Deedo IDDP-THN-1GAXIts promised completion date, May 2026, has passed and MahaRERA does not show it completed; no MahaRERA orders on record; 44% of its units are booked.
Chikanghar, Thane 421301 · by Mangesh Dashrath Gaikar · 75% of its projects kept the RERA date
Buying a flat here?
See every deed registered on it.
Its promised completion date, May 2026, has passed and MahaRERA does not show it completed
- This projectRegistered 24 Mar 2022, completion promised 31 May 2026, and still not shown completed today.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700034115
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700034115 | 24 Mar 2022 | 31 May 2026 | 31 May 2026 | Mangesh Dashrath Gaikar | Project page |
Documents166
1 document held by Deedo, 165 filings listed on MahaRERA's project page
Finance
- PAN CardMDG_PAN.pdf · uploaded 1 Nov 2021Source
Migrated
- 1 PAN CardMDG_PAN.pdf · uploaded 1 Nov 2021Source
- 1 Details of encumbrancesno encumbrances.pdf · uploaded 1 Nov 2021Source
- 1 Commencement Certificates / NA Order for plotted developmentSKM_C284e21102914000 (2).pdf · uploaded 1 Nov 2021Source
- 1 Declaration about Commencement Certificatedeclaration for commencement.pdf · uploaded 1 Nov 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate.pdf · uploaded 1 Nov 2021Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Cert.pdf · uploaded 1 Nov 2021Source
Show all 166 documentsShow fewer documents
Migrated
- 2 Commencement Certificates / NA Order for plotted developmentSKM_C284e21062106540_compressed(2).pdf · uploaded 2 Nov 2021Source
- 1 Proforma of Allotment letterFLAT SALE AGREEMENT RERA.pdf · uploaded 12 Nov 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 ca certificate.pdf · uploaded 22 Mar 2022Source
- 1 Copy of the legal title report118-4-5.pdf · uploaded 23 Mar 2022Source
- 1 Copy of Layout Approval (in case of layout)MYSCAN_20220323_0003 (2).PDF · uploaded 23 Mar 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentMYSCAN_20220323_0004.PDF · uploaded 23 Mar 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentMYSCAN_20220323_0005.PDF · uploaded 23 Mar 2022Source
- 1 Declaration in FORM B118-4-5_compressed.pdf · uploaded 23 Mar 2022Source
- 1 CERSAI detailscersai imperial declaration_compressed.pdf · uploaded 23 Mar 2022Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A.pdf · uploaded 16 Jan 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A.pdf · uploaded 8 Feb 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)IMG_0002.pdf · uploaded 21 Mar 2023Source
- 2 Details of encumbrancesEncumbrances Certificate.pdf · uploaded 19 May 2023Source
- 1 Disclosure of sold/ booked inventorySold Unsold list compress.pdf · uploaded 3 Jul 2023Source
- 2 Disclosure of sold/ booked inventoryDisclosure of sold inventory Imperial Mar 24_compressed.pdf · uploaded 23 Apr 2024Source
- 1 Disclosure of sold/ booked inventorySold details_compressed.pdf · uploaded 29 Jan 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement certificate.pdf · uploaded 1 Feb 2025Source
- 2 Commencement Certificates / NA Order for plotted developmentscan4583.pdf · uploaded 1 Feb 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentscan4582.pdf · uploaded 1 Feb 2025Source
- 2 Building Plan Approval / NA Order for plotted developmentscan4584.pdf · uploaded 1 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Imperial Mar 2022.pdf · uploaded 25 Jul 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Imperial June 2022.pdf · uploaded 25 Jul 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Imperial Sept 2022.pdf · uploaded 25 Jul 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Imperial Dec 2022.pdf · uploaded 25 Jul 2025Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Imperial Mar 2023.pdf · uploaded 25 Jul 2025Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Imperial June 2023.pdf · uploaded 25 Jul 2025Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Imperial Sept 2023.pdf · uploaded 25 Jul 2025Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Imperial Dec 2023.pdf · uploaded 25 Jul 2025Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Imperial Mar 2024.pdf · uploaded 25 Jul 2025Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Imperial June 2024.pdf · uploaded 25 Jul 2025Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Imperial Sept 2024.pdf · uploaded 25 Jul 2025Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Imperial Dec 2024.pdf · uploaded 25 Jul 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A.pdf · uploaded 25 Jul 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 2022-23-Imperial final.pdf · uploaded 25 Jul 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A.pdf · uploaded 25 Jul 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 2023-24-Imperial final.pdf · uploaded 25 Jul 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 imperial June 2022 final.pdf · uploaded 26 Jul 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 imperial Mar 2022 final.pdf · uploaded 26 Jul 2025Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 imperial Dec 24 final.pdf · uploaded 26 Jul 2025Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 imperial Sept 24 final.pdf · uploaded 26 Jul 2025Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 imperial June 24 final.pdf · uploaded 26 Jul 2025Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 imperial Mar 24 Final.pdf · uploaded 26 Jul 2025Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 imperial Dec 2023 final.pdf · uploaded 26 Jul 2025Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 imperial Sept 2023 final.pdf · uploaded 26 Jul 2025Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 imperial June 2023 final.pdf · uploaded 26 Jul 2025Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 imperial Mar 2023 final.pdf · uploaded 26 Jul 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 imperial Dec 2022 final.pdf · uploaded 26 Jul 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 imperial Sept 2022 final.pdf · uploaded 26 Jul 2025Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)Sold Unsold List Imperial.pdf · uploaded 26 Jul 2025Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 26 Jul 2025Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 26 Jul 2025Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 26 Jul 2025Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 26 Jul 2025Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 26 Jul 2025Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 26 Jul 2025Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 26 Jul 2025Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 26 Jul 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 26 Jul 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 26 Jul 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 26 Jul 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 26 Jul 2025Source
- 1 Disclosure of sold/ booked inventorySold unsold.pdf · uploaded 26 Jul 2025Source
- 2 Disclosure of sold/ booked inventorySold unsold.pdf · uploaded 26 Jul 2025Source
- 3 Disclosure of sold/ booked inventorysold unsold.pdf · uploaded 26 Jul 2025Source
- 4 Disclosure of sold/ booked inventorySold unsold.pdf · uploaded 26 Jul 2025Source
- 5 Disclosure of sold/ booked inventorySold unsold.pdf · uploaded 26 Jul 2025Source
- 6 Disclosure of sold/ booked inventorySold Unsold List Imperial Compressed.pdf · uploaded 26 Jul 2025Source
- 7 Disclosure of sold/ booked inventorySold unsold.pdf · uploaded 26 Jul 2025Source
- 8 Disclosure of sold/ booked inventorySold unsold.pdf · uploaded 26 Jul 2025Source
- Form 1Form 1 Imperial Mar 2022.pdf · uploaded 26 Jul 2025Source
- Form 2Form 2.pdf · uploaded 26 Jul 2025Source
- Form 3CA Certificate Form 3 imperial Mar 2022 final.pdf · uploaded 26 Jul 2025Source
- Disclosure of Sold and Booked InventorySold unsold.pdf · uploaded 26 Jul 2025Source
- Form 1Form 1 Imperial June 2022.pdf · uploaded 26 Jul 2025Source
- Form 2Form 2.pdf · uploaded 26 Jul 2025Source
- Form 3CA Certificate Form 3 imperial June 2022 final.pdf · uploaded 26 Jul 2025Source
- Disclosure of Sold and Booked InventorySold unsold.pdf · uploaded 26 Jul 2025Source
- Form 1Form 1 Imperial Sept 2022.pdf · uploaded 26 Jul 2025Source
- Form 2Form 2.pdf · uploaded 26 Jul 2025Source
- Form 3CA Certificate Form 3 imperial Sept 2022 final.pdf · uploaded 26 Jul 2025Source
- Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 26 Jul 2025Source
- Form 1Form 1 Imperial Dec 2022.pdf · uploaded 26 Jul 2025Source
- Form 2Form 2.pdf · uploaded 26 Jul 2025Source
- Form 3CA Certificate Form 3 imperial Dec 2022 final.pdf · uploaded 26 Jul 2025Source
- Disclosure of Sold and Booked InventorySold unsold.pdf · uploaded 26 Jul 2025Source
- Form 1Form 1 Imperial Mar 2023.pdf · uploaded 26 Jul 2025Source
- Form 2Form 2.pdf · uploaded 26 Jul 2025Source
- Form 3CA Certificate Form 3 imperial Mar 2023 final.pdf · uploaded 26 Jul 2025Source
- Disclosure of Sold and Booked InventorySold unsold.pdf · uploaded 26 Jul 2025Source
- Form 1Form 1 Imperial June 2023.pdf · uploaded 26 Jul 2025Source
- Form 2Form 2.pdf · uploaded 26 Jul 2025Source
- Form 3CA Certificate Form 3 imperial June 2023 final.pdf · uploaded 26 Jul 2025Source
- Disclosure of Sold and Booked InventorySold Unsold list.pdf · uploaded 26 Jul 2025Source
- Form 1Form 1 Imperial Sept 2023.pdf · uploaded 26 Jul 2025Source
- Form 2Form 2.pdf · uploaded 26 Jul 2025Source
- Form 3CA Certificate Form 3 imperial Sept 2023 final.pdf · uploaded 26 Jul 2025Source
- Disclosure of Sold and Booked InventorySold Unsold List Imperial.pdf · uploaded 26 Jul 2025Source
- Form 1Form 1 Imperial Dec 2023.pdf · uploaded 26 Jul 2025Source
- Form 2Form 2.pdf · uploaded 26 Jul 2025Source
- Form 3CA Certificate Form 3 imperial Dec 2023 final.pdf · uploaded 26 Jul 2025Source
- Disclosure of Sold and Booked InventorySold Unsold List Imperial.pdf · uploaded 26 Jul 2025Source
- Form 1Form 1 Imperial Mar 2024.pdf · uploaded 26 Jul 2025Source
- Form 2Form 2.pdf · uploaded 26 Jul 2025Source
- Form 3CA Certificate Form 3 imperial Mar 24 Final.pdf · uploaded 26 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold inventory Imperial Mar 24.pdf · uploaded 26 Jul 2025Source
- Form 1Form 1 Imperial June 2024.pdf · uploaded 26 Jul 2025Source
- Form 2Form 2.pdf · uploaded 26 Jul 2025Source
- Form 3CA Certificate Form 3 imperial June 24 final.pdf · uploaded 26 Jul 2025Source
- Disclosure of Sold and Booked InventorySold unsold.pdf · uploaded 26 Jul 2025Source
- Form 1Form 1 Imperial Sept 2024.pdf · uploaded 26 Jul 2025Source
- Form 2Form 2.pdf · uploaded 26 Jul 2025Source
- Form 3CA Certificate Form 3 imperial Sept 24 final.pdf · uploaded 26 Jul 2025Source
- Disclosure of Sold and Booked InventorySold unsold.pdf · uploaded 26 Jul 2025Source
- Form 1Form 1 Imperial Dec 2024.pdf · uploaded 26 Jul 2025Source
- Form 2Form 2.pdf · uploaded 26 Jul 2025Source
- Form 3CA Certificate Form 3 imperial Dec 24 final.pdf · uploaded 26 Jul 2025Source
- Disclosure of Sold and Booked InventorySold details.pdf · uploaded 26 Jul 2025Source
- Form 2A (FY 2021-2022)FORM 2A.pdf · uploaded 26 Jul 2025Source
- Form 2A (FY 2022-2023)Form 2A.pdf · uploaded 26 Jul 2025Source
- Form 2A (FY 2023-2024)Form 2A.pdf · uploaded 26 Jul 2025Source
- Form 1Form 1.pdf · uploaded 11 Sep 2026Source
- Form 2Form 2.pdf · uploaded 11 Sep 2026Source
- Form 3Form 3.pdf · uploaded 11 Sep 2026Source
- Disclosure of Sold and Booked InventorySold Booked Inventory.pdf · uploaded 11 Sep 2026Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 11 Sep 2026Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 11 Sep 2026Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 11 Sep 2026Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 11 Sep 2026Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 11 Sep 2026Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 11 Sep 2026Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 11 Sep 2026Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 11 Sep 2026Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 11 Sep 2026Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 11 Sep 2026Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 11 Sep 2026Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 11 Sep 2026Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 11 Sep 2026Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 11 Sep 2026Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 11 Sep 2026Source
Technical
Technical (Engineer)
- DocumentForm 2.pdf · uploaded 26 Jul 2025Source
- DocumentForm 2.pdf · uploaded 26 Jul 2025Source
- DocumentForm 2.pdf · uploaded 26 Jul 2025Source
- DocumentForm 2.pdf · uploaded 26 Jul 2025Source
- DocumentForm 2.pdf · uploaded 26 Jul 2025Source
- DocumentForm 2.pdf · uploaded 26 Jul 2025Source
- DocumentForm 2.pdf · uploaded 26 Jul 2025Source
- DocumentForm 2.pdf · uploaded 26 Jul 2025Source
- DocumentForm 2.pdf · uploaded 26 Jul 2025Source
- DocumentForm 2.pdf · uploaded 26 Jul 2025Source
- DocumentForm 2.pdf · uploaded 26 Jul 2025Source
- DocumentForm 2.pdf · uploaded 26 Jul 2025Source
- DocumentSold Unsold List Imperial.pdf · uploaded 26 Jul 2025Source
- DocumentForm 2.pdf · uploaded 11 Sep 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 5, S No 118 Hissa 4
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Village
- Chikanghar
- Location
- 19.24902, 73.13804
- Land area for this project
- 4,068 sq m (43,788 sq ft)
- Permissible built-up area
- 13,745 sq m (1,47,952 sq ft)
- Sanctioned built-up area
- 13,745 sq m (1,47,952 sq ft)
- Designated bank account
- 200
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
S No 118 Hissa 4,5
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals6
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Vitan Consultant | — |
| Chartered accountant | Ishan Shah | — |
| Chartered accountant | Kirti N Shah | — |
| Engineer | Dipali Patil | — |
| Other | Ajay Mhale | — |
| Other | Big City Project Pvt Ltd | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Chikanghar
- Windsor BRERA PM1330002602731
- Vishwajeet MajesticRERA PR1330002602532
- Omkar ChsRERA PR1330002602352
- Borgaonkar CapitalRERA PR1330002601458
- Pinnacle WestRERA PR1330002600939
- RitzeniaRERA PC1331012600853
- The Pyramid PrideRERA PR1330002600836
- Shree Yogiraj ConstructionRERA PC1330002502998
All 113 projects in Chikanghar · Compare Mangeshi Imperial with another project