Commercial · 1 building · 87 unitsRERA P51700049879

Vedant Connect

Deedo IDDP-THN-HXH7

Completion was pushed back 4 months, to Apr 2027; no MahaRERA orders on record; 34% of its units are booked.

Chikanghar, Thane 421301 · by Mohan Hardasmal Tharwani · 64% of its projects kept the RERA date

DeliveryExtended 4 moPromised Dec 2026 · now due Apr 2027RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales34% booked30 of 87 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Apr 2027

  • This projectRegistered 6 Mar 2023, completion promised 31 Dec 2026, revised to 30 Apr 2027.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700049879
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P517000498796 Mar 202331 Dec 202630 Apr 2027Mohan Hardasmal TharwaniProject page
Documents154

1 document held by Deedo, 153 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardMOHAN SIR NEW PAN CARD.PDF · uploaded 16 Feb 2023Source

Legal

  • Declaration Form BFORM B_compressed.pdf · uploaded 16 Feb 2023Source
  • Legal Title reportTitle Report_compressed.pdf · uploaded 18 Feb 2023Source
  • Legal Title reportNew title.pdf · uploaded 1 Aug 2024Source

Migrated

  • 1 PAN CardMOHAN SIR NEW PAN CARD.PDF · uploaded 16 Feb 2023Source
  • 1 a Details of encumbrances concerned to FinanceConcern Vedant Connect_compressed.pdf · uploaded 16 Feb 2023Source
  • 2 a Details of encumbrances concerned to FinanceDeclaration of Encumbrace Connect_compressed.pdf · uploaded 16 Feb 2023Source
Show all 154 documentsShow fewer documents

Migrated

  • 1 b Details of encumbrances concerned to LegalConcern Vedant Connect_compressed.pdf · uploaded 16 Feb 2023Source
  • 2 b Details of encumbrances concerned to LegalDeclaration of Encumbrace Connect_compressed.pdf · uploaded 16 Feb 2023Source
  • 1 Copy of Layout Approval (in case of layout)LAYOUT_compressed.pdf · uploaded 16 Feb 2023Source
  • 1 Building Plan Approval / NA Order for plotted developmentHPSCANNER0576_compressed.pdf · uploaded 16 Feb 2023Source
  • 2 Building Plan Approval / NA Order for plotted developmentHPSCANNER0578_compressed.pdf · uploaded 16 Feb 2023Source
  • 3 Building Plan Approval / NA Order for plotted developmentHPSCANNER0579_compressed.pdf · uploaded 16 Feb 2023Source
  • 4 Building Plan Approval / NA Order for plotted developmentHPSCANNER0581_compressed.pdf · uploaded 16 Feb 2023Source
  • 5 Building Plan Approval / NA Order for plotted developmentSECTION_compressed (2).pdf · uploaded 16 Feb 2023Source
  • 6 Building Plan Approval / NA Order for plotted developmentHPSCANNER0582_compressed.pdf · uploaded 16 Feb 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC_compressed.pdf · uploaded 16 Feb 2023Source
  • 1 Declaration about Commencement CertificateDeclaration Of Commrncement Vedant Connect_compressed.pdf · uploaded 16 Feb 2023Source
  • 1 Declaration in FORM BFORM B_compressed.pdf · uploaded 16 Feb 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_compressed.pdf · uploaded 16 Feb 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_compressed.pdf · uploaded 16 Feb 2023Source
  • 1 CERSAI detailsDocScanner.pdf · uploaded 16 Feb 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_compressed.pdf · uploaded 16 Feb 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A.PDF · uploaded 16 Feb 2023Source
  • 1 Proforma of Agreement for saleVEDANT CONNECT agreement_compressed.pdf · uploaded 16 Feb 2023Source
  • 1 Proforma of Allotment letterAllotment Letter Vedant Connect_compressed.pdf · uploaded 16 Feb 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBANK DECLARATION VEDANT CONNECT_compressed.pdf · uploaded 16 Feb 2023Source
  • 1 Deviation Report with respect to Allotment letterDeviation Report Vedant Connect_compressed.pdf · uploaded 16 Feb 2023Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation Report Agreement Of sale Connect_compressed.pdf · uploaded 16 Feb 2023Source
  • 1 Copy of the legal title reportTitle Report_compressed.pdf · uploaded 18 Feb 2023Source
  • 3 a Details of encumbrances concerned to FinanceLegal Encumbrances.PDF · uploaded 18 Feb 2023Source
  • 3 b Details of encumbrances concerned to LegalLegal Encumbrances.PDF · uploaded 18 Feb 2023Source
  • 7 Building Plan Approval / NA Order for plotted developmentLAYOUT PLAN_compressed.pdf · uploaded 20 Feb 2023Source
  • 8 Building Plan Approval / NA Order for plotted developmentLAYOUT PLAN_compressed.pdf · uploaded 20 Feb 2023Source
  • 9 Building Plan Approval / NA Order for plotted developmentBASEMENT FLOOR_compressed.pdf · uploaded 20 Feb 2023Source
  • 10 Building Plan Approval / NA Order for plotted developmentGROUND FLOOR LAYOUT_compressed.pdf · uploaded 20 Feb 2023Source
  • 11 Building Plan Approval / NA Order for plotted development1ST 2ND FLOOR_compressed.pdf · uploaded 20 Feb 2023Source
  • 12 Building Plan Approval / NA Order for plotted development3RD 4TH FLOOR_compressed.pdf · uploaded 20 Feb 2023Source
  • 13 Building Plan Approval / NA Order for plotted development5TH 6TH FLOOR_compressed.pdf · uploaded 20 Feb 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 5 Sep 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_compressed.pdf · uploaded 5 Sep 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_compressed.pdf · uploaded 5 Sep 2023Source
  • 1 Disclosure of sold/ booked inventorySOLD UNSOLD ANNEXURE_compressed.pdf · uploaded 26 Sep 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Vedant Connect_compressed.pdf · uploaded 20 Oct 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 20 Oct 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2 A.pdf · uploaded 20 Oct 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3_compressed.pdf · uploaded 20 Oct 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 cONNECT.pdf · uploaded 20 Oct 2023Source
  • 2 Disclosure of sold/ booked inventorysold unsold_compressed.pdf · uploaded 27 Oct 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 20 Jan 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_compressed.pdf · uploaded 20 Jan 2024Source
  • 3 Disclosure of sold/ booked inventorySOLD UNSOLD ANNEXURE.PDF · uploaded 20 Jan 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed (1).pdf · uploaded 20 Jan 2024Source
  • 2 Proforma of Allotment letterALLOTMENT LETTER 2.pdf · uploaded 23 Jan 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 19 Apr 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 19 Apr 2024Source
  • 4 Disclosure of sold/ booked inventorysold unsold.pdf · uploaded 19 Apr 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_11zon.pdf · uploaded 19 Apr 2024Source
  • 2 Proforma of Agreement for saleVEDANT CONNECT 27-05-24.pdf · uploaded 5 Jun 2024Source
  • 2 Deviation Report with respect to model copy of AgreementConnect Deviation_compressed.pdf · uploaded 5 Jun 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 20 Jul 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 20 Jul 2024Source
  • 5 Disclosure of sold/ booked inventorysold unsold.pdf · uploaded 20 Jul 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed.pdf · uploaded 20 Jul 2024Source
  • 2 Copy of the legal title reportNew title.pdf · uploaded 1 Aug 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A.pdf · uploaded 7 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5.pdf · uploaded 7 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)form3.pdf · uploaded 19 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)From 2.pdf · uploaded 19 Oct 2024Source
  • 2 Disclosure of sold/ booked inventoryDsclosure of sold.pdf · uploaded 19 Oct 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 7 Nov 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 20 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 20 Jan 2025Source
  • 1 Disclosure of sold/ booked inventorySold Unsold.pdf · uploaded 20 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 23 Jan 2025Source
  • 1 Copy of Layout Approval (in case of layout)Layout Heighlted-2_compressed.pdf · uploaded 3 Mar 2025Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 3 Mar 2025Source
  • 1 Building Plan Approval / NA Order for plotted developmentBuilding PLAN Heighlted-4-12-1-3_compressed.pdf · uploaded 3 Mar 2025Source
  • 2 Building Plan Approval / NA Order for plotted developmentBuilding PLAN Heighlted-4-12-4-6_compressed.pdf · uploaded 3 Mar 2025Source
  • 3 Building Plan Approval / NA Order for plotted developmentBuilding PLAN Heighlted-4-12-7-9_compressed.pdf · uploaded 3 Mar 2025Source
  • 1 Declaration about Commencement Certificate040325.pdf · uploaded 22 Mar 2025Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation Report.pdf · uploaded 22 Mar 2025Source
  • 1 Proforma of Agreement for saleVEDANT CONNECT final21-03-25.pdf · uploaded 22 Mar 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 24 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed (1).pdf · uploaded 24 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 24 Apr 2025Source
  • 1 Disclosure of sold/ booked inventorySold Unsold.pdf · uploaded 24 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 19 Jul 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed.pdf · uploaded 19 Jul 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 19 Jul 2025Source
  • 1 Disclosure of sold/ booked inventorySold Unsold.pdf · uploaded 19 Jul 2025Source
  • Form 1Form 1.pdf · uploaded 19 Jul 2025Source
  • Form 2Form 2.pdf · uploaded 19 Jul 2025Source
  • Form 3Form 3_compressed.pdf · uploaded 19 Jul 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold.pdf · uploaded 19 Jul 2025Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 31 Oct 2025Source
  • Withdrawal Update Form 2From 2.pdf · uploaded 31 Oct 2025Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 31 Oct 2025Source
  • Form 5 (FY 2024-2025)FORM 5.pdf · uploaded 29 Dec 2025Source
  • Form 2A (FY 2024-2025)Form 2A.pdf · uploaded 23 Jan 2026Source
  • Withdrawal Update Form 1Form-1.pdf · uploaded 16 Feb 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 16 Feb 2026Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 16 Feb 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 29 May 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 29 May 2026Source
  • Withdrawal Update Form 3Form 3_compressed.pdf · uploaded 29 May 2026Source
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 21 Jul 2026Source
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 21 Jul 2026Source
  • Withdrawal Update Form 3FORM 3.PDF · uploaded 21 Jul 2026Source
  • Form 2A (FY 2025-2026)Form 2A - Connect.pdf · uploaded 7 Aug 2026Source

Technical

  • DocumentLAYOUT_compressed.pdf · uploaded 16 Feb 2023Source
  • DocumentHPSCANNER0576_compressed.pdf · uploaded 16 Feb 2023Source
  • DocumentHPSCANNER0578_compressed.pdf · uploaded 16 Feb 2023Source
  • DocumentHPSCANNER0579_compressed.pdf · uploaded 16 Feb 2023Source
  • DocumentHPSCANNER0581_compressed.pdf · uploaded 16 Feb 2023Source
  • DocumentSECTION_compressed (2).pdf · uploaded 16 Feb 2023Source
  • DocumentHPSCANNER0582_compressed.pdf · uploaded 16 Feb 2023Source
  • DocumentLAYOUT PLAN_compressed.pdf · uploaded 20 Feb 2023Source
  • DocumentLAYOUT PLAN_compressed.pdf · uploaded 20 Feb 2023Source
  • DocumentBASEMENT FLOOR_compressed.pdf · uploaded 20 Feb 2023Source
  • DocumentGROUND FLOOR LAYOUT_compressed.pdf · uploaded 20 Feb 2023Source
  • Document1ST 2ND FLOOR_compressed.pdf · uploaded 20 Feb 2023Source
  • Document3RD 4TH FLOOR_compressed.pdf · uploaded 20 Feb 2023Source
  • Document5TH 6TH FLOOR_compressed.pdf · uploaded 20 Feb 2023Source
  • DocumentLayout Heighlted-2_compressed.pdf · uploaded 3 Mar 2025Source
  • DocumentBuilding PLAN Heighlted-4-12-1-3_compressed.pdf · uploaded 3 Mar 2025Source
  • DocumentBuilding PLAN Heighlted-4-12-4-6_compressed.pdf · uploaded 3 Mar 2025Source
  • DocumentBuilding PLAN Heighlted-4-12-7-9_compressed.pdf · uploaded 3 Mar 2025Source
  • Documentfinal CONNECT APPROVAL PLAN 12-11-2025 (1)-1.pdf · uploaded 21 Nov 2025Source
  • DocumentUPTO 2ND FLOOR.pdf · uploaded 21 Nov 2025Source
  • DocumentFROM 3RD TO 10TH FLOOR.pdf · uploaded 21 Nov 2025Source
  • DocumentFLOOR PLAN 11 TH TO 23RD FLOOR.pdf · uploaded 21 Nov 2025Source
  • Documentfinal CONNECT APPROVAL PLAN 12-11-2025 (1)-1.pdf · uploaded 21 Nov 2025Source
  • DocumentAPPROVAL PLAN DT-12-11-2025-15-16.pdf · uploaded 21 Nov 2025Source
  • DocumentBuilt Up Area APPROVAL PLAN-1.pdf · uploaded 21 Nov 2025Source
  • DocumentBuilt Up Area APPROVAL PLAN-2.pdf · uploaded 21 Nov 2025Source
  • DocumentBuilt Up Area APPROVAL PLAN-3.pdf · uploaded 21 Nov 2025Source
  • DocumentUPTO 2ND FLOOR.pdf · uploaded 21 Nov 2025Source
  • DocumentFROM 3RD TO 10TH FLOOR.pdf · uploaded 21 Nov 2025Source
  • DocumentFLOOR PLAN 11 TH TO 23RD FLOOR.pdf · uploaded 21 Nov 2025Source
  • DocumentBuilt Up Area APPROVAL PLAN-1.pdf · uploaded 21 Nov 2025Source
  • DocumentBuilt Up Area APPROVAL PLAN-2.pdf · uploaded 21 Nov 2025Source
  • DocumentBuilt Up Area APPROVAL PLAN-3.pdf · uploaded 21 Nov 2025Source

Technical (Architect)

  • DocumentFORM 1.pdf · uploaded 7 Nov 2024Source
  • DocumentForm 1.pdf · uploaded 23 Jan 2025Source
  • DocumentForm 1.pdf · uploaded 24 Apr 2025Source
  • DocumentForm 1.pdf · uploaded 19 Jul 2025Source
  • DocumentFORM 1.pdf · uploaded 20 Jul 2026Source

Technical (Engineer)

  • DocumentFrom 2.pdf · uploaded 19 Oct 2024Source
  • DocumentForm 2.pdf · uploaded 20 Jan 2025Source
  • DocumentForm 2.pdf · uploaded 24 Apr 2025Source
  • DocumentForm 2.pdf · uploaded 19 Jul 2025Source
  • DocumentFORM 2.pdf · uploaded 20 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 35/1/1/B, 36/5/B

As registered with MahaRERA and published on its project page

Project type
Commercial
Status on MahaRERA
Certificate Signed
Unit types
Duplex Shop, Office space87 units in all
Address
Plot No A, Survey Nos.34/A/1/B, 35/1/1/B, 36/5/B, Chikanghar, KalyaPIN 421301
Village
Chikanghar, Kalyan taluka
Land area for this project
2,473 sq m (26,619 sq ft)
Permissible built-up area
15,154 sq m (1,63,119 sq ft)
Sanctioned built-up area
15,153 sq m (1,63,101 sq ft)
Recreational open space
0 sq m (0 sq ft)
Developed in phases
No

Survey, CTS, gat or plot numbers

35/1/1/B36/5/BSurvey Nos.34/A/1/B

Land as published on MahaRERA's project page

Plot No A ,Survey Nos.34/A/1/B,35/1/1/B,36/5/B

Boundaries

North
Survey No-34
South
Survey No-36
East
Gut No-188
West
Gut No-186

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking87 units

30 of 87 units booked (34%), as the promoter reported to MahaRERA

Duplex Shop · 5 unitsOffice space · 82 units
TypeCarpet areaUnitsBooked
Duplex Shop138.64 sq m · 1,492 sq ft10
Duplex Shop149.8 sq m · 1,612 sq ft10
Duplex Shop151.99 sq m · 1,636 sq ft10
Duplex Shop171.97 sq m · 1,851 sq ft10
Duplex Shop194.16 sq m · 2,090 sq ft10
Office space25.21 sq m · 271 sq ft11
Office space28.04 sq m · 302 sq ft10
Office space30.91 sq m · 333 sq ft10
Show all 84 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
Office space32.41 sq m · 349 sq ft11
Office space32.42 sq m · 349 sq ft10
Office space32.58 sq m · 351 sq ft11
Office space32.61 sq m · 351 sq ft42
Office space32.67 sq m · 352 sq ft10
Office space32.7 sq m · 352 sq ft11
Office space33.67 sq m · 362 sq ft11
Office space33.78 sq m · 364 sq ft11
Office space34.64 sq m · 373 sq ft11
Office space35.09 sq m · 378 sq ft11
Office space35.54 sq m · 383 sq ft11
Office space36.72 sq m · 395 sq ft11
Office space36.9 sq m · 397 sq ft11
Office space37.52 sq m · 404 sq ft11
Office space37.69 sq m · 406 sq ft11
Office space37.78 sq m · 407 sq ft11
Office space38.54 sq m · 415 sq ft11
Office space39.15 sq m · 421 sq ft11
Office space39.81 sq m · 429 sq ft11
Office space39.94 sq m · 430 sq ft10
Office space40.13 sq m · 432 sq ft10
Office space40.73 sq m · 438 sq ft11
Office space42.39 sq m · 456 sq ft10
Office space42.57 sq m · 458 sq ft10
Office space43.14 sq m · 464 sq ft10
Office space43.35 sq m · 467 sq ft10
Office space44.78 sq m · 482 sq ft10
Office space45.58 sq m · 491 sq ft11
Office space45.75 sq m · 492 sq ft10
Office space46.09 sq m · 496 sq ft11
Office space47.17 sq m · 508 sq ft10
Office space47.24 sq m · 508 sq ft11
Office space47.46 sq m · 511 sq ft11
Office space48.02 sq m · 517 sq ft10
Office space49.61 sq m · 534 sq ft11
Office space50.51 sq m · 544 sq ft10
Office space51.12 sq m · 550 sq ft11
Office space51.17 sq m · 551 sq ft10
Office space53.6 sq m · 577 sq ft10
Office space54.02 sq m · 581 sq ft10
Office space56.69 sq m · 610 sq ft10
Office space57.33 sq m · 617 sq ft10
Office space60 sq m · 646 sq ft11
Office space60.45 sq m · 651 sq ft10
Office space62.38 sq m · 671 sq ft10
Office space64.77 sq m · 697 sq ft10
Office space67.73 sq m · 729 sq ft10
Office space69.11 sq m · 744 sq ft10
Office space69.53 sq m · 748 sq ft10
Office space70.58 sq m · 760 sq ft10
Office space71.12 sq m · 766 sq ft10
Office space71.33 sq m · 768 sq ft10
Office space72.4 sq m · 779 sq ft10
Office space73.98 sq m · 796 sq ft10
Office space74.57 sq m · 803 sq ft10
Office space76.16 sq m · 820 sq ft10
Office space76.81 sq m · 827 sq ft10
Office space77.07 sq m · 830 sq ft11
Office space79.46 sq m · 855 sq ft10
Office space79.64 sq m · 857 sq ft10
Office space80.02 sq m · 861 sq ft10
Office space80.38 sq m · 865 sq ft10
Office space82.47 sq m · 888 sq ft10
Office space83.02 sq m · 894 sq ft10
Office space83.11 sq m · 895 sq ft10
Office space85.31 sq m · 918 sq ft10
Office space86.02 sq m · 926 sq ft10
Office space86.5 sq m · 931 sq ft10
Office space90.56 sq m · 975 sq ft10
Office space97.41 sq m · 1,049 sq ft10
Office space100.39 sq m · 1,081 sq ft11
Office space109.2 sq m · 1,175 sq ft11
Office space116.5 sq m · 1,254 sq ft10
Office space117.16 sq m · 1,261 sq ft10
Office space211.98 sq m · 2,282 sq ft10
Office space227.3 sq m · 2,447 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals5

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectArchitects Inc—
Chartered accountantAtul A Shetye—
Chartered accountantBhavana Mukesh Verhani—
Chartered accountantVerhani & Co—
EngineerAvanish & Associates—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Chikanghar

All 113 projects in Chikanghar · Compare Vedant Connect with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology