Skip to content
Residential / Group Housing · 2 buildings · 56 unitsRERA P52000011327

Sai Srushti

Deedo IDDP-RAI-1CZ0

MahaRERA shows it completed; no MahaRERA orders on record; 82% of its units are booked.

Chikhale, Raigarh 410206 · by Om Construction And Developers

DeliveryCompletedCompletion / occupancy certificate on MahaRERARegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales82% booked46 of 56 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

MahaRERA shows it completed

  • This projectRegistered 31 Aug 2017, completion promised 22 May 2026.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

2 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52000011327
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5200001132731 Aug 201722 May 202622 May 2026Om Construction And DevelopersProject page
Documents174

1 document held by Deedo, 173 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPancard.pdf · uploaded 27 Jul 2021Source

Legal

  • Legal Title reportdeed 11.pdf · uploaded 31 Jul 2017Source
  • Legal Title reportdeed 12.pdf · uploaded 31 Jul 2017Source
  • Legal Title reportdeed 13.pdf · uploaded 31 Jul 2017Source
  • Legal Title reportdeed 14.pdf · uploaded 31 Jul 2017Source
  • Declaration Form BFORM B F.pdf · uploaded 31 Jul 2017Source
  • Declaration Form BRera affidavit25.pdf · uploaded 23 Jan 2025Source
Show all 174 documentsShow fewer documents

