Kumar Parc Residences - C Mhada
Deedo IDDP-PUN-ZJ36MahaRERA shows it completed; no MahaRERA orders on record; 67% of its units are booked.
Hadapsar, Pune 411028 · Property rates in Hadapsar · by Kumar Properties Infratech Developers Pvt Ltd
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed
- This projectRegistered 1 Dec 2022, completion promised 30 Nov 2026.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
- Rental · 24 mo · Mar 2024
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Mar 2024 | Not on record | Rental | — | View Rental, Mar 2024 |
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100047940
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100047940 | 1 Dec 2022 | 30 Nov 2026 | 30 Nov 2026 | Kumar Properties Infratech Developers Pvt Ltd | Project page |
Documents134
1 document held by Deedo, 133 filings listed on MahaRERA's project page
Finance
- PAN Card1_Pan Card.pdf · uploaded 26 Sep 2022Source
Legal
- Declaration Form B6_Form B_Declaration.pdf · uploaded 26 Sep 2022Source
- Legal Title report2_Legal Title Report_R1.pdf · uploaded 12 Oct 2022Source
- Declaration Form B250707_Legal Title Report.pdf · uploaded 15 Jul 2025Source
- Declaration Form B250707_Legal Title Report_Format A.pdf · uploaded 15 Jul 2025Source
- Others250804_Form B_R1.pdf · uploaded 4 Aug 2025Source
- Others240913_C Mhada_Agreement for Sale_R8.pdf · uploaded 14 Oct 2025Source
Show all 134 documentsShow fewer documents
Legal
- Declaration Form B260207_Form B_Declaration.pdf · uploaded 7 Feb 2026Source
- Declaration Form B7-12.pdf · uploaded 7 Feb 2026Source
- OthersBlank Page.pdf · uploaded 15 Jun 2026Source
- OthersBlank Page.pdf · uploaded 15 Jun 2026Source
- Declaration Form B260724_Legal Title Report.pdf · uploaded 27 Jul 2026Source
Migrated
- 1 PAN Card1_Pan Card.pdf · uploaded 26 Sep 2022Source
- 1 a Details of encumbrances concerned to Finance3_Encumbrance Certificate_Finance.pdf · uploaded 26 Sep 2022Source
- 1 b Details of encumbrances concerned to Legal3_Encumbrance Certificate_Legal.pdf · uploaded 26 Sep 2022Source
- 1 Copy of Layout Approval (in case of layout)4_Layout.pdf · uploaded 26 Sep 2022Source
- 1 Building Plan Approval / NA Order for plotted development13_Building Plan_1.pdf · uploaded 26 Sep 2022Source
- 2 Building Plan Approval / NA Order for plotted development13_Building Plan_2.pdf · uploaded 26 Sep 2022Source
- 1 Commencement Certificates / NA Order for plotted development11_Commencement Certificate.pdf · uploaded 26 Sep 2022Source
- 1 Declaration about Commencement Certificate14_Declaration about Commencement Certificate.pdf · uploaded 26 Sep 2022Source
- 1 Declaration in FORM B6_Form B_Declaration.pdf · uploaded 26 Sep 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same18_Self Declaration_Bank Accounts Details.pdf · uploaded 26 Sep 2022Source
- 1 Deviation Report with respect to Allotment letter16_Deviation report for Allotment Letter.pdf · uploaded 26 Sep 2022Source
- 1 CERSAI details15_CERSAI REPORT_R1.pdf · uploaded 10 Oct 2022Source
- 1 Copy of the legal title report2_Legal Title Report_R1.pdf · uploaded 12 Oct 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)221020_CA Certificate_3.pdf · uploaded 2 Nov 2022Source
- 1 Proforma of Allotment letter221116_Allotment Letter_R2.pdf · uploaded 16 Nov 2022Source
- 1 Deviation Report with respect to model copy of Agreement221121_Deviation Report_Agreement for Sale_R5.pdf · uploaded 21 Nov 2022Source
- 1 Proforma of Agreement for sale221123_Agreement for Sale_R6.pdf · uploaded 23 Nov 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)1_Arch Certificate.pdf · uploaded 21 Jan 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)2_Engg Certificate.pdf · uploaded 21 Jan 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)3_CA Certificate.pdf · uploaded 21 Jan 2023Source
- 2 Copy of Layout Approval (in case of layout)230214_Layout.pdf · uploaded 2 Mar 2023Source
- 3 Building Plan Approval / NA Order for plotted development230214_Building Plan 1_compressed.pdf · uploaded 2 Mar 2023Source
- 4 Building Plan Approval / NA Order for plotted development230214_Building Plan 2_compressed.pdf · uploaded 2 Mar 2023Source
- 2 Commencement Certificates / NA Order for plotted development230214_CC.pdf · uploaded 2 Mar 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)1_Arch Certificate.pdf · uploaded 21 Apr 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)2_Engg Certificate.pdf · uploaded 21 Apr 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)3_CA Certificate.pdf · uploaded 21 Apr 2023Source
- 3 Copy of Layout Approval (in case of layout)230427_Layout.pdf · uploaded 27 Apr 2023Source
- 5 Building Plan Approval / NA Order for plotted development230426_Sheet No 9_Bldg C_1st FL Pl.pdf · uploaded 27 Apr 2023Source
- 6 Building Plan Approval / NA Order for plotted development230426_Sheet No 10_Bldg C_Flr and Ref Pl.pdf · uploaded 27 Apr 2023Source
- 3 Commencement Certificates / NA Order for plotted development230426_CC.pdf · uploaded 27 Apr 2023Source
- 2 Declaration about Commencement Certificate230426_C_Declaration about CC.pdf · uploaded 27 Apr 2023Source
- 2 Proforma of Agreement for sale230426_C_Agreement for Sale_R6.pdf · uploaded 27 Apr 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)1_Arch Certificate.pdf · uploaded 20 Jul 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)2_Engg Certificate.pdf · uploaded 20 Jul 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)3_CA Certificate.pdf · uploaded 20 Jul 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)60_Kumar Parc Residences C Mhada.pdf · uploaded 2 Oct 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)1_Arch Certificate.pdf · uploaded 20 Oct 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)2_Engg Certificate.pdf · uploaded 20 Oct 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)3_CA Certificate.pdf · uploaded 20 Oct 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)1_Arch Certificate.pdf · uploaded 17 Jan 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)2_Cost Working.pdf · uploaded 17 Jan 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)3_CA Certificate.pdf · uploaded 17 Jan 2024Source
- 4 Copy of Layout Approval (in case of layout)240127_Layout.pdf · uploaded 12 Feb 2024Source
- 7 Building Plan Approval / NA Order for plotted development240127_Sheet 11_Bldg C_1st Fl Pl.pdf · uploaded 12 Feb 2024Source
- 8 Building Plan Approval / NA Order for plotted development240127_Sheet 12_Bldg C_Fl and Ref Pl.pdf · uploaded 12 Feb 2024Source
- 4 Commencement Certificates / NA Order for plotted development240127_CC.pdf · uploaded 12 Feb 2024Source
- 3 Declaration about Commencement Certificate240212_C_Declaration about CC.pdf · uploaded 12 Feb 2024Source
- 3 Proforma of Agreement for sale240202_C_Agreement for Sale_R7.pdf · uploaded 12 Feb 2024Source
- 1 Home Buyer /Allottee Grievance Redressal Cell240308_Decl about Grievance Redressal Cel.pdf · uploaded 8 Mar 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)1_Arch Certificate.pdf · uploaded 20 Apr 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)2_Engg Certificate.pdf · uploaded 20 Apr 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)5_Form 2A.pdf · uploaded 20 Apr 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)3_CA Certificate.pdf · uploaded 20 Apr 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)1_Arch Certificate.pdf · uploaded 20 Jul 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)2_Engg Certificate.pdf · uploaded 20 Jul 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)3_CA Certificate.pdf · uploaded 20 Jul 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)From 5-Parc Residences c Mhad March 24.pdf · uploaded 14 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)1_Ar Certificate.pdf · uploaded 21 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)3_CA Certificate_compressed.pdf · uploaded 21 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)2_Engg Certificate.pdf · uploaded 21 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)1_Arch Certificate.pdf · uploaded 20 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)3_CA Certificate.pdf · uploaded 20 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)2_Engg Certificate.pdf · uploaded 20 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)1_Ar Certificate.pdf · uploaded 18 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)3_CA Certificate_compressed.pdf · uploaded 18 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)2_Engg Certificate.pdf · uploaded 18 Apr 2025Source
- 1 Disclosure of sold/ booked inventory6_Disclosure of Sold Inventory.pdf · uploaded 18 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)5_Form 2A.pdf · uploaded 18 Apr 2025Source
- Form 5 (FY 2024-2025)Form 5_Parc Residences_C_Signed.pdf · uploaded 23 Sep 2025Source
- Withdrawal Update Form 11_Ar Certificate_Signed.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 22_Engg Certificate.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 33_CA certificate_Signed.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 11_Ar Certificate_Signed.pdf · uploaded 13 Jan 2026Source
- Withdrawal Update Form 22_Engg Certificate.pdf · uploaded 13 Jan 2026Source
- Withdrawal Update Form 33_CA Certificate.pdf · uploaded 13 Jan 2026Source
- Form 2A (FY 2022-2023)4_Form 2A March 2023.pdf · uploaded 12 Jun 2026Source
- Form 2A (FY 2023-2024)4_Form 2A March 2024.pdf · uploaded 12 Jun 2026Source
- Form 2A (FY 2024-2025)4_Form 2A March 2025.pdf · uploaded 12 Jun 2026Source
- Form 2A (FY 2025-2026)4_Form 2A March 2026.pdf · uploaded 12 Jun 2026Source
- Withdrawal Update Form 11_Ar Certificate.pdf · uploaded 17 Jul 2026Source
- Withdrawal Update Form 22_Engg Certificate.pdf · uploaded 17 Jul 2026Source
- Withdrawal Update Form 33_CA Certificate.pdf · uploaded 17 Jul 2026Source
- Withdrawal Update Form 1Form 1 - March 2026.pdf · uploaded 25 Aug 2026Source
- Withdrawal Update Form 2Form 2 - March 2026.pdf · uploaded 25 Aug 2026Source
- Withdrawal Update Form 3Form 3 - March 2026.pdf · uploaded 25 Aug 2026Source
- Withdrawal Update Form 1Form 1 - Architect Certificate.pdf · uploaded 26 Aug 2026Source
- Withdrawal Update Form 2Form 2 - Engineer Certificate.pdf · uploaded 26 Aug 2026Source
- Withdrawal Update Form 3Form 3 - CA Certificate.pdf · uploaded 26 Aug 2026Source
- Occupational CertificateOccupancy Certificate.pdf · uploaded 26 Aug 2026Source
- Occupational CertificateOC Verification Mail.pdf · uploaded 26 Aug 2026Source
- Occupational CertificateCommencement Certificate.pdf · uploaded 26 Aug 2026Source
- Occupational CertificateCC Plan.pdf · uploaded 26 Aug 2026Source
Technical
- Document4_Layout.pdf · uploaded 26 Sep 2022Source
- Document13_Building Plan_1.pdf · uploaded 26 Sep 2022Source
- Document13_Building Plan_2.pdf · uploaded 26 Sep 2022Source
- Document230214_Layout.pdf · uploaded 2 Mar 2023Source
- Document230214_Building Plan 1_compressed.pdf · uploaded 2 Mar 2023Source
- Document230214_Building Plan 2_compressed.pdf · uploaded 2 Mar 2023Source
- Document230427_Layout.pdf · uploaded 27 Apr 2023Source
- Document230426_Sheet No 9_Bldg C_1st FL Pl.pdf · uploaded 27 Apr 2023Source
- Document230426_Sheet No 10_Bldg C_Flr and Ref Pl.pdf · uploaded 27 Apr 2023Source
- Document240127_Layout.pdf · uploaded 12 Feb 2024Source
- Document240127_Sheet 11_Bldg C_1st Fl Pl.pdf · uploaded 12 Feb 2024Source
- Document240127_Sheet 12_Bldg C_Fl and Ref Pl.pdf · uploaded 12 Feb 2024Source
- Document250811_Layout_1.pdf · uploaded 26 Sep 2025Source
- Document250811_Layout_2.pdf · uploaded 26 Sep 2025Source
- Document1_260306_Building Layout.pdf · uploaded 2 Apr 2026Source
- Document2_260306_Parking Layout Basement.pdf · uploaded 2 Apr 2026Source
- Document3_260306_ Podium Parking Layout.pdf · uploaded 2 Apr 2026Source
- Document4_260306_Building C-LIG Floor Plans.pdf · uploaded 2 Apr 2026Source
- Document5_260306_Building C-LIG-Floor Plans.pdf · uploaded 2 Apr 2026Source
- Document6_260306_Building C-LIG-Sect Ele.pdf · uploaded 2 Apr 2026Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 178/1B, 178/2A
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK140 units in all
- Address
- 178 P, 179P, Mundhwa Kharadi Road, HadapsarPIN 411028
- Village
- Hadapsar, Haveli taluka
- Location
- 18.52087, 73.93440
- Land area for this project
- 1,795 sq m (19,318 sq ft)
- Approved layout area
- 40,500 sq m (4,35,938 sq ft)
- Permissible built-up area
- 7,574 sq m (81,523 sq ft)
- Sanctioned built-up area
- 7,574 sq m (81,523 sq ft)
- Recreational open space
- 3,443 sq m (37,056 sq ft)
- Designated bank account
- 76
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
Hissa No. /1A, 178/2A, 178/1B, 178/2B, 179/2/1A/2, 179/2/1A/2A, 179/2/1A/2B, 179/2/1B, 179/2/2
Boundaries
- North
- Sr No 179P
- South
- Sr No 242P
- East
- Nala
- West
- Nala
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking140 units
94 of 140 units booked (67%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 38.5 sq m · 414 sq ft | 140 | 94 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals69
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Vishal J Deshpande | — |
| Chartered accountant | Supriya Mundada | — |
| Engineer | Harshad Pendse | — |
| Registered real estate agent | Aaltaf Mukhtar Shaikh | — |
| Registered real estate agent | Abhijit Jagdish Muppid | — |
| Registered real estate agent | Abhishek Ashok Tripathi | — |
| Registered real estate agent | Akshay Anil Gaikwad | — |
| Registered real estate agent | Amruta Ghule | — |
Show all 69 professionalsShow fewer professionals
| Role | Name | Registration no. |
|---|---|---|
| Registered real estate agent | Amruta Santosh Dudhane | — |
| Registered real estate agent | Ankush Zadoo | — |
| Registered real estate agent | Anurag Vijay Sutar | — |
| Registered real estate agent | Arif Hamid Khan | — |
| Registered real estate agent | Ashwajeet Sanjay Kharat | — |
| Registered real estate agent | Atul Hanumant Pansare | — |
| Registered real estate agent | Bhagyashree Pramod Moholkar | — |
| Registered real estate agent | Bindu Ludovico D Silva | — |
| Registered real estate agent | Chandrakant Vithal Gaikwad | — |
| Registered real estate agent | Chirag Sharad Shah | — |
| Registered real estate agent | Chitralekha Laad | — |
| Registered real estate agent | Digambar Subhash Waghere | — |
| Registered real estate agent | Dipti Rajendra Joshi | — |
| Registered real estate agent | Ganesh Jadhav | — |
| Registered real estate agent | Ganesh Prakash Varma | — |
| Registered real estate agent | Gorksha Mhaske | — |
| Registered real estate agent | Harshita Maheswary | — |
| Registered real estate agent | Hussain Abbas | — |
| Registered real estate agent | Imran Ahmed Shaikh | — |
| Registered real estate agent | Isaque Ibrahim Shaikh | — |
| Registered real estate agent | Jawed Ansari | — |
| Registered real estate agent | Jay Shankar Singh | — |
| Registered real estate agent | Kailas Ramchandra Aher | — |
| Registered real estate agent | Kishor Kakaso Jadhav | — |
| Registered real estate agent | Mahipati Darade | — |
| Registered real estate agent | Mangesh Ramesh Kamble | — |
| Registered real estate agent | Manoj Kumar Singh | — |
| Registered real estate agent | Mayank Subhash Trivedi | — |
| Registered real estate agent | Mehran Anjum Parwani | — |
| Registered real estate agent | Mohammad Aslam Khamkar | — |
| Registered real estate agent | Mohammed Shamim Mohd Shafi | — |
| Registered real estate agent | Mustafa Hatim Kothambawala | — |
| Registered real estate agent | Neeraj Nimabalkar | — |
| Registered real estate agent | Niteen Sudhakar Budhawant | — |
| Registered real estate agent | Nitin Raju Mane | — |
| Registered real estate agent | Piyoush Pralahad Meghawani | — |
| Registered real estate agent | Prachi Rahul Bansode | — |
| Registered real estate agent | Pramod Pandit Patil | — |
| Registered real estate agent | Pranav Madhukar Moze | — |
| Registered real estate agent | puneet pradeep naik | — |
| Registered real estate agent | Radha Mahadev Wanave | — |
| Registered real estate agent | Rahul Manoj Gandhi | — |
| Registered real estate agent | Richard Subhash Hasnaly | — |
| Registered real estate agent | Rohit Dilip Kawade | — |
| Registered real estate agent | Sadaf Ilyas | — |
| Registered real estate agent | Sagar Devidas Wani | — |
| Registered real estate agent | Sana Wasim Shaikh | — |
| Registered real estate agent | Shivangi Vimal Khatri | — |
| Registered real estate agent | Shivshankar Ashok Yedale | — |
| Registered real estate agent | Shoaib Aslam Inamdar | — |
| Registered real estate agent | Shreya Pandharinath Darekar | — |
| Registered real estate agent | Sunil Tukaram Jadhav | — |
| Registered real estate agent | Tamanna Rafik Shaikh | — |
| Registered real estate agent | Tejas Pandurang Agarkar | — |
| Registered real estate agent | Tirupati Damodhar Balate | — |
| Registered real estate agent | Vasim Patel | — |
| Registered real estate agent | Vinod Baburav Pawar | — |
| Registered real estate agent | Vipin Bhagan More | — |
| Registered real estate agent | Vivek Andhalkar | — |
| Registered real estate agent | Yash Bipin Ghiya | — |
| Registered real estate agent | Yogesh Suresh Jagtap | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Hadapsar
- Palladio Presidential Towers Phase 1RERA PM1260002602526
- Dosti Greenscapes - Phase 5₹11,500 a sq ft
- Oxy BelamarRERA PM1260002601661
- Aastha HousingRERA PR1262022601204
- Gandharv Leela₹9,710 a sq ft
- Park Imperial Tower ARERA PR1261012600792
- Gandharv Gokulam₹11,900 a sq ft
- Euphoric BlossomRERA PR1260002600219
All 4,589 projects in Hadapsar · Compare Kumar Parc Residences - C Mhada with another project
Kumar Parc Residences - C Mhada in numbers
Registered deals, summarised
Deedo has 1 registered document at Kumar Parc Residences - C Mhada, from Mar 2024 to Mar 2024: 1 leave and licence agreement.
- Are properties at Kumar Parc Residences - C Mhada rented out?
- Yes: 1 leave and licence agreement is registered at Kumar Parc Residences - C Mhada.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Kumar Parc Residences - C Mhada by Deedo, last updated with deals registered in Mar 2024.
Latest deal · Rental · Mar 2024
₹20–50k / month