100016523 | C | Shop | 60.82 sq m · 655 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals3
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Architect | Malwadkar Architect | — | P52100016517 |
| Engineer | Nitin Raut | — | P52100016523 |
| Engineer | Satish Marathe | — | P52100016517 |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Hadapsar
- Palladio Presidential Towers Phase 1RERA PM1260002602526
- Dosti Greenscapes - Phase 5₹11,500 a sq ft
- Oxy BelamarRERA PM1260002601661
- Aastha HousingRERA PR1262022601204
- Gandharv Leela₹9,710 a sq ft
- Park Imperial Tower ARERA PR1261012600792
- Gandharv Gokulam₹11,900 a sq ft
- Euphoric BlossomRERA PR1260002600219
All 4,589 projects in Hadapsar · Compare Newton Homes Hadapsar with another project
Newton Homes Hadapsar in numbers
Registered deals, summarised
Deedo has 214 registered documents at Newton Homes Hadapsar, from Feb 2016 to Nov 2026: 140 sales, 9 leave and licence agreements, 53 mortgages. The median registered sale since Feb 2016 works out to about ₹8,500 per sq ft, at a median of ₹48 L a deal; 3% of sales were resales.
- What is the price per sq ft at Newton Homes Hadapsar?
- The median registered sale since Feb 2016 works out to about ₹8,500 per sq ft, at a median of ₹48 L a deal; 3% of sales were resales.
- How many properties have been sold at Newton Homes Hadapsar?
- 140 sales are registered at Newton Homes Hadapsar, 4 of them resales.
- Are properties at Newton Homes Hadapsar rented out?
- Yes: 9 leave and licence agreements are registered at Newton Homes Hadapsar, at a median rent since Feb 2016 of about ₹22,000 a month with a deposit of about ₹50,000.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Newton Homes Hadapsar by Deedo, last updated with deals registered in Nov 2026.
Latest deal · Primary sale · Nov 2026
₹50–75 L