Residential / Group Housing · 1 building · 177 unitsRERA P51700020335

Metro Hive D-1

Deedo IDDP-THN-KYA4

Completion was pushed back 4 months, to Apr 2027; no MahaRERA orders on record; 89% of its units are booked.

Owale, Thane 400615 · by Vihang Infrastructure Pvt Ltd

DeliveryExtended 4 moPromised Dec 2026 · now due Apr 2027RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales89% booked157 of 177 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Apr 2027

  • This projectRegistered 5 Apr 2019, completion promised 30 Dec 2026, revised to 30 Apr 2027.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700020335
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P517000203355 Apr 201930 Dec 202630 Apr 2027Vihang Infrastructure Pvt LtdProject page
Documents184

1 document held by Deedo, 183 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardVihang Infrastructure.pdf · uploaded 2 Apr 2019Source
  • Other – FinanceRera Bank Account details.pdf · uploaded 25 Jul 2023Source
  • DocumentFormat B New.pdf · uploaded 28 Jul 2025Source
  • Othersself declaration metrohive D1.pdf · uploaded 18 Aug 2025Source
  • OthersDECLARATION-CUM-UNDERTRAKING NO 35.pdf · uploaded 18 Aug 2025Source
  • Othersformat A.pdf · uploaded 18 Aug 2025Source
  • OthersRERA Form 3- Metro Hive D1 Q4_compressed (1).pdf · uploaded 18 Sep 2025Source
Show all 184 documentsShow fewer documents

Legal

  • Legal Title reportTitle 1.pdf · uploaded 2 Apr 2019Source
  • Legal Title reportTitle 2.pdf · uploaded 2 Apr 2019Source
  • Legal Title reportTitle 3.pdf · uploaded 2 Apr 2019Source
  • Declaration Form BFORM B - DECLARATION FOR METERO HIVE.pdf · uploaded 2 Apr 2019Source
  • Declaration Form B7 12 ALL.pdf · uploaded 19 May 2026Source
  • Declaration Form BDA 536.pdf · uploaded 21 May 2026Source
  • Declaration Form BAGM 9181.pdf · uploaded 21 May 2026Source
  • Declaration Form BAGM 2181.pdf · uploaded 21 May 2026Source
  • Declaration Form BDA 2179.pdf · uploaded 21 May 2026Source
  • Declaration Form BDA 8368.pdf · uploaded 21 May 2026Source
  • Declaration Form BAGM 7020.pdf · uploaded 21 May 2026Source
  • Declaration Form BTITLE REPORT metrohive D1 61 to 66.pdf · uploaded 27 Jul 2026Source
  • Declaration Form BTITLE REPORT metrohive D1 1 to 15.pdf · uploaded 28 Jul 2026Source
  • Declaration Form BTITLE REPORT metrohive D1 16 to 30.pdf · uploaded 28 Jul 2026Source
  • Declaration Form BTITLE REPORT metrohive D1 31 to 44.pdf · uploaded 28 Jul 2026Source
  • Declaration Form BTITLE REPORt metrohive D1 45 to 60.pdf · uploaded 28 Jul 2026Source
  • Declaration Form Bdeclaration cum undertaking Survey Nos.pdf · uploaded 28 Jul 2026Source

Migrated

  • 1 PAN CardVihang Infrastructure.pdf · uploaded 2 Apr 2019Source
  • 1 Copy of the legal title reportTitle 1.pdf · uploaded 2 Apr 2019Source
  • 2 Copy of the legal title reportTitle 2.pdf · uploaded 2 Apr 2019Source
  • 3 Copy of the legal title reportTitle 3.pdf · uploaded 2 Apr 2019Source
  • 1 Details of encumbrancesnon encumberance certificate.pdf · uploaded 2 Apr 2019Source
  • 1 Copy of Layout Approval (in case of layout)APPROVED LAYOUT PLAN METRO HIVE.pdf · uploaded 2 Apr 2019Source
  • 1 Building Plan Approval (IOD)METRO HIVE D-1 sanction.pdf · uploaded 2 Apr 2019Source
  • 1 Commencement Certificates / NA Order for plotted developmentMETRO HIVE D-1 C C.pdf · uploaded 2 Apr 2019Source
  • 1 Declaration in FORM BFORM B - DECLARATION FOR METERO HIVE.pdf · uploaded 2 Apr 2019Source
  • 1 Certificates of CA (Form 3)Form 3 D-1.pdf · uploaded 2 Apr 2019Source
  • 1 Proforma of Allotment letterallotment letter - undertaking for FSA.pdf · uploaded 2 Apr 2019Source
  • 2 Proforma of Allotment letterAllotment Letter - metro hive - D1.pdf · uploaded 2 Apr 2019Source
  • 2 Copy of Layout Approval (in case of layout)APPROVED SANCTION PLAN-D1.pdf · uploaded 3 Apr 2019Source
  • 3 Proforma of Allotment letterfinal draft of metro hive-28-05-2019.pdf · uploaded 30 May 2019Source
  • 4 Proforma of Allotment letterfinal draft of metro hive-28-05-2019.pdf · uploaded 30 May 2019Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 2A STRUCT ENGG CERTIFICATE.pdf · uploaded 15 May 2020Source
  • 1 CERSAI detailsUNDERTAKING- CERSAI- 15-12-2021.pdf · uploaded 15 Dec 2021Source
  • 2 Commencement Certificates / NA Order for plotted developmentCC Valley TDD-3962 Dated-11-2-2022 new_compressed.pdf · uploaded 8 Mar 2022Source
  • 1 Other – FinanceRera Bank Account details.pdf · uploaded 25 Jul 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1 30-04-2019.pdf · uploaded 24 Jul 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1 30-03-2020.pdf · uploaded 24 Jul 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1 30-03-2021.pdf · uploaded 24 Jul 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1 30- 03 -2022.pdf · uploaded 24 Jul 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1 30-03- 2023.pdf · uploaded 24 Jul 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1 30-03 -2024.pdf · uploaded 24 Jul 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Metro hive d-1 form 2 date 31-03-2020.pdf · uploaded 27 Jul 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Metro hive d-1 form 2 - date 31-03-2021.pdf · uploaded 27 Jul 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Metro hive d-1 form 2 - date 31-03-2022.pdf · uploaded 27 Jul 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Metro hive d-1 form 2 -date 31-03- 2023.pdf · uploaded 27 Jul 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Metro Hive D-1 Form 2 -date 31-03- 2024.pdf · uploaded 27 Jul 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Metro hive d-1 form 2A - date 31-03-2024.pdf · uploaded 27 Jul 2024Source
  • 1 Proforma of Agreement for saleGetUserDocumentFileContent.pdf · uploaded 19 Aug 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Metro Hive D1 Form 5 Mar 20_compressed.pdf · uploaded 17 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Metro Hive D1 Form 5 Mar 21_compressed.pdf · uploaded 17 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Metro Hive D1 Form 5 Mar 22_compressed.pdf · uploaded 17 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Metro Hive D1 Form 5 Mar 23_compressed.pdf · uploaded 17 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Metro Hive D1 Form 5 Mar 24_compressed.pdf · uploaded 17 Oct 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 METROHIVE D1 JUNE 2024.pdf · uploaded 23 Dec 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 METROHIVE D1 SEPT 2024.pdf · uploaded 23 Dec 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECTS CERTIFICATE VALLEY D1.pdf · uploaded 3 Feb 2025Source
  • 1 Declaration about all RERA Designated Bank Accounts (Format A)SEPARATE BANK ACCOUNT METRO HIVE D1.pdf · uploaded 26 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 METROHIVE MARCH 25.pdf · uploaded 12 Apr 2025Source
  • 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)FORMAT B METROHIVE.pdf · uploaded 25 Apr 2025Source
  • Withdrawal Update Form 1FORM-1 30-03 -2024.pdf · uploaded 21 Aug 2025Source
  • Withdrawal Update Form 1FORM-1 30-03 -2024.pdf · uploaded 21 Aug 2025Source
  • Withdrawal Update Form 2Metro Hive D-1 Form 2 -date 31-03- 2024.pdf · uploaded 21 Aug 2025Source
  • Withdrawal Update Form 2Metro Hive D-1 Form 2 -date 31-03- 2024.pdf · uploaded 21 Aug 2025Source
  • Withdrawal Update Form 3FORM 3.pdf · uploaded 21 Aug 2025Source
  • Withdrawal Update Form 3FORM 3.pdf · uploaded 21 Aug 2025Source
  • Withdrawal Update Form 1FORM-1 30-03 -2024.pdf · uploaded 22 Aug 2025Source
  • Withdrawal Update Form 1FORM-1 30-03 -2024.pdf · uploaded 22 Aug 2025Source
  • Withdrawal Update Form 1FORM-1 30-03 -2024.pdf · uploaded 22 Aug 2025Source
  • Withdrawal Update Form 1FORM-1 30-03 -2024.pdf · uploaded 22 Aug 2025Source
  • Withdrawal Update Form 1FORM-1 30-03 -2024.pdf · uploaded 22 Aug 2025Source
  • Withdrawal Update Form 1FORM-1 30-03 -2024.pdf · uploaded 22 Aug 2025Source
  • Withdrawal Update Form 2Metro Hive D-1 Form 2 -date 31-03- 2024.pdf · uploaded 22 Aug 2025Source
  • Withdrawal Update Form 2Metro Hive D-1 Form 2 -date 31-03- 2024.pdf · uploaded 22 Aug 2025Source
  • Withdrawal Update Form 2Metro Hive D-1 Form 2 -date 31-03- 2024.pdf · uploaded 22 Aug 2025Source
  • Withdrawal Update Form 2Metro Hive D-1 Form 2 -date 31-03- 2024.pdf · uploaded 22 Aug 2025Source
  • Withdrawal Update Form 2Metro Hive D-1 Form 2 -date 31-03- 2024.pdf · uploaded 22 Aug 2025Source
  • Withdrawal Update Form 2Metro Hive D-1 Form 2 -date 31-03- 2024.pdf · uploaded 22 Aug 2025Source
  • Withdrawal Update Form 3FORM 3.pdf · uploaded 22 Aug 2025Source
  • Withdrawal Update Form 3FORM 3.pdf · uploaded 22 Aug 2025Source
  • Withdrawal Update Form 3FORM 3.pdf · uploaded 22 Aug 2025Source
  • Withdrawal Update Form 3FORM 3.pdf · uploaded 22 Aug 2025Source
  • Withdrawal Update Form 3FORM 3.pdf · uploaded 22 Aug 2025Source
  • Withdrawal Update Form 3FORM 3.pdf · uploaded 22 Aug 2025Source
  • Withdrawal Update Form 1FORM-1 30-03 -2024.pdf · uploaded 20 Sep 2025Source
  • Withdrawal Update Form 2Metro Hive D-1 Form 2 -date 31-03- 2024.pdf · uploaded 20 Sep 2025Source
  • Withdrawal Update Form 3Correction Form3.pdf · uploaded 20 Sep 2025Source
  • Withdrawal Update Form 1FORM-1 30-03 -2024.pdf · uploaded 23 Sep 2025Source
  • Withdrawal Update Form 2Metro Hive D-1 Form 2 -date 31-03- 2024.pdf · uploaded 23 Sep 2025Source
  • Withdrawal Update Form 3Correction Form3.pdf · uploaded 23 Sep 2025Source
  • Withdrawal Update Form 1FORM-1 30-03 -2024.pdf · uploaded 1 Oct 2025Source
  • Withdrawal Update Form 1FORM-1 30-03 -2024.pdf · uploaded 1 Oct 2025Source
  • Withdrawal Update Form 2Metro Hive D-1 Form 2 -date 31-03- 2024.pdf · uploaded 1 Oct 2025Source
  • Withdrawal Update Form 2Metro Hive D-1 Form 2 -date 31-03- 2024.pdf · uploaded 1 Oct 2025Source
  • Withdrawal Update Form 3Correction Form3.pdf · uploaded 1 Oct 2025Source
  • Withdrawal Update Form 3Correction Form3.pdf · uploaded 1 Oct 2025Source
  • Form 1march 2023.pdf · uploaded 29 Jan 2026Source
  • Form 2march 2023.pdf · uploaded 29 Jan 2026Source
  • Form 3form march 23.pdf · uploaded 29 Jan 2026Source
  • Disclosure of Sold and Booked Inventoryform march 23.pdf · uploaded 29 Jan 2026Source
  • Form 1JUNE 24.pdf · uploaded 30 Jan 2026Source
  • Form 1march 2023.pdf · uploaded 30 Jan 2026Source
  • Form 1march 2023.pdf · uploaded 30 Jan 2026Source
  • Form 1MARCH 24.pdf · uploaded 30 Jan 2026Source
  • Form 1JUNE 24.pdf · uploaded 30 Jan 2026Source
  • Form 1SEPT 24.pdf · uploaded 30 Jan 2026Source
  • Form 1DEC 24.pdf · uploaded 30 Jan 2026Source
  • Form 1MARCH 25.pdf · uploaded 30 Jan 2026Source
  • Form 2JUNE 23.pdf · uploaded 30 Jan 2026Source
  • Form 2SEPT 23.pdf · uploaded 30 Jan 2026Source
  • Form 2DEC 23.pdf · uploaded 30 Jan 2026Source
  • Form 2MARCH 24.pdf · uploaded 30 Jan 2026Source
  • Form 2JUNE 24.pdf · uploaded 30 Jan 2026Source
  • Form 2SEPT 24.pdf · uploaded 30 Jan 2026Source
  • Form 2DEC 24.pdf · uploaded 30 Jan 2026Source
  • Form 2MARCH 25.pdf · uploaded 30 Jan 2026Source
  • Form 3FORM3JUNE 23.pdf · uploaded 30 Jan 2026Source
  • Form 3FORM3 SEPT 23.pdf · uploaded 30 Jan 2026Source
  • Form 3FORM3 DEC 23.pdf · uploaded 30 Jan 2026Source
  • Form 3FORM3 MARCH 24.pdf · uploaded 30 Jan 2026Source
  • Form 3FORM3 JUNE 24.pdf · uploaded 30 Jan 2026Source
  • Form 3FORM3 SEPT 24.pdf · uploaded 30 Jan 2026Source
  • Form 3FORM3 DEC 24.pdf · uploaded 30 Jan 2026Source
  • Form 3FORM3 MARCH 25.pdf · uploaded 30 Jan 2026Source
  • Disclosure of Sold and Booked InventoryMETROHIVE JUNE 2023.pdf · uploaded 30 Jan 2026Source
  • Disclosure of Sold and Booked InventoryMETROHIVE SEPT 2023.pdf · uploaded 30 Jan 2026Source
  • Disclosure of Sold and Booked InventoryMETROHIVE DEC 2023.pdf · uploaded 30 Jan 2026Source
  • Disclosure of Sold and Booked InventoryMETROHIVE MARCH 2024.pdf · uploaded 30 Jan 2026Source
  • Disclosure of Sold and Booked InventoryMETROHIVE JUNE 2024.pdf · uploaded 30 Jan 2026Source
  • Disclosure of Sold and Booked InventoryMETROHIVE SEPT 2024.pdf · uploaded 30 Jan 2026Source
  • Disclosure of Sold and Booked InventoryMETROHIVE DEC 2024.pdf · uploaded 30 Jan 2026Source
  • Disclosure of Sold and Booked InventoryMETROHIVE MARCH 2025.pdf · uploaded 30 Jan 2026Source
  • OthersFORM 2A JUNE 23.pdf · uploaded 30 Jan 2026Source
  • OthersFORM 2A SEPT 23.pdf · uploaded 30 Jan 2026Source
  • OthersFORM 2A DEC 23.pdf · uploaded 30 Jan 2026Source
  • OthersFORM 2A MARCH 24.pdf · uploaded 30 Jan 2026Source
  • OthersFORM 2A JUNE 24.pdf · uploaded 30 Jan 2026Source
  • OthersFORM 2A SEPT 24.pdf · uploaded 30 Jan 2026Source
  • OthersFORM 2A DEC 24.pdf · uploaded 30 Jan 2026Source
  • OthersFORM 2A MARCH 25.pdf · uploaded 30 Jan 2026Source
  • Withdrawal Update Form 1FORM-1 30-03 -2024.pdf · uploaded 30 Jan 2026Source
  • Withdrawal Update Form 1FORM-1 30-03 -2024.pdf · uploaded 30 Jan 2026Source
  • Withdrawal Update Form 2Metro Hive D-1 Form 2 -date 31-03- 2024.pdf · uploaded 30 Jan 2026Source
  • Withdrawal Update Form 2Metro Hive D-1 Form 2 -date 31-03- 2024.pdf · uploaded 30 Jan 2026Source
  • Withdrawal Update Form 3Correction Form3.pdf · uploaded 30 Jan 2026Source
  • Withdrawal Update Form 3FORM3 AUG 25.pdf · uploaded 30 Jan 2026Source
  • Withdrawal Update Form 1MARCH 25.pdf · uploaded 26 Feb 2026Source
  • Withdrawal Update Form 2Metro Hive D-1 Form 2 -date 31-03- 2024.pdf · uploaded 26 Feb 2026Source
  • Withdrawal Update Form 3FORM3 AUG 25.pdf · uploaded 26 Feb 2026Source
  • Withdrawal Update Form 1form 1 march 2025.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 2Metro Hive D-1 Form 2 -date 31-03- 2024.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 3form 3 as on 10032026.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 1form 1 march 2025.pdf · uploaded 30 Jul 2026Source
  • Withdrawal Update Form 2form 2 a june 2026.pdf · uploaded 30 Jul 2026Source
  • Withdrawal Update Form 3Metro Hive D1 RERA form 3.pdf · uploaded 30 Jul 2026Source
  • Form 5 (FY 2019-2020)form 5 19 20 metrohive.pdf · uploaded 1 Oct 2026Source
  • Form 5 (FY 2020-2021)form 5 20-21 metrohive.pdf · uploaded 1 Oct 2026Source
  • Form 5 (FY 2021-2022)form 5 21-22 metrohive.pdf · uploaded 1 Oct 2026Source
  • Form 5 (FY 2022-2023)form 5 22-23 metrohive.pdf · uploaded 1 Oct 2026Source
  • Form 5 (FY 2023-2024)form 5 23-24 metrohive.pdf · uploaded 1 Oct 2026Source
  • Form 5 (FY 2024-2025)form 5 24-25 metrohive.pdf · uploaded 1 Oct 2026Source

Technical

  • DocumentAPPROVED LAYOUT PLAN METRO HIVE.pdf · uploaded 2 Apr 2019Source
  • DocumentMETRO HIVE D-1 sanction.pdf · uploaded 2 Apr 2019Source
  • DocumentAPPROVED SANCTION PLAN-D1.pdf · uploaded 3 Apr 2019Source
  • DocumentLAYOUT.pdf · uploaded 30 Jan 2026Source
  • DocumentD1 LAYOUT red coundry.pdf · uploaded 13 Feb 2026Source
  • DocumentDECLARATION CUM UNDERTAKING AREA.pdf · uploaded 13 Feb 2026Source
  • DocumentD1 GROUND PODIUM.pdf · uploaded 23 Feb 2026Source
  • DocumentD1 REFUGE TYPICAL.pdf · uploaded 23 Feb 2026Source
  • DocumentD1 TERRACE SECTION.pdf · uploaded 23 Feb 2026Source
  • DocumentLAYOUT.pdf · uploaded 23 Feb 2026Source

Technical (Architect)

  • DocumentFORM 1 METROHIVE D1 JUNE 2024.pdf · uploaded 23 Dec 2024Source
  • Documentform 1 METROHIVE D1 SEPT 2024.pdf · uploaded 23 Dec 2024Source
  • DocumentARCHITECTS CERTIFICATE VALLEY D1.pdf · uploaded 3 Feb 2025Source
  • DocumentFORM 1 METROHIVE MARCH 25.pdf · uploaded 12 Apr 2025Source
  • Documentform 1 march 2025.pdf · uploaded 27 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 69/1/1, 69/1/2

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
1.5BHK, 1BHK, Shop no. 1, Shop no. 2, Shop no. 3, Shop no. 4, Shop no. 5, Shop no. 6, Shop no. 7, Shop no. 8, Shop no. 9177 units in all
Address
69/1, 3a/2, 4, 5, 6, 72/4a, 4c, 4e, 74/1/1, 1/2, 1/3, 74/2/A/2, 2b, 3/2, 4, 5, 75/1b, 2a, 2c, 77/1, 2, 3, 78/1a, 1/, G.b. Cross Road, OvalePIN 400615
Village
Owale, Thane taluka
Land area for this project
6,062 sq m (65,251 sq ft)
Approved layout area
33,849 sq m (3,64,342 sq ft)
Permissible built-up area
10,533 sq m (1,13,373 sq ft)
Sanctioned built-up area
10,533 sq m (1,13,373 sq ft)
Recreational open space
8,718 sq m (93,836 sq ft)
Designated bank account
109
Developed in phases
No

Survey, CTS, gat or plot numbers

69/1/169/1/269/3/A/169/3/A/269/469/5/169/5/269/672/4/B72/4/C72/4/D72/4/E74/1/1B74/1/2A74/1/2B74/1/3A74/1/3B74/2A/174/2A/274/2B74/3/174/3/274/474/575/1/A75/1/B75/2/B75/2/C7677/1/277/1/377/277/378/1/B78/1/D78/1/E78/3/A/178/3/A/278/3/B/178/3/B/278/3/B/378/4/A78/4/B

Land as published on MahaRERA's project page

69/1/1, 69/1/2, 69/3/A/1, 69/3/A/2, 69/4, 69/5/1, 69/5/2, 69/6, 72/4/B, 72/4/C, 72/4/D, 72/4/E, 74/1/1B, 74/1/2B, 74/1/2A, 74/1/3A, 74/1/3B, 74/3/1, 74/3/2, 74/5, 74/2B, 74/2A/1, 74/2A/2, 74/4, 75/1/A, 75/1/B, 75/2/B, 75/2/C, 77/2, 77/3, 77/1/2, 77/1/3, 78/3/B/1, 78/3/B/2, 78/3/B/3, 78/4/A, 78/4/B, 78/3/A/1, 78/3/A/2, 78/1/B, 78/1/D, 78/1/E, 76

Boundaries

North
N 19 16 07
South
N 19 16 07
East
1n 19 16 04
West
1n 19 16 071

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking177 units

157 of 177 units booked (89%), as the promoter reported to MahaRERA

1.5BHK · 43 units1BHK · 125 unitsShop no. 1 · 1 unitShop no. 2 · 1 unitShop no. 3 · 1 unitShop no. 4 · 1 unitShop no. 5 · 1 unitShop no. 6 · 1 unitShop no. 7 · 1 unitShop no. 8 · 1 unitShop no. 9 · 1 unit
TypeCarpet areaUnitsBooked
1.5BHK50.89 sq m · 548 sq ft4332
1BHK33.11 sq m · 356 sq ft8680
1BHK38.25 sq m · 412 sq ft3936
Shop no. 1323.69 sq m · 3,484 sq ft11
Shop no. 227.44 sq m · 295 sq ft11
Shop no. 319.46 sq m · 209 sq ft11
Shop no. 418.65 sq m · 201 sq ft11
Shop no. 536.32 sq m · 391 sq ft11
Show all 12 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
Shop no. 634.88 sq m · 375 sq ft11
Shop no. 722.49 sq m · 242 sq ft11
Shop no. 822.49 sq m · 242 sq ft11
Shop no. 937.78 sq m · 407 sq ft11

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals16

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAbhijeet Jagtap—
ArchitectAjay Ramesh Mane—
ArchitectTen Fold Architects—
Chartered accountantDharmesh Patel—
Chartered accountantVinod Kumar Jain—
EngineerTukaram Hamraskar—
OtherR C Tipnis—
Registered real estate agentAbdul Rahim Rehmatullah Shaikh—
Show all 16 professionalsShow fewer professionals
RoleNameRegistration no.
Registered real estate agentClick 4 Homes Real Estate Services—
Registered real estate agentDuvonto Consulting Private Limited—
Registered real estate agentFarahnaaz Shoaib khan—
Registered real estate agentKan India Realtors Private Limited—
Registered real estate agentLivnest Technologies Private Limited—
Registered real estate agentPropsearch Advisory LLP—
Registered real estate agentRehan Bedre—
Registered real estate agentVictor DSouza—

Source: MahaRERA project page. Contact details are not shown.