Valencia
Deedo IDDP-THN-ANPXCompletion was pushed back 4 months, to Jul 2027; no MahaRERA orders on record; 83% of its units are booked.
Dombivli, Thane 421202 · by Impressions · 33% of its projects kept the RERA date
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Jul 2027
- This projectRegistered 9 Mar 2020, completion promised 31 Mar 2027, revised to 31 Jul 2027.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700024879
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700024879 | 9 Mar 2020 | 31 Mar 2027 | 31 Jul 2027 | Impressions | Project page |
Documents126
2 documents held by Deedo, 124 filings listed on MahaRERA's project page
Finance
- PAN CardIMPRESSIONS PAN.pdf · uploaded 28 Jan 2020Source
Legal
Show all 126 documentsShow fewer documents
Migrated
- 1 Copy of Layout Approval (in case of layout)DESAI HOUSE PLAN.pdf · uploaded 28 Jan 2020Source
- 1 Building Plan Approval / NA Order for plotted developmentDESAI HOUSE CC.pdf · uploaded 28 Jan 2020Source
- 1 Commencement Certificates / NA Order for plotted developmentDESAI HOUSE CC.pdf · uploaded 28 Jan 2020Source
- 1 Proforma of Allotment letterAgreement letter format desai house_0001.pdf · uploaded 28 Jan 2020Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE.pdf · uploaded 30 Jan 2020Source
- 1 Details of encumbrancesENCUMBRANCE DESAI HOUSE.pdf · uploaded 26 Feb 2020Source
- 1 Declaration in FORM BFORM B DESAI HOUSE.pdf · uploaded 26 Feb 2020Source
- 2 Copy of Layout Approval (in case of layout)VALENCIA BLUE PRINT PLAN (1).pdf · uploaded 29 Dec 2021Source
- 2 Commencement Certificates / NA Order for plotted developmentDESAI HOUSE REVISED CC (1).pdf · uploaded 29 Dec 2021Source
- 3 Commencement Certificates / NA Order for plotted developmentVALENCIA CC14.pdf · uploaded 21 Nov 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 FY 2020-21.pdf · uploaded 22 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 FY 2019-20.pdf · uploaded 22 Jan 2025Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 FY 2024-25 Q2.pdf · uploaded 22 Jan 2025Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 FY 2024-25 Q1.pdf · uploaded 22 Jan 2025Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 FY 2023-24 Q4.pdf · uploaded 22 Jan 2025Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 FY 2023-24 Q3.pdf · uploaded 22 Jan 2025Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 FY 2023-24 Q2.pdf · uploaded 22 Jan 2025Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 FY 2023-24 Q1.pdf · uploaded 22 Jan 2025Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 FY 2022-23 Q4.pdf · uploaded 22 Jan 2025Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 FY 2022-23 Q3.pdf · uploaded 22 Jan 2025Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 FY 2022-23 Q2.pdf · uploaded 22 Jan 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 FY 2022-23 Q1.pdf · uploaded 22 Jan 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 FY 2021-22.pdf · uploaded 22 Jan 2025Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 FY 2024-25 Q2.pdf · uploaded 22 Jan 2025Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 FY 2024-25 Q1.pdf · uploaded 22 Jan 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 FY 2021-22.pdf · uploaded 22 Jan 2025Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 FY 2023-24 Q4.pdf · uploaded 22 Jan 2025Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 FY 2023-24 Q3.pdf · uploaded 22 Jan 2025Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 FY 2023-24 Q2.pdf · uploaded 22 Jan 2025Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 FY 2023-24 Q1.pdf · uploaded 22 Jan 2025Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 FY 2022-23 Q4.pdf · uploaded 22 Jan 2025Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 FY 2022-23 Q3.pdf · uploaded 22 Jan 2025Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 FY 2022-23 Q2.pdf · uploaded 22 Jan 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 FY 2022-23 Q1.pdf · uploaded 22 Jan 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 FY 2020-21.pdf · uploaded 22 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 FY 2019-20.pdf · uploaded 22 Jan 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 2A 2020.pdf · uploaded 22 Jan 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A 2021.pdf · uploaded 22 Jan 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A 2022.pdf · uploaded 22 Jan 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A 2023.pdf · uploaded 22 Jan 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A 2024.pdf · uploaded 22 Jan 2025Source
- 2 a Details of encumbrances concerned to FinanceDeclaration - Finance.pdf · uploaded 4 Mar 2025Source
- 1 a Details of encumbrances concerned to FinanceDeclaration - Legal.pdf · uploaded 4 Mar 2025Source
- 1 Declaration in FORM BApplication dt 2025-01-22 Form B.pdf · uploaded 4 Mar 2025Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Valencia Form 3 FY 2023-24 Q4 dt 2025-02-25.pdf · uploaded 4 Mar 2025Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)Valencia Form 3 FY 2024-25 Q2 dt 2025-02-25 v3.pdf · uploaded 4 Mar 2025Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)Valencia Form 3 FY 2024-25 Q1 dt 2025-02-25.pdf · uploaded 4 Mar 2025Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Valencia Form 3 FY 2023-24 Q3 dt 2025-02-25.pdf · uploaded 4 Mar 2025Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Valencia Form 3 FY 2023-24 Q2 dt 2025-02-25.pdf · uploaded 4 Mar 2025Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Valencia Form 3 FY 2023-24 Q1 dt 2025-02-25.pdf · uploaded 4 Mar 2025Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Valencia Form 3 FY 2022-23 Q3 dt 2025-02-25.pdf · uploaded 4 Mar 2025Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Valencia Form 3 FY 2022-23 Q2 dt 2025-02-25.pdf · uploaded 4 Mar 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Valencia Form 3 FY 2022-23 Q1 dt 2025-02-25.pdf · uploaded 4 Mar 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Valencia Form 3 FY 2021-22 dt 2025-02-25.pdf · uploaded 4 Mar 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Valencia Form 3 FY 2020-21 dt 2025-02-25.pdf · uploaded 4 Mar 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Valencia Form 3 FY 2019-20 dt 2025-02-25.pdf · uploaded 4 Mar 2025Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Valencia Form 3 FY 2022-23 Q4 dt 2025-02-25.pdf · uploaded 4 Mar 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 FY 2019-20.pdf · uploaded 4 Mar 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 FY 2020-21.pdf · uploaded 4 Mar 2025Source
- 1 CERSAI detailsDeclaration - CERSAI.pdf · uploaded 4 Mar 2025Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)Declaration - Bank Account Format A.pdf · uploaded 4 Mar 2025Source
- 1 b Details of encumbrances concerned to LegalDeclaration - Legal.pdf · uploaded 4 Mar 2025Source
- 2 b Details of encumbrances concerned to LegalDeclaration - Finance.pdf · uploaded 4 Mar 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 FY 2021-22.pdf · uploaded 4 Mar 2025Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDeclaration - Disclosure of Interest.pdf · uploaded 4 Mar 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 FY 2022-23.pdf · uploaded 4 Mar 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 FY 2023-24.pdf · uploaded 4 Mar 2025Source
- 1 Disclosure of sold/ booked inventoryDeclaration- Sold Unsold Units.pdf · uploaded 6 Mar 2025Source
- Withdrawal Update Form 1Form 1_June 25.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 1Form 1_Sep 25.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 1Form 1_Dec 25.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2Form 2_June 25.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2Form 2_Sep 25.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2Form 2_Dec 25.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3CA Certificate_Jun 25.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3CA Certificate_Sept 25.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3CA Certificate_Dec 25.pdf · uploaded 20 Apr 2026Source
- Form 2A (FY 2024-2025)Form 2A_FY 2024-25.pdf · uploaded 20 Apr 2026Source
- Form 2A (FY 2025-2026)Form 2A_FY 2025-26.pdf · uploaded 20 Apr 2026Source
- Form 5 (FY 2024-2025)Form 5_FY 2024-25.pdf · uploaded 21 Apr 2026Source
- Withdrawal Update Form 1Withdrawal Application Form1.pdf · uploaded 2 May 2026Source
- Withdrawal Update Form 2Withdrawal Application Form2.pdf · uploaded 2 May 2026Source
- Withdrawal Update Form 3CA Certificate_Mar 26 Signed Copy.pdf · uploaded 2 May 2026Source
- Withdrawal Update Form 1Form 1_Jun 26.pdf · uploaded 19 Aug 2026Source
- Withdrawal Update Form 2Form 2_Jun 26.pdf · uploaded 19 Aug 2026Source
- Withdrawal Update Form 3CA Certificate_Jun 26.pdf · uploaded 19 Aug 2026Source
Technical
- DocumentDESAI HOUSE PLAN.pdf · uploaded 28 Jan 2020Source
- DocumentDESAI HOUSE CC.pdf · uploaded 28 Jan 2020Source
- DocumentVALENCIA BLUE PRINT PLAN (1).pdf · uploaded 29 Dec 2021Source
- DocumentLayout Approval Plan.pdf · uploaded 15 May 2026Source
- DocumentRevised Sanctioned Plan.pdf · uploaded 15 May 2026Source
- OthersCC.pdf · uploaded 15 May 2026Source
Technical (Architect)
- DocumentForm 1 FY 2020-21.pdf · uploaded 22 Jan 2025Source
- DocumentForm 1 FY 2021-22.pdf · uploaded 22 Jan 2025Source
- DocumentForm 1 FY 2022-23 Q1.pdf · uploaded 22 Jan 2025Source
- DocumentForm 1 FY 2022-23 Q2.pdf · uploaded 22 Jan 2025Source
- DocumentForm 1 FY 2022-23 Q3.pdf · uploaded 22 Jan 2025Source
- DocumentForm 1 FY 2022-23 Q4.pdf · uploaded 22 Jan 2025Source
- DocumentForm 1 FY 2023-24 Q1.pdf · uploaded 22 Jan 2025Source
- DocumentForm 1 FY 2023-24 Q2.pdf · uploaded 22 Jan 2025Source
- DocumentForm 1 FY 2023-24 Q3.pdf · uploaded 22 Jan 2025Source
- DocumentForm 1 FY 2023-24 Q4.pdf · uploaded 22 Jan 2025Source
- DocumentForm 1 FY 2024-25 Q1.pdf · uploaded 22 Jan 2025Source
- DocumentForm 1 FY 2024-25 Q2.pdf · uploaded 22 Jan 2025Source
- DocumentForm 1_Jun 26.pdf · uploaded 19 Aug 2026Source
Technical (Engineer)
- DocumentForm 2 FY 2020-21.pdf · uploaded 22 Jan 2025Source
- DocumentForm 2 FY 2021-22.pdf · uploaded 22 Jan 2025Source
- DocumentForm 2 FY 2022-23 Q1.pdf · uploaded 22 Jan 2025Source
- DocumentForm 2 FY 2022-23 Q2.pdf · uploaded 22 Jan 2025Source
- DocumentForm 2 FY 2022-23 Q3.pdf · uploaded 22 Jan 2025Source
- DocumentForm 2 FY 2022-23 Q4.pdf · uploaded 22 Jan 2025Source
- DocumentForm 2 FY 2023-24 Q1.pdf · uploaded 22 Jan 2025Source
- DocumentForm 2 FY 2023-24 Q2.pdf · uploaded 22 Jan 2025Source
- DocumentForm 2 FY 2023-24 Q3.pdf · uploaded 22 Jan 2025Source
- DocumentForm 2 FY 2023-24 Q4.pdf · uploaded 22 Jan 2025Source
- DocumentForm 2 FY 2024-25 Q1.pdf · uploaded 22 Jan 2025Source
- DocumentForm 2 FY 2024-25 Q2.pdf · uploaded 22 Jan 2025Source
- DocumentForm 2_Jun 26.pdf · uploaded 19 Aug 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 1465, 1466
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK, Office space, Shop42 units in all
- Address
- C T S No 2065 To 2068, 1465 And 1466, Mahatma Phule Road, Mahatma Phule RoadPIN 421202
- Village
- Dombivli, Kalyan taluka
- Location
- 19.21958, 73.08784
- Land area for this project
- 888 sq m (9,558 sq ft)
- Permissible built-up area
- 4,221 sq m (45,435 sq ft)
- Sanctioned built-up area
- 4,220 sq m (45,418 sq ft)
- Designated bank account
- 82
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
C T S NO 2065 TO 2068, 1465 AND 1466
Boundaries
- North
- C T S No 2042
- South
- Karve Road
- East
- C T S No 2061
- West
- Mahatma Phule Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking42 units
35 of 42 units booked (83%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 45.13 sq m · 486 sq ft | 2 | 2 |
| 1BHK | 47.89 sq m · 515 sq ft | 3 | 3 |
| 1BHK | 50.18 sq m · 540 sq ft | 1 | 1 |
| 1BHK | 60.06 sq m · 646 sq ft | 1 | 1 |
| 2BHK | 62.11 sq m · 669 sq ft | 4 | 4 |
| 2BHK | 62.8 sq m · 676 sq ft | 3 | 3 |
| 2BHK | 67.12 sq m · 722 sq ft | 3 | 2 |
| 2BHK | 67.64 sq m · 728 sq ft | 3 | 3 |
Show all 24 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Office space | 6.94 sq m · 75 sq ft | 3 | 3 |
| Office space | 20.82 sq m · 224 sq ft | 2 | 1 |
| Office space | 26.65 sq m · 287 sq ft | 2 | 2 |
| Office space | 56.11 sq m · 604 sq ft | 1 | 1 |
| Office space | 59.95 sq m · 645 sq ft | 2 | 1 |
| Shop | 9.06 sq m · 98 sq ft | 1 | 0 |
| Shop | 9.66 sq m · 104 sq ft | 1 | 1 |
| Shop | 9.89 sq m · 106 sq ft | 1 | 0 |
| Shop | 11.21 sq m · 121 sq ft | 1 | 1 |
| Shop | 11.65 sq m · 125 sq ft | 1 | 1 |
| Shop | 12.99 sq m · 140 sq ft | 1 | 0 |
| Shop | 14.22 sq m · 153 sq ft | 1 | 1 |
| Shop | 15.2 sq m · 164 sq ft | 2 | 2 |
| Shop | 15.33 sq m · 165 sq ft | 1 | 1 |
| Shop | 20.18 sq m · 217 sq ft | 1 | 1 |
| Shop | 25.5 sq m · 274 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals4
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Uday Chopda | — |
| Chartered accountant | Priyottam Gajanan Ghaisas | — |
| Engineer | Rajesh Thakare | — |
| Other | Aryan Buildcon | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Dombivli
- Mali ShivalayaRERA PM1330002602683
- Shiv SadanRERA PR1330002602567
- Bhargav Co-Op Housing Society LimitedRERA PM1330002602519
- The MeadowsRERA PR1330002601825
- Om Ganesh PujaRERA PR1330002601796
- Payal Business ParkRERA PC1330002600694
- VedvikaRERA PR1330002600676
- YashrajRERA PM1330002600521
All 445 projects in Dombivli · Compare Valencia with another project