Skip to content
Deedo home
Menu

Sai Awas Apartment

Completed

Datala, Chandrapur 442401 |Promoter: Niraj Pralhadrao Padgilwar

Residential / Group HousingRERAP50900020406
9 Apr 2019Registered with MahaRERA
30 Dec 2021Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Land area for this project
655 sq m (7,045 sq ft)
Permissible built-up area
654 sq m (7,044 sq ft)
Sanctioned built-up area
654 sq m (7,044 sq ft)
Recreational open space
655 sq m (7,045 sq ft)
Address
7 And 8, Near Water Tank, Mhada Colany AreaPIN 442401
Designated bank account
Bank Of Maharashtra
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Sai Awas Apartment is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2021

The latest completion date on record passed 4 years and 10 months ago.

Registered
9 Apr 2019
Promised
30 Dec 2021

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P509000204069 Apr 201930 Dec 2021—Niraj Pralhadrao PadgilwarProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Sai Awas Apartment4—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Sai Awas Apartment

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBY BORWELL100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER PLAN100%
  • Storm Water DrainsAS PER PLAN100%
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And Disposal0%
  • Water conservation /Rain water harvestingAS PER PLAN100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

14 documents held by Deedo, 19 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Details of encumbrancesENCUMBRANCE CERTIFICATE.pdf · uploaded 4 Apr 2019View
  • Copy of Layout Approval (in case of layout)LAYOUT MAP.pdf · uploaded 5 Apr 2019View
  • Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 5 Apr 2019View
  • Commencement Certificates / NA Order for plotted developmentSACTION LETAR.pdf · uploaded 5 Apr 2019View
  • Building Plan Approval (IOD)BUILDING MAP.pdf · uploaded 5 Apr 2019View
  • Copy of the legal title reportSERCH REPORT.pdf · uploaded 5 Apr 2019View
  • OtherUNDIVIDED SHIAR OF LAND.pdf · uploaded 8 Apr 2019View
  • Declaration in FORM BFROM B NEW.pdf · uploaded 8 Apr 2019View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentcomplitaion saiawas.pdf · uploaded 21 Oct 2020View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentoc sai awas.pdf · uploaded 21 Oct 2020View
  • Architect’s Certificate on Completion of Project (Form 4)sai awas.pdf · uploaded 2 Jul 2021View
  • Architect’s Certificate on Completion of Project (Form 4)1 Architect’s Certificate on Completion of Project (Form 4).pdf · uploaded 5 Oct 2021View
  • Architect’s Certificate on Completion of Project (Form 4)FROM 4.pdf · uploaded 18 Dec 2021View

Promoter documents

  • Legal Title reportSERCH REPORT.pdf · uploaded 5 Apr 2019View
  • Declaration Form BFROM B NEW.pdf · uploaded 8 Apr 2019View

Technical documents

  • Layout ApprovalLAYOUT MAP.pdfView
  • Building Plan ApprovalBUILDING MAP.pdfView

Other legal documents

  • OtherUNDIVIDED SHIAR OF LAND.pdfView

Proforma allotment letter

  • Proforma allotment letterALLOTMENT LETTER.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Datala, Chandrapur taluka

Survey, CTS, gat or plot numbers

78

As published on MahaRERA's project page

7 AND 8

Boundaries

North
Land Of Survey No134
South
24mt D P Road
East
9mt Layout Road
West
Layout Plot No 6

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectShashank Padgilwar—
Chartered accountantAjay Mamidwar—
EngineerMahesh Kawale—
OtherAbdul Nazim Abdul Kadar—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology