Amanora Crown Towers
Deedo IDDP-PUN-80A1Completion was pushed back 4 months, to Apr 2027; no MahaRERA orders on record; 97% of its units are booked.
Hadapsar, Pune 411028 · Property rates in Hadapsar · by City Realty & Development Private Limited
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2027
- This projectRegistered 31 Oct 2022, completion promised 31 Dec 2026, revised to 30 Apr 2027.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
- Resale · Jul 2026
- Primary sale · Jul 2026
- Primary sale · Jul 2026
- Primary sale · Jun 2026
- Primary sale · Jun 2026
- Primary sale · Apr 2026
- Primary sale · Mar 2026
- Primary sale · Feb 2026
- Primary sale · Feb 2026
- Primary sale · Oct 2025
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Jul 2026 | Main building · 7 | Resale | 235 sq ft | View Resale, Jul 2026 | |
| Jul 2026 | Tower 93 · 2304 | Primary sale | — | View Primary sale, Jul 2026 | |
| Jul 2026 | Tower 93 · 604 | Primary sale | — | View Primary sale, Jul 2026 | |
| Jun 2026 | Tower 93 · 102 | Primary sale | — | View Primary sale, Jun 2026 | |
| Jun 2026 | Tower 92 · 103 | Primary sale | — | View Primary sale, Jun 2026 | |
| Apr 2026 | Tower 92 · 1906 | Primary sale | — | View Primary sale, Apr 2026 | |
| Mar 2026 | Tower 93 · 403 | Primary sale | — | View Primary sale, Mar 2026 | |
| Feb 2026 | Tower 93 · 2101 | Primary sale | — | View Primary sale, Feb 2026 | |
| Feb 2026 | Tower 92 · 105 | Primary sale | — | View Primary sale, Feb 2026 | |
| Oct 2025 | Tower 93 · 1001 | Primary sale | — | View Primary sale, Oct 2025 |
2 buildings
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100047454
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100047454 | 31 Oct 2022 | 31 Dec 2026 | 30 Apr 2027 | City Realty & Development Private Limited | Project page |
Documents119
1 document held by Deedo, 118 filings listed on MahaRERA's project page
Finance
- PAN CardCRDPL- PAN.PDF · uploaded 10 Oct 2022Source
Legal
Show all 119 documentsShow fewer documents
Migrated
- 1 Copy of the legal title reportLegal Title Report R-32.pdf · uploaded 11 Oct 2022Source
- 1 Copy of Layout Approval (in case of layout)layout plan.pdf · uploaded 11 Oct 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentBuilding Plan.pdf · uploaded 11 Oct 2022Source
- 1 CERSAI detailsCERSAI Encumbrance Certificate.pdf · uploaded 11 Oct 2022Source
- 1 Declaration in FORM BFrom B CRDPL with authorization.pdf · uploaded 12 Oct 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Amanora Crown Towers.pdf · uploaded 12 Oct 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Amanora Crown Towers.pdf · uploaded 12 Oct 2022Source
- 1 Proforma of Agreement for saleAgreement to Lease R-32 22102022 docx.pdf · uploaded 12 Oct 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Amanora Crown Towers.pdf · uploaded 13 Oct 2022Source
- 1 Proforma of Allotment letterAllotment Letter Head.pdf · uploaded 15 Oct 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration separate bank account.pdf · uploaded 15 Oct 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentBuilding Plan Amonora Crown Towers_-compressed.pdf · uploaded 20 Oct 2022Source
- 3 Building Plan Approval / NA Order for plotted developmentsheet 3.pdf · uploaded 20 Oct 2022Source
- 4 Building Plan Approval / NA Order for plotted developmentsheet 4.pdf · uploaded 20 Oct 2022Source
- 2 Copy of the legal title reportAnnexure - A Title Report.pdf · uploaded 21 Oct 2022Source
- 1 a Details of encumbrances concerned to FinanceFinance Encumbrance Certificate.pdf · uploaded 21 Oct 2022Source
- 1 b Details of encumbrances concerned to LegalFinance Encumbrance Certificate.pdf · uploaded 21 Oct 2022Source
- 1 Deviation Report with respect to Allotment letterDeviation Report with Allotment Letter.pdf · uploaded 21 Oct 2022Source
- 1 Deviation Report with respect to model copy of AgreementR-32 Deviation Report with Agreement.pdf · uploaded 21 Oct 2022Source
- 2 Deviation Report with respect to model copy of AgreementAdditional Declaration Note.pdf · uploaded 21 Oct 2022Source
- 2 a Details of encumbrances concerned to FinanceLegal Encumbrance Certificate.pdf · uploaded 27 Oct 2022Source
- 2 b Details of encumbrances concerned to LegalLegal Encumbrance Certificate.pdf · uploaded 27 Oct 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)2022-31-02 R32 Form 1 2022-12-31_compressed.pdf · uploaded 12 Jan 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Amanora Crown Towers 31122022.pdf · uploaded 18 Jan 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Crown Tower 31122022.pdf · uploaded 16 Mar 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Amanora Crown Towers (3).pdf · uploaded 24 Apr 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Amanora Crown Towers (3).pdf · uploaded 24 Apr 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Crown Tower as on 31-03-2023.pdf · uploaded 14 Jun 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Amanora Crown Towers 30062023.pdf · uploaded 20 Jul 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Amanora Crown Towers 30062023.pdf · uploaded 26 Jul 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_Amanora Crown Towers 30062023.pdf · uploaded 4 Aug 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A- Amanora Crown Tower 92 and 93- 31032023.pdf · uploaded 4 Sep 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 Crown Tower 31-03-2023.pdf · uploaded 13 Oct 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Amanora Crown Towers (5)- 30092023.pdf · uploaded 18 Oct 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Crown Tower_30092023.pdf · uploaded 19 Oct 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Amanora Crown Towers (5)- 30092023.pdf · uploaded 15 Nov 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Amanora Crown Towers - 31122023.pdf · uploaded 8 Jan 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Amanora Crown Towers 3112023.pdf · uploaded 10 Jan 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_Amanora Crown Towers_31122023.pdf · uploaded 30 Jan 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Amanora Crown Towers 31032024.pdf · uploaded 15 Apr 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Amanora Crown Towers 31032024.pdf · uploaded 6 May 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A- Amanora Crown Tower 92 and 93- 31032024.pdf · uploaded 6 May 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_Amanora Crown Towers_31032024.pdf · uploaded 13 May 2024Source
- 2 Copy of Layout Approval (in case of layout)Copy of Layout approval.pdf · uploaded 2 Jul 2024Source
- 5 Building Plan Approval / NA Order for plotted development1 building plan.pdf · uploaded 2 Jul 2024Source
- 6 Building Plan Approval / NA Order for plotted development2 building plan.pdf · uploaded 2 Jul 2024Source
- 7 Building Plan Approval / NA Order for plotted development3 building plan.pdf · uploaded 2 Jul 2024Source
- 8 Building Plan Approval / NA Order for plotted development4 building plan.pdf · uploaded 2 Jul 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentCommencement Certificate - R32 Revised I.pdf · uploaded 2 Jul 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Amanora Crown Towers 30062024.pdf · uploaded 8 Jul 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_Amanora Crown Towers_30062024.pdf · uploaded 19 Jul 2024Source
- 1 Disclosure of sold/ booked inventoryCrown Tower Inventory Disclosure 30062024.pdf · uploaded 13 Aug 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Amanora Crown Towers 30092024.pdf · uploaded 9 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_Amanora Crown Towers_30092024.pdf · uploaded 17 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Amanora Crown Towers 30062024.pdf · uploaded 24 Oct 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Amanora Crown Towers 30092024.pdf · uploaded 24 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Crown Towers Form-5.pdf · uploaded 24 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Amanora Crown Towers- 31122024.pdf · uploaded 9 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_Amanora Crown Towers_31122024.pdf · uploaded 13 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Amanora Crown Towers- 3112024.pdf · uploaded 13 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Amanora Crown Towers- 31032025.pdf · uploaded 9 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 1- Amanora Crown Towers- 31032025.pdf · uploaded 12 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_Amanora Crown Towers_31032025.pdf · uploaded 14 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Amanora Crown Towers 31032025.pdf · uploaded 14 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A- Amanora Crown Tower.pdf · uploaded 3 May 2025Source
- Form 5 (FY 2024-2025)Form 5 Crown Tower 31-03-2025.pdf · uploaded 19 Sep 2025Source
- Withdrawal Update Form 1Form1 - Amanora Crown Towers.pdf · uploaded 15 Oct 2025Source
- Withdrawal Update Form 2Form2 - Crown Towers.pdf · uploaded 15 Oct 2025Source
- Withdrawal Update Form 3Form 3 - Crown Tower.pdf · uploaded 15 Oct 2025Source
- Withdrawal Update Form 1Crown Towers- Form 1- 02012026.pdf · uploaded 12 Jan 2026Source
- Withdrawal Update Form 2Crown Towers- Form 2- 09012026.pdf · uploaded 12 Jan 2026Source
- Withdrawal Update Form 3Form 3 Amanora Crown Towers as on 31122025.pdf · uploaded 12 Jan 2026Source
- Withdrawal Update Form 1Crown Towers- Form 1- 26032026.pdf · uploaded 30 Mar 2026Source
- Withdrawal Update Form 2Crown Towers- Form 2- 26032026.pdf · uploaded 30 Mar 2026Source
- Withdrawal Update Form 3Crown Towers- Form 3- 25032026.pdf · uploaded 30 Mar 2026Source
- Form 2A (FY 2025-2026)Form 2A - Amanora Crown Towers 2025-26.pdf · uploaded 8 Apr 2026Source
- Withdrawal Update Form 1Form 1 - Crown Towers 03042026.pdf · uploaded 15 Apr 2026Source
- Withdrawal Update Form 2Crown Towers- Form 2- 31032026.pdf · uploaded 15 Apr 2026Source
- Withdrawal Update Form 3Form 3_Amanora Crown Towers_31032026.pdf · uploaded 15 Apr 2026Source
- Withdrawal Update Form 1Form 1 - Crown Towers 06052026.pdf · uploaded 14 May 2026Source
- Withdrawal Update Form 2Form 2 - Crown Towers 06052026.pdf · uploaded 14 May 2026Source
- Withdrawal Update Form 3Form 3_Amanora Crown Towers as on 30042026.pdf · uploaded 14 May 2026Source
- Withdrawal Update Form 1Form1- Crown Towers 02062026.pdf · uploaded 10 Jun 2026Source
- Withdrawal Update Form 2Form2- Crown Towers 04062026.pdf · uploaded 10 Jun 2026Source
- Withdrawal Update Form 3Form 3 - Amanora Crown Towers 05062026.pdf · uploaded 10 Jun 2026Source
- Withdrawal Update Form 12022-31-23 R32 Form 1 2026-07-02.pdf · uploaded 15 Jul 2026Source
- Withdrawal Update Form 2Form2 - Amanora Crown Towers 09072026.pdf · uploaded 15 Jul 2026Source
- Withdrawal Update Form 3Form 3_Amanora Crown Towers_30062026.pdf · uploaded 15 Jul 2026Source
- Form 5 (FY 2025-2026)Form 5 Crown Tower 31-03-2026.pdf · uploaded 26 Sep 2026Source
- Withdrawal Update Form 12022-31-24 R32 Form 1 2026-10-06.pdf · uploaded 12 Oct 2026Source
- Withdrawal Update Form 2Form2 - Crown Towers- 06102026.pdf · uploaded 12 Oct 2026Source
- Withdrawal Update Form 3Form 3_Amanora Crown Towers_30092026.pdf · uploaded 12 Oct 2026Source
Technical
- Documentlayout plan.pdf · uploaded 11 Oct 2022Source
- DocumentBuilding Plan.pdf · uploaded 11 Oct 2022Source
- DocumentBuilding Plan Amonora Crown Towers_-compressed.pdf · uploaded 20 Oct 2022Source
- Documentsheet 3.pdf · uploaded 20 Oct 2022Source
- Documentsheet 4.pdf · uploaded 20 Oct 2022Source
- DocumentCopy of Layout approval.pdf · uploaded 2 Jul 2024Source
- Document1 building plan.pdf · uploaded 2 Jul 2024Source
- Document2 building plan.pdf · uploaded 2 Jul 2024Source
- Document3 building plan.pdf · uploaded 2 Jul 2024Source
- Document4 building plan.pdf · uploaded 2 Jul 2024Source
Technical (Architect)
- DocumentForm 1- Amanora Crown Towers 30092024.pdf · uploaded 9 Oct 2024Source
- DocumentForm 1- Amanora Crown Towers- 31122024.pdf · uploaded 9 Jan 2025Source
- DocumentForm 1- Amanora Crown Towers- 31032025.pdf · uploaded 9 Apr 2025Source
- Document2022-31-24 R32 Form 1 2026-10-06.pdf · uploaded 12 Oct 2026Source
Technical (Engineer)
- DocumentForm 2- Amanora Crown Towers 30062024.pdf · uploaded 24 Oct 2024Source
- DocumentForm 2- Amanora Crown Towers 30092024.pdf · uploaded 24 Oct 2024Source
- DocumentForm 2- Amanora Crown Towers- 3112024.pdf · uploaded 13 Jan 2025Source
- DocumentForm 2- Amanora Crown Towers 31032025.pdf · uploaded 14 Apr 2025Source
- DocumentForm2 - Crown Towers- 06102026.pdf · uploaded 12 Oct 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel Sector R 32, S.No. 138/18
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2.5BHK 2.5B, 2BHK 2A, 2BHK 2B, 2BHK 2C, 3.5BHK Duplex, 3BHK 3A, 3BHK 3B, 3BHK 3D, 4BHKDUPLEX, 2.5BHK 2.5A, 3BHK 3C, 4BHK292 units in all
- Address
- S.No. 138/18 and Others, Sector R-32, Amanora Park Town, Hadapsar-Kharadi Byepass Road, Amanora Park TownPIN 411028
- Village
- Hadapsar, Haveli taluka
- Location
- 18.51784, 73.93952
- Land area for this project
- 11,310 sq m (1,21,740 sq ft)
- Permissible built-up area
- 41,428 sq m (4,45,931 sq ft)
- Sanctioned built-up area
- 41,428 sq m (4,45,931 sq ft)
- Recreational open space
- 2,098 sq m (22,580 sq ft)
- Designated bank account
- 85
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
S.No. 138/18 and Others, Sector R-32, Amanora Park Town
Boundaries
- North
- Amanora Internal Road
- South
- Survey Number 173 part
- East
- Amanora Internal Road
- West
- R P Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking292 units
283 of 292 units booked (97%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Tower 92 | 2.5BHK 2.5B | 101.15 sq m · 1,089 sq ft | 1 | 0 |
| Tower 92 | 2BHK 2A | 71.99 sq m · 775 sq ft | 29 | 28 |
| Tower 92 | 2BHK 2B | 79.11 sq m · 852 sq ft | 3 | 3 |
| Tower 92 | 2BHK 2C | 90.95 sq m · 979 sq ft | 1 | 0 |
| Tower 92 | 3.5BHK Duplex | 134.98 sq m · 1,453 sq ft | 13 | 13 |
| Tower 92 | 3BHK 3A | 104.46 sq m · 1,124 sq ft | 28 | 28 |
| Tower 92 | 3BHK 3B | 111.45 sq m · 1,200 sq ft | 29 | 28 |
| Tower 92 | 3BHK 3D | 98.05 sq m · 1,055 sq ft | 29 | 29 |
Show all 15 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Tower 92 | 4BHKDUPLEX | 178.44 sq m · 1,921 sq ft | 14 | 12 |
| Tower 93 | 2.5BHK 2.5A | 88.91 sq m · 957 sq ft | 29 | 29 |
| Tower 93 | 2BHK 2B | 79.11 sq m · 852 sq ft | 29 | 28 |
| Tower 93 | 2BHK 2C | 90.95 sq m · 979 sq ft | 1 | 0 |
| Tower 93 | 3BHK 3A | 104.46 sq m · 1,124 sq ft | 28 | 27 |
| Tower 93 | 3BHK 3C | 118.17 sq m · 1,272 sq ft | 29 | 29 |
| Tower 93 | 4BHK | 162.9 sq m · 1,753 sq ft | 29 | 29 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals3
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | GNA Architects | — |
| Chartered accountant | R V Porwal and Associates | — |
| Engineer | Ms Snehal Shinde | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Hadapsar
- Palladio Presidential Towers Phase 1RERA PM1260002602526
- Dosti Greenscapes - Phase 5₹11,500 a sq ft
- Oxy BelamarRERA PM1260002601661
- Aastha HousingRERA PR1262022601204
- Gandharv Leela₹9,710 a sq ft
- Park Imperial Tower ARERA PR1261012600792
- Gandharv Gokulam₹11,900 a sq ft
- Euphoric BlossomRERA PR1260002600219
All 4,589 projects in Hadapsar · Compare Amanora Crown Towers with another project
Amanora Crown Towers in numbers
Registered deals, summarised
Deedo has 577 registered documents at Amanora Crown Towers, from Jan 2016 to Nov 2026: 131 sales, 304 leave and licence agreements, 133 mortgages.
- How many properties have been sold at Amanora Crown Towers?
- 131 sales are registered at Amanora Crown Towers, 1 of them a resale.
- Are properties at Amanora Crown Towers rented out?
- Yes: 304 leave and licence agreements are registered at Amanora Crown Towers, at a median rent since Jan 2016 of about ₹28,000 a month with a deposit of about ₹75,000.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Amanora Crown Towers by Deedo, last updated with deals registered in Nov 2026.
Latest deal · Resale · Jul 2026
₹50–75 L