Its promised completion date, Nov 2026, has passed and MahaRERA does not show it completed; no MahaRERA orders on record; 13% of its units are booked.

Barave, Thane 421301 · by Shirdi Sai Sheltors LLP

Deliveryunder a month past duePromised Nov 2026 · no extension on record · not shown completedRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales13% booked29 of 226 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Its promised completion date, Nov 2026, has passed and MahaRERA does not show it completed

  • This projectRegistered 29 Nov 2021, completion promised 24 Nov 2026, and still not shown completed today.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

2 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700031951
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170003195129 Nov 202124 Nov 202624 Nov 2026Shirdi Sai Sheltors LLPProject page
Documents199

2 documents held by Deedo, 197 filings listed on MahaRERA's project page

Extension certificate

Registration certificate

Finance

  • PAN CardPAN CARD.pdf · uploaded 19 Nov 2021Source

Legal

  • Legal Title reportShirdi Sai Sheltors LLP New Title_compressed.pdf · uploaded 19 Nov 2021Source
  • Declaration Form BNOTARISED FORM B-AFFIDAVIT CUM DECLARATION_compressed.pdf · uploaded 23 Nov 2021Source
  • OtherSS SHELTORS FORM 2A Q3 FY 21-22.pdf · uploaded 17 Feb 2022Source
  • OtherDeclaration.pdf · uploaded 28 May 2022Source
  • OthersSupplementary Partnership Deed.pdf · uploaded 17 Jun 2026Source
Show all 199 documentsShow fewer documents