Legal

  • Declaration Form Bfresh Form B.pdf · uploaded 17 Feb 2025Source

Migrated

  • 1 Copy of the legal title reportdeed 11.pdf · uploaded 31 Jul 2017Source
  • 2 Copy of the legal title reportdeed 12.pdf · uploaded 31 Jul 2017Source
  • 3 Copy of the legal title reportdeed 13.pdf · uploaded 31 Jul 2017Source
  • 4 Copy of the legal title reportdeed 14.pdf · uploaded 31 Jul 2017Source
  • 1 Details of encumbrancesNon Incumbereances Declaration.pdf · uploaded 31 Jul 2017Source
  • 1 Copy of Layout Approval (in case of layout)site .pdf · uploaded 31 Jul 2017Source
  • 1 Building Plan Approval (IOD)site .pdf · uploaded 31 Jul 2017Source
  • 1 Declaration in FORM BFORM B F.pdf · uploaded 31 Jul 2017Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)arch cert f.pdf · uploaded 31 Jul 2017Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)engg f.pdf · uploaded 31 Jul 2017Source
  • 1 Certificates of CA (Form 3)CA.PDF · uploaded 31 Jul 2017Source
  • 1 Proforma of Allotment letterModel Agreement to sale.pdf · uploaded 31 Jul 2017Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)arch june_compressed.pdf · uploaded 6 Jan 2020Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)arch march_compressed.pdf · uploaded 6 Jan 2020Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)arch sep_compressed.pdf · uploaded 6 Jan 2020Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)eng june_compressed.pdf · uploaded 6 Jan 2020Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)eng march_compressed.pdf · uploaded 6 Jan 2020Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)eng sep_compressed.pdf · uploaded 6 Jan 2020Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)form 2a.pdf · uploaded 6 Jan 2020Source
  • 2 Certificates of CA (Form 3)form3 june_compressed.pdf · uploaded 6 Jan 2020Source
  • 3 Certificates of CA (Form 3)form3 march_compressed.pdf · uploaded 6 Jan 2020Source
  • 4 Certificates of CA (Form 3)form3 sept_compressed.pdf · uploaded 6 Jan 2020Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)form 5.pdf · uploaded 6 Jan 2020Source
  • 1 PAN CardPancard.pdf · uploaded 27 Jul 2021Source
  • 1 Commencement Certificates / NA Order for plotted developmentcc_compressed.pdf · uploaded 27 Jul 2021Source
  • 1 Declaration about Commencement CertificateFormat D.pdf · uploaded 27 Jul 2021Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)form1 0321_compressed.pdf · uploaded 27 Jul 2021Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)form1 0621_compressed.pdf · uploaded 27 Jul 2021Source
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)EC Jan 20.pdf · uploaded 27 Jul 2021Source
  • 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)EC March 20.pdf · uploaded 27 Jul 2021Source
  • 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)EC June 20.pdf · uploaded 27 Jul 2021Source
  • 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)EC Spt 20.pdf · uploaded 27 Jul 2021Source
  • 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)EC Dec 20.pdf · uploaded 27 Jul 2021Source
  • 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)EC March 21.pdf · uploaded 27 Jul 2021Source
  • 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)EC June 21.pdf · uploaded 27 Jul 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form2A_compressed.pdf · uploaded 27 Jul 2021Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of sold flats.pdf · uploaded 27 Jul 2021Source
  • 5 Certificates of CA (Form 3)CA1219_compressed.pdf · uploaded 27 Jul 2021Source
  • 6 Certificates of CA (Form 3)CA0320_compressed.pdf · uploaded 27 Jul 2021Source
  • 7 Certificates of CA (Form 3)CA0620_compressed.pdf · uploaded 27 Jul 2021Source
  • 8 Certificates of CA (Form 3)CA0920_compressed.pdf · uploaded 27 Jul 2021Source
  • 9 Certificates of CA (Form 3)CA0321_compressed.pdf · uploaded 27 Jul 2021Source
  • 10 Certificates of CA (Form 3)CA0621_compressed.pdf · uploaded 27 Jul 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)form 5.pdf · uploaded 27 Jul 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)form5 19-20.pdf · uploaded 27 Jul 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)form5 20-21.pdf · uploaded 27 Jul 2021Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Sai Srushti Chikhale EC 30-09-21.pdf · uploaded 13 Feb 2023Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Sai Srushti Chikhale EC 30-12-21.pdf · uploaded 13 Feb 2023Source
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCH Q2 21-22.pdf · uploaded 13 Feb 2023Source
  • 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCH Q3 21-22.pdf · uploaded 13 Feb 2023Source
  • 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCH Q4 21-22.pdf · uploaded 13 Feb 2023Source
  • 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCH Q1 22-23.pdf · uploaded 13 Feb 2023Source
  • 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCH Q2 22-23.pdf · uploaded 13 Feb 2023Source
  • 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCH Q3 22-23.pdf · uploaded 13 Feb 2023Source
  • 15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCH Q3 2022.pdf · uploaded 13 Feb 2023Source
  • 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Sai Srushti Chikhale EC 30-09-21.pdf · uploaded 13 Feb 2023Source
  • 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Sai Srushti Chikhale EC 30-12-21.pdf · uploaded 13 Feb 2023Source
  • 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Sai Srushti Chikhale EC 30-03-22.pdf · uploaded 13 Feb 2023Source
  • 15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Sai Shrushti Chikhale EC 30-06-22.pdf · uploaded 13 Feb 2023Source
  • 16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Sai Shrushti Chikhale EC 30-09-22.pdf · uploaded 13 Feb 2023Source
  • 17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Sai Shrushti Chikhale EC 30-12-22 (1).pdf · uploaded 13 Feb 2023Source
  • 11 Certificates of CA (Form 3)form3 july21tosep21_compressed.pdf · uploaded 25 Feb 2023Source
  • 12 Certificates of CA (Form 3)form3 oct21todec21_compressed.pdf · uploaded 25 Feb 2023Source
  • 13 Certificates of CA (Form 3)form21 jan22tomar22_compressed.pdf · uploaded 25 Feb 2023Source
  • 14 Certificates of CA (Form 3)form3 apr22tojune22_compressed.pdf · uploaded 25 Feb 2023Source
  • 15 Certificates of CA (Form 3)form3 jul22tosep22_compressed.pdf · uploaded 25 Feb 2023Source
  • 16 Certificates of CA (Form 3)form3 oct22todec22_compressed.pdf · uploaded 25 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)form5 mar21.pdf · uploaded 25 Feb 2023Source
  • 2 Copy of Layout Approval (in case of layout)Approved plans Amended CC_compressed-1-2.pdf · uploaded 17 Apr 2023Source
  • 3 Copy of Layout Approval (in case of layout)Approved plans Amended CC_compressed-3-4.pdf · uploaded 17 Apr 2023Source
  • 2 Commencement Certificates / NA Order for plotted developmentAmended CC[3886].pdf · uploaded 17 Apr 2023Source
  • 16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 Q4 22-23.pdf · uploaded 18 Jan 2024Source
  • 17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 Q1 23-24.pdf · uploaded 18 Jan 2024Source
  • 18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 q2 23-24.pdf · uploaded 18 Jan 2024Source
  • 19 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 Q3 23 -24.pdf · uploaded 18 Jan 2024Source
  • 18 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 MARCH 2023.pdf · uploaded 18 Jan 2024Source
  • 19 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 JUNE 2023.pdf · uploaded 18 Jan 2024Source
  • 20 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 DECEMBER 2023.pdf · uploaded 18 Jan 2024Source
  • 21 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FROM 2 SPT 2023.pdf · uploaded 18 Jan 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)2 A 22-23.pdf · uploaded 18 Jan 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)2 A 2023.pdf · uploaded 18 Jan 2024Source
  • 17 Certificates of CA (Form 3)form3 mar23_compressed.pdf · uploaded 18 Jan 2024Source
  • 18 Certificates of CA (Form 3)form3 sep23_compressed.pdf · uploaded 18 Jan 2024Source
  • 19 Certificates of CA (Form 3)form3 dec23_compressed.pdf · uploaded 18 Jan 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)form5 2023.pdf · uploaded 18 Jan 2024Source
  • 2 Disclosure of sold/ booked inventory1 Disclosure of sold_ booked inventory.pdf · uploaded 19 Jan 2024Source
  • 1 CERSAI detailsNo cersai.pdf · uploaded 24 Jan 2024Source
  • 1 Disclosure of Interest in Other Real Estate Organizationsannex A Interest Declaration .pdf · uploaded 24 Jan 2024Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameformat A Bank Ac.pdf · uploaded 24 Jan 2024Source
  • 4 Copy of Layout Approval (in case of layout)Approved plans Amended CC_compressed-1-2.pdf · uploaded 16 Aug 2024Source
  • 5 Copy of Layout Approval (in case of layout)Approved plans Amended CC_compressed-3-4.pdf · uploaded 16 Aug 2024Source
  • 6 Copy of Layout Approval (in case of layout)Approved Drawings1 (2)_compressed.pdf · uploaded 20 Aug 2024Source
  • 7 Copy of Layout Approval (in case of layout)Approved Drawings2 (2).pdf · uploaded 20 Aug 2024Source
  • 8 Copy of Layout Approval (in case of layout)Approved Drawings3 (2).pdf · uploaded 20 Aug 2024Source
  • 9 Copy of Layout Approval (in case of layout)Approved Drawings4 (2).pdf · uploaded 20 Aug 2024Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM-1-30032024.pdf · uploaded 22 Jan 2025Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)archcert0624.pdf · uploaded 22 Jan 2025Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)archcert0924.pdf · uploaded 22 Jan 2025Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)archcert1224.pdf · uploaded 22 Jan 2025Source
  • 4 Certificates of CA (Form 3)1224form3_compressed.pdf · uploaded 22 Jan 2025Source
  • 3 Certificates of CA (Form 3)0924form3_compressed.pdf · uploaded 22 Jan 2025Source
  • 2 Certificates of CA (Form 3)0624form3_compressed.pdf · uploaded 22 Jan 2025Source
  • 1 Certificates of CA (Form 3)0324form3_compressed.pdf · uploaded 22 Jan 2025Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Sai Srushti -- EC 30-03-24 with DSC.pdf · uploaded 22 Jan 2025Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Sai Srushti -- EC 29-06-24 with DSC.pdf · uploaded 22 Jan 2025Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Sai Srushti -- EC 30-09-24 with DSC.pdf · uploaded 22 Jan 2025Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Sai Srushti -- EC 31-12-24 with DSC.pdf · uploaded 22 Jan 2025Source
  • 1 Declaration in FORM BRera affidavit25.pdf · uploaded 23 Jan 2025Source
  • 1 Disclosure of sold/ booked inventorydisclosure of inventory.pdf · uploaded 25 Jan 2025Source
  • 2 Declaration in FORM Bfresh Form B.pdf · uploaded 17 Feb 2025Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM-1-30032024.pdf · uploaded 25 Feb 2025Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)arch 1 q3 24 25 signed.pdf · uploaded 25 Feb 2025Source
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)form2mar24.pdf · uploaded 25 Feb 2025Source
  • 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)form2june24.pdf · uploaded 25 Feb 2025Source
  • 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)form2sept24.pdf · uploaded 25 Feb 2025Source
  • 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)form2dec24.pdf · uploaded 25 Feb 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24).pdf · uploaded 25 Feb 2025Source
  • Withdrawal Update Form 1FORM 1 Q3 23 -24.pdf · uploaded 16 Jun 2026Source
  • Withdrawal Update Form 2Sai Srushti -- EC 31-12-24 with DSC.pdf · uploaded 16 Jun 2026Source
  • Withdrawal Update Form 3form3 dec23_compressed.pdf · uploaded 16 Jun 2026Source
  • Withdrawal Update Form 1Rrea Certificate.pdf · uploaded 21 Aug 2026Source
  • Withdrawal Update Form 1Rrea Certificate q 2 25 26.pdf · uploaded 21 Aug 2026Source
  • Withdrawal Update Form 1Rrea Certificate q 2 25 26.pdf · uploaded 21 Aug 2026Source
  • Withdrawal Update Form 2Sai Srushti -- EC 30-06-25 with DSC.pdf · uploaded 21 Aug 2026Source
  • Withdrawal Update Form 2Sai Srushti -- EC 30-06-25 with DSC.pdf · uploaded 21 Aug 2026Source
  • Withdrawal Update Form 2Sai Srushti -- EC 31-12-25 with DSC.pdf · uploaded 21 Aug 2026Source
  • Withdrawal Update Form 3form3jun25.pdf · uploaded 21 Aug 2026Source
  • Withdrawal Update Form 3form3sep25.pdf · uploaded 21 Aug 2026Source
  • Withdrawal Update Form 3form3dec25.pdf · uploaded 21 Aug 2026Source
  • Form 2A (FY 2025-2026)form2A2526.pdf · uploaded 21 Aug 2026Source
  • Form 5 (FY 2024-2025)form52425.pdf · uploaded 21 Aug 2026Source
  • Form 5 (FY 2025-2026)form52526.pdf · uploaded 21 Aug 2026Source
  • Withdrawal Update Form 1Rrea Certificate q 4 25 26.pdf · uploaded 21 Sep 2026Source
  • Withdrawal Update Form 1Rrea Certificate q 4 25 26.pdf · uploaded 21 Sep 2026Source
  • Withdrawal Update Form 2Sai Srushti -- EC 31-03-26 with DSC.pdf · uploaded 21 Sep 2026Source
  • Withdrawal Update Form 2Sai Srushti -- EC 31-03-26 with DSC.pdf · uploaded 21 Sep 2026Source
  • Withdrawal Update Form 3form3mar26.pdf · uploaded 21 Sep 2026Source
  • Withdrawal Update Form 3form3mar26.pdf · uploaded 21 Sep 2026Source
  • Occupational CertificateCIDCO_NAINA_BP-00538_2022_Amm1_OCC.pdf · uploaded 21 Sep 2026Source

Technical

  • Documentsite .pdf · uploaded 31 Jul 2017Source
  • Documentsite .pdf · uploaded 31 Jul 2017Source
  • DocumentApproved plans Amended CC_compressed-1-2.pdf · uploaded 17 Apr 2023Source
  • DocumentApproved plans Amended CC_compressed-3-4.pdf · uploaded 17 Apr 2023Source
  • DocumentApproved plans Amended CC_compressed-1-2.pdf · uploaded 16 Aug 2024Source
  • DocumentApproved plans Amended CC_compressed-3-4.pdf · uploaded 16 Aug 2024Source
  • DocumentApproved Drawings1 (2)_compressed.pdf · uploaded 20 Aug 2024Source
  • DocumentApproved Drawings2 (2).pdf · uploaded 20 Aug 2024Source
  • DocumentApproved Drawings3 (2).pdf · uploaded 20 Aug 2024Source
  • DocumentApproved Drawings4 (2).pdf · uploaded 20 Aug 2024Source

Technical (Architect)

  • DocumentFORM-1-30032024.pdf · uploaded 22 Jan 2025Source
  • Documentarchcert0624.pdf · uploaded 22 Jan 2025Source
  • Documentarchcert0924.pdf · uploaded 22 Jan 2025Source
  • Documentarchcert1224.pdf · uploaded 22 Jan 2025Source
  • DocumentFORM-1-30032024.pdf · uploaded 25 Feb 2025Source
  • Documentarch 1 q3 24 25 signed.pdf · uploaded 25 Feb 2025Source
  • DocumentRrea Certificate q 4 25 26.pdf · uploaded 21 Sep 2026Source

Technical (Engineer)

  • DocumentSai Srushti -- EC 30-03-24 with DSC.pdf · uploaded 22 Jan 2025Source
  • DocumentSai Srushti -- EC 29-06-24 with DSC.pdf · uploaded 22 Jan 2025Source
  • DocumentSai Srushti -- EC 30-09-24 with DSC.pdf · uploaded 22 Jan 2025Source
  • DocumentSai Srushti -- EC 31-12-24 with DSC.pdf · uploaded 22 Jan 2025Source
  • Documentform2mar24.pdf · uploaded 25 Feb 2025Source
  • Documentform2june24.pdf · uploaded 25 Feb 2025Source
  • Documentform2sept24.pdf · uploaded 25 Feb 2025Source
  • Documentform2dec24.pdf · uploaded 25 Feb 2025Source
  • DocumentSai Srushti -- EC 31-03-26 with DSC.pdf · uploaded 21 Sep 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 7 1 C

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
1BHK, T2, T4, Ti56 units in all
Address
7 1 C, Chikhale, ChikhalePIN 410206
Village
Chikhale, Panvel taluka
Land area for this project
2,400 sq m (25,833 sq ft)
Permissible built-up area
2,500 sq m (26,910 sq ft)
Sanctioned built-up area
2,218 sq m (23,874 sq ft)
Recreational open space
240 sq m (2,583 sq ft)
Designated bank account
21
Developed in phases
Yes

Survey, CTS, gat or plot numbers

7 1 C

Land as published on MahaRERA's project page

7 1 C

Boundaries

North
Road
South
S No 7 1 B
East
S No 7 1 B
West
S No 7 1 D

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking56 units

46 of 56 units booked (82%), as the promoter reported to MahaRERA

1BHK · 43 unitsT2 · 3 unitsT4 · 1 unitTi · 9 units
BuildingTypeCarpet areaUnitsBooked
A And B1BHK25.71 sq m · 277 sq ft55
A And B1BHK26.06 sq m · 281 sq ft10
A And B1BHK27.01 sq m · 291 sq ft20
A And B1BHK33.5 sq m · 361 sq ft22
A And B1BHK35.4 sq m · 381 sq ft1212
A And B1BHK35.5 sq m · 382 sq ft11
A And BT248.75 sq m · 525 sq ft31
A And BT433.64 sq m · 362 sq ft11
Show all 12 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
A And BTi48.87 sq m · 526 sq ft99
C1BHK33.5 sq m · 361 sq ft99
C1BHK33.64 sq m · 362 sq ft66
C1BHK35.4 sq m · 381 sq ft50

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals4

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectVISTAR ARCHITECT Thakre—
Chartered accountantSandeep Patil—
EngineerRcc Consultants—
OtherSwanand Dhondse—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Chikhale

All 5 projects in Chikhale · Compare Sai Srushti with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology