Skip to content
Deedo home
Menu

Shiv Shakti Complex

Certificate Signed

Chikhale, Raigarh 410221 |Promoter: Shiv Shakti Developers

Residential / Group HousingRERAP52000048777
17 Jan 2023Registered with MahaRERA
31 Dec 2028Promised completion
5Buildings
235Units registered10 booked (4%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
5
Unit types
1BHK, 1RK, 2BHK235 units in all
Address
Survey No. 81, Hissa No. 3, Chikhale Village, Panvel, RaigarhPIN 410221
Designated bank account
82
Developed in phases
Yes

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2028

Registered
17 Jan 2023
Promised
31 Dec 2028

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5200004877717 Jan 202331 Dec 202831 Dec 2028Shiv Shakti DevelopersProject page

5 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Building No 1648
Building No 2, A Wing648
Building No 2, B Wing654
Building No 3, A Wing550
Building No 3, B Wing535

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

10 of 235 units booked (4%), as the promoter reported to MahaRERA

1BHK · 208 units1RK · 12 units2BHK · 15 units
BuildingTypeCarpet areaUnitsBooked
Building No 11BHK31.92 sq m · 344 sq ft120
Building No 11BHK32.44 sq m · 349 sq ft120
Building No 11BHK32.58 sq m · 351 sq ft120
Building No 11BHK32.58 sq m · 351 sq ft120
Building No 2, A Wing1BHK33.11 sq m · 356 sq ft60
Building No 2, A Wing1BHK33.16 sq m · 357 sq ft60
Building No 2, A Wing1BHK33.56 sq m · 361 sq ft60
Building No 2, A Wing1BHK33.67 sq m · 362 sq ft60
Show all 36 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Building No 2, A Wing1BHK33.77 sq m · 363 sq ft120
Building No 2, A Wing1BHK34.05 sq m · 367 sq ft60
Building No 2, A Wing1RK21.88 sq m · 236 sq ft60
Building No 2, B Wing1BHK33.11 sq m · 356 sq ft60
Building No 2, B Wing1BHK33.16 sq m · 357 sq ft60
Building No 2, B Wing1BHK33.46 sq m · 360 sq ft60
Building No 2, B Wing1BHK33.56 sq m · 361 sq ft60
Building No 2, B Wing1BHK33.65 sq m · 362 sq ft60
Building No 2, B Wing1BHK33.67 sq m · 362 sq ft120
Building No 2, B Wing1BHK33.77 sq m · 363 sq ft60
Building No 2, B Wing1RK21.88 sq m · 236 sq ft62
Building No 3, A Wing1BHK29.61 sq m · 319 sq ft50
Building No 3, A Wing1BHK30.11 sq m · 324 sq ft50
Building No 3, A Wing1BHK30.14 sq m · 324 sq ft50
Building No 3, A Wing1BHK30.41 sq m · 327 sq ft50
Building No 3, A Wing1BHK30.55 sq m · 329 sq ft50
Building No 3, A Wing1BHK31.77 sq m · 342 sq ft50
Building No 3, A Wing1BHK32 sq m · 344 sq ft50
Building No 3, A Wing1BHK32.04 sq m · 345 sq ft50
Building No 3, A Wing2BHK41.55 sq m · 447 sq ft53
Building No 3, A Wing2BHK45.98 sq m · 495 sq ft50
Building No 3, B Wing1BHK26.77 sq m · 288 sq ft51
Building No 3, B Wing1BHK31.26 sq m · 336 sq ft52
Building No 3, B Wing1BHK32.03 sq m · 345 sq ft50
Building No 3, B Wing1BHK32.08 sq m · 345 sq ft50
Building No 3, B Wing1BHK32.48 sq m · 350 sq ft50
Building No 3, B Wing1BHK35.06 sq m · 377 sq ft51
Building No 3, B Wing2BHK41.27 sq m · 444 sq ft51

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

2 documents held by Deedo, 169 filings listed on MahaRERA's project page

Extension certificate

Registration certificate

Finance

  • PAN CardSELF DECLARATION FOR BANK CHANGE.pdf · uploaded 2 Jul 2022Source
  • OthersFORM 3 CA CERTIFICATE 08 05 2025.pdf · uploaded 18 Jul 2025Source