Migrated

  • 1 PAN CardPAN CARD.pdf · uploaded 19 Nov 2021Source
  • 1 Copy of the legal title reportShirdi Sai Sheltors LLP New Title_compressed.pdf · uploaded 19 Nov 2021Source
  • 1 Details of encumbrancesNO ENCUMBRANCES CERTIFICATE.pdf · uploaded 19 Nov 2021Source
  • 1 Copy of Layout Approval (in case of layout)Layout Approval compressed.pdf · uploaded 19 Nov 2021Source
  • 1 Building Plan Approval / NA Order for plotted developmentNA Order.pdf · uploaded 19 Nov 2021Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed-compressed.pdf · uploaded 19 Nov 2021Source
  • 1 Proforma of Allotment letterFINAL FORMAT OF ALLOTMENT LETTER FLATS.pdf · uploaded 19 Nov 2021Source
  • 2 Proforma of Allotment letterFLAT SALE -RERA- DRAFT - BARAVE.pdf · uploaded 19 Nov 2021Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 23 Nov 2021Source
  • 1 Declaration about Commencement CertificateIMG_20211123_0002.pdf · uploaded 23 Nov 2021Source
  • 1 Declaration in FORM BNOTARISED FORM B-AFFIDAVIT CUM DECLARATION_compressed.pdf · uploaded 23 Nov 2021Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)SHIRDI SAI SHELTORS LLP - ARCHITECT CERTIFICATE COMPRESSED.pdf · uploaded 23 Nov 2021Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)SHIRDI SAI SHELTORS LLP - ENGINEER'S CERTIFICATE_compressed.pdf · uploaded 23 Nov 2021Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE - 05 JAN 2022 compressed.pdf · uploaded 24 Jan 2022Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE - 10 JAN 2022 compressed.pdf · uploaded 24 Jan 2022Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 COMPRESSED.pdf · uploaded 24 Jan 2022Source
  • 1 CERSAI detailsSS Sheltors LLP CERSAI_Search_Report_200230509552_For_Asset_Based_Search_17_02_2022_19_01_19_055.pdf · uploaded 17 Feb 2022Source
  • 1 OtherSS SHELTORS FORM 2A Q3 FY 21-22.pdf · uploaded 17 Feb 2022Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE 31 MAR 2022.pdf · uploaded 11 Apr 2022Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)SSS ENGINEER CERTIFICATE TILL 31 MAR 2022 compressed.pdf · uploaded 6 May 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)SSS LLP Form 2A Q4 TILL 31 MARCH 2022.pdf · uploaded 6 May 2022Source
  • 1 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY UPDATE - Q3.pdf · uploaded 6 May 2022Source
  • 2 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY UPDATE - Q4.pdf · uploaded 6 May 2022Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE Q4 TILL 31 MARCH 2022 COMPRESSED.pdf · uploaded 6 May 2022Source
  • 2 OtherDeclaration.pdf · uploaded 28 May 2022Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)SSS LLP ARCHITECT CERTIFICATE - Q1 FY 2022-23_compressed.pdf · uploaded 9 Jul 2022Source
  • 3 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY UPDATE - Q1 FY 2022-23.pdf · uploaded 9 Jul 2022Source
  • 2 CERSAI detailsCERSAI_Search_Report_200241789218_For_Asset_Based_Search_09_07_2022_17_49_20_821.pdf · uploaded 9 Jul 2022Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSS LLP FORM 3 - Q1 FY 2022-23 COMPRESSED.pdf · uploaded 9 Jul 2022Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)SSS LLP ENGINEER CERTIFICATE - Q1 FY 2022-23 compressed.pdf · uploaded 11 Jul 2022Source
  • 2 Details of encumbrancesMIDTOWN TWIN TOWERS REVISED ENCUMBRANCE CERTIFICATE.pdf · uploaded 24 Sep 2022Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)SSS LLP FORM 1 Q1 FY 22-23.pdf · uploaded 14 Oct 2022Source
  • 4 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY UPDATE - Q2 FY 2022-23 signed.pdf · uploaded 14 Oct 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5.pdf · uploaded 14 Oct 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)SSS LLP FORM 5 FY 21-22.pdf · uploaded 14 Oct 2022Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSS LLP FORM 3 Q2 FY 2022-23_compressed.pdf · uploaded 21 Oct 2022Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSS LLP FORM 3 Q2 FY 2022-23_compressed.pdf · uploaded 21 Oct 2022Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)SSS LLP FORM 2 Q2 FY 22-23.pdf · uploaded 31 Oct 2022Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)SSS LLP FORM 1 Q3 FY 2022-23.pdf · uploaded 9 Jan 2023Source
  • 5 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY UPDATE - Q3 FY 2022-23.pdf · uploaded 9 Jan 2023Source
  • 2 Copy of Layout Approval (in case of layout)REVISED PLAN COPY.pdf · uploaded 10 Jan 2023Source
  • 2 Commencement Certificates / NA Order for plotted developmentREVISED COMMENCEMENT CERTIFICATE_compressed.pdf · uploaded 10 Jan 2023Source
  • 6 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY UPDATE - Q3 FY 2022-23.pdf · uploaded 10 Jan 2023Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSS LLP FORM 3 Q3 FY 22-23.pdf · uploaded 11 Jan 2023Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)SSS LLP FORM 2 Q3 FY 22-23.pdf · uploaded 26 Jan 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - Q4 - FY 2022-23 compressed.pdf · uploaded 8 Apr 2023Source
  • 7 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY UPDATE - Q4 FY 2022-23.pdf · uploaded 8 Apr 2023Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 - Q4 - FY 2022-23_compressed.pdf · uploaded 19 Apr 2023Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - Q4 FY 2022-23_compressed.pdf · uploaded 22 Apr 2023Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)MIDTOWN TWIN TOWERS.pdf · uploaded 8 Jul 2023Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)SSS LLP FORM 2 Q1 FY 23-24 compressed.pdf · uploaded 20 Jul 2023Source
  • 8 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY UPDATE - Q1 FY 2023-24.pdf · uploaded 20 Jul 2023Source
  • 9 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY UPDATE - Q1 FY 2023-24.pdf · uploaded 20 Jul 2023Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSS LLP FORM 3 Q1 FY 23-24 COMPRESSED.pdf · uploaded 20 Jul 2023Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)SSS LLP FORM 1 Q2 FY 23-24_compressed.pdf · uploaded 20 Oct 2023Source
  • 10 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY UPDATE - Q2 FY 2023-24.pdf · uploaded 20 Oct 2023Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSS LLP FORM 3 Q2 FY 23-24_compressed.pdf · uploaded 25 Oct 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)SSS LLP FORM 5 FY 22-23.pdf · uploaded 25 Oct 2023Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)SSS LLP FORM 2 FY 22-23.pdf · uploaded 26 Oct 2023Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)SHIRDI SAI SHELTORS LLP FORM 1 Q3 FY 23-24.pdf · uploaded 11 Jan 2024Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)SHIRDI SAI SHELTORS LLP FORM 1 Q3 FY 23-24.pdf · uploaded 11 Jan 2024Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)SHIRDI SAI SHELTORS LLP FORM 1 Q3 FY 23-24_compressed.pdf · uploaded 11 Jan 2024Source
  • 11 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY UPDATE - Q3 FY 2023-24.pdf · uploaded 27 Jan 2024Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)SHIRDI SAI SHELTORS LLP FORM 3 Q3 FY 23-24.pdf · uploaded 27 Jan 2024Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)SSS LLP FORM 2 Q3 FY 23-24.pdf · uploaded 30 Jan 2024Source
  • 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)MIDTOWN SHELTORS LLP FORM 1 Q4 FY 23-24.pdf · uploaded 24 Apr 2024Source
  • 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)SHIRDI SAI SHELTORS LLP FORM 1 Q4 FY 23-24.pdf · uploaded 24 Apr 2024Source
  • 12 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY UPDATE - Q4 FY 2023-24.pdf · uploaded 24 Apr 2024Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)SHIRDI SAI SHELTORS LLP FORM 3 Q4 FY 23-24.pdf · uploaded 2 May 2024Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)SSS LLP FORM 2.pdf · uploaded 3 May 2024Source
  • 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)SHIRDI SAI SHELTORS LLP FORM 1 Q1 FY 24-25.pdf · uploaded 19 Jul 2024Source
  • 13 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY UPDATE - Q1 FY 2024-25.pdf · uploaded 24 Jul 2024Source
  • 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSS LLP FORM 3 Q1 FY 2024-25.pdf · uploaded 27 Jul 2024Source
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)SSS LLP FORM 2 Q1 FY 24-25.pdf · uploaded 30 Jul 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)SSS LLP FORM 1 Q2 FY 2024-25 Compressed.pdf · uploaded 10 Dec 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSS LLP FORM 3 Q2 FY 24-25 Compressed.pdf · uploaded 10 Dec 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)SSS LLP FORM 2 Q2 FY 23-24.pdf · uploaded 10 Dec 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentRevised CC.pdf · uploaded 10 Dec 2024Source
  • 2 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY UPDATE - Q2 FY 2024-25.pdf · uploaded 10 Dec 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)SSS LLP FORM 1 Q3 FY 2024-25.pdf · uploaded 24 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSS LLP FORM 3 Q3 FY 2024-25.pdf · uploaded 29 Jan 2025Source
  • 1 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY UPDATE - Q3 FY 2024-25.pdf · uploaded 29 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)SSS LLP FORM 2 Q3 FY 2024-25.pdf · uploaded 30 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)SSS LLP FORM 1 Q4 FY 2024-25 signed.pdf · uploaded 28 Apr 2025Source
  • 1 Disclosure of sold/ booked inventorysold and unsold inventory shirdi sai llp q4 fy 24-25 signed.pdf · uploaded 29 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)SHIRDI SAI FORM 3 Q4 FY 24-25 F.pdf · uploaded 16 May 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SSS LLP.pdf · uploaded 21 May 2025Source
  • Form 1SSS LLP FORM 1 Q1 FY 2025-26.pdf · uploaded 1 Aug 2025Source
  • Form 2SSS LLP FORM 2 Q1 FY 2025-26.pdf · uploaded 1 Aug 2025Source
  • Form 3SSS LLP FORM 3 Q1 FY 2025-26.pdf · uploaded 1 Aug 2025Source
  • Disclosure of Sold and Booked InventorySOLD AND UNSOLD INVENTORY Q1 FY 2025-26 SIGNED.pdf · uploaded 1 Aug 2025Source
  • Form 5 (FY 2022-2023)SSS LLP FORM 5 FY 22-23.pdf · uploaded 17 Oct 2025Source
  • Form 5 (FY 2023-2024)SSS LLP FORM 5 FY 2023-24.pdf · uploaded 17 Oct 2025Source
  • Form 5 (FY 2024-2025)SSS LLP FORM 5 FY 2024-25.pdf · uploaded 17 Oct 2025Source
  • Form 2A (FY 2021-2022)FORM 2A SHIRDI SAI SHELTORS 21-22.pdf · uploaded 17 Jan 2026Source
  • Form 2A (FY 2022-2023)FORM 2A SHIRDI SAI SHELTORS 22-23.pdf · uploaded 17 Jan 2026Source
  • Form 2A (FY 2023-2024)FORM 2A SHIRDI SAI SHELTORS 23-24.pdf · uploaded 17 Jan 2026Source
  • Form 2A (FY 2024-2025)FORM 2A SIGNED.pdf · uploaded 17 Jan 2026Source
  • Form 1ARCHITECT CERTIFICATE - 05 JAN 2022 compressed.pdf · uploaded 26 Feb 2026Source
  • Form 2ENGINEER CERTIFICATE - 10 JAN 2022 compressed.pdf · uploaded 26 Feb 2026Source
  • Form 3FORM 3 COMPRESSED.pdf · uploaded 26 Feb 2026Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD INVENTORY UPDATE - Q3.pdf · uploaded 26 Feb 2026Source
  • Form 1ARCHITECT CERTIFICATE 31 MAR 2022.pdf · uploaded 26 Feb 2026Source
  • Form 2SSS ENGINEER CERTIFICATE TILL 31 MAR 2022 compressed.pdf · uploaded 26 Feb 2026Source
  • Form 3CA CERTIFICATE Q4 TILL 31 MARCH 2022 COMPRESSED.pdf · uploaded 26 Feb 2026Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD INVENTORY UPDATE - Q4.pdf · uploaded 26 Feb 2026Source
  • Form 1SSS LLP FORM 1 Q1 FY 2022-23.pdf · uploaded 26 Feb 2026Source
  • Form 2SSS LLP FORM 2 Q1 FY 2022-23.pdf · uploaded 26 Feb 2026Source
  • Form 3SSS LLP FORM 3 - Q1 FY 2022-23 COMPRESSED.pdf · uploaded 26 Feb 2026Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD INVENTORY UPDATE - Q1 FY 2022-23.pdf · uploaded 26 Feb 2026Source
  • Form 1SSS LLP FORM 1 Q2 FY 22-23.pdf · uploaded 26 Feb 2026Source
  • Form 2SSS LLP FORM 2 Q2 FY 22-23.pdf · uploaded 26 Feb 2026Source
  • Form 3SSS LLP FORM 3 Q2 FY 2022-23_compressed.pdf · uploaded 26 Feb 2026Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD INVENTORY UPDATE - Q2 FY 2022-23 signed.pdf · uploaded 26 Feb 2026Source
  • Form 1SSS LLP FORM 1 Q3 FY 2022-23.pdf · uploaded 26 Feb 2026Source
  • Form 2SSS LLP FORM 2 Q3 FY 22-23.pdf · uploaded 26 Feb 2026Source
  • Form 3SSS LLP FORM 3 Q3 FY 22-23.pdf · uploaded 26 Feb 2026Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD INVENTORY UPDATE - Q3 FY 2022-23.pdf · uploaded 26 Feb 2026Source
  • Form 1FORM 1 - Q4 - FY 2022-23 compressed.pdf · uploaded 26 Feb 2026Source
  • Form 2FORM 2 - Q4 FY 2022-23_compressed.pdf · uploaded 26 Feb 2026Source
  • Form 3FORM 3 - Q4 - FY 2022-23_compressed.pdf · uploaded 26 Feb 2026Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD INVENTORY UPDATE - Q4 FY 2022-23.pdf · uploaded 26 Feb 2026Source
  • Form 2SSS LLP FORM 2 Q1 FY 23-24 compressed.pdf · uploaded 26 Feb 2026Source
  • Form 1SSS LLP FORM 1 Q1 FY 23-24.pdf · uploaded 26 Feb 2026Source
  • Form 3SSS LLP FORM 3 Q1 FY 23-24 COMPRESSED.pdf · uploaded 26 Feb 2026Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD INVENTORY UPDATE - Q1 FY 2023-24.pdf · uploaded 26 Feb 2026Source
  • Form 1SSS LLP FORM 1 Q2 FY 23-24_compressed.pdf · uploaded 26 Feb 2026Source
  • Form 3SSS LLP FORM 3 Q2 FY 23-24_compressed.pdf · uploaded 26 Feb 2026Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD INVENTORY UPDATE - Q2 FY 2023-24.pdf · uploaded 26 Feb 2026Source
  • Form 2SSS LLP FORM 2 Q2 FY 23-24.pdf · uploaded 26 Feb 2026Source
  • Form 1SHIRDI SAI SHELTORS LLP FORM 1 Q3 FY 23-24 compressed.pdf · uploaded 26 Feb 2026Source
  • Form 2SHIRDI SAI SHELTORS LLP FORM 2 Q3 FY 23-24.pdf · uploaded 26 Feb 2026Source
  • Form 3SHIRDI SAI SHELTORS LLP FORM 3 Q3 FY 23-24.pdf · uploaded 26 Feb 2026Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD INVENTORY UPDATE - Q3 FY 2023-24.pdf · uploaded 26 Feb 2026Source
  • Form 1SHIRDI SAI SHELTORS LLP FORM 1 Q4 FY 23-24.pdf · uploaded 26 Feb 2026Source
  • Form 2SHIRDI SAI SHELTORS LLP FORM 2 Q4 FY 23-24.pdf · uploaded 26 Feb 2026Source
  • Form 3SHIRDI SAI SHELTORS LLP FORM 3 Q4 FY 23-24.pdf · uploaded 26 Feb 2026Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD INVENTORY UPDATE - Q4 FY 2023-24.pdf · uploaded 26 Feb 2026Source
  • Form 1SSS LLP FORM 1 Q1 FY 2024-25.pdf · uploaded 26 Feb 2026Source
  • Form 2SSS LLP FORM 2 Q1 FY 24-25.pdf · uploaded 26 Feb 2026Source
  • Form 3SSS LLP FORM 3 Q1 FY 2024-25.pdf · uploaded 26 Feb 2026Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD INVENTORY UPDATE - Q1 FY 2024-25.pdf · uploaded 26 Feb 2026Source
  • Form 1SSS LLP FORM 1 Q2 FY 2024-25 Compressed.pdf · uploaded 26 Feb 2026Source
  • Form 2SSS LLP FORM 2 Q2 FY 23-24.pdf · uploaded 26 Feb 2026Source
  • Form 3SSS LLP FORM 3 Q2 FY 24-25 Compressed.pdf · uploaded 26 Feb 2026Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD INVENTORY UPDATE - Q2 FY 2024-25.pdf · uploaded 26 Feb 2026Source
  • Form 1SSS LLP FORM 1 Q3 FY 2024-25.pdf · uploaded 26 Feb 2026Source
  • Form 2SSS LLP FORM 2 Q3 FY 2024-25.pdf · uploaded 26 Feb 2026Source
  • Form 3SSS LLP FORM 3 FY 2024-25 PHYSICALLY SIGNED.pdf · uploaded 26 Feb 2026Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD INVENTORY UPDATE - Q3 FY 2024-25.pdf · uploaded 26 Feb 2026Source
  • Form 1SSS LLP FORM 1 Q4 FY 2024-25 signed.pdf · uploaded 26 Feb 2026Source
  • Form 2SSS LLP FORM 2 Q4 FY 2024-25 signed.pdf · uploaded 26 Feb 2026Source
  • Form 3SHIRDI SAI FORM 3 Q4 FY 24-25 COMPRESSED.pdf · uploaded 26 Feb 2026Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD INVENTORY UPDATE - Q4 FY 2024-25.pdf · uploaded 26 Feb 2026Source
  • Withdrawal Update Form 1SSS LLP FORM 1 Q1 FY 2025-26.pdf · uploaded 27 Feb 2026Source
  • Withdrawal Update Form 1FORM 1 SSS LLP SIGNED Q2 FY 2025-26.pdf · uploaded 27 Feb 2026Source
  • Withdrawal Update Form 1SSS LLP FORM 1 Q3 FY 2025-26.pdf · uploaded 27 Feb 2026Source
  • Withdrawal Update Form 2SSS LLP FORM 2 Q1 FY 2025-26.pdf · uploaded 27 Feb 2026Source
  • Withdrawal Update Form 2FORM 2 SSS LLP SIGNED Q2 FY 2025-26.pdf · uploaded 27 Feb 2026Source
  • Withdrawal Update Form 2SSS LLP FORM 2 Q3 FY 2025-26.pdf · uploaded 27 Feb 2026Source
  • Withdrawal Update Form 3SSS LLP FORM 3 Q1 25-26 PHYSICALLY SIGNED.pdf · uploaded 27 Feb 2026Source
  • Withdrawal Update Form 3FORM 3 SSS LLP SIGNED Q2 FY 2025-26_compressed.pdf · uploaded 27 Feb 2026Source
  • Withdrawal Update Form 3SSS LLP FORM 3 Q3 FY 2025-26_compressed.pdf · uploaded 27 Feb 2026Source
  • Withdrawal Update Form 1SSS LLP FORM 1 Q1 FY 2025-26.pdf · uploaded 12 Mar 2026Source
  • Withdrawal Update Form 2SSS LLP FORM 2 Q1 FY 2025-26.pdf · uploaded 12 Mar 2026Source
  • Withdrawal Update Form 3SSS LLP FORM 3 Q1 25-26 PHYSICALLY SIGNED.pdf · uploaded 12 Mar 2026Source
  • Form 2A (FY 2025-2026)FORM 2A SIGNED SHIRDI SAI SHELTORS LLP 2025-26.pdf · uploaded 2 May 2026Source
  • Withdrawal Update Form 1SSS LLP FORM 1 Q4 FY 2025-26.pdf · uploaded 4 May 2026Source
  • Withdrawal Update Form 2SSS LLP FORM 2 Q4 FY 2025-26.pdf · uploaded 4 May 2026Source
  • Withdrawal Update Form 3Shirdi Sai Sheltors LLP Form 3 Q4 25-26.pdf · uploaded 4 May 2026Source
  • Withdrawal Update Form 1SSS LLP FORM 1 Q1 FY 2026-27.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 2SSS LLP FORM 2 Q1 FY 2026-27.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 3SSS LLP FORM 3 Q1 FY 2026-27.pdf · uploaded 18 Jul 2026Source
  • Form 5 (FY 2025-2026)Shirdi Sai Sheltors LLP (Form 5) FY 2025-26.pdf · uploaded 28 Sep 2026Source

Technical

  • DocumentLayout Approval compressed.pdf · uploaded 19 Nov 2021Source
  • DocumentNA Order.pdf · uploaded 19 Nov 2021Source
  • DocumentREVISED PLAN COPY.pdf · uploaded 10 Jan 2023Source
  • DocumentLayout Approval Plan.pdf · uploaded 17 Jun 2026Source
  • DocumentRevised Sanctioned Plan.pdf · uploaded 17 Jun 2026Source
  • DocumentAnnexure A.pdf · uploaded 10 Jul 2026Source
  • DocumentBuilding Plan 1-3_Tower-1_2024.pdf · uploaded 11 Jul 2026Source
  • DocumentBuilding Plan 4-5_Tower-2_2024.pdf · uploaded 11 Jul 2026Source
  • DocumentRevised Sanctioned Plan T-1 T-2_Highlighted.pdf · uploaded 11 Jul 2026Source

Technical (Architect)

  • DocumentSSS LLP FORM 1 Q2 FY 2024-25 Compressed.pdf · uploaded 10 Dec 2024Source
  • DocumentSSS LLP FORM 1 Q3 FY 2024-25.pdf · uploaded 24 Jan 2025Source
  • DocumentSSS LLP FORM 1 Q4 FY 2024-25 signed.pdf · uploaded 28 Apr 2025Source
  • DocumentSSS LLP FORM 1 Q1 FY 2026-27.pdf · uploaded 18 Jul 2026Source

Technical (Engineer)

  • DocumentSSS LLP FORM 2 Q2 FY 23-24.pdf · uploaded 10 Dec 2024Source
  • DocumentSSS LLP FORM 2 Q3 FY 2024-25.pdf · uploaded 30 Jan 2025Source
  • DocumentFORM 2 SSS LLP.pdf · uploaded 21 May 2025Source
  • DocumentSSS LLP FORM 2 Q1 FY 2026-27.pdf · uploaded 18 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel H. NO. 3, H. NO. 3

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 2BHK226 units in all
Address
S. No. 12, H. No. 3, Godrej Hill Road, Village Barave, Near Wadhwa's Shiv MandirPIN 421301
Village
Barave, Kalyan taluka
Land area for this project
6,100 sq m (65,660 sq ft)
Permissible built-up area
19,858 sq m (2,13,748 sq ft)
Sanctioned built-up area
19,465 sq m (2,09,523 sq ft)
Recreational open space
0 sq m (0 sq ft)
Designated bank account
190
Developed in phases
Yes

Survey, CTS, gat or plot numbers

H. NO. 3H. NO. 3S. NO. 12S. NO. 12

Land as published on MahaRERA's project page

S. NO. 12, H. NO. 3

Boundaries

North
Godrej Riverside Society
South
Shivleela Wadhwa Heights Society
East
Urban Villa Society
West
Niraj Riveria Society

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking226 units

29 of 226 units booked (13%), as the promoter reported to MahaRERA

1BHK · 158 units2BHK · 68 units
BuildingTypeCarpet areaUnitsBooked
Midtown Twin Towers T-11BHK43.31 sq m · 466 sq ft290
Midtown Twin Towers T-11BHK43.33 sq m · 466 sq ft291
Midtown Twin Towers T-11BHK45.8 sq m · 493 sq ft22
Midtown Twin Towers T-11BHK47.33 sq m · 509 sq ft22
Midtown Twin Towers T-11BHK49.9 sq m · 537 sq ft581
Midtown Twin Towers T-12BHK69.96 sq m · 753 sq ft300
Midtown Twin Towers T-21BHK54.16 sq m · 583 sq ft339
Midtown Twin Towers T-21BHK54.71 sq m · 589 sq ft52
Midtown Twin Towers T-22BHK74.48 sq m · 802 sq ft288
Midtown Twin Towers T-22BHK80.33 sq m · 865 sq ft104

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals4

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectVitan Consultants—
Chartered accountantP M Dalvi & Co—
EngineerReji George—
Registered real estate agentDilip Nagdev—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Barave

All 6 projects in Barave · Compare Midtown Twin Towers with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology