Laxmideep Chssl, Laxmideep Chsl
Deedo IDDP-THN-8M82-LC5 flats have a sale on record, 0 are booked without a sale deed yet and 5 are unsold, per MahaRERA's Oct 2026 disclosure and the registered deeds.
Every flat, floor by floor
Tap a flat to see its record.
- Sale registered
- Unsold
- Reserved, rehab or other
Other units on these floors (no stack in the number):
Sale status from MahaRERA's Oct 2026 disclosure; deeds from IGR Index II, placed on a flat only when the deed names this tower and flat. “Listed by developer” comes from the developer and is labelled as such.
Flat 604
1 BHK · 286 sq ft · floor 6
- Deeds
- 0
- Last activity
- None on record
- Last sale
- None registered
Units & parking in Laxmideep Chssl
MahaRERA's project page with unit types hasn't been imported for this registration.
Parking: Closed/Covered 1 · Open Space 34 (as declared to MahaRERA)
Construction progress (declared)
Work completed, as the promoter reported it to MahaRERA (Form 1). Not verified on site.
- Excavation100%
- Basement (if any)0%
- Podiums (if any)0%
- Plinth100%
- Stilt Floor100%
- Slabs of Super Structure100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
- Sanitary Fittings within the flats / premises100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
As registered with MahaRERA
- Sanctioned habitable floors
- 8
- Deedo ID
- DP-THN-8M82-LC
Questions about Laxmideep Chssl
How many flats in Laxmideep Chssl are sold?
5 flats have a sale on record, 0 are booked without a sale deed yet and 5 are unsold, per MahaRERA's Oct 2026 disclosure and the registered deeds.
When is Laxmideep Chssl due for completion?
The MahaRERA registration promises 31 Dec 2025.
How many floors does Laxmideep Chssl have?
8 sanctioned habitable floors, as registered with MahaRERA.
