Shiv Malhar

Deedo IDDP-PUN-34RC

Completion was pushed back 4 months, to Apr 2028; no MahaRERA orders on record; 12% of its units are booked.

Wakad, Pune 411057 · Property rates in Wakad · by Shiv Developers

DeliveryExtended 4 moPromised Dec 2027 · now due Apr 2028RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales12% booked11 of 91 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Apr 2028

  • This projectRegistered 21 Aug 2023, completion promised 31 Dec 2027, revised to 30 Apr 2028.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

2 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100052401
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210005240121 Aug 202331 Dec 202730 Apr 2028Shiv DevelopersProject page
Documents128

1 document held by Deedo, 127 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN Cardshiv dev PAN.pdf · uploaded 24 Jul 2023Source

Legal

  • Declaration Form BSHIV DEVLOPERS (2).pdf · uploaded 11 Jul 2023Source
  • Legal Title reportFormat A Search Upload Final 31072023.pdf · uploaded 31 Jul 2023Source
  • Legal Title reportSEARCH AND TITLE 29072023.pdf · uploaded 31 Jul 2023Source

Migrated

  • 1 Declaration in FORM BSHIV DEVLOPERS (2).pdf · uploaded 11 Jul 2023Source
  • 1 PAN Cardshiv dev PAN.pdf · uploaded 24 Jul 2023Source
  • 1 a Details of encumbrances concerned to FinanceFinancial Encumbrance.pdf · uploaded 24 Jul 2023Source
Show all 128 documentsShow fewer documents

Migrated

  • 2 a Details of encumbrances concerned to FinanceLegal encumbrance.pdf · uploaded 24 Jul 2023Source
  • 1 b Details of encumbrances concerned to LegalFinancial Encumbrance.pdf · uploaded 24 Jul 2023Source
  • 2 b Details of encumbrances concerned to LegalLegal encumbrance.pdf · uploaded 24 Jul 2023Source
  • 1 Copy of Layout Approval (in case of layout)plan 01.pdf · uploaded 24 Jul 2023Source
  • 1 Building Plan Approval / NA Order for plotted developmentplan 02.pdf · uploaded 24 Jul 2023Source
  • 2 Building Plan Approval / NA Order for plotted developmentplan 03.pdf · uploaded 24 Jul 2023Source
  • 3 Building Plan Approval / NA Order for plotted developmentplan 04.pdf · uploaded 24 Jul 2023Source
  • 4 Building Plan Approval / NA Order for plotted developmentplan 05.pdf · uploaded 24 Jul 2023Source
  • 5 Building Plan Approval / NA Order for plotted developmentplan 06.pdf · uploaded 24 Jul 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentCOM CERTI.pdf · uploaded 24 Jul 2023Source
  • 1 Declaration about Commencement CertificateFormat D.pdf · uploaded 24 Jul 2023Source
  • 1 CERSAI detailsCERSAI.pdf · uploaded 24 Jul 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsRGZ disclosre of int.pdf · uploaded 24 Jul 2023Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of interest Uddhav.pdf · uploaded 24 Jul 2023Source
  • 1 Proforma of Agreement for saleAFS Draft.pdf · uploaded 24 Jul 2023Source
  • 1 Proforma of Allotment letterAllotment letter order 31.pdf · uploaded 24 Jul 2023Source
  • 1 Deviation Report with respect to Allotment letterDEVIATION REPORT ALLOTMENT LETTER.pdf · uploaded 24 Jul 2023Source
  • 1 Deviation Report with respect to model copy of Agreementagreement for sal.pdf · uploaded 26 Jul 2023Source
  • 1 Copy of the legal title reportFormat A Search Upload Final 31072023.pdf · uploaded 31 Jul 2023Source
  • 2 Copy of the legal title reportSEARCH AND TITLE 29072023.pdf · uploaded 31 Jul 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)ca form 3 upload.pdf · uploaded 1 Aug 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the samebank declaration.pdf · uploaded 1 Aug 2023Source
  • 2 Proforma of Agreement for saleAFS Draft.pdf · uploaded 3 Aug 2023Source
  • 2 Deviation Report with respect to model copy of AgreementSHIV DEVELOPERS.pdf · uploaded 3 Aug 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architects Certificate.pdf · uploaded 15 Feb 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Shiv Malhar FORM 3 Chartered Accountant Certificate 12022024.pdf · uploaded 15 Feb 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Engineer Certificate.pdf · uploaded 1 Mar 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate.pdf · uploaded 13 May 2024Source
  • 1 Disclosure of sold/ booked inventorySold Unsold.pdf · uploaded 15 May 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Shiv Malhar FORM 3 Chartered Accountant Certificate 31032024.pdf · uploaded 15 May 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECTS CERTIFICATE Q1 2024.pdf · uploaded 16 Jul 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate.pdf · uploaded 22 Jul 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)C A Certificate.pdf · uploaded 22 Jul 2024Source
  • 2 Disclosure of sold/ booked inventoryInventory Declaration Sold Unsold.pdf · uploaded 23 Jul 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 3 Dec 2024Source
  • 2 Disclosure of sold/ booked inventoryInventory Declaration Sold Unsold.pdf · uploaded 4 Dec 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 7 Dec 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 28 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 8 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 8 Feb 2025Source
  • 1 Disclosure of sold/ booked inventorySold Unsold.pdf · uploaded 8 Feb 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A-FY 2023-24.pdf · uploaded 11 Feb 2025Source
  • 1 Copy of Layout Approval (in case of layout)scan01.pdf · uploaded 21 Mar 2025Source
  • 1 Commencement Certificates / NA Order for plotted developmentSKM_36725031812160.pdf · uploaded 21 Mar 2025Source
  • 1 Building Plan Approval / NA Order for plotted developmentscan02.pdf · uploaded 21 Mar 2025Source
  • 2 Building Plan Approval / NA Order for plotted developmentscan03.pdf · uploaded 21 Mar 2025Source
  • 3 Building Plan Approval / NA Order for plotted developmentscan04.pdf · uploaded 21 Mar 2025Source
  • 4 Building Plan Approval / NA Order for plotted developmentscan05.pdf · uploaded 21 Mar 2025Source
  • 5 Building Plan Approval / NA Order for plotted developmentscan06.pdf · uploaded 21 Mar 2025Source
  • 6 Building Plan Approval / NA Order for plotted developmentscan07.pdf · uploaded 21 Mar 2025Source
  • 1 Declaration about Commencement CertificateScan22032025.pdf · uploaded 22 Mar 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate (1).pdf · uploaded 18 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q4 FY 2024-25 Shiv Malhar FORM 3 Chartered Accountant Certificate 31032025.pdf · uploaded 30 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate.pdf · uploaded 30 Apr 2025Source
  • 1 Disclosure of sold/ booked inventorySold Unsold.pdf · uploaded 30 Apr 2025Source
  • Form 1Architect Certificate Q1 FY 2025-26.pdf · uploaded 24 Jul 2025Source
  • Form 2Form 2 Engineer Certificate.pdf · uploaded 24 Jul 2025Source
  • Form 3Form 3.pdf · uploaded 24 Jul 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold.pdf · uploaded 24 Jul 2025Source
  • Form 1Form 1 Architect Certificate 30092025.pdf · uploaded 13 Nov 2025Source
  • Form 2Form 2 Engineer Certificate Q2.pdf · uploaded 13 Nov 2025Source
  • Form 3Q2 FY 2025-26 Shiv Malhar FORM 3 Chartered Accountant Certificate 30092025 NEW.pdf · uploaded 13 Nov 2025Source
  • Disclosure of Sold and Booked InventoryInventory Declaration Sold Unsold.pdf · uploaded 13 Nov 2025Source
  • Withdrawal Update Form 1Form 1 Architect Certificate 31122025.pdf · uploaded 9 Feb 2026Source
  • Withdrawal Update Form 2Form 2 Engineer Certificate 31122025 Comp.pdf · uploaded 9 Feb 2026Source
  • Withdrawal Update Form 3Form 3 Chartered Accountant Certificate 31122025 Comp.pdf · uploaded 9 Feb 2026Source
  • Withdrawal Update Form 1Form 1 Architect Certificate Q4.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 2Form 2 Engineer Certificate Q4.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 3Q4 FY 2025-26 Shiv Malhar FORM 3 Chartered Accountant Certificate 31032026.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 1Form 1 Architect Certificate Q1 FY 2026-27.pdf · uploaded 11 Jul 2026Source
  • Withdrawal Update Form 2Form 2 Engineer Certificate Q1 FY 2026-27.pdf · uploaded 11 Jul 2026Source
  • Withdrawal Update Form 3Form 3 Shiv Malhar Chartered Accountant Certifiate Q1 FY 2026-27.PDF · uploaded 11 Jul 2026Source
  • Form 2A (FY 2023-2024)Form 2A 23-24.pdf · uploaded 18 Aug 2026Source
  • Form 2A (FY 2024-2025)Form 2A 24-25.pdf · uploaded 18 Aug 2026Source
  • Form 2A (FY 2025-2026)Form 2A 25-26.pdf · uploaded 18 Aug 2026Source
  • Form 5 (FY 2023-2024)Form 5 23-24.pdf · uploaded 24 Aug 2026Source
  • Form 5 (FY 2024-2025)Form 5 24-25.pdf · uploaded 24 Aug 2026Source
  • Form 5 (FY 2025-2026)From 5 25-26.pdf · uploaded 24 Aug 2026Source

Technical

  • Documentplan 01.pdf · uploaded 24 Jul 2023Source
  • Documentplan 02.pdf · uploaded 24 Jul 2023Source
  • Documentplan 03.pdf · uploaded 24 Jul 2023Source
  • Documentplan 04.pdf · uploaded 24 Jul 2023Source
  • Documentplan 05.pdf · uploaded 24 Jul 2023Source
  • Documentplan 06.pdf · uploaded 24 Jul 2023Source
  • Others27-08-2024-5.pdf · uploaded 5 Oct 2024Source
  • Others27-08-2024-6.pdf · uploaded 5 Oct 2024Source
  • Others27-08-2024-7.pdf · uploaded 5 Oct 2024Source
  • Others27-08-2024-8.pdf · uploaded 5 Oct 2024Source
  • Others27-08-2024-9.pdf · uploaded 5 Oct 2024Source
  • Others27-08-2024-10.pdf · uploaded 5 Oct 2024Source
  • Others27-08-2024-11.pdf · uploaded 5 Oct 2024Source
  • OthersCC.pdf · uploaded 5 Oct 2024Source
  • Documentscan01.pdf · uploaded 21 Mar 2025Source
  • Documentscan02.pdf · uploaded 21 Mar 2025Source
  • Documentscan03.pdf · uploaded 21 Mar 2025Source
  • Documentscan04.pdf · uploaded 21 Mar 2025Source
  • Documentscan05.pdf · uploaded 21 Mar 2025Source
  • Documentscan06.pdf · uploaded 21 Mar 2025Source
  • Documentscan07.pdf · uploaded 21 Mar 2025Source
  • DocumentLayout.pdf · uploaded 13 Nov 2025Source
  • DocumentPlan 1.pdf · uploaded 13 Nov 2025Source
  • DocumentPlan 2.pdf · uploaded 13 Nov 2025Source
  • DocumentPlan 3.pdf · uploaded 13 Nov 2025Source
  • DocumentPlan 4.pdf · uploaded 13 Nov 2025Source
  • DocumentPlan 5.pdf · uploaded 13 Nov 2025Source
  • DocumentPlan 6.pdf · uploaded 13 Nov 2025Source
  • DocumentLayout.pdf · uploaded 18 Nov 2025Source
  • DocumentPlan 1.pdf · uploaded 18 Nov 2025Source
  • DocumentPlan 2.pdf · uploaded 18 Nov 2025Source
  • DocumentPlan 3.pdf · uploaded 18 Nov 2025Source
  • DocumentPlan 4.pdf · uploaded 18 Nov 2025Source
  • DocumentPlan 5.pdf · uploaded 18 Nov 2025Source
  • DocumentPlan 6.pdf · uploaded 18 Nov 2025Source

Technical (Architect)

  • DocumentForm 1.pdf · uploaded 28 Jan 2025Source
  • DocumentArchitect Certificate (1).pdf · uploaded 18 Apr 2025Source
  • DocumentForm 1 Architect Certificate Q1 FY 2026-27.pdf · uploaded 11 Jul 2026Source

Technical (Engineer)

  • DocumentForm 2.pdf · uploaded 3 Dec 2024Source
  • DocumentForm 2.pdf · uploaded 8 Feb 2025Source
  • DocumentForm 2 Engineer Certificate.pdf · uploaded 30 Apr 2025Source
  • DocumentForm 2 Engineer Certificate Q1 FY 2026-27.pdf · uploaded 11 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 10, 23

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
Mall, Office space, Shop 1, Shop 2, Shop 3, Shop 4, Shop 5, Shop 6, 2BHK, 3BHK91 units in all
Address
S. No. 125/2/2A/3, 4, 5, 6, 7, 8, 10, 23, 27, 31(P), Village Wakad, Taluka Mulshi, Pune, Opp. Choudhary Park, Wakad RoadPIN 411057
Village
Wakad, Mulshi taluka
Land area for this project
3,050 sq m (32,834 sq ft)
Permissible built-up area
15,326 sq m (1,64,963 sq ft)
Sanctioned built-up area
15,326 sq m (1,64,963 sq ft)
Recreational open space
305 sq m (3,283 sq ft)
Designated bank account
66
Developed in phases
Yes

Survey, CTS, gat or plot numbers

10232731(P)45678S. No. 125/2/2A/3

Land as published on MahaRERA's project page

S. No. 125/2/2A/3,4,5,6,7,8,10,23,27,31(P), Village Wakad, Taluka Mulshi, Pune

Boundaries

North
Shubh Mangalam Apartment
South
Thergao Wakad Road
East
Jeevan Shree Society
West
Culture Society

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking91 units

11 of 91 units booked (12%), as the promoter reported to MahaRERA

Mall · 1 unitOffice space · 12 unitsShop 1 · 1 unitShop 2 · 1 unitShop 3 · 1 unitShop 4 · 1 unitShop 5 · 1 unitShop 6 · 1 unit2BHK · 2 units3BHK · 70 units
BuildingTypeCarpet areaUnitsBooked
Wing A CommercialMall383.5 sq m · 4,128 sq ft10
Wing A CommercialOffice space32.7 sq m · 352 sq ft10
Wing A CommercialOffice space35.02 sq m · 377 sq ft10
Wing A CommercialOffice space45.8 sq m · 493 sq ft60
Wing A CommercialOffice space46.45 sq m · 500 sq ft40
Wing A CommercialShop 135.3 sq m · 380 sq ft10
Wing A CommercialShop 288.26 sq m · 950 sq ft10
Wing A CommercialShop 380.55 sq m · 867 sq ft10
Show all 15 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Wing A CommercialShop 480.55 sq m · 867 sq ft10
Wing A CommercialShop 574.68 sq m · 804 sq ft10
Wing A CommercialShop 674.68 sq m · 804 sq ft10
Wing B Residential2BHK71.07 sq m · 765 sq ft20
Wing B Residential3BHK89.28 sq m · 961 sq ft221
Wing B Residential3BHK90.21 sq m · 971 sq ft244
Wing B Residential3BHK92.25 sq m · 993 sq ft246

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals4

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectProjection Studio—
ArchitectSangram Salunke—
Chartered accountantPhule Wagh & Associates LLP wagh—
EngineerMr Vinod Vasant Jagtap—

Source: MahaRERA project page. Contact details are not shown.