Deedo IDDP-THN-4YSWIts promised completion date, Nov 2026, has passed and MahaRERA does not show it completed; no MahaRERA orders on record; 13% of its units are booked.
Barave, Thane 421301 · by Shirdi Sai Sheltors LLP
Buying a flat here?
See every deed registered on it.
Its promised completion date, Nov 2026, has passed and MahaRERA does not show it completed
- This projectRegistered 29 Nov 2021, completion promised 24 Nov 2026, and still not shown completed today.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
2 buildings
Open a building to see every flat, floor by floor.
- Midtown Twin Towers T-132 floors · 150 units4% booked
- Midtown Twin Towers T-220 floors · 76 units30% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700031951
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700031951 | 29 Nov 2021 | 24 Nov 2026 | 24 Nov 2026 | Shirdi Sai Sheltors LLP | Project page |
Documents199
2 documents held by Deedo, 197 filings listed on MahaRERA's project page
Finance
- PAN CardPAN CARD.pdf · uploaded 19 Nov 2021Source
Legal
- Legal Title reportShirdi Sai Sheltors LLP New Title_compressed.pdf · uploaded 19 Nov 2021Source
- Declaration Form BNOTARISED FORM B-AFFIDAVIT CUM DECLARATION_compressed.pdf · uploaded 23 Nov 2021Source
- OtherSS SHELTORS FORM 2A Q3 FY 21-22.pdf · uploaded 17 Feb 2022Source
- OtherDeclaration.pdf · uploaded 28 May 2022Source
- OthersSupplementary Partnership Deed.pdf · uploaded 17 Jun 2026Source
Show all 199 documentsShow fewer documents
Migrated
- 1 PAN CardPAN CARD.pdf · uploaded 19 Nov 2021Source
- 1 Copy of the legal title reportShirdi Sai Sheltors LLP New Title_compressed.pdf · uploaded 19 Nov 2021Source
- 1 Details of encumbrancesNO ENCUMBRANCES CERTIFICATE.pdf · uploaded 19 Nov 2021Source
- 1 Copy of Layout Approval (in case of layout)Layout Approval compressed.pdf · uploaded 19 Nov 2021Source
- 1 Building Plan Approval / NA Order for plotted developmentNA Order.pdf · uploaded 19 Nov 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed-compressed.pdf · uploaded 19 Nov 2021Source
- 1 Proforma of Allotment letterFINAL FORMAT OF ALLOTMENT LETTER FLATS.pdf · uploaded 19 Nov 2021Source
- 2 Proforma of Allotment letterFLAT SALE -RERA- DRAFT - BARAVE.pdf · uploaded 19 Nov 2021Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 23 Nov 2021Source
- 1 Declaration about Commencement CertificateIMG_20211123_0002.pdf · uploaded 23 Nov 2021Source
- 1 Declaration in FORM BNOTARISED FORM B-AFFIDAVIT CUM DECLARATION_compressed.pdf · uploaded 23 Nov 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)SHIRDI SAI SHELTORS LLP - ARCHITECT CERTIFICATE COMPRESSED.pdf · uploaded 23 Nov 2021Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)SHIRDI SAI SHELTORS LLP - ENGINEER'S CERTIFICATE_compressed.pdf · uploaded 23 Nov 2021Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE - 05 JAN 2022 compressed.pdf · uploaded 24 Jan 2022Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE - 10 JAN 2022 compressed.pdf · uploaded 24 Jan 2022Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 COMPRESSED.pdf · uploaded 24 Jan 2022Source
- 1 CERSAI detailsSS Sheltors LLP CERSAI_Search_Report_200230509552_For_Asset_Based_Search_17_02_2022_19_01_19_055.pdf · uploaded 17 Feb 2022Source
- 1 OtherSS SHELTORS FORM 2A Q3 FY 21-22.pdf · uploaded 17 Feb 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE 31 MAR 2022.pdf · uploaded 11 Apr 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)SSS ENGINEER CERTIFICATE TILL 31 MAR 2022 compressed.pdf · uploaded 6 May 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)SSS LLP Form 2A Q4 TILL 31 MARCH 2022.pdf · uploaded 6 May 2022Source
- 1 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY UPDATE - Q3.pdf · uploaded 6 May 2022Source
- 2 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY UPDATE - Q4.pdf · uploaded 6 May 2022Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE Q4 TILL 31 MARCH 2022 COMPRESSED.pdf · uploaded 6 May 2022Source
- 2 OtherDeclaration.pdf · uploaded 28 May 2022Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)SSS LLP ARCHITECT CERTIFICATE - Q1 FY 2022-23_compressed.pdf · uploaded 9 Jul 2022Source
- 3 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY UPDATE - Q1 FY 2022-23.pdf · uploaded 9 Jul 2022Source
- 2 CERSAI detailsCERSAI_Search_Report_200241789218_For_Asset_Based_Search_09_07_2022_17_49_20_821.pdf · uploaded 9 Jul 2022Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSS LLP FORM 3 - Q1 FY 2022-23 COMPRESSED.pdf · uploaded 9 Jul 2022Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)SSS LLP ENGINEER CERTIFICATE - Q1 FY 2022-23 compressed.pdf · uploaded 11 Jul 2022Source
- 2 Details of encumbrancesMIDTOWN TWIN TOWERS REVISED ENCUMBRANCE CERTIFICATE.pdf · uploaded 24 Sep 2022Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)SSS LLP FORM 1 Q1 FY 22-23.pdf · uploaded 14 Oct 2022Source
- 4 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY UPDATE - Q2 FY 2022-23 signed.pdf · uploaded 14 Oct 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5.pdf · uploaded 14 Oct 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)SSS LLP FORM 5 FY 21-22.pdf · uploaded 14 Oct 2022Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSS LLP FORM 3 Q2 FY 2022-23_compressed.pdf · uploaded 21 Oct 2022Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSS LLP FORM 3 Q2 FY 2022-23_compressed.pdf · uploaded 21 Oct 2022Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)SSS LLP FORM 2 Q2 FY 22-23.pdf · uploaded 31 Oct 2022Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)SSS LLP FORM 1 Q3 FY 2022-23.pdf · uploaded 9 Jan 2023Source
- 5 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY UPDATE - Q3 FY 2022-23.pdf · uploaded 9 Jan 2023Source
- 2 Copy of Layout Approval (in case of layout)REVISED PLAN COPY.pdf · uploaded 10 Jan 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentREVISED COMMENCEMENT CERTIFICATE_compressed.pdf · uploaded 10 Jan 2023Source
- 6 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY UPDATE - Q3 FY 2022-23.pdf · uploaded 10 Jan 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSS LLP FORM 3 Q3 FY 22-23.pdf · uploaded 11 Jan 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)SSS LLP FORM 2 Q3 FY 22-23.pdf · uploaded 26 Jan 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - Q4 - FY 2022-23 compressed.pdf · uploaded 8 Apr 2023Source
- 7 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY UPDATE - Q4 FY 2022-23.pdf · uploaded 8 Apr 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 - Q4 - FY 2022-23_compressed.pdf · uploaded 19 Apr 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - Q4 FY 2022-23_compressed.pdf · uploaded 22 Apr 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)MIDTOWN TWIN TOWERS.pdf · uploaded 8 Jul 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)SSS LLP FORM 2 Q1 FY 23-24 compressed.pdf · uploaded 20 Jul 2023Source
- 8 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY UPDATE - Q1 FY 2023-24.pdf · uploaded 20 Jul 2023Source
- 9 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY UPDATE - Q1 FY 2023-24.pdf · uploaded 20 Jul 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSS LLP FORM 3 Q1 FY 23-24 COMPRESSED.pdf · uploaded 20 Jul 2023Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)SSS LLP FORM 1 Q2 FY 23-24_compressed.pdf · uploaded 20 Oct 2023Source
- 10 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY UPDATE - Q2 FY 2023-24.pdf · uploaded 20 Oct 2023Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSS LLP FORM 3 Q2 FY 23-24_compressed.pdf · uploaded 25 Oct 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)SSS LLP FORM 5 FY 22-23.pdf · uploaded 25 Oct 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)SSS LLP FORM 2 FY 22-23.pdf · uploaded 26 Oct 2023Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)SHIRDI SAI SHELTORS LLP FORM 1 Q3 FY 23-24.pdf · uploaded 11 Jan 2024Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)SHIRDI SAI SHELTORS LLP FORM 1 Q3 FY 23-24.pdf · uploaded 11 Jan 2024Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)SHIRDI SAI SHELTORS LLP FORM 1 Q3 FY 23-24_compressed.pdf · uploaded 11 Jan 2024Source
- 11 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY UPDATE - Q3 FY 2023-24.pdf · uploaded 27 Jan 2024Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)SHIRDI SAI SHELTORS LLP FORM 3 Q3 FY 23-24.pdf · uploaded 27 Jan 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)SSS LLP FORM 2 Q3 FY 23-24.pdf · uploaded 30 Jan 2024Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)MIDTOWN SHELTORS LLP FORM 1 Q4 FY 23-24.pdf · uploaded 24 Apr 2024Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)SHIRDI SAI SHELTORS LLP FORM 1 Q4 FY 23-24.pdf · uploaded 24 Apr 2024Source
- 12 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY UPDATE - Q4 FY 2023-24.pdf · uploaded 24 Apr 2024Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)SHIRDI SAI SHELTORS LLP FORM 3 Q4 FY 23-24.pdf · uploaded 2 May 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)SSS LLP FORM 2.pdf · uploaded 3 May 2024Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)SHIRDI SAI SHELTORS LLP FORM 1 Q1 FY 24-25.pdf · uploaded 19 Jul 2024Source
- 13 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY UPDATE - Q1 FY 2024-25.pdf · uploaded 24 Jul 2024Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSS LLP FORM 3 Q1 FY 2024-25.pdf · uploaded 27 Jul 2024Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)SSS LLP FORM 2 Q1 FY 24-25.pdf · uploaded 30 Jul 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)SSS LLP FORM 1 Q2 FY 2024-25 Compressed.pdf · uploaded 10 Dec 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSS LLP FORM 3 Q2 FY 24-25 Compressed.pdf · uploaded 10 Dec 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)SSS LLP FORM 2 Q2 FY 23-24.pdf · uploaded 10 Dec 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentRevised CC.pdf · uploaded 10 Dec 2024Source
- 2 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY UPDATE - Q2 FY 2024-25.pdf · uploaded 10 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)SSS LLP FORM 1 Q3 FY 2024-25.pdf · uploaded 24 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSS LLP FORM 3 Q3 FY 2024-25.pdf · uploaded 29 Jan 2025Source
- 1 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY UPDATE - Q3 FY 2024-25.pdf · uploaded 29 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)SSS LLP FORM 2 Q3 FY 2024-25.pdf · uploaded 30 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)SSS LLP FORM 1 Q4 FY 2024-25 signed.pdf · uploaded 28 Apr 2025Source
- 1 Disclosure of sold/ booked inventorysold and unsold inventory shirdi sai llp q4 fy 24-25 signed.pdf · uploaded 29 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)SHIRDI SAI FORM 3 Q4 FY 24-25 F.pdf · uploaded 16 May 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SSS LLP.pdf · uploaded 21 May 2025Source
- Form 1SSS LLP FORM 1 Q1 FY 2025-26.pdf · uploaded 1 Aug 2025Source
- Form 2SSS LLP FORM 2 Q1 FY 2025-26.pdf · uploaded 1 Aug 2025Source
- Form 3SSS LLP FORM 3 Q1 FY 2025-26.pdf · uploaded 1 Aug 2025Source
- Disclosure of Sold and Booked InventorySOLD AND UNSOLD INVENTORY Q1 FY 2025-26 SIGNED.pdf · uploaded 1 Aug 2025Source
- Form 5 (FY 2022-2023)SSS LLP FORM 5 FY 22-23.pdf · uploaded 17 Oct 2025Source
- Form 5 (FY 2023-2024)SSS LLP FORM 5 FY 2023-24.pdf · uploaded 17 Oct 2025Source
- Form 5 (FY 2024-2025)SSS LLP FORM 5 FY 2024-25.pdf · uploaded 17 Oct 2025Source
- Form 2A (FY 2021-2022)FORM 2A SHIRDI SAI SHELTORS 21-22.pdf · uploaded 17 Jan 2026Source
- Form 2A (FY 2022-2023)FORM 2A SHIRDI SAI SHELTORS 22-23.pdf · uploaded 17 Jan 2026Source
- Form 2A (FY 2023-2024)FORM 2A SHIRDI SAI SHELTORS 23-24.pdf · uploaded 17 Jan 2026Source
- Form 2A (FY 2024-2025)FORM 2A SIGNED.pdf · uploaded 17 Jan 2026Source
- Form 1ARCHITECT CERTIFICATE - 05 JAN 2022 compressed.pdf · uploaded 26 Feb 2026Source
- Form 2ENGINEER CERTIFICATE - 10 JAN 2022 compressed.pdf · uploaded 26 Feb 2026Source
- Form 3FORM 3 COMPRESSED.pdf · uploaded 26 Feb 2026Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD INVENTORY UPDATE - Q3.pdf · uploaded 26 Feb 2026Source
- Form 1ARCHITECT CERTIFICATE 31 MAR 2022.pdf · uploaded 26 Feb 2026Source
- Form 2SSS ENGINEER CERTIFICATE TILL 31 MAR 2022 compressed.pdf · uploaded 26 Feb 2026Source
- Form 3CA CERTIFICATE Q4 TILL 31 MARCH 2022 COMPRESSED.pdf · uploaded 26 Feb 2026Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD INVENTORY UPDATE - Q4.pdf · uploaded 26 Feb 2026Source
- Form 1SSS LLP FORM 1 Q1 FY 2022-23.pdf · uploaded 26 Feb 2026Source
- Form 2SSS LLP FORM 2 Q1 FY 2022-23.pdf · uploaded 26 Feb 2026Source
- Form 3SSS LLP FORM 3 - Q1 FY 2022-23 COMPRESSED.pdf · uploaded 26 Feb 2026Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD INVENTORY UPDATE - Q1 FY 2022-23.pdf · uploaded 26 Feb 2026Source
- Form 1SSS LLP FORM 1 Q2 FY 22-23.pdf · uploaded 26 Feb 2026Source
- Form 2SSS LLP FORM 2 Q2 FY 22-23.pdf · uploaded 26 Feb 2026Source
- Form 3SSS LLP FORM 3 Q2 FY 2022-23_compressed.pdf · uploaded 26 Feb 2026Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD INVENTORY UPDATE - Q2 FY 2022-23 signed.pdf · uploaded 26 Feb 2026Source
- Form 1SSS LLP FORM 1 Q3 FY 2022-23.pdf · uploaded 26 Feb 2026Source
- Form 2SSS LLP FORM 2 Q3 FY 22-23.pdf · uploaded 26 Feb 2026Source
- Form 3SSS LLP FORM 3 Q3 FY 22-23.pdf · uploaded 26 Feb 2026Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD INVENTORY UPDATE - Q3 FY 2022-23.pdf · uploaded 26 Feb 2026Source
- Form 1FORM 1 - Q4 - FY 2022-23 compressed.pdf · uploaded 26 Feb 2026Source
- Form 2FORM 2 - Q4 FY 2022-23_compressed.pdf · uploaded 26 Feb 2026Source
- Form 3FORM 3 - Q4 - FY 2022-23_compressed.pdf · uploaded 26 Feb 2026Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD INVENTORY UPDATE - Q4 FY 2022-23.pdf · uploaded 26 Feb 2026Source
- Form 2SSS LLP FORM 2 Q1 FY 23-24 compressed.pdf · uploaded 26 Feb 2026Source
- Form 1SSS LLP FORM 1 Q1 FY 23-24.pdf · uploaded 26 Feb 2026Source
- Form 3SSS LLP FORM 3 Q1 FY 23-24 COMPRESSED.pdf · uploaded 26 Feb 2026Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD INVENTORY UPDATE - Q1 FY 2023-24.pdf · uploaded 26 Feb 2026Source
- Form 1SSS LLP FORM 1 Q2 FY 23-24_compressed.pdf · uploaded 26 Feb 2026Source
- Form 3SSS LLP FORM 3 Q2 FY 23-24_compressed.pdf · uploaded 26 Feb 2026Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD INVENTORY UPDATE - Q2 FY 2023-24.pdf · uploaded 26 Feb 2026Source
- Form 2SSS LLP FORM 2 Q2 FY 23-24.pdf · uploaded 26 Feb 2026Source
- Form 1SHIRDI SAI SHELTORS LLP FORM 1 Q3 FY 23-24 compressed.pdf · uploaded 26 Feb 2026Source
- Form 2SHIRDI SAI SHELTORS LLP FORM 2 Q3 FY 23-24.pdf · uploaded 26 Feb 2026Source
- Form 3SHIRDI SAI SHELTORS LLP FORM 3 Q3 FY 23-24.pdf · uploaded 26 Feb 2026Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD INVENTORY UPDATE - Q3 FY 2023-24.pdf · uploaded 26 Feb 2026Source
- Form 1SHIRDI SAI SHELTORS LLP FORM 1 Q4 FY 23-24.pdf · uploaded 26 Feb 2026Source
- Form 2SHIRDI SAI SHELTORS LLP FORM 2 Q4 FY 23-24.pdf · uploaded 26 Feb 2026Source
- Form 3SHIRDI SAI SHELTORS LLP FORM 3 Q4 FY 23-24.pdf · uploaded 26 Feb 2026Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD INVENTORY UPDATE - Q4 FY 2023-24.pdf · uploaded 26 Feb 2026Source
- Form 1SSS LLP FORM 1 Q1 FY 2024-25.pdf · uploaded 26 Feb 2026Source
- Form 2SSS LLP FORM 2 Q1 FY 24-25.pdf · uploaded 26 Feb 2026Source
- Form 3SSS LLP FORM 3 Q1 FY 2024-25.pdf · uploaded 26 Feb 2026Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD INVENTORY UPDATE - Q1 FY 2024-25.pdf · uploaded 26 Feb 2026Source
- Form 1SSS LLP FORM 1 Q2 FY 2024-25 Compressed.pdf · uploaded 26 Feb 2026Source
- Form 2SSS LLP FORM 2 Q2 FY 23-24.pdf · uploaded 26 Feb 2026Source
- Form 3SSS LLP FORM 3 Q2 FY 24-25 Compressed.pdf · uploaded 26 Feb 2026Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD INVENTORY UPDATE - Q2 FY 2024-25.pdf · uploaded 26 Feb 2026Source
- Form 1SSS LLP FORM 1 Q3 FY 2024-25.pdf · uploaded 26 Feb 2026Source
- Form 2SSS LLP FORM 2 Q3 FY 2024-25.pdf · uploaded 26 Feb 2026Source
- Form 3SSS LLP FORM 3 FY 2024-25 PHYSICALLY SIGNED.pdf · uploaded 26 Feb 2026Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD INVENTORY UPDATE - Q3 FY 2024-25.pdf · uploaded 26 Feb 2026Source
- Form 1SSS LLP FORM 1 Q4 FY 2024-25 signed.pdf · uploaded 26 Feb 2026Source
- Form 2SSS LLP FORM 2 Q4 FY 2024-25 signed.pdf · uploaded 26 Feb 2026Source
- Form 3SHIRDI SAI FORM 3 Q4 FY 24-25 COMPRESSED.pdf · uploaded 26 Feb 2026Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD INVENTORY UPDATE - Q4 FY 2024-25.pdf · uploaded 26 Feb 2026Source
- Withdrawal Update Form 1SSS LLP FORM 1 Q1 FY 2025-26.pdf · uploaded 27 Feb 2026Source
- Withdrawal Update Form 1FORM 1 SSS LLP SIGNED Q2 FY 2025-26.pdf · uploaded 27 Feb 2026Source
- Withdrawal Update Form 1SSS LLP FORM 1 Q3 FY 2025-26.pdf · uploaded 27 Feb 2026Source
- Withdrawal Update Form 2SSS LLP FORM 2 Q1 FY 2025-26.pdf · uploaded 27 Feb 2026Source
- Withdrawal Update Form 2FORM 2 SSS LLP SIGNED Q2 FY 2025-26.pdf · uploaded 27 Feb 2026Source
- Withdrawal Update Form 2SSS LLP FORM 2 Q3 FY 2025-26.pdf · uploaded 27 Feb 2026Source
- Withdrawal Update Form 3SSS LLP FORM 3 Q1 25-26 PHYSICALLY SIGNED.pdf · uploaded 27 Feb 2026Source
- Withdrawal Update Form 3FORM 3 SSS LLP SIGNED Q2 FY 2025-26_compressed.pdf · uploaded 27 Feb 2026Source
- Withdrawal Update Form 3SSS LLP FORM 3 Q3 FY 2025-26_compressed.pdf · uploaded 27 Feb 2026Source
- Withdrawal Update Form 1SSS LLP FORM 1 Q1 FY 2025-26.pdf · uploaded 12 Mar 2026Source
- Withdrawal Update Form 2SSS LLP FORM 2 Q1 FY 2025-26.pdf · uploaded 12 Mar 2026Source
- Withdrawal Update Form 3SSS LLP FORM 3 Q1 25-26 PHYSICALLY SIGNED.pdf · uploaded 12 Mar 2026Source
- Form 2A (FY 2025-2026)FORM 2A SIGNED SHIRDI SAI SHELTORS LLP 2025-26.pdf · uploaded 2 May 2026Source
- Withdrawal Update Form 1SSS LLP FORM 1 Q4 FY 2025-26.pdf · uploaded 4 May 2026Source
- Withdrawal Update Form 2SSS LLP FORM 2 Q4 FY 2025-26.pdf · uploaded 4 May 2026Source
- Withdrawal Update Form 3Shirdi Sai Sheltors LLP Form 3 Q4 25-26.pdf · uploaded 4 May 2026Source
- Withdrawal Update Form 1SSS LLP FORM 1 Q1 FY 2026-27.pdf · uploaded 18 Jul 2026Source
- Withdrawal Update Form 2SSS LLP FORM 2 Q1 FY 2026-27.pdf · uploaded 18 Jul 2026Source
- Withdrawal Update Form 3SSS LLP FORM 3 Q1 FY 2026-27.pdf · uploaded 18 Jul 2026Source
- Form 5 (FY 2025-2026)Shirdi Sai Sheltors LLP (Form 5) FY 2025-26.pdf · uploaded 28 Sep 2026Source
Technical
- DocumentLayout Approval compressed.pdf · uploaded 19 Nov 2021Source
- DocumentNA Order.pdf · uploaded 19 Nov 2021Source
- DocumentREVISED PLAN COPY.pdf · uploaded 10 Jan 2023Source
- DocumentLayout Approval Plan.pdf · uploaded 17 Jun 2026Source
- DocumentRevised Sanctioned Plan.pdf · uploaded 17 Jun 2026Source
- DocumentAnnexure A.pdf · uploaded 10 Jul 2026Source
- DocumentBuilding Plan 1-3_Tower-1_2024.pdf · uploaded 11 Jul 2026Source
- DocumentBuilding Plan 4-5_Tower-2_2024.pdf · uploaded 11 Jul 2026Source
- DocumentRevised Sanctioned Plan T-1 T-2_Highlighted.pdf · uploaded 11 Jul 2026Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel H. NO. 3, H. NO. 3
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK226 units in all
- Address
- S. No. 12, H. No. 3, Godrej Hill Road, Village Barave, Near Wadhwa's Shiv MandirPIN 421301
- Village
- Barave, Kalyan taluka
- Location
- 19.15494, 73.08399
- Land area for this project
- 6,100 sq m (65,660 sq ft)
- Permissible built-up area
- 19,858 sq m (2,13,748 sq ft)
- Sanctioned built-up area
- 19,465 sq m (2,09,523 sq ft)
- Recreational open space
- 0 sq m (0 sq ft)
- Designated bank account
- 190
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
S. NO. 12, H. NO. 3
Boundaries
- North
- Godrej Riverside Society
- South
- Shivleela Wadhwa Heights Society
- East
- Urban Villa Society
- West
- Niraj Riveria Society
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking226 units
29 of 226 units booked (13%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Midtown Twin Towers T-1 | 1BHK | 43.31 sq m · 466 sq ft | 29 | 0 |
| Midtown Twin Towers T-1 | 1BHK | 43.33 sq m · 466 sq ft | 29 | 1 |
| Midtown Twin Towers T-1 | 1BHK | 45.8 sq m · 493 sq ft | 2 | 2 |
| Midtown Twin Towers T-1 | 1BHK | 47.33 sq m · 509 sq ft | 2 | 2 |
| Midtown Twin Towers T-1 | 1BHK | 49.9 sq m · 537 sq ft | 58 | 1 |
| Midtown Twin Towers T-1 | 2BHK | 69.96 sq m · 753 sq ft | 30 | 0 |
| Midtown Twin Towers T-2 | 1BHK | 54.16 sq m · 583 sq ft | 33 | 9 |
| Midtown Twin Towers T-2 | 1BHK | 54.71 sq m · 589 sq ft | 5 | 2 |
| Midtown Twin Towers T-2 | 2BHK | 74.48 sq m · 802 sq ft | 28 | 8 |
| Midtown Twin Towers T-2 | 2BHK | 80.33 sq m · 865 sq ft | 10 | 4 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals4
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Vitan Consultants | — |
| Chartered accountant | P M Dalvi & Co | — |
| Engineer | Reji George | — |
| Registered real estate agent | Dilip Nagdev | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Barave
- Athena & Eden by TCJ RealtyRERA PM1330002602258
- Rm SolitaireRERA PR1330002601795
- Precious Villas by RM | ParijasRERA P51700056173
- Cross WindRERA P51700051960
- Gnp LandmarkRERA P51700049895
All 6 projects in Barave · Compare Midtown Twin Towers with another project