Deedo IDDP-THN-0NNRCompletion was pushed back 4 months, to Jun 2030; no MahaRERA orders on record; 0% of its units are booked.
Hedutane, Thane 421203 · by Lodha Developers Limited · 93% of its projects kept the RERA date
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Jun 2030
- P51700046352Registered 22 Jun 2022, completion promised 31 Oct 2026, revised to 28 Feb 2027.
- P51700078112Registered 25 Nov 2024, completion promised 28 Feb 2030, revised to 28 Jun 2030.
1 extension certificate on record.
2 registrations · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
3 buildings
Open a building to see every flat, floor by floor.
- Sector O, Cluster 15 Point 04 Wing I24 floors · 161 units0% booked
- Wing G24 floors · 159 units0% booked
- Wing H24 floors · 161 units0% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrations2
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700046352 | 22 Jun 2022 | 31 Oct 2026 | 28 Feb 2027 | Lodha Developers Limited | Project page |
| P51700078112 | 25 Nov 2024 | 28 Feb 2030 | 28 Jun 2030 | Lodha Developers Limited | Project page |
Documents204
3 documents held by Deedo, 201 filings listed on MahaRERA's project page
Registration certificate (2)
Finance
- PAN CardP51700046352 · Macrotech Developers Ltd PAN CARD.pdf · uploaded 18 Jun 2022Source
- PAN CardP51700078112 · 1 PAN Card (1).pdf · uploaded 5 Nov 2024Source
- Other – FinanceP51700078112 · Devki MDL Authority for RERA Registration.pdf · uploaded 21 Nov 2024Source
- Other – FinanceP51700078112 · Devki MDL Authority for RERA Registration.pdf · uploaded 21 Nov 2024Source
Legal
- Legal Title reportP51700046352 · Premier Title Report-Fiora F.pdf · uploaded 18 Jun 2022Source
Show all 204 documentsShow fewer documents
Legal
- Declaration Form BP51700046352 · Form B Revised.pdf · uploaded 18 Jun 2022Source
- Legal Title reportP51700078112 · Legal Title Report - Fiora I.pdf · uploaded 5 Nov 2024Source
- Declaration Form BP51700078112 · Form B - Fiora I.pdf · uploaded 7 Nov 2024Source
- Other – LegalP51700078112 · COI_MDL.PDF · uploaded 8 Nov 2024Source
- Other – LegalP51700078112 · 17 Palava 4 with LDPL merger and Palava into Eisa demerger.pdf · uploaded 8 Nov 2024Source
- Other – LegalP51700078112 · हेदुटणे_24_1_ब_Satbara.pdf · uploaded 8 Nov 2024Source
- Other – LegalP51700078112 · हेदुटणे_24_1_अ_Satbara.pdf · uploaded 8 Nov 2024Source
Migrated
- 1 PAN CardP51700046352 · Macrotech Developers Ltd PAN CARD.pdf · uploaded 18 Jun 2022Source
- 1 Copy of the legal title reportP51700046352 · Premier Title Report-Fiora F.pdf · uploaded 18 Jun 2022Source
- 1 Details of encumbrancesP51700046352 · Encum.pdf · uploaded 18 Jun 2022Source
- 1 Copy of Layout Approval (in case of layout)P51700046352 · 1 Copy of Layout Approval (in case of layout) (2).pdf · uploaded 18 Jun 2022Source
- 2 Copy of Layout Approval (in case of layout)P51700046352 · 2 Copy of Layout Approval (in case of layout) (1).pdf · uploaded 18 Jun 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentP51700046352 · Building Plan.pdf · uploaded 18 Jun 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentP51700046352 · 1 Commencement Certificates _ NA Order for plotted development (6).pdf · uploaded 18 Jun 2022Source
- 1 Declaration about Commencement CertificateP51700046352 · CC Dec.pdf · uploaded 18 Jun 2022Source
- 1 Declaration in FORM BP51700046352 · Form B Revised.pdf · uploaded 18 Jun 2022Source
- 1 CERSAI detailsP51700046352 · CC Dec.pdf · uploaded 18 Jun 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700046352 · Form 3_compressed.pdf · uploaded 18 Jun 2022Source
- 1 Proforma of Allotment letterP51700046352 · Sale Agreement and Allotment Letter.pdf · uploaded 18 Jun 2022Source
- 2 Details of encumbrancesP51700046352 · Fiora G , H.pdf · uploaded 30 Jul 2022Source
- 2 CERSAI detailsP51700046352 · CERSAI-Immovable 1.pdf · uploaded 30 Jul 2022Source
- 3 CERSAI detailsP51700046352 · CERSAI-Immovable 2.pdf · uploaded 30 Jul 2022Source
- 4 CERSAI detailsP51700046352 · CERSAI-Immovable 3.pdf · uploaded 30 Jul 2022Source
- 5 CERSAI detailsP51700046352 · CERSAI-Immovable 4.pdf · uploaded 30 Jul 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP51700046352 · Fiora G H.pdf · uploaded 7 Nov 2022Source
- 1 Disclosure of sold/ booked inventoryP51700046352 · Sold-Unsold_Fiora G , H.pdf · uploaded 26 May 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P51700046352 · Fiora G H.pdf · uploaded 16 Oct 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700046352 · Fiora G H - Form1 - Sep23.pdf · uploaded 21 Nov 2023Source
- 2 Disclosure of sold/ booked inventoryP51700046352 · Fiora G and H-P51700046352.pdf · uploaded 1 Dec 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700046352 · Form1 - Fiora G H - P51700046352 - Dec23.pdf · uploaded 26 Feb 2024Source
- 3 Disclosure of sold/ booked inventoryP51700046352 · Sold Unsold - Fiora G H - P51700046352 - Dec23.pdf · uploaded 27 Feb 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700046352 · Form 1 - Fiora G H - P51700046352 - March 24.pdf · uploaded 7 May 2024Source
- 4 Disclosure of sold/ booked inventoryP51700046352 · Sold Unsold - Fiora G H - P51700046352 - March 24.pdf · uploaded 28 May 2024Source
- 5 Disclosure of sold/ booked inventoryP51700046352 · Fiora G H - P51700046352 - June24.pdf · uploaded 7 Aug 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700046352 · Fiora G H - P51700046352 - June24.pdf · uploaded 10 Aug 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P51700046352 · Form 2A - Fiora G H - P51700046352.pdf · uploaded 17 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P51700046352 · P51700046352 - Fiora G H.pdf · uploaded 19 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700046352 · Fiora G and H.pdf · uploaded 4 Nov 2024Source
- 1 PAN CardP51700078112 · 1 PAN Card (1).pdf · uploaded 5 Nov 2024Source
- 1 Copy of the legal title reportP51700078112 · Legal Title Report - Fiora I.pdf · uploaded 5 Nov 2024Source
- 1 a Details of encumbrances concerned to FinanceP51700078112 · Finance Encum.pdf · uploaded 7 Nov 2024Source
- 2 a Details of encumbrances concerned to FinanceP51700078112 · Legal Encum.pdf · uploaded 7 Nov 2024Source
- 1 Copy of Layout Approval (in case of layout)P51700078112 · Fiora Wing I - converted.pdf · uploaded 7 Nov 2024Source
- 1 Proforma of Allotment letterP51700078112 · Final - Allotment Letter.pdf · uploaded 7 Nov 2024Source
- 1 Declaration in FORM BP51700078112 · Form B - Fiora I.pdf · uploaded 7 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700078112 · Form 1 Fiora I- New Reg.pdf · uploaded 7 Nov 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentP51700078112 · 1 Commencement Certificates _ NA Order for plotted development (1).pdf · uploaded 7 Nov 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentP51700078112 · 20240315 - Palava 2 - CC - Sheet N19 (1).pdf · uploaded 7 Nov 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentP51700078112 · 20240315 - Palava 2 - CC - Sheet N24.pdf · uploaded 7 Nov 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentP51700078112 · 20240315 - Palava 2 - CC - Sheet N25.pdf · uploaded 7 Nov 2024Source
- 1 Declaration about Commencement CertificateP51700078112 · 1470_001_removed.pdf · uploaded 7 Nov 2024Source
- 1 CERSAI detailsP51700078112 · Cersai Declara.pdf · uploaded 7 Nov 2024Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)P51700078112 · Format A.pdf · uploaded 7 Nov 2024Source
- 1 Deviation Report with respect to Allotment letterP51700078112 · Allottment Devation Fiora I Final.pdf · uploaded 7 Nov 2024Source
- 1 b Details of encumbrances concerned to LegalP51700078112 · Finance Encum.pdf · uploaded 7 Nov 2024Source
- 2 b Details of encumbrances concerned to LegalP51700078112 · Legal Encum.pdf · uploaded 7 Nov 2024Source
- 1 Other – TechnicalP51700078112 · Order 50.pdf · uploaded 7 Nov 2024Source
- 1 Deviation Report with respect to model copy of AgreementP51700078112 · ATS Devaiton - Final Fiora I.pdf · uploaded 7 Nov 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP51700078112 · 1 Disclosure of Interest in Other Real Estate Organizations.pdf · uploaded 7 Nov 2024Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)P51700078112 · Format B - Signed.pdf · uploaded 7 Nov 2024Source
- 1 Disclosure for secured/unsecured finance availed for the projectP51700078112 · Secure Unsecure.pdf · uploaded 7 Nov 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700078112 · Form 2 Fiora I.pdf · uploaded 8 Nov 2024Source
- 2 Other – LegalP51700078112 · हेदुटणे_24_1_ब_Satbara.pdf · uploaded 8 Nov 2024Source
- 1 Other – LegalP51700078112 · हेदुटणे_24_1_अ_Satbara.pdf · uploaded 8 Nov 2024Source
- 3 Other – LegalP51700078112 · 17 Palava 4 with LDPL merger and Palava into Eisa demerger.pdf · uploaded 8 Nov 2024Source
- 4 Other – LegalP51700078112 · COI_MDL.PDF · uploaded 8 Nov 2024Source
- 2 CERSAI detailsP51700078112 · CERSAI_Search_Report_200326922162_For_Asset_Based_Search_08_11_2024_11_55_28_286.pdf · uploaded 8 Nov 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700078112 · fORM 3 Fiora.pdf · uploaded 21 Nov 2024Source
- 1 Other – FinanceP51700078112 · Devki MDL Authority for RERA Registration.pdf · uploaded 21 Nov 2024Source
- 1 Proforma of Agreement for saleP51700078112 · AFS - Fiora I.pdf · uploaded 21 Nov 2024Source
- 1 Proforma of Agreement for saleP51700078112 · AFS - Fiora I.pdf · uploaded 21 Nov 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700078112 · fORM 3 Fiora.pdf · uploaded 21 Nov 2024Source
- 1 Other – FinanceP51700078112 · Devki MDL Authority for RERA Registration.pdf · uploaded 21 Nov 2024Source
- 2 Disclosure of sold/ booked inventoryP51700046352 · Fiora G And H .pdf · uploaded 21 Nov 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700046352 · Form 2 3 - Dec 23.pdf · uploaded 22 Nov 2024Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700046352 · Form 3 - Sep24.pdf · uploaded 22 Nov 2024Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700046352 · Form 2 3 - June 24.pdf · uploaded 22 Nov 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700046352 · Form 2 3 - March 24.pdf · uploaded 22 Nov 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700046352 · Form 2 3 - Sep-23.pdf · uploaded 22 Nov 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700046352 · Form 1 2 3 - June 23.pdf · uploaded 22 Nov 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700046352 · Form 1 2 3 - march 23.pdf · uploaded 22 Nov 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700046352 · Form 1 2 3 - Dec 22.pdf · uploaded 22 Nov 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700046352 · Form 1 2 3 - Sep 22.pdf · uploaded 22 Nov 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700046352 · Form 1 2 3 - June22.pdf · uploaded 22 Nov 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700046352 · Form 1 2 3 - June22.pdf · uploaded 22 Nov 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700046352 · Form 2 - Sep24.pdf · uploaded 22 Nov 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700046352 · Form 2 3 - June 24.pdf · uploaded 22 Nov 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700046352 · Form 2 3 - March 24.pdf · uploaded 22 Nov 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700046352 · Form 2 3 - Dec 23.pdf · uploaded 22 Nov 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700046352 · Form 2 3 - Sep-23.pdf · uploaded 22 Nov 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700046352 · Form 1 2 3 - June 23.pdf · uploaded 22 Nov 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700046352 · Form 1 2 3 - march 23.pdf · uploaded 22 Nov 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700046352 · Form 1 2 3 - Dec 22.pdf · uploaded 22 Nov 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700046352 · Form 1 2 3 - Sep 22.pdf · uploaded 22 Nov 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P51700046352 · Form 2A.pdf · uploaded 22 Nov 2024Source
- 1 Disclosure of sold/ booked inventoryP51700078112 · Sold-Unsold_Fiora I Dec 2024.pdf · uploaded 23 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP51700046352 · Sold-Unsold_Fiora G and H Dec 2024.pdf · uploaded 23 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700078112 · Fiora I.pdf · uploaded 24 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700078112 · Fiora I - Form 2 and 3 - Dec 24.pdf · uploaded 24 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700078112 · Fiora I - Form 2 and 3 - Dec 24.pdf · uploaded 24 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700046352 · Fiora G and H.pdf · uploaded 24 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700046352 · Fiora G and H - Form 2 and 3 - Dec 24.pdf · uploaded 24 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700046352 · Fiora G and H - Form 2 and 3 - Dec 24.pdf · uploaded 24 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700046352 · Fiora G and H.pdf · uploaded 2 May 2025Source
- Form 1P51700046352 · Form1-Fiora G and H -March 25.pdf · uploaded 6 Jun 2025Source
- Form 2P51700046352 · Signed Form 2 Fiora G and H March 2025.pdf · uploaded 6 Jun 2025Source
- Form 3P51700046352 · Signed Form 3 Fiora G and H March 2025.pdf · uploaded 6 Jun 2025Source
- Disclosure of Sold and Booked InventoryP51700046352 · Signed Sold-Unsold_Fiora G and H March 2025.pdf · uploaded 6 Jun 2025Source
- Self-declaration of Quarterly ProgressP51700046352 · Declaration.pdf · uploaded 6 Jun 2025Source
- Form 1P51700078112 · Declaration -Form 1 (Fiora I ).pdf · uploaded 10 Jun 2025Source
- Form 2P51700078112 · Signed Fiora I - Form 2 - March 2025.pdf · uploaded 10 Jun 2025Source
- Form 3P51700078112 · Signed Fiora I - Form 3 - March 2025.pdf · uploaded 10 Jun 2025Source
- Disclosure of Sold and Booked InventoryP51700078112 · Signed Sold-Unsold_Fiora I March 2025.pdf · uploaded 10 Jun 2025Source
- Self-declaration of Quarterly ProgressP51700078112 · Declaration.pdf · uploaded 10 Jun 2025Source
- Form 1P51700078112 · Fiora I - Form1- P51700078112- June-25-ok.pdf · uploaded 18 Jul 2025Source
- Form 2P51700078112 · Fiora I Form 2 June 2025.pdf · uploaded 18 Jul 2025Source
- Form 3P51700078112 · Fiora I Form 3 June 2025.pdf · uploaded 18 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700078112 · Fiora I Sold Unsold June 2025.pdf · uploaded 18 Jul 2025Source
- Form 1P51700046352 · Premier -Fiora G H - Form1 - June 25 - P51700046352-ok.pdf · uploaded 18 Jul 2025Source
- Form 2P51700046352 · Fiora G and H Form 2 June 2025.pdf · uploaded 18 Jul 2025Source
- Form 3P51700046352 · Fiora G and H Form 3 June 2025.pdf · uploaded 18 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700046352 · Fiora G and H Sold Unsold June 2025.pdf · uploaded 18 Jul 2025Source
- Self-declaration of Quarterly ProgressP51700046352 · Updated CC.pdf · uploaded 18 Jul 2025Source
- OthersP51700046352 · Layout - Fiora - Cluster 15 04 Wing G H.pdf · uploaded 18 Jul 2025Source
- Form 2A (FY 2024-2025)P51700078112 · Fiora I - P51700078112 - Form 2A.pdf · uploaded 25 Jul 2025Source
- Form 2A (FY 2024-2025)P51700046352 · Fiora G - H - P51700046352 - Form 2A.pdf · uploaded 25 Jul 2025Source
- Form 5 (FY 2024-2025)P51700078112 · Fiora I.pdf · uploaded 13 Oct 2025Source
- Form 5 (FY 2024-2025)P51700046352 · Form 5 - P51700046352 - Fiora G & H.pdf · uploaded 15 Oct 2025Source
- Withdrawal Update Form 1P51700078112 · Fiora I.pdf · uploaded 1 Nov 2025Source
- Withdrawal Update Form 2P51700078112 · Form 02 - Fiora I - Sep 25 signed.pdf · uploaded 1 Nov 2025Source
- Withdrawal Update Form 3P51700078112 · Form 03 - Fiora I - Sep 25 signed.pdf · uploaded 1 Nov 2025Source
- Withdrawal Update Form 1P51700046352 · Fiora G u0026 H.pdf · uploaded 1 Nov 2025Source
- Withdrawal Update Form 2P51700046352 · Form 02 - Fiora GH - Sep 25 signed.pdf · uploaded 1 Nov 2025Source
- Withdrawal Update Form 3P51700046352 · Form 03 - Fiora GH - Sep 25 signed.pdf · uploaded 1 Nov 2025Source
- Withdrawal Update Form 1P51700046352 · Form-1 Fiora G and H- Dec-25.pdf · uploaded 27 Jan 2026Source
- Withdrawal Update Form 2P51700046352 · Fiora GH Form 02 Signed Dec 25.pdf · uploaded 27 Jan 2026Source
- Withdrawal Update Form 3P51700046352 · Form 03 - Fiora GH - Sep 25 signed.pdf · uploaded 27 Jan 2026Source
- Withdrawal Update Form 1P51700078112 · Form-1 Fiora I.pdf · uploaded 20 Feb 2026Source
- Withdrawal Update Form 2P51700078112 · Form 02 - Fiora I - Sep 25 signed.pdf · uploaded 20 Feb 2026Source
- Withdrawal Update Form 3P51700078112 · Form 3 fIora I Final.pdf · uploaded 20 Feb 2026Source
- Withdrawal Update Form 1P51700078112 · Form1 - Fiora I - P51700078112.pdf · uploaded 16 Apr 2026Source
- Withdrawal Update Form 2P51700078112 · Fiora I Mar 2026 - Form 02 Signed.pdf · uploaded 16 Apr 2026Source
- Withdrawal Update Form 3P51700078112 · Form 3 fIora I Final.pdf · uploaded 16 Apr 2026Source
- Withdrawal Update Form 1P51700078112 · Form1 - Fiora I - P51700078112.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2P51700078112 · Fiora I Mar 2026 - Form 02 Signed.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3P51700078112 · Fiora I Mar 2026 - Form 03 Signed.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 1P51700046352 · Form1- Fiora G H - P51700046352.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2P51700046352 · Fiora GH Mar 2026 - Form 02 Signed.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3P51700046352 · Fiora GH Mar 2026 - Form 03 Signed.pdf · uploaded 20 Apr 2026Source
- Form 2A (FY 2025-2026)P51700078112 · Form 2A - Fiora I - P51700078112.pdf · uploaded 23 Jun 2026Source
- Form 2A (FY 2025-2026)P51700046352 · Form 2A - Fiora G and H - P51700046352.pdf · uploaded 23 Jun 2026Source
- Withdrawal Update Form 1P51700078112 · Form1 - Fiora I - P51700078112.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 2P51700078112 · Form2 - Fiora I - P51700078112.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 3P51700078112 · Form3 - Fiora I - P51700078112.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 1P51700046352 · Form1 - Fiora G H - P51700046352.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 2P51700046352 · form 2 fiora gh Signed.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 3P51700046352 · form 3 fiora gh Signed.pdf · uploaded 20 Jul 2026Source
- Form 5 (FY 2025-2026)P51700046352 · Fiora G and H.pdf · uploaded 28 Sep 2026Source
- Form 5 (FY 2025-2026)P51700078112 · Fiora I.pdf · uploaded 29 Sep 2026Source
Technical
- DocumentP51700046352 · 1 Copy of Layout Approval (in case of layout) (2).pdf · uploaded 18 Jun 2022Source
- DocumentP51700046352 · 2 Copy of Layout Approval (in case of layout) (1).pdf · uploaded 18 Jun 2022Source
- DocumentP51700046352 · Building Plan.pdf · uploaded 18 Jun 2022Source
- DocumentP51700078112 · Fiora Wing I - converted.pdf · uploaded 7 Nov 2024Source
- DocumentP51700078112 · 20240315 - Palava 2 - CC - Sheet N25.pdf · uploaded 7 Nov 2024Source
- DocumentP51700078112 · 20240315 - Palava 2 - CC - Sheet N24.pdf · uploaded 7 Nov 2024Source
- DocumentP51700078112 · 20240315 - Palava 2 - CC - Sheet N19 (1).pdf · uploaded 7 Nov 2024Source
- Other – TechnicalP51700078112 · Order 50.pdf · uploaded 7 Nov 2024Source
- DocumentP51700078112 · Fiora - Cluster 15 04 Wing I - converted (1).pdf · uploaded 23 Nov 2025Source
- DocumentP51700078112 · Fiora - Cluster 15 04 Wing I - converted (1).pdf · uploaded 23 Nov 2025Source
- DocumentP51700046352 · Fiora - Cluster 15 04 Wing G,H - converted (1).pdf · uploaded 23 Nov 2025Source
- DocumentP51700078112 · Fiora - Cluster 15 04 Wing I - converted (1).pdf · uploaded 25 Nov 2025Source
- DocumentP51700046352 · Fiora - Cluster 15 04 Wing G H - converted (1).pdf · uploaded 25 Nov 2025Source
- DocumentP51700078112 · Layout Plan Wing I.pdf · uploaded 28 May 2026Source
- DocumentP51700078112 · 20260217 - Sheet 36.pdf · uploaded 28 May 2026Source
- DocumentP51700078112 · 20260217 - Sheet 37.pdf · uploaded 28 May 2026Source
- DocumentP51700078112 · 20260217 - Sheet 38.pdf · uploaded 28 May 2026Source
- DocumentP51700078112 · 20260217 - Sheet 39.pdf · uploaded 28 May 2026Source
Technical (Architect)
- DocumentP51700046352 · Fiora G and H.pdf · uploaded 4 Nov 2024Source
- DocumentP51700078112 · Fiora I.pdf · uploaded 24 Jan 2025Source
- DocumentP51700046352 · Fiora G and H.pdf · uploaded 24 Jan 2025Source
- DocumentP51700046352 · Fiora G and H.pdf · uploaded 2 May 2025Source
- DocumentP51700078112 · Form1 - Fiora I - P51700078112.pdf · uploaded 20 Jul 2026Source
- DocumentP51700046352 · Form1 - Fiora G H - P51700046352.pdf · uploaded 20 Jul 2026Source
Technical (Engineer)
- DocumentP51700046352 · Form 1 2 3 - June22.pdf · uploaded 22 Nov 2024Source
- DocumentP51700046352 · Form 1 2 3 - Sep 22.pdf · uploaded 22 Nov 2024Source
- DocumentP51700046352 · Form 1 2 3 - Dec 22.pdf · uploaded 22 Nov 2024Source
- DocumentP51700046352 · Form 1 2 3 - march 23.pdf · uploaded 22 Nov 2024Source
- DocumentP51700046352 · Form 1 2 3 - June 23.pdf · uploaded 22 Nov 2024Source
- DocumentP51700046352 · Form 2 3 - Sep-23.pdf · uploaded 22 Nov 2024Source
- DocumentP51700046352 · Form 2 3 - Dec 23.pdf · uploaded 22 Nov 2024Source
- DocumentP51700046352 · Form 2 3 - March 24.pdf · uploaded 22 Nov 2024Source
- DocumentP51700046352 · Form 2 3 - June 24.pdf · uploaded 22 Nov 2024Source
- DocumentP51700046352 · Form 2 - Sep24.pdf · uploaded 22 Nov 2024Source
- DocumentP51700078112 · Fiora I - Form 2 and 3 - Dec 24.pdf · uploaded 24 Jan 2025Source
- DocumentP51700078112 · Form2 - Fiora I - P51700078112.pdf · uploaded 20 Jul 2026Source
- DocumentP51700046352 · form 2 fiora gh Signed.pdf · uploaded 20 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 212/2 (PT), 24/1A(pt)
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Phases
- 2
- Unit types
- 1BHK, 3BHK, —481 units in all
- Address
- 24/1B (PT), 212/2 (PT), Hedutane, HedutanePIN 421203
- Village
- Hedutane, Kalyan taluka
- Location
- 19.18005, 73.09635
- Land area for this project
- 2,474 sq m (26,626 sq ft)
- Permissible built-up area
- 21,858 sq m (2,35,277 sq ft)
- Sanctioned built-up area
- 19,871 sq m (2,13,890 sq ft)
- Recreational open space
- 1,382 sq m (14,871 sq ft)
- Designated bank account
- 229
- Developed in phases
- Yes
- Also registered as
- Fiora G and H, Fiora I
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
24/1B (PT) ,212/2 (PT)
Boundaries
- North
- 212 By 1 Pt
- South
- 260 By 1 A And B Part
- East
- 212 By 2
- West
- 24 1a
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking481 units
0 of 481 units booked (0%), as the promoter reported to MahaRERA
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P51700078112 | Sector O, Cluster 15 Point 04 Wing I | 1BHK | 39.07 sq m · 421 sq ft | 39 | 0 |
| P51700078112 | Sector O, Cluster 15 Point 04 Wing I | 1BHK | 39.38 sq m · 424 sq ft | 117 | 0 |
| P51700078112 | Sector O, Cluster 15 Point 04 Wing I | 1BHK | 39.72 sq m · 428 sq ft | 2 | 0 |
| P51700078112 | Sector O, Cluster 15 Point 04 Wing I | 3BHK | 73.82 sq m · 795 sq ft | 3 | 0 |
| P51700046352 | Wing G | — | — | 159 | — |
| P51700046352 | Wing H | — | — | 161 | — |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals9
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Architect | Pradeep Kamble | — | P51700046352 |
| Architect | Pradeep Kamble | — | P51700078112 |
| Architect | Vilas Desai & Associates | — | P51700046352 |
| Chartered accountant | Chirag Sarvaiya & Co | — | P51700078112 |
| Chartered accountant | Chirag Sarvaiya & Co | — | P51700046352 |
| Engineer | Dadaso Gavali | — | P51700078112 |
| Engineer | Dadaso Gavali | — | P51700046352 |
| Engineer | Mehul Shah | — | P51700046352 |
| Engineer | Mehul Shah | — | P51700078112 |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Hedutane
- BelvedereRERA P51700078177
- Belvedere IRERA P51700077599
- Belvedere-B and CRERA P51700052950
- FioraRERA P51700052406
- BelvedereRERA P51700052237
- Casa BelvedereRERA P51700046311
- Fiora FRERA P51700046315
- FioraRERA P51700033965
All 11 projects in Hedutane · Compare Fiora with another project