Residential / Group Housing · 1 building · 77 unitsRERA P51700050620

Anjani One

Deedo IDDP-THN-DPKP

Completion was pushed back 4 months, to Jul 2027; no MahaRERA orders on record; 34% of its units are booked.

Mirabhayandar (M Corp.), Thane 401105 · by Anjani Kumar Co Pvt Ltd

DeliveryExtended 4 moPromised Mar 2027 · now due Jul 2027RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales34% booked26 of 77 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Jul 2027

  • This projectRegistered 21 Apr 2023, completion promised 31 Mar 2027, revised to 31 Jul 2027.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700050620
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170005062021 Apr 202331 Mar 202731 Jul 2027Anjani Kumar Co Pvt LtdProject page
Documents136

1 document held by Deedo, 135 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPAN.pdf · uploaded 22 Mar 2023Source

Legal

  • Declaration Form BAffidavit Form B.pdf · uploaded 22 Mar 2023Source
  • Other – Legal1.pdf · uploaded 25 Mar 2023Source
  • Other – Legal2.pdf · uploaded 25 Mar 2023Source
  • Other – Legal3.pdf · uploaded 25 Mar 2023Source
  • Other – Legal4.pdf · uploaded 25 Mar 2023Source
  • Other – Legal1.pdf · uploaded 25 Mar 2023Source
Show all 136 documentsShow fewer documents

Legal

  • Other – Legal2.pdf · uploaded 25 Mar 2023Source
  • Other – Legal3.pdf · uploaded 25 Mar 2023Source
  • Other – Legal4.pdf · uploaded 25 Mar 2023Source
  • Other – Legal1.pdf · uploaded 25 Mar 2023Source
  • Other – Legal2.pdf · uploaded 25 Mar 2023Source
  • Other – Legal3.pdf · uploaded 25 Mar 2023Source
  • Other – Legal1.pdf · uploaded 25 Mar 2023Source
  • Other – Legal2.pdf · uploaded 25 Mar 2023Source
  • Other – LegalMOU.pdf · uploaded 31 Mar 2023Source
  • Other – LegalAffidavit Cum Declaration.pdf · uploaded 31 Mar 2023Source
  • Legal Title reportLegal title Report.pdf · uploaded 11 Apr 2023Source

Migrated

  • 1 PAN CardPAN.pdf · uploaded 22 Mar 2023Source
  • 1 a Details of encumbrances concerned to FinanceNo Encumbrances Concerned to Legal.pdf · uploaded 22 Mar 2023Source
  • 2 a Details of encumbrances concerned to FinanceNo Encumbrances Concerned to Finance.pdf · uploaded 22 Mar 2023Source
  • 1 b Details of encumbrances concerned to LegalNo Encumbrances Concerned to Legal.pdf · uploaded 22 Mar 2023Source
  • 2 b Details of encumbrances concerned to LegalNo Encumbrances Concerned to Finance.pdf · uploaded 22 Mar 2023Source
  • 1 Copy of Layout Approval (in case of layout)Layout 1.pdf · uploaded 22 Mar 2023Source
  • 2 Copy of Layout Approval (in case of layout)Layout 2.pdf · uploaded 22 Mar 2023Source
  • 3 Copy of Layout Approval (in case of layout)Layout 3.pdf · uploaded 22 Mar 2023Source
  • 1 Building Plan Approval / NA Order for plotted developmentLayout 4.pdf · uploaded 22 Mar 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 22 Mar 2023Source
  • 1 Declaration about Commencement CertificateDeclaration About Commencemnt Certificate format -D_001.pdf · uploaded 22 Mar 2023Source
  • 1 Declaration in FORM BAffidavit Form B.pdf · uploaded 22 Mar 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 22 Mar 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 22 Mar 2023Source
  • 1 CERSAI detailsCERSAI DECLARATION.pdf · uploaded 22 Mar 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDisclusre of Interest in other RE Amarchand.pdf · uploaded 22 Mar 2023Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsDisclusre of Interest in other RE Gaurav.pdf · uploaded 22 Mar 2023Source
  • 3 Disclosure of Interest in Other Real Estate OrganizationsDisclusre of Interest in other RE Madanlal.pdf · uploaded 22 Mar 2023Source
  • 4 Disclosure of Interest in Other Real Estate OrganizationsDisclusre of Interest in other RE Maheshchandra.pdf · uploaded 22 Mar 2023Source
  • 5 Disclosure of Interest in Other Real Estate OrganizationsDisclusre of Interest in other RE Manish.pdf · uploaded 22 Mar 2023Source
  • 6 Disclosure of Interest in Other Real Estate OrganizationsDisclusre of Interest in Other RE Nandlal.pdf · uploaded 22 Mar 2023Source
  • 7 Disclosure of Interest in Other Real Estate OrganizationsDisclusre of Interest in other RE Pankaj.pdf · uploaded 22 Mar 2023Source
  • 8 Disclosure of Interest in Other Real Estate OrganizationsDisclusre of Interest in other RE Rameshchandra.pdf · uploaded 22 Mar 2023Source
  • 9 Disclosure of Interest in Other Real Estate OrganizationsDisclusre of Interest in other RE Ramutar.pdf · uploaded 22 Mar 2023Source
  • 10 Disclosure of Interest in Other Real Estate OrganizationsDisclusre of Interest in other RE Rohit.pdf · uploaded 22 Mar 2023Source
  • 11 Disclosure of Interest in Other Real Estate OrganizationsDisclusre of Interest in other RE Sharad.pdf · uploaded 22 Mar 2023Source
  • 1 Proforma of Allotment letterProforma of Allotment Letter.pdf · uploaded 22 Mar 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration about Seprate bank AC.pdf · uploaded 22 Mar 2023Source
  • 1 Deviation Report with respect to Allotment letterNo Deviation in Allotment letter.pdf · uploaded 22 Mar 2023Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation Report Agreement for Sale.pdf · uploaded 25 Mar 2023Source
  • 1 Other – Legal1.pdf · uploaded 25 Mar 2023Source
  • 2 Other – Legal2.pdf · uploaded 25 Mar 2023Source
  • 3 Other – Legal3.pdf · uploaded 25 Mar 2023Source
  • 4 Other – Legal4.pdf · uploaded 25 Mar 2023Source
  • 5 Other – Legal1.pdf · uploaded 25 Mar 2023Source
  • 6 Other – Legal2.pdf · uploaded 25 Mar 2023Source
  • 7 Other – Legal3.pdf · uploaded 25 Mar 2023Source
  • 8 Other – Legal4.pdf · uploaded 25 Mar 2023Source
  • 9 Other – Legal1.pdf · uploaded 25 Mar 2023Source
  • 10 Other – Legal2.pdf · uploaded 25 Mar 2023Source
  • 11 Other – Legal3.pdf · uploaded 25 Mar 2023Source
  • 12 Other – Legal1.pdf · uploaded 25 Mar 2023Source
  • 13 Other – Legal2.pdf · uploaded 25 Mar 2023Source
  • 2 CERSAI detailsCERSAI REPORT.pdf · uploaded 30 Mar 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate.pdf · uploaded 30 Mar 2023Source
  • 14 Other – LegalMOU.pdf · uploaded 31 Mar 2023Source
  • 15 Other – LegalAffidavit Cum Declaration.pdf · uploaded 31 Mar 2023Source
  • 1 Copy of the legal title reportLegal title Report.pdf · uploaded 11 Apr 2023Source
  • 2 Commencement Certificates / NA Order for plotted developmentResponse to query raised.pdf · uploaded 11 Apr 2023Source
  • 1 Proforma of Agreement for saleFINAL DRAFT AGREEMENT FOR SALE.pdf · uploaded 17 Apr 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 anjani one_compressed (1).pdf · uploaded 21 Jul 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 21 Jul 2023Source
  • 1 Disclosure of sold/ booked inventoryDisclosure sold-Booked Inventory (Building wise) Anjani One.pdf · uploaded 21 Jul 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 21 Jul 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 18 Oct 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 18 Oct 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 18 Oct 2023Source
  • 2 Disclosure of sold/ booked inventoryDiscloure of Inventoery Anjani One.pdf · uploaded 18 Oct 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 20 Oct 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form -1 anjani one.pdf · uploaded 19 Jan 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Pro- tech Consultants - Engineer Certificate.pdf · uploaded 19 Jan 2024Source
  • 3 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD Inventory - Anjani One.pdf · uploaded 19 Jan 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 19 Jan 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 19 Apr 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 19 Apr 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A.pdf · uploaded 19 Apr 2024Source
  • 4 Disclosure of sold/ booked inventoryDisclosure of Sold Booked Inventory.pdf · uploaded 19 Apr 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3.pdf · uploaded 20 Apr 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Annexure A Compressed.pdf · uploaded 19 Jul 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Pro - tech EC Anjani one_compressed.pdf · uploaded 19 Jul 2024Source
  • 5 Disclosure of sold/ booked inventoryInventoery Anjani one_compressed.pdf · uploaded 19 Jul 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 compressed.pdf · uploaded 20 Jul 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1-Ajani one .pdf · uploaded 19 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 19 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 19 Oct 2024Source
  • 2 Disclosure of sold/ booked inventorySold - booked Inventory Anjani one.pdf · uploaded 19 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Anjani One Rera Form 5.pdf · uploaded 24 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 20 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 20 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 20 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryInventory.pdf · uploaded 20 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 19 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 19 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 19 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD INVENTORY.pdf · uploaded 19 Apr 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A.pdf · uploaded 19 Apr 2025Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A.pdf · uploaded 19 Apr 2025Source
  • Withdrawal Update Form 1Anjani One Form 1 30062025.pdf · uploaded 30 Jan 2026Source
  • Withdrawal Update Form 2Anjani One Form 2 30062025.pdf · uploaded 30 Jan 2026Source
  • Withdrawal Update Form 3Anjani One Form 3 30062025 - converted.pdf · uploaded 30 Jan 2026Source
  • Withdrawal Update Form 1Anjani One Form 1 30092025.pdf · uploaded 31 Jan 2026Source
  • Withdrawal Update Form 2Anjani One Form 2 30092025.pdf · uploaded 31 Jan 2026Source
  • Withdrawal Update Form 3Anjani One Form 3 30092025.pdf · uploaded 31 Jan 2026Source
  • Form 5 (FY 2024-2025)FORM 5 RERA AKCPL FY 2024-25 NEW.pdf · uploaded 4 Feb 2026Source
  • Withdrawal Update Form 1Anjani One Form 1.pdf · uploaded 16 Feb 2026Source
  • Withdrawal Update Form 2Anjani One Form 2.pdf · uploaded 16 Feb 2026Source
  • Withdrawal Update Form 3Anjani One Form 3.pdf · uploaded 16 Feb 2026Source
  • Withdrawal Update Form 1Form 1 Anjani One March 26.pdf · uploaded 1 Aug 2026Source
  • Withdrawal Update Form 2Form - 2 Anjani One March 2026.pdf · uploaded 1 Aug 2026Source
  • Withdrawal Update Form 3Anjani One Form 3 March 2026.pdf · uploaded 1 Aug 2026Source
  • Withdrawal Update Form 1Form 1 Anjani One Jun 26.pdf · uploaded 3 Aug 2026Source
  • Withdrawal Update Form 2Form - 2 Anjani One June 2026.pdf · uploaded 3 Aug 2026Source
  • Withdrawal Update Form 3Form 3 June 2026.pdf · uploaded 3 Aug 2026Source
  • Form 2A (FY 2025-2026)Form 2A Anjani One.pdf · uploaded 6 Aug 2026Source
  • Form 5 (FY 2025-2026)FORM 5 RERA AKCPL FY 2025-26.pdf · uploaded 30 Sep 2026Source

Technical

  • DocumentLayout 1.pdf · uploaded 22 Mar 2023Source
  • DocumentLayout 2.pdf · uploaded 22 Mar 2023Source
  • DocumentLayout 3.pdf · uploaded 22 Mar 2023Source
  • DocumentLayout 4.pdf · uploaded 22 Mar 2023Source

Technical (Architect)

  • DocumentForm 1-Ajani one .pdf · uploaded 19 Oct 2024Source
  • DocumentForm 1.pdf · uploaded 20 Jan 2025Source
  • DocumentFORM 1.pdf · uploaded 19 Apr 2025Source
  • DocumentForm 1 Anjani One Jun 26.pdf · uploaded 3 Aug 2026Source

Technical (Engineer)

  • DocumentForm 2.pdf · uploaded 19 Oct 2024Source
  • DocumentForm 2.pdf · uploaded 20 Jan 2025Source
  • DocumentFORM 2.pdf · uploaded 19 Apr 2025Source
  • DocumentForm - 2 Anjani One June 2026.pdf · uploaded 3 Aug 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 10, 11

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 2BHK77 units in all
Address
Old Survey No. 236, New Survey No. 30, Hissa No. 7, 10 And 11, Old Survey No. 237, New Survey No. 186, Hissa No. 3, Old Survey No. 241, New Survey No. 34, Hissa No. 6 And 10, Indralok Phase - 4, Navghar Village, Bhayandar EastPIN 401105
Village
Mira-Bhayandar (M Corp.), Thane taluka
Land area for this project
2,845 sq m (30,623 sq ft)
Permissible built-up area
5,371 sq m (57,811 sq ft)
Sanctioned built-up area
5,321 sq m (57,273 sq ft)
Designated bank account
82
Developed in phases
No

Survey, CTS, gat or plot numbers

1011HISSA NO. 3HISSA NO. 6HISSA NO. 7NEW SURVEY NO. 186NEW SURVEY NO. 30NEW SURVEY NO. 34OLD SURVEY NO. 236OLD SURVEY NO. 237OLD SURVEY NO. 241

Land as published on MahaRERA's project page

OLD SURVEY NO. 236, NEW SURVEY NO. 30, HISSA NO. 7, 10 AND 11, OLD SURVEY NO. 237, NEW SURVEY NO. 186, HISSA NO. 3, OLD SURVEY NO. 241, NEW SURVEY NO. 34, HISSA NO. 6 AND 10

Boundaries

North
Old Sn 242 New Sn 33 Hn 7 Old Sn 241 New Sn 34 Hn4
South
Old Sn 236 New Sn 30 Hn4 Old Sn 237 New Sn186 Hn4
East
Old Sn 241 New Sn 34 Hn 7 8 10pt New Sn 18 Hn 8
West
D P Road

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking77 units

26 of 77 units booked (34%), as the promoter reported to MahaRERA

1BHK · 61 units2BHK · 16 units
TypeCarpet areaUnitsBooked
1BHK40.66 sq m · 438 sq ft6112
2BHK56.32 sq m · 606 sq ft1614

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals11

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectArchitect Rushikesh H—
Chartered accountantJugal Joshi—
Chartered accountantShivratan Agarwal—
Chartered accountantVaibhav Patil & Co—
EngineerProtech Consultants—
EngineerSandeep Sakpal—
OtherGaurav Constructions—
Registered real estate agentDelta Yards Realty Private Limited—
Show all 11 professionalsShow fewer professionals
RoleNameRegistration no.
Registered real estate agentKamlesh Kumar Bhnshraj Singh—
Registered real estate agentMitnarayan Punnilal Yadav—
Registered real estate agentRamesh Rammilan Pandey—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Mirabhayandar (M Corp.)

All 225 projects in Mirabhayandar (M Corp.) · Compare Anjani One with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology