Completion was pushed back 4 months, to Apr 2027; no MahaRERA orders on record; 38% of its units are booked.

Badlapur (M Cl), Thane 421503 · by Thanekar Construction Llp

DeliveryExtended 4 moPromised Dec 2026 · now due Apr 2027RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales38% booked97 of 257 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Apr 2027

  • This projectRegistered 8 Jun 2023, completion promised 31 Dec 2026, revised to 30 Apr 2027.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

7 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700051381
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P517000513818 Jun 202331 Dec 202630 Apr 2027Thanekar Construction LLPProject page
Documents111

1 document held by Deedo, 110 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN Card1 PAN Card.pdf · uploaded 24 May 2023Source

Legal

  • Legal Title report1 Copy of the legal title report (16).pdf · uploaded 24 May 2023Source
  • Declaration Form B1 Declaration in FORM B (5).pdf · uploaded 25 May 2023Source

Migrated

  • 1 PAN Card1 PAN Card.pdf · uploaded 24 May 2023Source
  • 1 Copy of the legal title report1 Copy of the legal title report (16).pdf · uploaded 24 May 2023Source
  • 1 a Details of encumbrances concerned to Finance1 a Details of encumbrances concerned to Finance (7).pdf · uploaded 24 May 2023Source
  • 1 b Details of encumbrances concerned to Legal1 a Details of encumbrances concerned to Finance (7).pdf · uploaded 24 May 2023Source
Show all 111 documentsShow fewer documents

Migrated

  • 1 Copy of Layout Approval (in case of layout)1 Copy of Layout Approval (in case of layout) (14).pdf · uploaded 24 May 2023Source
  • 1 Building Plan Approval / NA Order for plotted development1 Building Plan Approval _ NA Order for plotted development (11).pdf · uploaded 25 May 2023Source
  • 2 Building Plan Approval / NA Order for plotted development2 Building Plan Approval _ NA Order for plotted development (6).pdf · uploaded 25 May 2023Source
  • 3 Building Plan Approval / NA Order for plotted development3 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 25 May 2023Source
  • 4 Building Plan Approval / NA Order for plotted development4 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 25 May 2023Source
  • 5 Building Plan Approval / NA Order for plotted development5 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 25 May 2023Source
  • 1 Commencement Certificates / NA Order for plotted development1 Commencement Certificates _ NA Order for plotted development (10).pdf · uploaded 25 May 2023Source
  • 1 Declaration about Commencement Certificate1 Declaration about Commencement Certificate (5).pdf · uploaded 25 May 2023Source
  • 1 Declaration in FORM B1 Declaration in FORM B (5).pdf · uploaded 25 May 2023Source
  • 1 CERSAI detailsCERSAI_Search_Report_200269696191_For_Asset_Based_Search_25_05_2023_16_08_19_228.pdf · uploaded 25 May 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed (1).pdf · uploaded 25 May 2023Source
  • 1 Disclosure of Interest in Other Real Estate Organizations1 Disclosure of Interest in Other Real Estate Organizations (3).pdf · uploaded 25 May 2023Source
  • 2 Disclosure of Interest in Other Real Estate Organizations2 Disclosure of Interest in Other Real Estate Organizations.pdf · uploaded 25 May 2023Source
  • 3 Disclosure of Interest in Other Real Estate Organizations3 Disclosure of Interest in Other Real Estate Organizations.pdf · uploaded 25 May 2023Source
  • 1 Proforma of Agreement for saleRERA AGREEMENT THANEKAR PALACIO - phase 2- new allotee.pdf · uploaded 25 May 2023Source
  • 1 Proforma of Allotment letterAllotment Letter.PDF · uploaded 25 May 2023Source
  • 1 Deviation Report with respect to Allotment letter1 Deviation Report with respect to Allotment letter.pdf · uploaded 25 May 2023Source
  • 1 Deviation Report with respect to model copy of Agreement1 Deviation Report with respect to model copy of Agreement (3).pdf · uploaded 25 May 2023Source
  • 2 CERSAI detailsDeclaration about cersai 1.pdf · uploaded 29 May 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeprate bank.pdf · uploaded 29 May 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate (Form-1).PDF · uploaded 20 Oct 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate (Form-2).PDF · uploaded 20 Oct 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 20 Oct 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)From-1.PDF · uploaded 19 Jan 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)From-2.PDF · uploaded 19 Jan 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)From-3.PDF · uploaded 19 Jan 2024Source
  • 2 Copy of Layout Approval (in case of layout)Layout-Compressed.pdf · uploaded 22 Jan 2024Source
  • 6 Building Plan Approval / NA Order for plotted development1- 4th-compressed.pdf · uploaded 22 Jan 2024Source
  • 7 Building Plan Approval / NA Order for plotted developmentGround_Compressed.pdf · uploaded 22 Jan 2024Source
  • 8 Building Plan Approval / NA Order for plotted development5-6th-compressed.pdf · uploaded 22 Jan 2024Source
  • 9 Building Plan Approval / NA Order for plotted development5-6th-compressed.pdf · uploaded 22 Jan 2024Source
  • 10 Building Plan Approval / NA Order for plotted development6th-15th-compressed.pdf · uploaded 22 Jan 2024Source
  • 2 Commencement Certificates / NA Order for plotted developmentNew Commencement Certificat.PDF · uploaded 22 Jan 2024Source
  • 1 Disclosure of sold/ booked inventoryACE Scanner_2024_02_03(1)_compressed.pdf · uploaded 6 Feb 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FROM 1_compressed.pdf · uploaded 23 May 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 23 May 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 TCCLLP 31-03-2024 Sign.pdf · uploaded 23 May 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_compressed.pdf · uploaded 19 Aug 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2- FINAL.pdf · uploaded 19 Aug 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 30-06-2024 Thanekar Palacio Ph II Sign_compressed.pdf · uploaded 19 Aug 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form-5 Thanekar Palacio Phase II FY 2023-24.pdf · uploaded 23 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form - 3 30-09-2024 Sign.pdf · uploaded 19 Nov 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form -2 (1).pdf · uploaded 19 Nov 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form - 3 30-09-2024 Sign.pdf · uploaded 19 Nov 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form -2 (1).pdf · uploaded 19 Nov 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form - 1 Sing_compressed.pdf · uploaded 20 Nov 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form - 1 Sing_compressed.pdf · uploaded 20 Nov 2024Source
  • 1 a Details of encumbrances concerned to FinanceDeclaration_merged.pdf · uploaded 7 Dec 2024Source
  • 2 a Details of encumbrances concerned to FinanceDeclaration_merged.pdf · uploaded 7 Dec 2024Source
  • 1 b Details of encumbrances concerned to LegalDeclaration_merged.pdf · uploaded 7 Dec 2024Source
  • 2 b Details of encumbrances concerned to LegalDeclaration_merged.pdf · uploaded 7 Dec 2024Source
  • 2 Disclosure of sold/ booked inventorySold Unsold March 2024_compressed.pdf · uploaded 21 Dec 2024Source
  • 3 Disclosure of sold/ booked inventorySold Unsold June 2024_compressed.pdf · uploaded 21 Dec 2024Source
  • 4 Disclosure of sold/ booked inventorySold Unsold Sep 2024_compressed.pdf · uploaded 21 Dec 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form - 1 Sing_compressed.pdf · uploaded 4 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form - 3 (3)_compressed.pdf · uploaded 4 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form - 2 Sing_compressed.pdf · uploaded 4 Feb 2025Source
  • 1 Disclosure of sold/ booked inventorysold unsold_compressed.pdf · uploaded 4 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)From 1_compressed.pdf · uploaded 24 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)From 3 Sign Sign_compressed.pdf · uploaded 25 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Sign Sign.pdf · uploaded 25 Apr 2025Source
  • 1 Disclosure of sold/ booked inventorySold Unsold list_compressed.pdf · uploaded 29 Apr 2025Source
  • Form 1Form 1 (1).pdf · uploaded 2 Aug 2025Source
  • Form 2Form -2.pdf · uploaded 2 Aug 2025Source
  • Form 3Form 3.pdf · uploaded 2 Aug 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold.pdf · uploaded 2 Aug 2025Source
  • Form 5 (FY 2024-2025)TCON LLP - Palacio - II (1).PDF · uploaded 7 Oct 2025Source
  • Form 1Form 1 Signed.pdf · uploaded 15 Nov 2025Source
  • Form 2Form 2 Signed.pdf · uploaded 15 Nov 2025Source
  • Form 3Form-3 Signed.pdf · uploaded 15 Nov 2025Source
  • Disclosure of Sold and Booked InventorySold unsold list.pdf · uploaded 15 Nov 2025Source
  • Withdrawal Update Form 1Form 1 31 12 2025.pdf · uploaded 20 Feb 2026Source
  • Withdrawal Update Form 2Form 2 31 12 2025.pdf · uploaded 20 Feb 2026Source
  • Withdrawal Update Form 3Form 3 31 12 2025 Final compressed.pdf · uploaded 20 Feb 2026Source
  • Withdrawal Update Form 1Form 1 Q4 Final.pdf · uploaded 5 May 2026Source
  • Withdrawal Update Form 2Form 2 Q4.pdf · uploaded 5 May 2026Source
  • Withdrawal Update Form 3From 3 Q4 FInal.pdf · uploaded 5 May 2026Source
  • Form 5 (FY 2025-2026)FORM 5 SIGNED.pdf · uploaded 29 Jun 2026Source
  • Withdrawal Update Form 1form 1 final.pdf · uploaded 2 Sep 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 2 Sep 2026Source
  • Withdrawal Update Form 3Form 3 SIGNED_compressed.pdf · uploaded 2 Sep 2026Source

Technical

  • Document1 Copy of Layout Approval (in case of layout) (14).pdf · uploaded 24 May 2023Source
  • Document1 Building Plan Approval _ NA Order for plotted development (11).pdf · uploaded 25 May 2023Source
  • Document2 Building Plan Approval _ NA Order for plotted development (6).pdf · uploaded 25 May 2023Source
  • Document3 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 25 May 2023Source
  • Document4 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 25 May 2023Source
  • Document5 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 25 May 2023Source
  • DocumentLayout-Compressed.pdf · uploaded 22 Jan 2024Source
  • Document1- 4th-compressed.pdf · uploaded 22 Jan 2024Source
  • DocumentGround_Compressed.pdf · uploaded 22 Jan 2024Source
  • Document5-6th-compressed.pdf · uploaded 22 Jan 2024Source
  • Document5-6th-compressed.pdf · uploaded 22 Jan 2024Source
  • Document6th-15th-compressed.pdf · uploaded 22 Jan 2024Source

Technical (Architect)

  • DocumentForm - 1 Sing_compressed.pdf · uploaded 20 Nov 2024Source
  • DocumentForm - 1 Sing_compressed.pdf · uploaded 20 Nov 2024Source
  • DocumentForm - 1 Sing_compressed.pdf · uploaded 4 Feb 2025Source
  • DocumentFrom 1_compressed.pdf · uploaded 24 Apr 2025Source
  • Documentform 1 final.pdf · uploaded 2 Sep 2026Source

Technical (Engineer)

  • DocumentForm -2 (1).pdf · uploaded 19 Nov 2024Source
  • DocumentForm -2 (1).pdf · uploaded 19 Nov 2024Source
  • DocumentForm - 2 Sing_compressed.pdf · uploaded 4 Feb 2025Source
  • DocumentForm 2 Sign Sign.pdf · uploaded 25 Apr 2025Source
  • DocumentForm 2.pdf · uploaded 2 Sep 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 7, Survey No. 82/2/1 Survey No 83/3/6 Survey No 83/3/7 Survey No 83/4A Plot No 3 5 6

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
Bungalow, 1BHK, 2BHK, 3BHK, Shop257 units in all
Address
Survey No. 82/2/1 Survey No 83/3/6 Survey No 83/3/7 Survey No 83/4A Plot No 3 5 6 & 7, Badlapur, Badlapur EastPIN 421503
Village
Badlapur (M Cl), Ambarnath taluka
Land area for this project
5,411 sq m (58,248 sq ft)
Permissible built-up area
18,252 sq m (1,96,460 sq ft)
Sanctioned built-up area
18,252 sq m (1,96,460 sq ft)
Designated bank account
171
Developed in phases
Yes

Survey, CTS, gat or plot numbers

7Survey No. 82/2/1 Survey No 83/3/6 Survey No 83/3/7 Survey No 83/4A Plot No 3 5 6

Land as published on MahaRERA's project page

Survey No. 82/2/1 Survey No 83/3/6 Survey No 83/3/7 Survey No 83/4A Plot No 3 5 6 & 7

Boundaries

North
internal layout road
South
Part of land bearing sr no 82
East
15 meter wide road
West
Part of land bearing no sr no

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking257 units

97 of 257 units booked (38%), as the promoter reported to MahaRERA

Bungalow · 6 units1BHK · 6 units2BHK · 161 units3BHK · 70 unitsShop · 14 units
BuildingTypeCarpet areaUnitsBooked
Bunglow Type ABungalow104.68 sq m · 1,127 sq ft10
Bunglow Type BBungalow94.2 sq m · 1,014 sq ft10
Bunglow Type CBungalow110.7 sq m · 1,192 sq ft10
Bunglow Type DBungalow93.21 sq m · 1,003 sq ft10
Bunglow Type EBungalow116.09 sq m · 1,250 sq ft10
Bunglow Type FBungalow113.02 sq m · 1,217 sq ft10
Thanekar Palacio Phase II1BHK31.39 sq m · 338 sq ft54
Thanekar Palacio Phase II1BHK34.02 sq m · 366 sq ft11
Show all 35 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Thanekar Palacio Phase II2BHK46.46 sq m · 500 sq ft128
Thanekar Palacio Phase II2BHK47.08 sq m · 507 sq ft100
Thanekar Palacio Phase II2BHK47.43 sq m · 511 sq ft3020
Thanekar Palacio Phase II2BHK48.37 sq m · 521 sq ft168
Thanekar Palacio Phase II2BHK49.06 sq m · 528 sq ft164
Thanekar Palacio Phase II2BHK49.64 sq m · 534 sq ft321
Thanekar Palacio Phase II2BHK50.73 sq m · 546 sq ft164
Thanekar Palacio Phase II2BHK51.85 sq m · 558 sq ft2914
Thanekar Palacio Phase II3BHK60 sq m · 646 sq ft54
Thanekar Palacio Phase II3BHK62.84 sq m · 676 sq ft11
Thanekar Palacio Phase II3BHK65.37 sq m · 704 sq ft150
Thanekar Palacio Phase II3BHK66 sq m · 710 sq ft162
Thanekar Palacio Phase II3BHK66.41 sq m · 715 sq ft165
Thanekar Palacio Phase II3BHK68.33 sq m · 735 sq ft1612
Thanekar Palacio Phase II3BHK70.4 sq m · 758 sq ft11
Thanekar Palacio Phase IIShop17.62 sq m · 190 sq ft11
Thanekar Palacio Phase IIShop19.04 sq m · 205 sq ft11
Thanekar Palacio Phase IIShop20.45 sq m · 220 sq ft10
Thanekar Palacio Phase IIShop23.49 sq m · 253 sq ft11
Thanekar Palacio Phase IIShop23.92 sq m · 257 sq ft32
Thanekar Palacio Phase IIShop27.62 sq m · 297 sq ft10
Thanekar Palacio Phase IIShop29.91 sq m · 322 sq ft10
Thanekar Palacio Phase IIShop35.6 sq m · 383 sq ft11
Thanekar Palacio Phase IIShop38.32 sq m · 412 sq ft11
Thanekar Palacio Phase IIShop43.06 sq m · 463 sq ft11
Thanekar Palacio Phase IIShop49.15 sq m · 529 sq ft10
Thanekar Palacio Phase IIShop94.07 sq m · 1,013 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals3

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSuraj Andhare—
Chartered accountantMayur K Jain & Co—
EngineerNitin Nandwani—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Badlapur (M Cl)

All 432 projects in Badlapur (M Cl) · Compare Thanekar Palacio Phase II with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology