Vaibhavi Heights

Completed

Datala, Chandrapur 442406 |Promoter: Yashpal Dewanand Khobragade

Residential / Group HousingRERAP50900008437
18 Aug 2017Registered with MahaRERA
30 Dec 2023Promised completion
3Buildings
58Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
3
Unit types
Flat, 2BHK, 3BHK, Row house58 units in all
Land area for this project
3,359 sq m (36,151 sq ft)
Permissible built-up area
5,374 sq m (57,841 sq ft)
Sanctioned built-up area
2,123 sq m (22,854 sq ft)
Address
293/1aPIN 442406
Designated bank account
Canara Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.01194, 79.22573
Vaibhavi Heights is at latitude 20.01194, longitude 79.22573.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2023

The latest completion date on record passed 2 years and 10 months ago.

Registered
18 Aug 2017
Promised
30 Dec 2023

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5090000843718 Aug 201730 Dec 2023—Yashpal Dewanand KhobragadeProject page

3 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Vaibhavi Height Block-A612
Vaibhavi Height Block B And C844
Vaibhavi Height Block D22

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

58 units registered

Flat · 12 units2BHK · 32 units3BHK · 12 unitsRow house · 2 units
BuildingTypeCarpet areaUnits
Vaibhavi Height Block-AFlat39.78 sq m · 428 sq ft12
Vaibhavi Height Block B And C2BHK28.55 sq m · 307 sq ft12
Vaibhavi Height Block B And C2BHK53.46 sq m · 575 sq ft20
Vaibhavi Height Block B And C3BHK67.31 sq m · 725 sq ft12
Vaibhavi Height Block DRow house50.45 sq m · 543 sq ft2

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Vaibhavi Height Block-AClosed/Covered00001
Vaibhavi Height Block-AOpen Space00000
Vaibhavi Height Block B And CClosed/Covered00001
Vaibhavi Height Block B And COpen Space00000
Vaibhavi Height Block DClosed/Covered00000
Vaibhavi Height Block DOpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Vaibhavi Height Block-A

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Vaibhavi Height Block B And C

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Vaibhavi Height Block D

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsBOLDER SOLING100%
  • Water SupplyFROM BOREWELL100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)WILL BE DONE AT THE TIME OF COMPLETION100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingTREE PLANTATION ONLY100%
  • Street LightingLED LIGHTS ON WALL COMPOUND100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRAIN WATER HR. WILL DONE AT THE TIME OF COMPLETION100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationELE. ROOM WILL BE DONE AT THE TIME OF COMPLETION100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

47 documents held by Deedo, 71 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Commencement Certificates / NA Order for plotted developmentpage-1.pdf · uploaded 25 Jul 2017View
  • Building Plan Approval (IOD)Block-B-C.pdf · uploaded 25 Jul 2017View
  • Building Plan Approval (IOD)Block-D.pdf · uploaded 25 Jul 2017View
  • Building Plan Approval (IOD)site plan.pdf · uploaded 25 Jul 2017View
  • Details of encumbrancesEncumbrances Certificate.pdf · uploaded 26 Jul 2017View
  • Proforma of Allotment letterAllotment Letter.pdf · uploaded 26 Jul 2017View
  • Copy of the legal title reportpage-1.pdf · uploaded 26 Jul 2017View
  • Copy of the legal title reportpage-2.pdf · uploaded 26 Jul 2017View
  • Copy of the legal title reportpage-3.pdf · uploaded 26 Jul 2017View
  • Copy of the legal title reportpage-5.pdf · uploaded 26 Jul 2017View
  • Copy of the legal title reportpage-6.pdf · uploaded 26 Jul 2017View
  • Copy of the legal title reportpage-7.pdf · uploaded 26 Jul 2017View
  • Copy of the legal title reportpage-8.pdf · uploaded 26 Jul 2017View
  • Copy of the legal title reportpage-9.pdf · uploaded 26 Jul 2017View
  • Copy of the legal title reportpage-10.pdf · uploaded 26 Jul 2017View
  • Copy of the legal title reportpage-11.pdf · uploaded 26 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)page-1.pdf · uploaded 26 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)page-2.pdf · uploaded 26 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)page-3.pdf · uploaded 26 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)page-4.pdf · uploaded 26 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)page-5.pdf · uploaded 26 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)page-1.pdf · uploaded 26 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)page-2.pdf · uploaded 26 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)page-3.pdf · uploaded 26 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)page-4.pdf · uploaded 26 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentpage-2.pdf · uploaded 26 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentpage-3.pdf · uploaded 26 Jul 2017View
  • Copy of the legal title reportpage-4.pdf · uploaded 26 Jul 2017View
  • Declaration in FORM BFORM B.pdf · uploaded 26 Jul 2017View
  • Declaration in FORM BFORM B-1.pdf · uploaded 26 Jul 2017View
  • Declaration in FORM BFORM B-2.pdf · uploaded 26 Jul 2017View
  • Building Plan Approval (IOD)Block-A.pdf · uploaded 26 Jul 2017View
  • Copy of Layout Approval (in case of layout)page-5.pdf · uploaded 26 Jul 2017View
  • Proforma of Allotment letterundertaking for agreement to sell.pdf · uploaded 28 Jul 2017View
  • Otherbank ac dec.pdf · uploaded 28 Jul 2017View
  • OtherRevised Receipt.pdf · uploaded 24 Aug 2018View
  • Building Plan Approval (IOD)BLOCK A.pdf · uploaded 24 Aug 2018View
  • Building Plan Approval (IOD)BLOCK BC.pdf · uploaded 24 Aug 2018View
  • Building Plan Approval (IOD)BLOCK D.pdf · uploaded 24 Aug 2018View
  • Building Plan Approval (IOD)SITE PLAN.pdf · uploaded 24 Aug 2018View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentoccupancy.pdf · uploaded 30 Dec 2022View
  • Architect’s Certificate on Completion of Project (Form 4)Form No 4.pdf · uploaded 4 Feb 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Adobe Scan 21-Jun-2023 (2) (1).pdf · uploaded 21 Jun 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Adobe Scan 21-Jun-2023 (1).pdf · uploaded 21 Jun 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Adobe Scan 21-Jun-2023.pdf · uploaded 21 Jun 2023View

Promoter documents

  • Legal Title reportpage-1.pdf · uploaded 26 Jul 2017View
  • Legal Title reportpage-2.pdf · uploaded 26 Jul 2017View
  • Legal Title reportpage-3.pdf · uploaded 26 Jul 2017View
  • Legal Title reportpage-5.pdf · uploaded 26 Jul 2017View
  • Legal Title reportpage-6.pdf · uploaded 26 Jul 2017View
  • Legal Title reportpage-7.pdf · uploaded 26 Jul 2017View
  • Legal Title reportpage-8.pdf · uploaded 26 Jul 2017View
  • Legal Title reportpage-9.pdf · uploaded 26 Jul 2017View
  • Legal Title reportpage-10.pdf · uploaded 26 Jul 2017View
  • Legal Title reportpage-11.pdf · uploaded 26 Jul 2017View
  • Legal Title reportpage-4.pdf · uploaded 26 Jul 2017View
  • Declaration Form BFORM B.pdf · uploaded 26 Jul 2017View
  • Declaration Form BFORM B-1.pdf · uploaded 26 Jul 2017View
  • Declaration Form BFORM B-2.pdf · uploaded 26 Jul 2017View

Technical documents

  • Building Plan ApprovalBlock-A.pdfView
  • Layout Approvalpage-5.pdfView
  • Building Plan ApprovalBlock-B-C.pdfView
  • Building Plan ApprovalBlock-D.pdfView
  • Building Plan Approvalsite plan.pdfView
  • Building Plan ApprovalBLOCK A.pdfView
  • Building Plan ApprovalBLOCK BC.pdfView
  • Building Plan ApprovalBLOCK D.pdfView
  • Building Plan ApprovalSITE PLAN.pdfView

Other legal documents

  • Otherbank ac dec.pdfView
  • OtherRevised Receipt.pdfView

Proforma allotment letter

  • Proforma allotment letterundertaking for agreement to sell.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Datala, Chandrapur taluka

Survey, CTS, gat or plot numbers

293/1A

As published on MahaRERA's project page

293/1A

Boundaries

North
Part Of Survey No 293-1a
South
12 Mtr Service Road Then 30mtr Mdr
East
Survey No 293-1b
West
Wall Compound Then Nallah

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectDeepak Panakanti Pratibimb Design Consortium—
EngineerAnant Ashok Kapse—
EngineerKajal Bhandari—
OtherBaijnath Pal—

Source: MahaRERA project page. Contact details are not shown.