Krushna Vihar - Phase I
Deedo IDDP-THN-6K43Completion was pushed back 4 months, to Apr 2027; no MahaRERA orders on record; 40% of its units are booked.
Usatane, Thane 421501 · by Krushan Dham Builders & Developers
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2027
- This projectRegistered 15 Oct 2021, completion promised 31 Dec 2026, revised to 30 Apr 2027.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
5 buildings
Open a building to see every flat, floor by floor.
- Building No - 37 floors · 148 units49% booked
- Building No - 47 floors · 147 units39% booked
- Building No - 55 floors · 35 units0% booked
- Building No - 64 floors · 36 units0% booked
- Building No - 77 floors · 53 units70% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700031250
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700031250 | 15 Oct 2021 | 31 Dec 2026 | 30 Apr 2027 | Krushan Dham Builders & Developers | Project page |
Documents146
1 document held by Deedo, 145 filings listed on MahaRERA's project page
Finance
- PAN CardPAN CARD - KRUSHAN DHAM BUILDERS.pdf · uploaded 28 Sep 2021Source
- Other – FinanceDECLARATION OF SEPARATE BANK ACCOUNT - FORMAT A.pdf · uploaded 28 Oct 2024Source
- Other – FinanceDECLARATION CUM UNDERTAKING - ANNEXURE A.pdf · uploaded 28 Oct 2024Source
- Other – FinanceSELF DECLARATION FOR CHANGE OF BANK ACCOUNT.pdf · uploaded 28 Oct 2024Source
- Other – FinanceLOAN NO DUES CERTIFICATE.pdf · uploaded 8 Nov 2024Source
Show all 146 documentsShow fewer documents
Legal
Migrated
- 1 PAN CardPAN CARD - KRUSHAN DHAM BUILDERS.pdf · uploaded 28 Sep 2021Source
- 1 Details of encumbrancesLETTER OF ENCUMBRANCES - KRUSHAN DHAM BUILDERS AND DEVELOPER.pdf · uploaded 28 Sep 2021Source
- 1 Copy of Layout Approval (in case of layout)LAYOUT PLAN - KRUSHAN DHAM BUILDERS AND DEVELOPERS.pdf · uploaded 28 Sep 2021Source
- 1 Declaration in FORM BFORM B - KRUSHAN DHAM BUILDERS AND DEVELOPER.pdf · uploaded 28 Sep 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE - KRUSHAN DHAM BUILDERS AND DEVELOPERS.pdf · uploaded 28 Sep 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE - KRUSHAN DHAM BUILDERS AND DEVELOPERS.pdf · uploaded 28 Sep 2021Source
- 1 Copy of the legal title reportLEGAL TITLE REPORT - 111-2-2 - KRUSHAN DHAM BUILDERS AND DEVELOPERS.pdf · uploaded 30 Sep 2021Source
- 1 Building Plan Approval / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE - KRUSHAN DHAM BUILDERS AND DEVELOPERS.pdf · uploaded 30 Sep 2021Source
- 1 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE - KRUSHAN DHAM BUILDERS AND DEVELOPERS.pdf · uploaded 30 Sep 2021Source
- 1 Declaration about Commencement CertificateDECLARATION ABOUT CC - KRUSHAN DHAM BUILDERS AND DEVELOPERS.pdf · uploaded 30 Sep 2021Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEERS CERTIFICATE - - KRUSHAN DHAM BUILDERS AND DEVELOPERS.pdf · uploaded 30 Sep 2021Source
- 2 Copy of the legal title reportLEGAL TITLE REPORT - 111 - 2 - 1.pdf · uploaded 1 Oct 2021Source
- 3 Copy of the legal title reportLEGAL TITLE REPORT - 111-1-B.pdf · uploaded 1 Oct 2021Source
- 1 Proforma of Allotment letterPROFORMA OF ALLOTMENT LETTER - KRUSHAN DHAM B AND D - KRISHNA VIHAR.pdf · uploaded 4 Oct 2021Source
- 2 Proforma of Allotment letterPROFORMA OF Agreement for Sale - KRUSHAN DHAM BUILDERS- KRUSHNA VIHAR.pdf · uploaded 4 Oct 2021Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - 30-06-2022.pdf · uploaded 21 Jun 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - 30-09-2022.pdf · uploaded 21 Jun 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - 31-03-2022.pdf · uploaded 21 Jun 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - 31-03-2022.pdf · uploaded 21 Jun 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - 30-06-2022.pdf · uploaded 21 Jun 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - 30-09-2022.pdf · uploaded 21 Jun 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - 31-03-2022.pdf · uploaded 21 Jun 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - 31-03-2023.pdf · uploaded 21 Jun 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - 31-12-2022.pdf · uploaded 21 Jun 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A - 30-06-2022.pdf · uploaded 21 Jun 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A - 30-09-2022.pdf · uploaded 21 Jun 2023Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A - 31-12-2022.pdf · uploaded 21 Jun 2023Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A - 31-03-2022.pdf · uploaded 21 Jun 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A - 31-12-2022.pdf · uploaded 21 Jun 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A - 31-03-2022.pdf · uploaded 21 Jun 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 - 30-09-2022.pdf · uploaded 22 Jun 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 - 30-09-2022.pdf · uploaded 22 Jun 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 - 31-03-2022.pdf · uploaded 22 Jun 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 - 31-03-2023.pdf · uploaded 22 Jun 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 - 31-12-2021.pdf · uploaded 22 Jun 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 - 31-12-2022.pdf · uploaded 22 Jun 2023Source
- 1 Disclosure of sold/ booked inventorySOLD INVENTORY.pdf · uploaded 8 Jul 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 - 30-06-2022.pdf · uploaded 8 Jul 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 - 30-09-2022.pdf · uploaded 8 Jul 2023Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 - 31-03-2022.pdf · uploaded 8 Jul 2023Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 - 31-12-2021.pdf · uploaded 8 Jul 2023Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 - KRUSHNA VIHAR - 31-12-2022.pdf · uploaded 8 Jul 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - 30-06-2026.pdf · uploaded 23 Feb 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - 30-06-2023.pdf · uploaded 23 Feb 2024Source
- 2 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD INVENTORY - 30-06-2023.pdf · uploaded 23 Feb 2024Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 - 30-06-2023.pdf · uploaded 23 Feb 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - 30-09-2023.pdf · uploaded 26 Feb 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - 31-12-2023.pdf · uploaded 26 Feb 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - 30-09-2023.pdf · uploaded 26 Feb 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - 31-12-2023.pdf · uploaded 26 Feb 2024Source
- 3 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD INVENTORY - 30-09-2023.pdf · uploaded 26 Feb 2024Source
- 4 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD INVENTORY - 31-12-2023.pdf · uploaded 26 Feb 2024Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 - 30-09-2023.pdf · uploaded 26 Feb 2024Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 - 31-12-2023.pdf · uploaded 26 Feb 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 - 2022 - 23 - KRUSHAN DHAM.pdf · uploaded 5 Mar 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - MAR - 2024.pdf · uploaded 26 Jul 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - 03-04-2024.pdf · uploaded 26 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A - 31-03-2024.pdf · uploaded 26 Jul 2024Source
- 5 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD INVENTORY - 20-06-2024 - converted.pdf · uploaded 26 Jul 2024Source
- 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 - 20-06-2024.pdf · uploaded 26 Jul 2024Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - 30-06-2024.pdf · uploaded 16 Aug 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - 30-06-2024.pdf · uploaded 16 Aug 2024Source
- 6 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD INVENTORY - JUNE 2024.pdf · uploaded 16 Aug 2024Source
- 17 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 - 30-06-2024.pdf · uploaded 16 Aug 2024Source
- 18 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 - 30-06-2024 - REVISED.pdf · uploaded 16 Aug 2024Source
- 19 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 - 31-03-2024 - REVISED.pdf · uploaded 16 Aug 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 - 23-24.pdf · uploaded 16 Aug 2024Source
- 2 Details of encumbrancesLETTER OF ENCUMBRANCES - FINANCE.pdf · uploaded 17 Aug 2024Source
- 1 CERSAI detailsCERSAI_Search_Report_200317280197_For_Asset_Based_Search_17_08_2024_12_43_01_712.pdf · uploaded 17 Aug 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - 30-09-2024.pdf · uploaded 11 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 - 08-10-2024.pdf · uploaded 11 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - KRUSHAN DHAM BUILDERS AND DEVELOPERS.pdf · uploaded 11 Oct 2024Source
- 1 Other – LegalSELF DECLARATION.pdf · uploaded 11 Oct 2024Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)DECLARATION OF BANK ACCOUNT - FORMAT A.pdf · uploaded 11 Oct 2024Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)HDFC BANK (RERA LETTER).pdf · uploaded 11 Oct 2024Source
- 1 Other – FinanceDECLARATION OF SEPARATE BANK ACCOUNT - FORMAT A.pdf · uploaded 28 Oct 2024Source
- 2 Other – FinanceDECLARATION CUM UNDERTAKING - ANNEXURE A.pdf · uploaded 28 Oct 2024Source
- 3 Other – FinanceSELF DECLARATION FOR CHANGE OF BANK ACCOUNT.pdf · uploaded 28 Oct 2024Source
- 1 Details of encumbrancesENCUMBRANCE CERTIFICATE.pdf · uploaded 8 Nov 2024Source
- 3 Disclosure of sold/ booked inventoryDisclosure of Sold Wing M1.pdf · uploaded 8 Nov 2024Source
- 7 Disclosure of sold/ booked inventoryDisclosure of Sold N wing.pdf · uploaded 8 Nov 2024Source
- 6 Disclosure of sold/ booked inventoryDisclosure of Sold and unsold inventory wing H J K.pdf · uploaded 8 Nov 2024Source
- 5 Disclosure of sold/ booked inventoryDisclosure of Sold and unsold inventory Wing E F G.pdf · uploaded 8 Nov 2024Source
- 4 Disclosure of sold/ booked inventoryDisclosure of Sold Wing M2.pdf · uploaded 8 Nov 2024Source
- 2 Disclosure of sold/ booked inventoryDisclosure of Sold Wing L.pdf · uploaded 8 Nov 2024Source
- 4 Other – FinanceLOAN NO DUES CERTIFICATE.pdf · uploaded 8 Nov 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE - REVISED - 06-12-2024 - converted.pdf · uploaded 7 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - 31-12-2024.pdf · uploaded 15 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 - 31-12-2024.pdf · uploaded 15 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - 31-12-2024.pdf · uploaded 15 Feb 2025Source
- 1 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD INVENTORY - DEC 2024.pdf · uploaded 19 Feb 2025Source
- Form 1FORM 1 - 31-03-2025.pdf · uploaded 4 Aug 2025Source
- Form 2FORM 2 - 31-03-2025.pdf · uploaded 4 Aug 2025Source
- Form 3FORM 3 - 31-03-2025.pdf · uploaded 4 Aug 2025Source
- Disclosure of Sold and Booked InventoryDISCLOSURE OF SOLD INVENTORY - 31-03-2025.pdf · uploaded 4 Aug 2025Source
- Form 2A (FY 2024-2025)FORM 2A - 31-03-2025 - KDBD.pdf · uploaded 30 Aug 2025Source
- Withdrawal Update Form 1FORM 1 - 30-06-2025.pdf · uploaded 16 Dec 2025Source
- Withdrawal Update Form 1FORM 1 - 30-06-2025.pdf · uploaded 16 Dec 2025Source
- Withdrawal Update Form 2FORM 2 - 30-06-2025.pdf · uploaded 16 Dec 2025Source
- Withdrawal Update Form 2FORM 2 - 30-06-2025.pdf · uploaded 16 Dec 2025Source
- Withdrawal Update Form 3FORM 3 - 30-06-2025.pdf · uploaded 16 Dec 2025Source
- Withdrawal Update Form 3FORM 3 - 30-06-2025.pdf · uploaded 16 Dec 2025Source
- Withdrawal Update Form 1FORM 1 - KRUSHNA VIHAR - PHASE I - SEPT 2025.pdf · uploaded 6 Jan 2026Source
- Withdrawal Update Form 1FORM 1 - KRUSHNA VIHAR - PHASE I - SEPT 2025.pdf · uploaded 6 Jan 2026Source
- Withdrawal Update Form 2FORM 2 - KRUSHNA VIHAR - PHASE I - SEPT 2025.pdf · uploaded 6 Jan 2026Source
- Withdrawal Update Form 2FORM 2 - KRUSHNA VIHAR - PHASE I - SEPT 2025.pdf · uploaded 6 Jan 2026Source
- Withdrawal Update Form 3FORM 3 - KRUSHNA VIHAR - PHASE I - SEPT 2025.pdf · uploaded 6 Jan 2026Source
- Withdrawal Update Form 3FORM 3 - KRUSHNA VIHAR - PHASE I - SEPT 2025.pdf · uploaded 6 Jan 2026Source
- Form 5 (FY 2024-2025)FORM 5 - USATANE - 2024-2025.pdf · uploaded 27 Jan 2026Source
- Withdrawal Update Form 1FORM 1 - USATANE - 31-12-2025.pdf · uploaded 24 Feb 2026Source
- Withdrawal Update Form 2FORM 2 - USATANE - 31-12-2025.pdf · uploaded 24 Feb 2026Source
- Withdrawal Update Form 3FORM 3 - USATANE - 31-12-2025.pdf · uploaded 24 Feb 2026Source
- Withdrawal Update Form 1FORM 1 - KRUSHAN DHAM B AND D - 31-03-2026 .pdf · uploaded 12 Sep 2026Source
- Withdrawal Update Form 2FORM 2 - KRUSHAN DHAM B AND D - 31-03-2026.pdf · uploaded 12 Sep 2026Source
- Withdrawal Update Form 3FORM 3 - KRUSHAN DHAM B AND D - 31-03-2026.pdf · uploaded 12 Sep 2026Source
- Withdrawal Update Form 1FORM 1 - KRUSHAN DHAM B AND D - 30-06-2026.pdf · uploaded 29 Sep 2026Source
- Withdrawal Update Form 2FORM 2 - KRUSHAN DHAM B AND D - 30-06-2026.pdf · uploaded 29 Sep 2026Source
- Withdrawal Update Form 3FORM 3 - KRUSHAN DHAM B AND D - 30-06-2026.pdf · uploaded 29 Sep 2026Source
Technical
- DocumentLAYOUT PLAN - KRUSHAN DHAM BUILDERS AND DEVELOPERS.pdf · uploaded 28 Sep 2021Source
- DocumentCOMMENCEMENT CERTIFICATE - KRUSHAN DHAM BUILDERS AND DEVELOPERS.pdf · uploaded 30 Sep 2021Source
- DocumentAMENDED COMMENCEMENT CERTIFICATE - 24-07-2024_.pdf · uploaded 24 Feb 2026Source
- DocumentAMENDED LAYOUT PLAN - 1.pdf · uploaded 24 Feb 2026Source
- DocumentAMENDED LAYOUT PLAN - 2.pdf · uploaded 24 Feb 2026Source
- DocumentAMENDED LAYOUT PLAN - 3.pdf · uploaded 24 Feb 2026Source
- DocumentAMENDED LAYOUT PLAN - 4.pdf · uploaded 24 Feb 2026Source
- DocumentAMENDED LAYOUT PLAN - 5.pdf · uploaded 24 Feb 2026Source
- DocumentAMENDED LAYOUT PLAN - 6.pdf · uploaded 24 Feb 2026Source
- DocumentAMENDED LAYOUT PLAN - 7.pdf · uploaded 24 Feb 2026Source
- DocumentAMENDED LAYOUT PLAN - 8.pdf · uploaded 24 Feb 2026Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvals
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1 BHK E WING, 1BHK E WING, 1 BHK F WING, 1BHK F WING, 1 BHK G WING, 1 RK E WING, 1RK E WING, 1 RK F WING, 1RK F WING, 1 RK G WING, 1RK G WING, 2 BHK G WING, 1 BHK H WING, 1 BHK J WING, 1BHK J WING, 1 BHK K WING, 1BHK K WING, 2BHK H WING, 2BHK J WING, 2 BHK K WING, 2 BHK L WING, 2BHK L WING, 1 BHK M1 WING, 1BHK M2 WING, 1RK M2 WING, 2 BHK M1 WING, 2 BHK N WING, Shop n wing419 units in all
- Address
- Survey No. - 111 1 B, 111 2 1 And 111 2 2, Usatane, AmbarnathPIN 421501
- Village
- Usatane, Ambarnath taluka
- Land area for this project
- 13,760 sq m (1,48,111 sq ft)
- Permissible built-up area
- 30,822 sq m (3,31,769 sq ft)
- Sanctioned built-up area
- 18,544 sq m (1,99,604 sq ft)
- Recreational open space
- 0 sq m (0 sq ft)
- Designated bank account
- 76
- Developed in phases
- Yes
Land as published on MahaRERA's project page
SURVEY NO. - 111 1 B, 111 2 1 AND 111 2 2
Boundaries
- North
- Survey No - 110
- South
- Survey No - 113
- East
- Survey No 111-1-A
- West
- Survey No - 109
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking419 units
167 of 419 units booked (40%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building No - 3 | 1 BHK E WING | 24.44 sq m · 263 sq ft | 7 | 5 |
| Building No - 3 | 1BHK E WING | 24.45 sq m · 263 sq ft | 1 | 0 |
| Building No - 3 | 1 BHK F WING | 28.43 sq m · 306 sq ft | 7 | 1 |
| Building No - 3 | 1BHK F WING | 24.44 sq m · 263 sq ft | 7 | 6 |
| Building No - 3 | 1BHK F WING | 24.45 sq m · 263 sq ft | 1 | 0 |
| Building No - 3 | 1 BHK G WING | 24.44 sq m · 263 sq ft | 7 | 6 |
| Building No - 3 | 1 BHK G WING | 28.43 sq m · 306 sq ft | 7 | 1 |
| Building No - 3 | 1 BHK G WING | 29.25 sq m · 315 sq ft | 1 | 0 |
Show all 46 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building No - 3 | 1 RK E WING | 17.76 sq m · 191 sq ft | 7 | 5 |
| Building No - 3 | 1 RK E WING | 20.56 sq m · 221 sq ft | 29 | 19 |
| Building No - 3 | 1RK E WING | 17.77 sq m · 191 sq ft | 1 | 0 |
| Building No - 3 | 1 RK F WING | 17.76 sq m · 191 sq ft | 7 | 6 |
| Building No - 3 | 1 RK F WING | 20.56 sq m · 221 sq ft | 28 | 10 |
| Building No - 3 | 1RK F WING | 17.77 sq m · 191 sq ft | 1 | 0 |
| Building No - 3 | 1 RK G WING | 20.56 sq m · 221 sq ft | 29 | 7 |
| Building No - 3 | 1RK G WING | 17.76 sq m · 191 sq ft | 7 | 6 |
| Building No - 3 | 2 BHK G WING | 35.92 sq m · 387 sq ft | 1 | 0 |
| Building No - 4 | 1 BHK H WING | 28.43 sq m · 306 sq ft | 7 | 1 |
| Building No - 4 | 1 BHK H WING | 29.25 sq m · 315 sq ft | 7 | 6 |
| Building No - 4 | 1 BHK H WING | 31.39 sq m · 338 sq ft | 28 | 3 |
| Building No - 4 | 1 BHK J WING | 28.43 sq m · 306 sq ft | 7 | 4 |
| Building No - 4 | 1 BHK J WING | 31.39 sq m · 338 sq ft | 28 | 1 |
| Building No - 4 | 1BHK J WING | 29.25 sq m · 315 sq ft | 7 | 7 |
| Building No - 4 | 1 BHK K WING | 28.43 sq m · 306 sq ft | 7 | 5 |
| Building No - 4 | 1 BHK K WING | 29.25 sq m · 315 sq ft | 7 | 6 |
| Building No - 4 | 1BHK K WING | 31.39 sq m · 338 sq ft | 28 | 6 |
| Building No - 4 | 2BHK H WING | 35.94 sq m · 387 sq ft | 7 | 6 |
| Building No - 4 | 2BHK J WING | 35.94 sq m · 387 sq ft | 7 | 6 |
| Building No - 4 | 2 BHK K WING | 35.94 sq m · 387 sq ft | 7 | 7 |
| Building No - 5 | 2 BHK L WING | 42.3 sq m · 455 sq ft | 7 | 0 |
| Building No - 5 | 2 BHK L WING | 49.48 sq m · 533 sq ft | 14 | 0 |
| Building No - 5 | 2BHK L WING | 35.92 sq m · 387 sq ft | 14 | 0 |
| Building No - 6 | 1 BHK M1 WING | 26.25 sq m · 283 sq ft | 9 | 0 |
| Building No - 6 | 1BHK M2 WING | 26.25 sq m · 283 sq ft | 9 | 0 |
| Building No - 6 | 1RK M2 WING | 17.77 sq m · 191 sq ft | 9 | 0 |
| Building No - 6 | 2 BHK M1 WING | 42.3 sq m · 455 sq ft | 9 | 0 |
| Building No - 7 | 2 BHK N WING | 44.69 sq m · 481 sq ft | 28 | 24 |
| Building No - 7 | 2 BHK N WING | 46.19 sq m · 497 sq ft | 14 | 9 |
| Building No - 7 | Shop n wing | 11.88 sq m · 128 sq ft | 1 | 0 |
| Building No - 7 | Shop n wing | 16.08 sq m · 173 sq ft | 2 | 1 |
| Building No - 7 | Shop n wing | 18.8 sq m · 202 sq ft | 1 | 0 |
| Building No - 7 | Shop n wing | 20.62 sq m · 222 sq ft | 1 | 0 |
| Building No - 7 | Shop n wing | 21.58 sq m · 232 sq ft | 2 | 1 |
| Building No - 7 | Shop n wing | 21.76 sq m · 234 sq ft | 1 | 0 |
| Building No - 7 | Shop n wing | 23.55 sq m · 253 sq ft | 1 | 0 |
| Building No - 7 | Shop n wing | 29.9 sq m · 322 sq ft | 2 | 2 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals7
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Atul Mhatre | — |
| Chartered accountant | ABHL and Associates | — |
| Chartered accountant | Anil Kumar Dutta | — |
| Chartered accountant | Sachin Sunil Jain | — |
| Engineer | Bhauso Bhimrao Desai | — |
| Engineer | Kartik Godbole | — |
| Engineer | Ram Chaurasiya | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Usatane
- Neelkamal Residency And Business ParkRERA P51700022681
- Krushan DhamRERA P51700015294
All 3 projects in Usatane · Compare Krushna Vihar - Phase I with another project