Legal

  • Declaration Form BFORM B.pdf · uploaded 2 Jul 2022Source
  • Legal Title reportFormat A Title Certificate.pdf · uploaded 23 Sep 2022Source
  • Legal Title reportSearch Report.pdf · uploaded 23 Sep 2022Source

Migrated

  • 1 PAN CardFIRM PAN CARD.pdf · uploaded 2 Jul 2022Source
Show all 171 documentsShow fewer documents

Migrated

  • 1 a Details of encumbrances concerned to FinanceENCUMBRANCES LETTER.pdf · uploaded 2 Jul 2022Source
  • 1 Copy of Layout Approval (in case of layout)LAYOUT PLAN 1.pdf · uploaded 2 Jul 2022Source
  • 2 Copy of Layout Approval (in case of layout)LAYOUT PLAN 2.pdf · uploaded 2 Jul 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentBUILDING PLAN 1.pdf · uploaded 2 Jul 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentBUILDING PLAN 2.pdf · uploaded 2 Jul 2022Source
  • 3 Building Plan Approval / NA Order for plotted developmentBUILDING PLAN 3.pdf · uploaded 2 Jul 2022Source
  • 4 Building Plan Approval / NA Order for plotted developmentBUILDING PLAN 4.pdf · uploaded 2 Jul 2022Source
  • 5 Building Plan Approval / NA Order for plotted developmentBUILDING PLAN 5.pdf · uploaded 2 Jul 2022Source
  • 6 Building Plan Approval / NA Order for plotted developmentBUILDING PLAN 6.pdf · uploaded 2 Jul 2022Source
  • 7 Building Plan Approval / NA Order for plotted developmentBUILDING PLAN 7.pdf · uploaded 2 Jul 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC 1 TO 5 PAGES.pdf · uploaded 2 Jul 2022Source
  • 2 Commencement Certificates / NA Order for plotted developmentCC 6 TO 9 PAGES.pdf · uploaded 2 Jul 2022Source
  • 3 Commencement Certificates / NA Order for plotted developmentCC 10 TO 13 PAGES.pdf · uploaded 2 Jul 2022Source
  • 1 Declaration about Commencement CertificateC C DECLARATION.pdf · uploaded 2 Jul 2022Source
  • 1 Declaration in FORM BFORM B.pdf · uploaded 2 Jul 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE.pdf · uploaded 2 Jul 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE.pdf · uploaded 2 Jul 2022Source
  • 1 CERSAI detailsCERSAI CERTIFICATE.pdf · uploaded 2 Jul 2022Source
  • 1 Copy of the legal title reportFormat A Title Certificate.pdf · uploaded 23 Sep 2022Source
  • 2 Copy of the legal title reportSearch Report.pdf · uploaded 23 Sep 2022Source
  • 1 b Details of encumbrances concerned to LegalDeclaration For Hypothecated.pdf · uploaded 23 Sep 2022Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBank Letter.pdf · uploaded 23 Sep 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE FINAL.pdf · uploaded 4 Oct 2022Source
  • 2 a Details of encumbrances concerned to FinanceLEGAL ENCUMBRANCE LETTER.pdf · uploaded 21 Nov 2022Source
  • 2 b Details of encumbrances concerned to LegalLEGAL ENCUMBRANCE LETTER.pdf · uploaded 21 Nov 2022Source
  • 1 Proforma of Allotment letterDRAFT ALLOTEMENT LETTER UPDATED.pdf · uploaded 21 Nov 2022Source
  • 1 Proforma of Agreement for saleDRAFT SALE AGREEMENT UPDATED.pdf · uploaded 21 Nov 2022Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Partners.pdf · uploaded 11 Jan 2023Source
  • 1 Deviation Report with respect to Allotment letterDeviation Letter AL.pdf · uploaded 11 Jan 2023Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation Letter AFS Part 1.pdf · uploaded 11 Jan 2023Source
  • 2 Deviation Report with respect to model copy of AgreementDeviation Letter AFS Part 2.pdf · uploaded 11 Jan 2023Source
  • 3 Deviation Report with respect to model copy of AgreementDeviation Letter AFS Part 3.pdf · uploaded 11 Jan 2023Source
  • 1 Disclosure of sold/ booked inventoryBuilding No 1 31 03 2023.pdf · uploaded 11 Sep 2023Source
  • 2 Disclosure of sold/ booked inventoryBuilding No 2 31 03 2023.pdf · uploaded 11 Sep 2023Source
  • 3 Disclosure of sold/ booked inventoryBuilding No 3 31 03 2023.pdf · uploaded 11 Sep 2023Source
  • 4 Disclosure of sold/ booked inventoryBuilding No 1 30 06 2023.pdf · uploaded 11 Sep 2023Source
  • 5 Disclosure of sold/ booked inventoryBuilding No 2 30 06 2023.pdf · uploaded 11 Sep 2023Source
  • 6 Disclosure of sold/ booked inventoryBuilding No 3 30 06 2023.pdf · uploaded 11 Sep 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE 31 3 2023.pdf · uploaded 13 Sep 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE 30 6 2023.pdf · uploaded 13 Sep 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A ENGINEER CERTIFICATE.pdf · uploaded 9 Oct 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 Shiv Shakti Complex.pdf · uploaded 10 Oct 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE 30 9 2023.pdf · uploaded 19 Oct 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 ENG 31 03 2023.pdf · uploaded 19 Oct 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 ENG 30 06 2023.pdf · uploaded 19 Oct 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 ENG 30 09 2023.pdf · uploaded 19 Oct 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 ENG 30 09 2023.pdf · uploaded 19 Oct 2023Source
  • 7 Disclosure of sold/ booked inventoryBuilding No 1 30 09 2023.pdf · uploaded 19 Oct 2023Source
  • 8 Disclosure of sold/ booked inventoryBuilding No 2 30 09 2023.pdf · uploaded 19 Oct 2023Source
  • 9 Disclosure of sold/ booked inventoryBuilding No 3 30 09 2023.pdf · uploaded 19 Oct 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 CA 31 3 2023 FINAL.pdf · uploaded 19 Oct 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 CA 30 6 2023 FINAL.pdf · uploaded 19 Oct 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 CA 30 9 2023 FINAL.pdf · uploaded 19 Oct 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE 30 9 2023.pdf · uploaded 28 Nov 2023Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 ENG 31 03 2023.pdf · uploaded 28 Nov 2023Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 ENG 30 06 2023.pdf · uploaded 28 Nov 2023Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 ENG 30 09 2023.pdf · uploaded 28 Nov 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 CA 31 3 2023 FINAL.pdf · uploaded 28 Nov 2023Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 CA 30 6 2023 FINAL.pdf · uploaded 28 Nov 2023Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 CA 30 9 2023 FINAL.pdf · uploaded 28 Nov 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 ARCHITECH 31 12 2023.pdf · uploaded 20 Jan 2024Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 ENG 31 12 2023.pdf · uploaded 20 Jan 2024Source
  • 10 Disclosure of sold/ booked inventoryBUILDING 1 31 12 2023.pdf · uploaded 20 Jan 2024Source
  • 11 Disclosure of sold/ booked inventoryBUILDING 2 31 12 2023.pdf · uploaded 20 Jan 2024Source
  • 12 Disclosure of sold/ booked inventoryBUILDING 3 31 12 2023.pdf · uploaded 20 Jan 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 CA 31 12 2023.pdf · uploaded 20 Jan 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 ARCHITECT CERTIFICATE.pdf · uploaded 19 Apr 2024Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 ENGINEER CERTIFICATE.pdf · uploaded 19 Apr 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Farm-2A ENGINEER CERTIFICATE.pdf · uploaded 19 Apr 2024Source
  • 13 Disclosure of sold/ booked inventorySOLD UNSOLD UPDATES FINAL.pdf · uploaded 19 Apr 2024Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 CA CERTIFICATE FINAL.pdf · uploaded 19 Apr 2024Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 ARCHITECTS CERTIFICATE.pdf · uploaded 20 Jul 2024Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 ENGINEER CERTIFICATE.pdf · uploaded 20 Jul 2024Source
  • 14 Disclosure of sold/ booked inventorySOLD UNSOLD QTRLY UPDATE.pdf · uploaded 20 Jul 2024Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 CA CERTIFICATE FINAL.pdf · uploaded 20 Jul 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 ARCHITECT CERTIFICATE.pdf · uploaded 19 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 CA CERTIFICATE.pdf · uploaded 19 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 ENGINEER CERTIFICATE.pdf · uploaded 19 Oct 2024Source
  • 2 Disclosure of sold/ booked inventorySOLD UNSOLD QTRLY UPDATE.pdf · uploaded 19 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 SHIV SHAKTI COMPLEX.pdf · uploaded 10 Dec 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 ARCHITECH CERTIFICATE.pdf · uploaded 15 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 CA CERTIFICATE FINAL.pdf · uploaded 15 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 ENGINEER CERTIFICATE.pdf · uploaded 15 Jan 2025Source
  • 1 Disclosure of sold/ booked inventorySOLD UNSOLD QTRY UPDATE FINAL.pdf · uploaded 15 Jan 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A ENGINEER CERTIFICATE 2023 24.pdf · uploaded 3 Mar 2025Source
  • 2 Copy of Layout Approval (in case of layout)BUILDING LAYOUT PLAN PAGE 3.pdf · uploaded 5 Mar 2025Source
  • 3 Copy of Layout Approval (in case of layout)BUILDING LAYOUT PLAN PAGE 4 AND 5.pdf · uploaded 5 Mar 2025Source
  • 4 Copy of Layout Approval (in case of layout)BUILDING LAYOUT PLAN PAGE 6 AND 7.pdf · uploaded 5 Mar 2025Source
  • 5 Copy of Layout Approval (in case of layout)BUILDING LAYOUT PLAN PAGE 1 AND 2 FINAL.pdf · uploaded 5 Mar 2025Source
  • 6 Copy of Layout Approval (in case of layout)BUILDING LAYOUT PLAN PAGE 3 AND 4 FINAL.pdf · uploaded 5 Mar 2025Source
  • 7 Copy of Layout Approval (in case of layout)BUILDING LAYOUT PLAN PAGE 5 AND 6 FINAL.pdf · uploaded 5 Mar 2025Source
  • 8 Copy of Layout Approval (in case of layout)BUILDING LAYOUT PLAN PAGE 7 FINAL.pdf · uploaded 5 Mar 2025Source
  • 1 Copy of Layout Approval (in case of layout)BUILDING LAYOUT PLAN PAGE 1 AND 2.pdf · uploaded 5 Mar 2025Source
  • 1 Building Plan Approval / NA Order for plotted developmentBUILDING LAYOUT PLAN PAGE 3.pdf · uploaded 5 Mar 2025Source
  • 8 Building Plan Approval / NA Order for plotted developmentBUILDING LAYOUT PLAN PAGE 7 FINAL.pdf · uploaded 5 Mar 2025Source
  • 7 Building Plan Approval / NA Order for plotted developmentBUILDING LAYOUT PLAN PAGE 5 AND 6 FINAL.pdf · uploaded 5 Mar 2025Source
  • 6 Building Plan Approval / NA Order for plotted developmentBUILDING LAYOUT PLAN PAGE 3 AND 4 FINAL.pdf · uploaded 5 Mar 2025Source
  • 5 Building Plan Approval / NA Order for plotted developmentBUILDING LAYOUT PLAN PAGE 1 AND 2 FINAL.pdf · uploaded 5 Mar 2025Source
  • 4 Building Plan Approval / NA Order for plotted developmentBUILDING LAYOUT PLAN PAGE 6 AND 7.pdf · uploaded 5 Mar 2025Source
  • 3 Building Plan Approval / NA Order for plotted developmentBUILDING LAYOUT PLAN PAGE 4 AND 5.pdf · uploaded 5 Mar 2025Source
  • 2 Building Plan Approval / NA Order for plotted developmentBUILDING LAYOUT PLAN PAGE 1 AND 2.pdf · uploaded 5 Mar 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 CA CERTIFICATE 15 02 2025.pdf · uploaded 7 Mar 2025Source
  • 1 Proforma of Allotment letterDRAFT ALLOTMENT LETTER.pdf · uploaded 17 Apr 2025Source
  • 1 Deviation Report with respect to Allotment letterREVISED DEVIATION ALLOTMENT FINAL.pdf · uploaded 17 Apr 2025Source
  • 1 Deviation Report with respect to model copy of AgreementREVISED DEVIATION AGREEMENT FINAL.pdf · uploaded 17 Apr 2025Source
  • 1 Proforma of Agreement for saleDRAFT AGREEMENT FOR SALE.pdf · uploaded 17 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 ARCHITECT CERTIFICATE 31 3 2025.pdf · uploaded 18 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 CA CERTIFICATE 31 3 2025 FINAL.pdf · uploaded 18 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 ENGINEER CERTIFICATE 31 3 2025.pdf · uploaded 18 Apr 2025Source
  • 1 Disclosure of sold/ booked inventorySOLD UNSOLD CERTIFICATE 31 3 2025 FINAL.pdf · uploaded 18 Apr 2025Source
  • Withdrawal Update Form 1FORM 1 ARCHITECTS CERTIFICATE.pdf · uploaded 18 Jul 2025Source
  • Withdrawal Update Form 2FORM 2 ENGINEER CERTIFICATE.pdf · uploaded 18 Jul 2025Source
  • Withdrawal Update Form 3FORM 3 CA CERTIFICATE 08 05 2025.pdf · uploaded 18 Jul 2025Source
  • Withdrawal Update Form 1FORM 1 ARCHITECT CERTIFICATE.pdf · uploaded 6 Aug 2025Source
  • Withdrawal Update Form 2FORM 2 ENGINEER CERTIFICATE.pdf · uploaded 6 Aug 2025Source
  • Withdrawal Update Form 3FORM 3 CA CERTIFICATE.pdf · uploaded 6 Aug 2025Source
  • Form 2A (FY 2024-2025)FORM 2A F.Y. 2024-25.pdf · uploaded 6 Aug 2025Source
  • Withdrawal Update Form 1FORM 1 ARCHITECT CERTIFICATE.pdf · uploaded 18 Oct 2025Source
  • Withdrawal Update Form 2FORM 2 ENGINEER CERTIFICATE.pdf · uploaded 18 Oct 2025Source
  • Withdrawal Update Form 3FORM 3 CA CERTIFICATE.pdf · uploaded 18 Oct 2025Source
  • Form 5 (FY 2024-2025)FORM 5 SHIV SHAKTI COMPLEX.pdf · uploaded 2 Dec 2025Source
  • Withdrawal Update Form 1FORM 1 ARCHITECT CERTIFICATE 31 12 25.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 2FORM 2 ENGINEER CERTIFICATE 31 12 25.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 3FORM 3 CA CERTIFICATE 31 12 25.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 1FORM 1 ARCHITECT CERTIFICATE 31 03 26.pdf · uploaded 18 Apr 2026Source
  • Withdrawal Update Form 2FORM 2 ENGINEER CERTIFICATE 31 03 26.pdf · uploaded 18 Apr 2026Source
  • Withdrawal Update Form 3FORM 3 CA CERTIFICATE 31 03 2026...pdf · uploaded 18 Apr 2026Source
  • Withdrawal Update Form 1FORM 1 ARCHITECT SHIV 30 06 2026.pdf · uploaded 17 Jul 2026Source
  • Withdrawal Update Form 2FORM 2 ENGINEER SHIV 30 06 2026.pdf · uploaded 17 Jul 2026Source
  • Withdrawal Update Form 3FORM 3 CA SHIV 30 06 2026.pdf · uploaded 17 Jul 2026Source

Technical

  • DocumentLAYOUT PLAN 1.pdf · uploaded 2 Jul 2022Source
  • DocumentLAYOUT PLAN 2.pdf · uploaded 2 Jul 2022Source
  • DocumentBUILDING PLAN 1.pdf · uploaded 2 Jul 2022Source
  • DocumentBUILDING PLAN 2.pdf · uploaded 2 Jul 2022Source
  • DocumentBUILDING PLAN 3.pdf · uploaded 2 Jul 2022Source
  • DocumentBUILDING PLAN 4.pdf · uploaded 2 Jul 2022Source
  • DocumentBUILDING PLAN 5.pdf · uploaded 2 Jul 2022Source
  • DocumentBUILDING PLAN 6.pdf · uploaded 2 Jul 2022Source
  • DocumentBUILDING PLAN 7.pdf · uploaded 2 Jul 2022Source
  • DocumentBUILDING LAYOUT PLAN PAGE 1 AND 2.pdf · uploaded 5 Mar 2025Source
  • DocumentBUILDING LAYOUT PLAN PAGE 3.pdf · uploaded 5 Mar 2025Source
  • DocumentBUILDING LAYOUT PLAN PAGE 4 AND 5.pdf · uploaded 5 Mar 2025Source
  • DocumentBUILDING LAYOUT PLAN PAGE 6 AND 7.pdf · uploaded 5 Mar 2025Source
  • DocumentBUILDING LAYOUT PLAN PAGE 1 AND 2 FINAL.pdf · uploaded 5 Mar 2025Source
  • DocumentBUILDING LAYOUT PLAN PAGE 3 AND 4 FINAL.pdf · uploaded 5 Mar 2025Source
  • DocumentBUILDING LAYOUT PLAN PAGE 5 AND 6 FINAL.pdf · uploaded 5 Mar 2025Source
  • DocumentBUILDING LAYOUT PLAN PAGE 7 FINAL.pdf · uploaded 5 Mar 2025Source
  • DocumentBUILDING LAYOUT PLAN PAGE 3.pdf · uploaded 5 Mar 2025Source
  • DocumentBUILDING LAYOUT PLAN PAGE 1 AND 2.pdf · uploaded 5 Mar 2025Source
  • DocumentBUILDING LAYOUT PLAN PAGE 4 AND 5.pdf · uploaded 5 Mar 2025Source
  • DocumentBUILDING LAYOUT PLAN PAGE 6 AND 7.pdf · uploaded 5 Mar 2025Source
  • DocumentBUILDING LAYOUT PLAN PAGE 1 AND 2 FINAL.pdf · uploaded 5 Mar 2025Source
  • DocumentBUILDING LAYOUT PLAN PAGE 3 AND 4 FINAL.pdf · uploaded 5 Mar 2025Source
  • DocumentBUILDING LAYOUT PLAN PAGE 5 AND 6 FINAL.pdf · uploaded 5 Mar 2025Source
  • DocumentBUILDING LAYOUT PLAN PAGE 7 FINAL.pdf · uploaded 5 Mar 2025Source

Technical (Architect)

  • DocumentFORM 1 ARCHITECT CERTIFICATE.pdf · uploaded 19 Oct 2024Source
  • DocumentFORM 1 ARCHITECH CERTIFICATE.pdf · uploaded 15 Jan 2025Source
  • DocumentFORM 1 ARCHITECT CERTIFICATE 31 3 2025.pdf · uploaded 18 Apr 2025Source
  • DocumentFORM 1 ARCHITECT SHIV 30 06 2026.pdf · uploaded 17 Jul 2026Source

Technical (Engineer)

  • DocumentFORM 2 ENGINEER CERTIFICATE.pdf · uploaded 19 Oct 2024Source
  • DocumentFORM 2 ENGINEER CERTIFICATE.pdf · uploaded 15 Jan 2025Source
  • DocumentFORM 2 ENGINEER CERTIFICATE 31 3 2025.pdf · uploaded 18 Apr 2025Source
  • DocumentFORM 2 ENGINEER SHIV 30 06 2026.pdf · uploaded 17 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Chikhale, Panvel taluka

Survey, CTS, gat or plot numbers

Hissa No. 3Survey No. 81

Boundaries

North
Survey No 81-2
South
Survey No 81-1
East
Survey No 81-4
West
Gaonthan Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAayadi Architects & Planners—
Chartered accountantYogesh Nanda And Associates—
EngineerPrapti Associate—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology