Others · 2 buildings · 86 unitsRERA P51700049895

Gnp Landmark

Completion was pushed back 4 months, to May 2027; no MahaRERA orders on record; 33% of its units are booked.

Barave, Thane 421301 · Promoter: Gnp Landmark

DeliveryExtended 4 moPromised Jan 2027 · now due May 2027RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales33% booked28 of 86 units · as the promoter reported to MahaRERA
Gnp Landmark project report cardPDF: delivery, regulatory orders, people on record, every tower and the registered deals — for your bank or lawyerSee what's inside · from ₹1,499

Completion was pushed back 4 months, to May 2027

  • This projectRegistered 6 Mar 2023, completion promised 31 Jan 2027, revised to 31 May 2027.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

2 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700049895
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P517000498956 Mar 202331 Jan 202731 May 2027Gnp LandmarkProject page
Documents127

1 document held by Deedo, 126 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPAN CARD.PDF · uploaded 27 Jan 2023Source

Legal

  • Declaration Form BForm B - Landmark.pdf · uploaded 27 Jan 2023Source
  • Legal Title reportGNP Landmark Title and Flow.pdf · uploaded 1 Feb 2023Source

Migrated

  • 1 PAN CardPAN CARD.PDF · uploaded 27 Jan 2023Source
  • 1 Copy of Layout Approval (in case of layout)Landmark Approved Plan -02_compressed.pdf · uploaded 27 Jan 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentLandmark CC Letter - 13-04-2022.pdf · uploaded 27 Jan 2023Source
  • 1 Declaration about Commencement CertificateDeclaration for CC.pdf · uploaded 27 Jan 2023Source
Show all 127 documentsShow fewer documents

Migrated

  • 1 Declaration in FORM BForm B - Landmark.pdf · uploaded 27 Jan 2023Source
  • 1 a Details of encumbrances concerned to FinanceNo Encumbrances Certificate Finance and Litigation.pdf · uploaded 31 Jan 2023Source
  • 1 b Details of encumbrances concerned to LegalNo Encumbrances Certificate Finance and Litigation.pdf · uploaded 31 Jan 2023Source
  • 1 Building Plan Approval / NA Order for plotted developmentApproved Floor Plan.pdf · uploaded 31 Jan 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form - 1 Architect Certificate.pdf · uploaded 31 Jan 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form - 2 Engineer Certificate.pdf · uploaded 31 Jan 2023Source
  • 1 CERSAI detailsCERSAI Undertaking.pdf · uploaded 31 Jan 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate.pdf · uploaded 31 Jan 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDISCLOSURE OF GIRISH PAWAR.pdf · uploaded 31 Jan 2023Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsDISCLOSURE OF KAUSTUB LATKE.pdf · uploaded 31 Jan 2023Source
  • 1 Proforma of Agreement for saleAgreement for Sale.pdf · uploaded 31 Jan 2023Source
  • 1 Proforma of Allotment letterAllotment Letter.pdf · uploaded 31 Jan 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration for Bank Account.pdf · uploaded 31 Jan 2023Source
  • 1 Deviation Report with respect to Allotment letterDeviation Report Of Allotment Letter_compressed.pdf · uploaded 31 Jan 2023Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation Report Of Agreement_compressed.pdf · uploaded 31 Jan 2023Source
  • 1 Copy of the legal title reportGNP Landmark Title and Flow.pdf · uploaded 1 Feb 2023Source
  • 2 Building Plan Approval / NA Order for plotted developmentApporved plan - 1_compressed.pdf · uploaded 2 Aug 2023Source
  • 3 Building Plan Approval / NA Order for plotted developmentApporved plan - 2_compressed.pdf · uploaded 2 Aug 2023Source
  • 2 Commencement Certificates / NA Order for plotted developmentRevised CC.pdf · uploaded 2 Aug 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 31032023.pdf · uploaded 22 Nov 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 30062023.pdf · uploaded 22 Nov 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 30092023.pdf · uploaded 22 Nov 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 31032023.PDF · uploaded 22 Nov 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)form2 30062023.PDF · uploaded 22 Nov 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 30092023.PDF · uploaded 22 Nov 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)form3 31032023.pdf · uploaded 22 Nov 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)form3 30062023.pdf · uploaded 22 Nov 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)form3 30092023.pdf · uploaded 22 Nov 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5.PDF · uploaded 30 Nov 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A.pdf · uploaded 7 Dec 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 20 Jan 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 20 Jan 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 20 Jan 2024Source
  • 1 Disclosure of sold/ booked inventorySold and Booked Inventory.pdf · uploaded 13 Feb 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form - 1.pdf · uploaded 8 May 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form - 2.pdf · uploaded 8 May 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Engineer Certificate Quality Assurance - Landmark - 31-03-2024.pdf · uploaded 8 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Engineer Certificate Quality Assurance - Landmark - 31-03-2024.pdf · uploaded 8 May 2024Source
  • 2 Disclosure of sold/ booked inventorySold Booked Inventory.pdf · uploaded 8 May 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form - 3.pdf · uploaded 8 May 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form - 1.pdf · uploaded 24 Oct 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form - 3.pdf · uploaded 24 Oct 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form - 2.pdf · uploaded 24 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form-5.pdf · uploaded 14 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1.pdf · uploaded 10 Feb 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1.pdf · uploaded 10 Feb 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1.pdf · uploaded 10 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3.pdf · uploaded 10 Feb 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3.pdf · uploaded 10 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2.pdf · uploaded 10 Feb 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2.pdf · uploaded 10 Feb 2025Source
  • Form 5 (FY 2024-2025)Form 5.pdf · uploaded 13 Oct 2025Source
  • Form 1Form 1 30092025.pdf · uploaded 28 Nov 2025Source
  • Form 2Form 2 30092025.pdf · uploaded 28 Nov 2025Source
  • Form 3Form 3 30092025.pdf · uploaded 28 Nov 2025Source
  • Disclosure of Sold and Booked InventorySold unsold inventory GNP Landmark 30092025.pdf · uploaded 28 Nov 2025Source
  • Form 1Form 1 31032023_compressed.pdf · uploaded 28 Nov 2025Source
  • Form 2Form 2 31032023_compressed.pdf · uploaded 28 Nov 2025Source
  • Form 3Form 3 31032023_compressed.pdf · uploaded 28 Nov 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure Sold and Booked 31032023.pdf · uploaded 28 Nov 2025Source
  • Form 1Form 1 30062023_compressed.pdf · uploaded 28 Nov 2025Source
  • Form 2Form 2 30062023_compressed.pdf · uploaded 28 Nov 2025Source
  • Form 3Form 3 30062023_compressed.pdf · uploaded 28 Nov 2025Source
  • Disclosure of Sold and Booked InventoryDiscloseure of Sold and Booked 30062023.pdf · uploaded 28 Nov 2025Source
  • Form 1Form 1 30092023_compressed.pdf · uploaded 28 Nov 2025Source
  • Form 2Form 2 30092023_compressed.pdf · uploaded 28 Nov 2025Source
  • Form 3Form3 30092023_compressed.pdf · uploaded 28 Nov 2025Source
  • Disclosure of Sold and Booked InventoryDiscloseure of Sold and Booked 30092023.pdf · uploaded 28 Nov 2025Source
  • Form 1Form 1 31122023_compressed.pdf · uploaded 28 Nov 2025Source
  • Form 2Form 2 31122023.pdf · uploaded 28 Nov 2025Source
  • Form 3Form 3 31122023_compressed.pdf · uploaded 28 Nov 2025Source
  • Disclosure of Sold and Booked InventoryDiscloseure of Sold and Booked 31122023.pdf · uploaded 28 Nov 2025Source
  • Form 1Form 1 31032024_compressed.pdf · uploaded 28 Nov 2025Source
  • Form 2Form 2 31032024.pdf · uploaded 28 Nov 2025Source
  • Form 3Form 3 31032024_compressed.pdf · uploaded 28 Nov 2025Source
  • Disclosure of Sold and Booked InventoryDiscloseure of Sold and Booked 31032024.pdf · uploaded 28 Nov 2025Source
  • Form 1Form 1 30062024_compressed.pdf · uploaded 28 Nov 2025Source
  • Form 2Form 2 30062024.pdf · uploaded 28 Nov 2025Source
  • Form 3Form 3 30062024_compressed.pdf · uploaded 28 Nov 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold and Booked 30062024.pdf · uploaded 28 Nov 2025Source
  • Form 1Form 1 30092024.pdf · uploaded 28 Nov 2025Source
  • Form 2Form 2 30092024.pdf · uploaded 28 Nov 2025Source
  • Form 3Form 3 30092024.pdf · uploaded 28 Nov 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold and Booked 30092024.pdf · uploaded 28 Nov 2025Source
  • Form 1Form 1 31122024.pdf · uploaded 28 Nov 2025Source
  • Form 2Form 2 31122024.pdf · uploaded 28 Nov 2025Source
  • Form 3Form 3 31122024.pdf · uploaded 28 Nov 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold and Booked 31122024.pdf · uploaded 28 Nov 2025Source
  • Form 1Form 1 31032025.pdf · uploaded 28 Nov 2025Source
  • Form 2Form 2 31032025.pdf · uploaded 28 Nov 2025Source
  • Form 3Form 3 31032025.pdf · uploaded 28 Nov 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold and Booked 31032025.pdf · uploaded 28 Nov 2025Source
  • Form 1Form 1 30062025_compressed.pdf · uploaded 28 Nov 2025Source
  • Form 2Form 2 30062025.pdf · uploaded 28 Nov 2025Source
  • Form 3Form 3 30062025.pdf · uploaded 28 Nov 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold and Unsold 30062025.pdf · uploaded 28 Nov 2025Source
  • Form 1Form 1.pdf · uploaded 14 Apr 2026Source
  • Form 2Form 2.pdf · uploaded 14 Apr 2026Source
  • Form 3Form 3.pdf · uploaded 14 Apr 2026Source
  • Disclosure of Sold and Booked InventorySold Booked Inventory.pdf · uploaded 14 Apr 2026Source
  • Withdrawal Update Form 1RERA - Form 1 - GNP Landmark (1).pdf · uploaded 12 Jun 2026Source
  • Withdrawal Update Form 2RERA - Form 2 - GNP Landmark.pdf · uploaded 12 Jun 2026Source
  • Withdrawal Update Form 3RERA - Form 3 - GNP Landmark.pdf · uploaded 12 Jun 2026Source

Technical

  • DocumentLandmark Approved Plan -02_compressed.pdf · uploaded 27 Jan 2023Source
  • DocumentApproved Floor Plan.pdf · uploaded 31 Jan 2023Source
  • DocumentApporved plan - 1_compressed.pdf · uploaded 2 Aug 2023Source
  • DocumentApporved plan - 2_compressed.pdf · uploaded 2 Aug 2023Source
  • DocumentPage 1 - (Highlighted) (Permissible and Sanctioned BUA) (Parking).pdf · uploaded 16 Jul 2026Source
  • DocumentPage 2 - Floor Plans.pdf · uploaded 16 Jul 2026Source
  • DocumentPage 3 - Floor plans and Elevation.pdf · uploaded 16 Jul 2026Source

Technical (Architect)

  • DocumentForm - 1.pdf · uploaded 24 Oct 2024Source
  • DocumentForm-1.pdf · uploaded 10 Feb 2025Source
  • DocumentForm-1.pdf · uploaded 10 Feb 2025Source
  • DocumentForm-1.pdf · uploaded 10 Feb 2025Source
  • DocumentRERA - Form 1 - GNP Landmark (1).pdf · uploaded 12 Jun 2026Source

Technical (Engineer)

  • DocumentForm - 2.pdf · uploaded 24 Oct 2024Source
  • DocumentForm-2.pdf · uploaded 10 Feb 2025Source
  • DocumentForm-2.pdf · uploaded 10 Feb 2025Source
  • DocumentRERA - Form 2 - GNP Landmark.pdf · uploaded 12 Jun 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvals61/1/A/2, 61/1/B/2

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
Office space, Shop, 2BHK, 3BHK, 5BHK & more86 units in all
Address
61/9/1, 61/9/2, 61/1/A/2, 61/1/B/2, Club Road, KhadakpadaPIN 421301
Village
Barave, Kalyan taluka
Designated bank account
154
Developed in phases
Yes

Survey, CTS, gat or plot numbers

61/1/A/261/1/B/261/9/161/9/2

Boundaries

North
Spring Time Club
South
Vani Vidyalay
East
Wadhwa Society
West
Road

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking86 units

28 of 86 units booked (33%), as the promoter reported to MahaRERA

Office space · 16 unitsShop · 4 units2BHK · 26 units3BHK · 26 units5BHK & more · 14 units
BuildingTypeCarpet areaUnitsBooked
Commercial Building No 1Office space29.73 sq m · 320 sq ft44
Commercial Building No 1Office space44.73 sq m · 481 sq ft42
Commercial Building No 1Office space68.44 sq m · 737 sq ft33
Commercial Building No 1Office space68.88 sq m · 741 sq ft11
Commercial Building No 1Office space70.49 sq m · 759 sq ft43
Commercial Building No 1Shop34.76 sq m · 374 sq ft11
Commercial Building No 1Shop48.06 sq m · 517 sq ft11
Commercial Building No 1Shop69.19 sq m · 745 sq ft11
Show all 13 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Commercial Building No 1Shop70.1 sq m · 755 sq ft11
Residential Building No 22BHK78.83 sq m · 849 sq ft264
Residential Building No 23BHK106.5 sq m · 1,146 sq ft265
Residential Building No 25BHK & more192.81 sq m · 2,075 sq ft122
Residential Building No 25BHK & more304.69 sq m · 3,280 sq ft20

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals4

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectLandmark Group—
Chartered accountantMs Dhaval Mehta & Associates—
Chartered accountantSahil Ravriya—
EngineerEpicons Consultants Pvt Ltd—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology