Completion was pushed back 4 months, to Jun 2028; no MahaRERA orders on record; 92% of its units are booked.

Hedutane, Thane 421203 · by Lodha Developers Limited · 93% of its projects kept the RERA date

DeliveryExtended 4 moPromised Feb 2028 · now due Jun 2028RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales92% booked216 of 235 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Jun 2028

  • P51700052237Registered 2 Aug 2023, completion promised 29 Feb 2028, revised to 29 Jun 2028.
  • P51700052333Registered 14 Aug 2023, completion promised 31 May 2027.

No extension certificate on record.

2 registrations · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

2 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrations2
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P517000522372 Aug 202329 Feb 202829 Jun 2028Lodha Developers LimitedProject page
P5170005233314 Aug 202331 May 202731 May 2027Lodha Developers LimitedProject page
Documents142

2 documents held by Deedo, 140 filings listed on MahaRERA's project page

Registration certificate (2)

  • Registration certificateP51700052333 · 15 May 2026ViewSource
  • Registration certificateP51700052237 · 24 Sep 2026ViewSource

Finance

  • PAN CardP51700052333 · Macrotech Developers Ltd PAN CARD.pdf · uploaded 30 Jun 2023Source
  • PAN CardP51700052237 · 1 PAN Card.pdf · uploaded 7 Jul 2023Source

Legal

  • Legal Title reportP51700052333 · Title Report.pdf · uploaded 3 Jul 2023Source
  • Declaration Form BP51700052333 · Form B.pdf · uploaded 3 Jul 2023Source
  • Other – LegalP51700052237 · 1 Other – Legal (3).pdf · uploaded 7 Jul 2023Source
  • Other – LegalP51700052237 · 2 Other – Legal (3).pdf · uploaded 7 Jul 2023Source
Show all 142 documentsShow fewer documents

Legal

  • Other – LegalP51700052237 · 3 Other – Legal.pdf · uploaded 7 Jul 2023Source
  • Other – LegalP51700052237 · 4 Other – Legal.pdf · uploaded 7 Jul 2023Source
  • Legal Title reportP51700052237 · RERA New Format-Hedutane.pdf · uploaded 7 Jul 2023Source
  • Declaration Form BP51700052237 · Form B.pdf · uploaded 7 Jul 2023Source
  • Declaration Form BP51700052333 · 25 2 A.pdf · uploaded 16 Apr 2026Source
  • Declaration Form BP51700052333 · 25 2 B.pdf · uploaded 16 Apr 2026Source

Migrated

  • 1 PAN CardP51700052237 · 1 PAN Card.pdf · uploaded 7 Jul 2023Source
  • 1 Copy of the legal title reportP51700052237 · RERA New Format-Hedutane.pdf · uploaded 7 Jul 2023Source
  • 1 a Details of encumbrances concerned to FinanceP51700052237 · Legal Liti.pdf · uploaded 7 Jul 2023Source
  • 1 b Details of encumbrances concerned to LegalP51700052237 · Legal Liti.pdf · uploaded 7 Jul 2023Source
  • 1 Copy of Layout Approval (in case of layout)P51700052237 · Layout.pdf · uploaded 7 Jul 2023Source
  • 1 Building Plan Approval / NA Order for plotted developmentP51700052237 · Ground.pdf · uploaded 7 Jul 2023Source
  • 2 Building Plan Approval / NA Order for plotted developmentP51700052237 · 1 2 T.pdf · uploaded 7 Jul 2023Source
  • 3 Building Plan Approval / NA Order for plotted developmentP51700052237 · Typical Refuge.pdf · uploaded 7 Jul 2023Source
  • 4 Building Plan Approval / NA Order for plotted developmentP51700052237 · Section.pdf · uploaded 7 Jul 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentP51700052237 · CC.pdf · uploaded 7 Jul 2023Source
  • 1 Declaration about Commencement CertificateP51700052237 · CC Declaration.pdf · uploaded 7 Jul 2023Source
  • 1 Declaration in FORM BP51700052237 · Form B.pdf · uploaded 7 Jul 2023Source
  • 1 CERSAI detailsP51700052237 · CERSAI.pdf · uploaded 7 Jul 2023Source
  • 2 CERSAI detailsP51700052237 · Cersai Decl.pdf · uploaded 7 Jul 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700052237 · Form 3.pdf · uploaded 7 Jul 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsP51700052237 · 1 Disclosure of Interest in Other Real Estate Organizations (6).pdf · uploaded 7 Jul 2023Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsP51700052237 · 2 Disclosure of Interest in Other Real Estate Organizations (5).pdf · uploaded 7 Jul 2023Source
  • 1 Proforma of Agreement for saleP51700052237 · 1 Proforma of Agreement for sale (10).pdf · uploaded 7 Jul 2023Source
  • 1 Proforma of Allotment letterP51700052237 · 1 Proforma of Allotment letter (7).pdf · uploaded 7 Jul 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP51700052237 · Bank Declaration.pdf · uploaded 7 Jul 2023Source
  • 1 Deviation Report with respect to Allotment letterP51700052237 · 1 Deviation Report with respect to Allotment letter (2)_compressed.pdf · uploaded 7 Jul 2023Source
  • 1 Deviation Report with respect to model copy of AgreementP51700052237 · ilovepdf_merged (6)_compressed.pdf · uploaded 7 Jul 2023Source
  • 1 Other – LegalP51700052237 · 1 Other – Legal (3).pdf · uploaded 7 Jul 2023Source
  • 2 Other – LegalP51700052237 · 2 Other – Legal (3).pdf · uploaded 7 Jul 2023Source
  • 3 Other – LegalP51700052237 · 3 Other – Legal.pdf · uploaded 7 Jul 2023Source
  • 4 Other – LegalP51700052237 · 4 Other – Legal.pdf · uploaded 7 Jul 2023Source
  • 1 Other – TechnicalP51700052237 · 1 Other – Technical (2).pdf · uploaded 7 Jul 2023Source
  • 2 Other – TechnicalP51700052237 · 2 Other – Technical (1).pdf · uploaded 7 Jul 2023Source
  • 2 a Details of encumbrances concerned to FinanceP51700052237 · Finance Encumbrances.pdf · uploaded 12 Jul 2023Source
  • 2 b Details of encumbrances concerned to LegalP51700052237 · Finance Encumbrances.pdf · uploaded 12 Jul 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700052237 · Belvedere D - Form1 - Sep23.pdf · uploaded 21 Nov 2023Source
  • 1 Disclosure of sold/ booked inventoryP51700052237 · Belvedere D - P51700052237 - Sep23.pdf · uploaded 21 Dec 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700052237 · Form1 - Belvedere D - P51700052237 - Dec23.pdf · uploaded 26 Feb 2024Source
  • 2 Disclosure of sold/ booked inventoryP51700052237 · Sold Unsold - Belvedere D - P51700052237 - Dec23.pdf · uploaded 27 Feb 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700052237 · Form 1 - Belvedere D - P51700052237 - March 24.pdf · uploaded 7 May 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700052237 · Form 2 Belvedere Sep-23.pdf · uploaded 23 May 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700052237 · Form 2 Belvedere Dec-23.pdf · uploaded 23 May 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700052237 · Form 2 Belvedere D Mar 24.pdf · uploaded 23 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P51700052237 · Page.pdf · uploaded 23 May 2024Source
  • 3 Disclosure of sold/ booked inventoryP51700052237 · Sold Unsold Belverde D Mar-24.pdf · uploaded 23 May 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700052237 · Form 3 Belvedere Sep-23.pdf · uploaded 23 May 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700052237 · Form 3 Belvedere Dec-23.pdf · uploaded 23 May 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700052237 · Form 3 Belverde D Mar-24.pdf · uploaded 23 May 2024Source
  • 4 Disclosure of sold/ booked inventoryP51700052237 · Belverde D Sold Unsold - Mar-24.pdf · uploaded 24 May 2024Source
  • 5 Disclosure of sold/ booked inventoryP51700052237 · Belvedere D - P51700052237 - June24.pdf · uploaded 8 Aug 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700052237 · Belvedere D - P51700052237 - June24.pdf · uploaded 10 Aug 2024Source
  • 5 Building Plan Approval / NA Order for plotted developmentP51700052237 · 20240315 - Palava 2 - CC - Sheet N30 - converted.pdf · uploaded 14 Aug 2024Source
  • 6 Building Plan Approval / NA Order for plotted developmentP51700052237 · 20240315 - Palava 2 - CC - Sheet N31 - converted.pdf · uploaded 14 Aug 2024Source
  • 7 Building Plan Approval / NA Order for plotted developmentP51700052237 · 20240315 - Palava 2 - CC - Sheet N32 - converted.pdf · uploaded 14 Aug 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P51700052237 · P51700052237 - Belvedere D.pdf · uploaded 19 Oct 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700052237 · Belvedere D.pdf · uploaded 4 Nov 2024Source
  • 2 Disclosure of sold/ booked inventoryP51700052237 · Belvedere D Sold Unsold Belvedere D Sep 2024.pdf · uploaded 30 Dec 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700052237 · Signed Form 3 Belvedere D Sep 2024.pdf · uploaded 3 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700052237 · Signed Form 2 Belvedere D Sep 2024.pdf · uploaded 3 Jan 2025Source
  • 1 Commencement Certificates / NA Order for plotted developmentP51700052237 · Palava 2_Amended CC - Compress.pdf · uploaded 17 Jan 2025Source
  • 1 Building Plan Approval / NA Order for plotted developmentP51700052237 · 2024 12 30 - Palava 2 - CC PLan Sheet No 79 - Belvedere D - Compress.pdf · uploaded 17 Jan 2025Source
  • 2 Building Plan Approval / NA Order for plotted developmentP51700052237 · 2024 12 30 - Palava 2 - CC PLan Sheet No 80 - Belvedere D - Compress.pdf · uploaded 17 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700052237 · Belvedere D.pdf · uploaded 24 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryP51700052237 · Sold Unsold Belvedere D Dec 2024.pdf · uploaded 28 Jan 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700052237 · Form 3 - Belvedere D - Dec 24.pdf · uploaded 3 Feb 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700052237 · Signed Form 2 Belvedere D Dec 2024.pdf · uploaded 25 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700052237 · Belvedere D.pdf · uploaded 2 May 2025Source
  • Form 1P51700052237 · Form 1- Belvedere D Mar-25.pdf · uploaded 17 Jun 2025Source
  • Form 2P51700052237 · Signed Form 2 Belvedere D March 2025.pdf · uploaded 17 Jun 2025Source
  • Form 3P51700052237 · Signed Form 3 Belvedere D March 2025.pdf · uploaded 17 Jun 2025Source
  • Disclosure of Sold and Booked InventoryP51700052237 · Signed Sold Unsold Belvedere D March 2025.pdf · uploaded 17 Jun 2025Source
  • Form 1P51700052237 · Belvedere D - Form1 - June 25 - P51700052237-ok.pdf · uploaded 18 Jul 2025Source
  • Form 2P51700052237 · Form 2_ June-25.pdf · uploaded 18 Jul 2025Source
  • Form 3P51700052237 · Form_3 June-25.pdf · uploaded 18 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP51700052237 · Sold Unsold June-25.pdf · uploaded 18 Jul 2025Source
  • Self-declaration of Quarterly ProgressP51700052237 · Updated CC.pdf · uploaded 18 Jul 2025Source
  • OthersP51700052237 · Layout -Belvedere - Cluster 15 01 Wing D.pdf · uploaded 18 Jul 2025Source
  • Form 2A (FY 2024-2025)P51700052237 · Belvedere D - P51700052237 - Form 2A.pdf · uploaded 25 Jul 2025Source
  • Form 5 (FY 2024-2025)P51700052237 · Belvedere D.pdf · uploaded 14 Oct 2025Source
  • Withdrawal Update Form 1P51700052237 · Belvedere D.pdf · uploaded 31 Oct 2025Source
  • Withdrawal Update Form 2P51700052237 · Form 2 - Belvedere D - Sep 25.pdf · uploaded 31 Oct 2025Source
  • Withdrawal Update Form 3P51700052237 · Form 03 - Belvedere D - Sep 25 signed.pdf · uploaded 31 Oct 2025Source
  • Withdrawal Update Form 1P51700052237 · Form-1 Belvedere D- Dec-25.pdf · uploaded 27 Jan 2026Source
  • Withdrawal Update Form 2P51700052237 · Belvedere D Form 02 Signed Dec 25.pdf · uploaded 27 Jan 2026Source
  • Withdrawal Update Form 3P51700052237 · Belvedere D Form 03 Signed Dec 25.pdf · uploaded 27 Jan 2026Source
  • Withdrawal Update Form 1P51700052237 · Form1 - Belvedere D - P51700052237.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 2P51700052237 · Belvedere D Mar 2026 - Form 02 Signed.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 3P51700052237 · Belvedere D Mar 2026 - Form 03 Signed.pdf · uploaded 20 Apr 2026Source
  • Form 2A (FY 2025-2026)P51700052237 · Form 2A - Belvedere D - P51700052237.pdf · uploaded 23 Jun 2026Source
  • Withdrawal Update Form 1P51700052237 · Form1 - Belvedere D - P51700052237.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 2P51700052237 · Form 2 Belvedere D.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 3P51700052237 · Form 3 Belvedere D.pdf · uploaded 20 Jul 2026Source
  • Form 5 (FY 2025-2026)P51700052237 · Belvedere D.pdf · uploaded 28 Sep 2026Source

Technical

  • DocumentP51700052333 · Sheet-M37.pdf · uploaded 3 Jul 2023Source
  • DocumentP51700052333 · Sheet-M38.pdf · uploaded 3 Jul 2023Source
  • DocumentP51700052333 · Sheet-M39.pdf · uploaded 3 Jul 2023Source
  • DocumentP51700052333 · Layout.pdf · uploaded 3 Jul 2023Source
  • DocumentP51700052237 · Layout.pdf · uploaded 7 Jul 2023Source
  • DocumentP51700052237 · Ground.pdf · uploaded 7 Jul 2023Source
  • DocumentP51700052237 · 1 2 T.pdf · uploaded 7 Jul 2023Source
  • DocumentP51700052237 · Typical Refuge.pdf · uploaded 7 Jul 2023Source
  • DocumentP51700052237 · Section.pdf · uploaded 7 Jul 2023Source
  • Other – TechnicalP51700052237 · 1 Other – Technical (2).pdf · uploaded 7 Jul 2023Source
  • Other – TechnicalP51700052237 · 2 Other – Technical (1).pdf · uploaded 7 Jul 2023Source
  • DocumentP51700052237 · 20240315 - Palava 2 - CC - Sheet N30 - converted.pdf · uploaded 14 Aug 2024Source
  • DocumentP51700052237 · 20240315 - Palava 2 - CC - Sheet N31 - converted.pdf · uploaded 14 Aug 2024Source
  • DocumentP51700052237 · 20240315 - Palava 2 - CC - Sheet N32 - converted.pdf · uploaded 14 Aug 2024Source
  • DocumentP51700052237 · 2024 12 30 - Palava 2 - CC PLan Sheet No 79 - Belvedere D - Compress.pdf · uploaded 17 Jan 2025Source
  • DocumentP51700052237 · 2024 12 30 - Palava 2 - CC PLan Sheet No 80 - Belvedere D - Compress.pdf · uploaded 17 Jan 2025Source
  • DocumentP51700052333 · Belvedere - Cluster 1501 Wing H - converted.pdf · uploaded 23 Nov 2025Source
  • DocumentP51700052333 · Belvedere - Cluster 1501 Wing H - converted.pdf · uploaded 25 Nov 2025Source
  • DocumentP51700052237 · Belvedere - Cluster 15 01 Wing D - converted.pdf · uploaded 25 Nov 2025Source
  • DocumentP51700052333 · 2026 03 25 - Palava 2 - Sector -D I2 O (O C Plan) (Sheet No -28) - Compress.pdf · uploaded 1 Apr 2026Source
  • DocumentP51700052333 · 2026 03 25 - Palava 2 - Sector -D I2 O (O C Plan) (Sheet No -29) - Compress.pdf · uploaded 1 Apr 2026Source
  • DocumentP51700052333 · 2026 03 25 - Palava 2 - Sector -D I2 O (O C Plan) (Sheet No -30) - Compress.pdf · uploaded 1 Apr 2026Source
  • DocumentP51700052333 · 2026 03 25 - Palava 2 - Sector -D I2 O (O C Plan) (Sheet No -31) - Compress.pdf · uploaded 1 Apr 2026Source
  • DocumentP51700052237 · Layout Plan.pdf · uploaded 2 Jul 2026Source
  • DocumentP51700052237 · 20241230 - Sheet 79.pdf · uploaded 2 Jul 2026Source
  • DocumentP51700052237 · 20241230 - Sheet 80.pdf · uploaded 2 Jul 2026Source
  • DocumentP51700052237 · Layout Plan.pdf · uploaded 20 Jul 2026Source
  • DocumentP51700052237 · 20241230 - Sheet 79.pdf · uploaded 20 Jul 2026Source
  • DocumentP51700052237 · 20241230 - Sheet 80.pdf · uploaded 20 Jul 2026Source
  • DocumentP51700052237 · 2024-12-30 - Palava 2_Amended CC_compressed.pdf · uploaded 20 Jul 2026Source

Technical (Architect)

  • DocumentP51700052237 · Belvedere D.pdf · uploaded 4 Nov 2024Source
  • DocumentP51700052237 · Belvedere D.pdf · uploaded 24 Jan 2025Source
  • DocumentP51700052237 · Belvedere D.pdf · uploaded 2 May 2025Source
  • DocumentP51700052237 · Form1 - Belvedere D - P51700052237.pdf · uploaded 20 Jul 2026Source

Technical (Engineer)

  • DocumentP51700052333 · Signed Form 2 Belvedere H Sep 2024.pdf · uploaded 3 Jan 2025Source
  • DocumentP51700052237 · Signed Form 2 Belvedere D Sep 2024.pdf · uploaded 3 Jan 2025Source
  • DocumentP51700052333 · Signed Form 2 Belvedere H Dec 2024.pdf · uploaded 25 Feb 2025Source
  • DocumentP51700052237 · Signed Form 2 Belvedere D Dec 2024.pdf · uploaded 25 Feb 2025Source
  • DocumentP51700052333 · Belvedere H Mar 2026 - Form 02 Signed.pdf · uploaded 20 Apr 2026Source
  • DocumentP51700052237 · Form 2 Belvedere D.pdf · uploaded 20 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 25/2A Part, 25/2B Part

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Phases
2
Unit types
—236 units in all
Village
Hedutane
Land area for this project
1,961 sq m (21,105 sq ft)
Permissible built-up area
10,978 sq m (1,18,167 sq ft)
Sanctioned built-up area
10,978 sq m (1,18,167 sq ft)
Recreational open space
686 sq m (7,381 sq ft)
Developed in phases
No
Also registered as
Belvedere H, Belvedere D

Survey, CTS, gat or plot numbers

25/2A Part25/2B Part25/3 Part

Land as published on MahaRERA's project page

25/2A Part,25/2B Part,25/3 Part

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking236 units

236 units registered

— · 236 units
RERABuildingTypeCarpet areaUnits
P51700052237Wing D of Sector O Cluster 15 Point 01——95
P51700052333Wing H Sector O Cluster 15 Point 01——141

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals7

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.RERA
ArchitectPradeep Kamble—P51700052237
ArchitectPradeep Kamble—P51700052333
ArchitectVilas Desai & Associate—P51700052333
Chartered accountantChirag Sarvaiya & Co—P51700052333
EngineerDadaso Gavali—P51700052333
EngineerK C Shah Consultants—P51700052333
Registered real estate agentHousenotch Private Limited—P51700052333

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology