Deedo IDDP-THN-2BQ3MahaRERA shows it completed; no MahaRERA orders on record; 90% of its units are booked.
Thane (M Corp.), Thane 400607 · by Vijay Suraksha Realty Llp · 33% of its projects kept the RERA date
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed
- This projectRegistered 11 Aug 2017, completion promised 30 Mar 2023.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
6 buildings
Open a building to see every flat, floor by floor.
- Fern32 floors · 157 units94% booked
- Indigo32 floors · 157 units87% booked
- Ivy32 floors · 157 units96% booked
- MARIGOLD East End4 floors · 52 units63% booked
- Marigold West End4 floors · 36 units78% booked
- Periwinkle32 floors · 157 units94% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700005653
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700005653 | 11 Aug 2017 | 30 Mar 2023 | 30 Mar 2023 | Vijay Suraksha Realty LLP | Project page |
Documents81
1 document held by Deedo, 80 filings listed on MahaRERA's project page
Finance
- PAN CardVijay Suraksha Realty LLP_pan card.PDF · uploaded 25 Jul 2017Source
Legal
- OtherDisclosure Letter.pdf · uploaded 30 Jul 2017Source
- Declaration Form BForm B Orovia.pdf · uploaded 30 Jul 2017Source
- Legal Title reportTitle Report Part 1.pdf · uploaded 30 Jul 2017Source
- Legal Title reportTitle Report Part 2.pdf · uploaded 30 Jul 2017Source
- Legal Title reportTitle Report Part 3.pdf · uploaded 30 Jul 2017Source
- Legal Title reportTitle Report Part 4.pdf · uploaded 30 Jul 2017Source
Show all 81 documentsShow fewer documents
Legal
- Legal Title reportTitle Report Part 5.pdf · uploaded 30 Jul 2017Source
- Legal Title reportTitle Report Part 6.pdf · uploaded 30 Jul 2017Source
- Legal Title reportTitle Report Part 7.pdf · uploaded 30 Jul 2017Source
- Legal Title reportTitle Report Part 8.pdf · uploaded 30 Jul 2017Source
- Legal Title reportTitle Report Part 9.pdf · uploaded 30 Jul 2017Source
Migrated
- 1 PAN CardVijay Suraksha Realty LLP_pan card.PDF · uploaded 25 Jul 2017Source
- 1 Copy of the legal title reportTitle Report Part 1.pdf · uploaded 30 Jul 2017Source
- 2 Copy of the legal title reportTitle Report Part 2.pdf · uploaded 30 Jul 2017Source
- 3 Copy of the legal title reportTitle Report Part 3.pdf · uploaded 30 Jul 2017Source
- 4 Copy of the legal title reportTitle Report Part 4.pdf · uploaded 30 Jul 2017Source
- 5 Copy of the legal title reportTitle Report Part 5.pdf · uploaded 30 Jul 2017Source
- 6 Copy of the legal title reportTitle Report Part 6.pdf · uploaded 30 Jul 2017Source
- 7 Copy of the legal title reportTitle Report Part 7.pdf · uploaded 30 Jul 2017Source
- 8 Copy of the legal title reportTitle Report Part 8.pdf · uploaded 30 Jul 2017Source
- 9 Copy of the legal title reportTitle Report Part 9.pdf · uploaded 30 Jul 2017Source
- 1 Details of encumbrancesSelf Declaration.pdf · uploaded 30 Jul 2017Source
- 1 Copy of Layout Approval (in case of layout)IOD CC Layout.pdf · uploaded 30 Jul 2017Source
- 1 Building Plan Approval (IOD)IOD CC Layout.pdf · uploaded 30 Jul 2017Source
- 1 Commencement Certificates / NA Order for plotted developmentIOD CC Layout.pdf · uploaded 30 Jul 2017Source
- 1 Declaration in FORM BForm B Orovia.pdf · uploaded 30 Jul 2017Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Orovia.pdf · uploaded 30 Jul 2017Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 _ENGINEER CERTIFICATE_.pdf · uploaded 30 Jul 2017Source
- 1 Certificates of CA (Form 3)Form 3 Orovia.pdf · uploaded 30 Jul 2017Source
- 1 Proforma of Allotment letterFlat Sale Agreement.pdf · uploaded 30 Jul 2017Source
- 2 Proforma of Allotment letterDeclaration for Commercial Units.pdf · uploaded 30 Jul 2017Source
- 3 Proforma of Allotment letterOrovia Allotment.pdf · uploaded 30 Jul 2017Source
- 1 OtherDisclosure Letter.pdf · uploaded 30 Jul 2017Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form-1_OR_edit.pdf · uploaded 16 Oct 2017Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM - 2_OR_edit.pdf · uploaded 26 Oct 2017Source
- 2 Certificates of CA (Form 3)FORM-3_OR_edit R1.pdf · uploaded 26 Oct 2017Source
- 4 Proforma of Allotment letterAGREEMENT FOR SALE-OROVIA Commercial.pdf · uploaded 6 Jan 2018Source
- 2 Building Plan Approval (IOD)AMENDED CC-DT- 07112017.pdf · uploaded 15 Jan 2018Source
- 2 Commencement Certificates / NA Order for plotted developmentAMENDED CC-DT- 07112017.pdf · uploaded 15 Jan 2018Source
- 1 Certificates of CA (Form 5)FORM 5 -OR.pdf · uploaded 5 Nov 2018Source
- 5 Proforma of Allotment letterOrovia Draft Agreement_12 11 2019.pdf · uploaded 12 Nov 2019Source
- 3 Certificates of CA (Form 3)Form3.pdf · uploaded 29 Jun 2022Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)19th Qtr Jan 22.pdf · uploaded 16 Jan 2023Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)19th Qtr Feb 22.pdf · uploaded 16 Jan 2023Source
- 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)19th Qtr March 22.pdf · uploaded 16 Jan 2023Source
- 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)20th Qtr April 22.pdf · uploaded 16 Jan 2023Source
- 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)18th Qtr Dec 21.pdf · uploaded 16 Jan 2023Source
- 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)17th Qtr.pdf · uploaded 16 Jan 2023Source
- 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)16th Qtr.pdf · uploaded 16 Jan 2023Source
- 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)15th Qtr.pdf · uploaded 16 Jan 2023Source
- 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)14th Qtr.pdf · uploaded 16 Jan 2023Source
- 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)13th Qtr.pdf · uploaded 16 Jan 2023Source
- 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)12th Qtr.pdf · uploaded 16 Jan 2023Source
- 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)11th Qtr.pdf · uploaded 16 Jan 2023Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form-II_11th Qtr.pdf · uploaded 16 Jan 2023Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form-II_12th Qtr.pdf · uploaded 16 Jan 2023Source
- 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form-II_13th Qtr.pdf · uploaded 16 Jan 2023Source
- 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form-II_14th Qtr.pdf · uploaded 16 Jan 2023Source
- 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form-II_15th Qtr.pdf · uploaded 16 Jan 2023Source
- 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM-II_16th Qtr.pdf · uploaded 16 Jan 2023Source
- 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form-II_17th Qtr.pdf · uploaded 16 Jan 2023Source
- 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form-II_18th Qtr.pdf · uploaded 16 Jan 2023Source
- 4 Certificates of CA (Form 3)Form 3 Dec21 (2).pdf · uploaded 27 Jan 2023Source
- 5 Certificates of CA (Form 3)Form 3 June 21 (2).pdf · uploaded 27 Jan 2023Source
- 6 Certificates of CA (Form 3)Form 3 March 21 (2).pdf · uploaded 27 Jan 2023Source
- 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)March 2022.pdf · uploaded 6 Feb 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 Certificate_March 19.pdf · uploaded 8 Feb 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 Certificate_March 20.pdf · uploaded 8 Feb 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 Certificate_March 21.pdf · uploaded 8 Feb 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 Certificate_March 22.pdf · uploaded 8 Feb 2023Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC INDIGO.pdf · uploaded 27 Jun 2023Source
- 2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC IVY FERN.pdf · uploaded 27 Jun 2023Source
- 3 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC PERI MARIGOLD.pdf · uploaded 27 Jun 2023Source
- 2 Architect’s Certificate on Completion of Project (Form 4)Form 4.pdf · uploaded 3 Jul 2023Source
Technical
Technical (Architect)
- Document11th Qtr.pdf · uploaded 16 Jan 2023Source
Technical (Engineer)
- DocumentMarch 2022.pdf · uploaded 6 Feb 2023Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 106/2PT, 111/1PT
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1 BHK SMART, 1 BHK SPACIO, 2.5BHK, 2BHK LUXURY, 3BHK, 1BHKSMART, 1BHK SPACIO, Office space, Restaurant, Shop, 2 BHK SMART, 2BHK SPACIO716 units in all
- Address
- SNO 106/1/1PT, 106/2PT, 111/1PT, 111/2PT, 76/4PT, Waghbil Road, Village Kavesar, Ghodbunder RoadPIN 400607
- Village
- Thane (M Corp.), Thane taluka
- Location
- 19.26358, 72.97827
- Land area for this project
- 4,083 sq m (43,949 sq ft)
- Permissible built-up area
- 33,845 sq m (3,64,299 sq ft)
- Sanctioned built-up area
- 33,845 sq m (3,64,299 sq ft)
- Recreational open space
- 2,891 sq m (31,118 sq ft)
- Designated bank account
- 229
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
SNO 106/1/1PT, 106/2PT, 111/1PT, 111/2PT, 76/4PT
Boundaries
- North
- CTS NO 106 part 2
- South
- CTS NO 114 part 1
- East
- CTS NO 76 part 3
- West
- CTS NO 106 part 1 of 1
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking716 units
643 of 716 units booked (90%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Fern | 1 BHK SMART | 35.57 sq m · 383 sq ft | 49 | 44 |
| Fern | 1 BHK SMART | 35.7 sq m · 384 sq ft | 54 | 53 |
| Fern | 1 BHK SPACIO | 36.6 sq m · 394 sq ft | 54 | 51 |
| Indigo | 2.5BHK | 64.42 sq m · 693 sq ft | 54 | 44 |
| Indigo | 2BHK LUXURY | 57.55 sq m · 619 sq ft | 22 | 13 |
| Indigo | 2BHK LUXURY | 60.67 sq m · 653 sq ft | 27 | 26 |
| Indigo | 3BHK | 68.4 sq m · 736 sq ft | 54 | 53 |
| Ivy | 1 BHK SMART | 35.57 sq m · 383 sq ft | 49 | 46 |
Show all 65 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Ivy | 1BHKSMART | 35.7 sq m · 384 sq ft | 54 | 50 |
| Ivy | 1BHK SPACIO | 36.6 sq m · 394 sq ft | 54 | 54 |
| MARIGOLD East End | Office space | 20.36 sq m · 219 sq ft | 1 | 1 |
| MARIGOLD East End | Office space | 27.4 sq m · 295 sq ft | 1 | 1 |
| MARIGOLD East End | Office space | 30.62 sq m · 330 sq ft | 1 | 0 |
| MARIGOLD East End | Office space | 30.63 sq m · 330 sq ft | 2 | 2 |
| MARIGOLD East End | Office space | 30.64 sq m · 330 sq ft | 2 | 2 |
| MARIGOLD East End | Office space | 30.67 sq m · 330 sq ft | 1 | 0 |
| MARIGOLD East End | Office space | 30.78 sq m · 331 sq ft | 1 | 0 |
| MARIGOLD East End | Office space | 30.8 sq m · 332 sq ft | 1 | 1 |
| MARIGOLD East End | Office space | 30.87 sq m · 332 sq ft | 3 | 1 |
| MARIGOLD East End | Office space | 30.88 sq m · 332 sq ft | 3 | 1 |
| MARIGOLD East End | Office space | 30.99 sq m · 334 sq ft | 1 | 1 |
| MARIGOLD East End | Office space | 31.61 sq m · 340 sq ft | 1 | 1 |
| MARIGOLD East End | Office space | 31.88 sq m · 343 sq ft | 1 | 1 |
| MARIGOLD East End | Office space | 32 sq m · 344 sq ft | 1 | 1 |
| MARIGOLD East End | Office space | 33.37 sq m · 359 sq ft | 1 | 0 |
| MARIGOLD East End | Office space | 34.62 sq m · 373 sq ft | 1 | 1 |
| MARIGOLD East End | Office space | 81.96 sq m · 882 sq ft | 1 | 0 |
| MARIGOLD East End | Office space | 103.71 sq m · 1,116 sq ft | 3 | 0 |
| MARIGOLD East End | Restaurant | 54.67 sq m · 588 sq ft | 2 | 0 |
| MARIGOLD East End | Shop | 20.1 sq m · 216 sq ft | 1 | 1 |
| MARIGOLD East End | Shop | 27.45 sq m · 295 sq ft | 1 | 1 |
| MARIGOLD East End | Shop | 30.71 sq m · 331 sq ft | 1 | 1 |
| MARIGOLD East End | Shop | 30.82 sq m · 332 sq ft | 1 | 1 |
| MARIGOLD East End | Shop | 30.9 sq m · 333 sq ft | 1 | 1 |
| MARIGOLD East End | Shop | 30.91 sq m · 333 sq ft | 3 | 2 |
| MARIGOLD East End | Shop | 30.92 sq m · 333 sq ft | 6 | 6 |
| MARIGOLD East End | Shop | 31.1 sq m · 335 sq ft | 2 | 2 |
| MARIGOLD East End | Shop | 31.52 sq m · 339 sq ft | 1 | 1 |
| MARIGOLD East End | Shop | 32.16 sq m · 346 sq ft | 1 | 1 |
| MARIGOLD East End | Shop | 34.06 sq m · 367 sq ft | 1 | 1 |
| MARIGOLD East End | Shop | 34.27 sq m · 369 sq ft | 1 | 1 |
| MARIGOLD East End | Shop | 81.7 sq m · 879 sq ft | 1 | 0 |
| MARIGOLD East End | Shop | 103.62 sq m · 1,115 sq ft | 2 | 0 |
| MARIGOLD East End | Shop | 103.64 sq m · 1,116 sq ft | 1 | 0 |
| Marigold West End | Office space | 22.99 sq m · 247 sq ft | 1 | 1 |
| Marigold West End | Office space | 23.93 sq m · 258 sq ft | 1 | 1 |
| Marigold West End | Office space | 26.86 sq m · 289 sq ft | 1 | 1 |
| Marigold West End | Office space | 27.6 sq m · 297 sq ft | 1 | 0 |
| Marigold West End | Office space | 30.62 sq m · 330 sq ft | 1 | 1 |
| Marigold West End | Office space | 30.64 sq m · 330 sq ft | 4 | 4 |
| Marigold West End | Office space | 30.86 sq m · 332 sq ft | 1 | 0 |
| Marigold West End | Office space | 30.88 sq m · 332 sq ft | 6 | 3 |
| Marigold West End | Office space | 30.92 sq m · 333 sq ft | 1 | 1 |
| Marigold West End | Office space | 34.53 sq m · 372 sq ft | 1 | 1 |
| Marigold West End | Restaurant | 54.67 sq m · 588 sq ft | 2 | 0 |
| Marigold West End | Shop | 23.04 sq m · 248 sq ft | 1 | 1 |
| Marigold West End | Shop | 23.91 sq m · 257 sq ft | 1 | 1 |
| Marigold West End | Shop | 26.91 sq m · 290 sq ft | 1 | 1 |
| Marigold West End | Shop | 27.64 sq m · 298 sq ft | 1 | 1 |
| Marigold West End | Shop | 30.88 sq m · 332 sq ft | 1 | 1 |
| Marigold West End | Shop | 30.92 sq m · 333 sq ft | 10 | 9 |
| Marigold West End | Shop | 34.58 sq m · 372 sq ft | 1 | 1 |
| Periwinkle | 2 BHK SMART | 46.13 sq m · 497 sq ft | 54 | 52 |
| Periwinkle | 2BHK SPACIO | 53.83 sq m · 579 sq ft | 54 | 47 |
| Periwinkle | 2BHK SPACIO | 55.86 sq m · 601 sq ft | 49 | 49 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Other projects in Thane (M Corp.)
- Metro MilleniaRERA PM1330002602679
- Kalyani Krupa Co.op Hsg Soc LtdRERA PR1330002602399
- Shreeji's Laxmi Jyot CHSLRERA PR1330002602306
- RivantaRERA PM1330002601984
- Shree Gangadhar ChslRERA PM1330002601922
- The Lake CornerRERA PM1330002601899
- Shree AudumbarRERA PR1330002601484
- Shreyas Co-Op Hsg. Soc. Ltd.RERA PR1330002601418
All 898 projects in Thane (M Corp.) · Compare Orovia Phase 1 with another project