Nyati Exuberance IV
Deedo IDDP-PUN-DG5KCompletion was pushed back 4 months, to Jul 2027; no MahaRERA orders on record.
Undri, Pune 411060 · Property rates in Undri · by Nyati Builders Private Limited · 53% of its projects kept the RERA date
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Jul 2027
- This projectRegistered 10 Nov 2023, completion promised 31 Mar 2027, revised to 31 Jul 2027.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
- Primary sale · Nov 2026
- Primary sale · Nov 2026
- Primary sale · Oct 2026
- Primary sale · Oct 2026
- Primary sale · Oct 2026
- Primary sale · Oct 2026
- Primary sale · Oct 2026
- Primary sale · Sep 2026
- Primary sale · Sep 2026
- Primary sale · Sep 2026
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Nov 2026 | Unit 603 | Primary sale | 639 sq ft | View Primary sale, Nov 2026 | |
| Nov 2026 | Unit 401 | Primary sale | 641 sq ft | View Primary sale, Nov 2026 | |
| Oct 2026 | Unit 1103 | Primary sale | 639 sq ft | View Primary sale, Oct 2026 | |
| Oct 2026 | Unit 104 | Primary sale | 639 sq ft | View Primary sale, Oct 2026 | |
| Oct 2026 | Unit 1201 | Primary sale | 641 sq ft | View Primary sale, Oct 2026 | |
| Oct 2026 | Unit 1003 | Primary sale | 639 sq ft | View Primary sale, Oct 2026 | |
| Oct 2026 | Unit 402 | Primary sale | 641 sq ft | View Primary sale, Oct 2026 | |
| Sep 2026 | Unit 503 | Primary sale | 639 sq ft | View Primary sale, Sep 2026 | |
| Sep 2026 | Unit 502 | Primary sale | 641 sq ft | View Primary sale, Sep 2026 | |
| Sep 2026 | Unit 2501 | Primary sale | 641 sq ft | View Primary sale, Sep 2026 |
3 buildings
Open a building to see every flat, floor by floor.
- Bldg C326 floors · 104 units85% booked
- Bldg C426 floors · 104 units57% booked
- Bldg C526 floors · 104 units2% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100053576
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100053576 | 10 Nov 2023 | 31 Mar 2027 | 31 Jul 2027 | Nyati Builders Private Limited | Project page |
Documents128
1 document held by Deedo, 127 filings listed on MahaRERA's project page
Finance
- PAN CardPAN NBPL.pdf · uploaded 20 Sep 2023Source
Legal
- Declaration Form BForm B.pdf · uploaded 21 Sep 2023Source
- Other – LegalALL INDEX II.pdf · uploaded 3 Oct 2023Source
- Legal Title reportTitle Report compressed.pdf · uploaded 19 Oct 2023Source
- Other – LegalREV DECLARATION ABOUT CC.PDF · uploaded 30 Oct 2023Source
- Other – LegalSELF DECLARATION REGARDING CERSAI.PDF · uploaded 30 Oct 2023Source
- Other – LegalBP SANSTION LAYOUT.PDF · uploaded 30 Oct 2023Source
Show all 128 documentsShow fewer documents
Migrated
- 1 Copy of Layout Approval (in case of layout)BP SANSTION LAYOUT.pdf · uploaded 18 Sep 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentC3 Typ 1st to 3rd.pdf · uploaded 18 Sep 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentC4 Typ 1st to 3rd.pdf · uploaded 18 Sep 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentC5 Typ 1st to 3rd.pdf · uploaded 18 Sep 2023Source
- 4 Building Plan Approval / NA Order for plotted developmentSection A B C.pdf · uploaded 18 Sep 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 18 Sep 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE.pdf · uploaded 18 Sep 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE.pdf · uploaded 18 Sep 2023Source
- 1 PAN CardPAN NBPL.pdf · uploaded 20 Sep 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsNDN DISCLOUSER REAL ESTATE.pdf · uploaded 20 Sep 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsPNN DISCLOUSER REAL ESTATE.pdf · uploaded 20 Sep 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration about Separate Bank Account.pdf · uploaded 20 Sep 2023Source
- 1 Declaration in FORM BForm B.pdf · uploaded 21 Sep 2023Source
- 1 Other – LegalALL INDEX II.pdf · uploaded 3 Oct 2023Source
- 1 a Details of encumbrances concerned to FinanceUNDERTAKING 11102023.pdf · uploaded 11 Oct 2023Source
- 1 b Details of encumbrances concerned to LegalUNDERTAKING 11102023.pdf · uploaded 11 Oct 2023Source
- 1 Declaration about Commencement CertificateFROMAT D 11102023.pdf · uploaded 11 Oct 2023Source
- 1 CERSAI detailsUNDERTAKING 11102023.pdf · uploaded 11 Oct 2023Source
- 1 Other – TechnicalDECLARATION ABOUT SANCTIONED FSI.pdf · uploaded 17 Oct 2023Source
- 1 Copy of the legal title reportTitle Report compressed.pdf · uploaded 19 Oct 2023Source
- 2 a Details of encumbrances concerned to FinanceRev Legal Finance Encumbrance.pdf · uploaded 19 Oct 2023Source
- 2 b Details of encumbrances concerned to LegalRev Legal Finance Encumbrance.pdf · uploaded 19 Oct 2023Source
- 1 Proforma of Allotment letterEXUBERANCE IV ALLOTMENT LETTER 18102023.pdf · uploaded 19 Oct 2023Source
- 1 Proforma of Agreement for saleExuberance IV UNIT AGREE 181023.pdf · uploaded 19 Oct 2023Source
- 1 Deviation Report with respect to Allotment letterDeviation Sheet of Allotment.pdf · uploaded 19 Oct 2023Source
- 1 Deviation Report with respect to model copy of AgreementRev Deviation of Agreement compressed.pdf · uploaded 19 Oct 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Exuburance IV.pdf · uploaded 27 Oct 2023Source
- 2 Other – LegalREV DECLARATION ABOUT CC.PDF · uploaded 30 Oct 2023Source
- 3 Other – LegalSELF DECLARATION REGARDING CERSAI.PDF · uploaded 30 Oct 2023Source
- 4 Other – LegalBP SANSTION LAYOUT.PDF · uploaded 30 Oct 2023Source
- 2 CERSAI detailsCERSAI REPORT EXUBERANCE.pdf · uploaded 5 Dec 2023Source
- 3 a Details of encumbrances concerned to FinanceUndertaking Exuberance IV.pdf · uploaded 14 Dec 2023Source
- 3 b Details of encumbrances concerned to LegalUndertaking Exuberance IV.pdf · uploaded 14 Dec 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 16 Jan 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 16 Jan 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 16 Jan 2024Source
- 1 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD UNSOLD INVENTORY.pdf · uploaded 19 Jan 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 8 Apr 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 8 Apr 2024Source
- 2 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD UNSOLD INVENTORY.pdf · uploaded 11 Apr 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)NBPL Form 3 - Exuberance IV_11zon.pdf · uploaded 11 Apr 2024Source
- 3 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD UNSOLD INVENTORY.pdf · uploaded 20 Apr 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A.pdf · uploaded 18 May 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 12 Jul 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FPRM 2.pdf · uploaded 12 Jul 2024Source
- 4 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD UNSOLD INVENTORY.pdf · uploaded 12 Jul 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 20 Jul 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 20 Jul 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 20 Jul 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Nyati Exuberance IV - Form 5.pdf · uploaded 7 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 18 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 18 Oct 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 22 Oct 2024Source
- 1 Proforma of Agreement for saleEXUBERANCE IV UNIT AGREE 22102024 CLEAN.pdf · uploaded 23 Oct 2024Source
- 1 Copy of Layout Approval (in case of layout)1_13 Layout.pdf · uploaded 24 Oct 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 24 Oct 2024Source
- 4 Building Plan Approval / NA Order for plotted development7_13 C5 Typical Floor.pdf · uploaded 24 Oct 2024Source
- 7 Building Plan Approval / NA Order for plotted development10_13 C3 C4 C5 Section CC.pdf · uploaded 24 Oct 2024Source
- 6 Building Plan Approval / NA Order for plotted development9_13 C3 C4 C5 Section AA.pdf · uploaded 24 Oct 2024Source
- 5 Building Plan Approval / NA Order for plotted development8_13 C3 C4 C5 Elevation.pdf · uploaded 24 Oct 2024Source
- 3 Building Plan Approval / NA Order for plotted development6_13 C4 Typical Floor.pdf · uploaded 24 Oct 2024Source
- 2 Building Plan Approval / NA Order for plotted development5_13 C3 Typical Floor.pdf · uploaded 24 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted development2_13 Parking Layout.pdf · uploaded 24 Oct 2024Source
- 1 Declaration about Commencement CertificateDeclaration about commencement certificate - Exuberance-IV.pdf · uploaded 24 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD UNSOLD INVENTORY.pdf · uploaded 12 Nov 2024Source
- 1 CERSAI detailsCERSAI Report Exuberance 22082024.pdf · uploaded 23 Nov 2024Source
- 1 a Details of encumbrances concerned to FinanceExuberance Finance Declarartion.pdf · uploaded 25 Nov 2024Source
- 1 b Details of encumbrances concerned to LegalExuberance Finance Declarartion.pdf · uploaded 25 Nov 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A.pdf · uploaded 3 Dec 2024Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Format B.pdf · uploaded 3 Dec 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Exuberance IV.pdf · uploaded 18 Dec 2024Source
- 3 Disclosure of sold/ booked inventory5 Disclosure of sold_ booked inventory.pdf · uploaded 18 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 3 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 3 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Exuberance IV CA Certificate.pdf · uploaded 4 Jan 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD UNSOLD INVENTORY.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD UNSOLD INVENTORY.pdf · uploaded 8 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 9 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 11 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Nyati Exuberance IV Form 3.pdf · uploaded 17 Apr 2025Source
- Form 2A (FY 2024-2025)Nyati Exuberance IV Form 2A 2024-2025.pdf · uploaded 23 Sep 2025Source
- Form 5 (FY 2024-2025)Nyati Exuberance IV Form 5.pdf · uploaded 23 Sep 2025Source
- Withdrawal Update Form 1FORM 1.pdf · uploaded 28 Oct 2025Source
- Withdrawal Update Form 2FORM 2.pdf · uploaded 28 Oct 2025Source
- Withdrawal Update Form 3FORM 3.pdf · uploaded 28 Oct 2025Source
- Withdrawal Update Form 1FORM 1.pdf · uploaded 21 Jan 2026Source
- Withdrawal Update Form 2FORM 2.pdf · uploaded 21 Jan 2026Source
- Withdrawal Update Form 3FORM 3.pdf · uploaded 21 Jan 2026Source
- Form 2A (FY 2023-2024)FORM 2A.pdf · uploaded 25 Mar 2026Source
- Withdrawal Update Form 1FORM 1.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2FORM 2.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3FORM 3.pdf · uploaded 20 Apr 2026Source
- Form 2A (FY 2025-2026)Nyati Exuberance IV Form 2A 2025-2026.pdf · uploaded 23 Apr 2026Source
- Withdrawal Update Form 1FORM 1.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 2FORM 2.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 3FORM 3.pdf · uploaded 20 Jul 2026Source
- Form 5 (FY 2025-2026)Form 5 Nyati Exuberance IV.pdf · uploaded 27 Sep 2026Source
Technical
- DocumentBP SANSTION LAYOUT.pdf · uploaded 18 Sep 2023Source
- DocumentC3 Typ 1st to 3rd.pdf · uploaded 18 Sep 2023Source
- DocumentC4 Typ 1st to 3rd.pdf · uploaded 18 Sep 2023Source
- DocumentC5 Typ 1st to 3rd.pdf · uploaded 18 Sep 2023Source
- DocumentSection A B C.pdf · uploaded 18 Sep 2023Source
- Other – TechnicalDECLARATION ABOUT SANCTIONED FSI.pdf · uploaded 17 Oct 2023Source
- Document1_13 Layout.pdf · uploaded 24 Oct 2024Source
- Document2_13 Parking Layout.pdf · uploaded 24 Oct 2024Source
- Document5_13 C3 Typical Floor.pdf · uploaded 24 Oct 2024Source
- Document6_13 C4 Typical Floor.pdf · uploaded 24 Oct 2024Source
- Document7_13 C5 Typical Floor.pdf · uploaded 24 Oct 2024Source
- Document8_13 C3 C4 C5 Elevation.pdf · uploaded 24 Oct 2024Source
- Document9_13 C3 C4 C5 Section AA.pdf · uploaded 24 Oct 2024Source
- Document10_13 C3 C4 C5 Section CC.pdf · uploaded 24 Oct 2024Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 26 HISSA NO 2/1+2/1/2/1+2/1/5+2/1/7+1/1+1/2+1/3+1/1/4+1/5+1/6+1/7+1/8+1/9+1/10+1/11+1/12+1/13+1/14, SURVEY NO. 24
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2BHK312 units in all
- Address
- Survey No. 24, 26 Hissa No 2/1+2/1/2/1+2/1/5+2/1/7+1/1+1/2+1/3+1/1/4+1/5+1/6+1/7+1/8+1/9+1/10+1/11+1/12+1/13+1/14, Undri Pune 411060, Undri, UndriPIN 411060
- Village
- Undri, Haveli taluka
- Location
- 18.46305, 73.91204
- Land area for this project
- 1,400 sq m (15,069 sq ft)
- Permissible built-up area
- 26,508 sq m (2,85,324 sq ft)
- Sanctioned built-up area
- 26,508 sq m (2,85,324 sq ft)
- Recreational open space
- 0 sq m (0 sq ft)
- Designated bank account
- 76
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
SURVEY NO. 24,26 HISSA NO 2/1+2/1/2/1+2/1/5+2/1/7+1/1+1/2+1/3+1/1/4+1/5+1/6+1/7+1/8+1/9+1/10+1/11+1/12+1/13+1/14, UNDRI PUNE 411060
Boundaries
- North
- Amenity Space
- South
- Adj Sr No 24 Part And 26 Part
- East
- Adj Bldg C2 For Project Nyati Exuberance I
- West
- Adj Sr No 24 Part
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking312 units
149 of 312 units booked (48%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Bldg C3 | 2BHK | 59.38 sq m · 639 sq ft | 52 | 40 |
| Bldg C3 | 2BHK | 59.54 sq m · 641 sq ft | 52 | 48 |
| Bldg C4 | 2BHK | 59.38 sq m · 639 sq ft | 52 | 22 |
| Bldg C4 | 2BHK | 59.54 sq m · 641 sq ft | 52 | 37 |
| Bldg C5 | 2BHK | 59.38 sq m · 639 sq ft | 52 | 2 |
| Bldg C5 | 2BHK | 59.54 sq m · 641 sq ft | 52 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals43
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Chartered accountant | Amol Chalak | — |
| Engineer | Amol Shitole | — |
| Engineer | Ketan Jaykar | — |
| Engineer | Satish Marathe | — |
| Engineer | Vishwanath Dhande | — |
| Registered real estate agent | Abhishek Ashok Tripathi | — |
| Registered real estate agent | Amit Kumar | — |
| Registered real estate agent | Anant Haridas Kate | — |
Show all 43 professionalsShow fewer professionals
| Role | Name | Registration no. |
|---|---|---|
| Registered real estate agent | Anis Shergadwala | — |
| Registered real estate agent | Anupam Gadodia | — |
| Registered real estate agent | Bahman Fereydoun Bahmany | — |
| Registered real estate agent | Darshana Rohan Bhansali | — |
| Registered real estate agent | Dikshant Vijay Rathod | — |
| Registered real estate agent | Dipen Ashwin Bhardwaj | — |
| Registered real estate agent | Ganesh Laxman Tatar | — |
| Registered real estate agent | Ganesh Vinayak Patil | — |
| Registered real estate agent | Honey Ashwinkumar Sharma | — |
| Registered real estate agent | Hussain Abbas | — |
| Registered real estate agent | Imran Ibrahim Shaikh | — |
| Registered real estate agent | Jay Shankar Singh | — |
| Registered real estate agent | Kiran Ramdeo Nagawade | — |
| Registered real estate agent | Kumar Gaurav Singh | — |
| Registered real estate agent | Kunal Ashok Sharma | — |
| Registered real estate agent | Manoj Satu Malkani | — |
| Registered real estate agent | Mayur Raghunath Chavan | — |
| Registered real estate agent | Nagarjun Subbaya Tadikala | — |
| Registered real estate agent | Nikhil Sanjeev Salavi | — |
| Registered real estate agent | Paresh Jitendra Jain | — |
| Registered real estate agent | Pruthviraj Vitthal Waghmare | — |
| Registered real estate agent | Radhika Kapoor | — |
| Registered real estate agent | Sagar Devidas Wani | — |
| Registered real estate agent | Sanjay Abhimanyu Pathak | — |
| Registered real estate agent | Satyasheel More | — |
| Registered real estate agent | Shakruddin Mujawar | — |
| Registered real estate agent | Shrikant Arjun Nalawade | — |
| Registered real estate agent | Sohana Begum | — |
| Registered real estate agent | Sunny Santosh Chinchane | — |
| Registered real estate agent | Venkatesh Dattatray Dhondale | — |
| Registered real estate agent | Vinay Kumar Mishra | — |
| Registered real estate agent | Vipin Deshmukh | — |
| Registered real estate agent | Vishal Ulhas Nakhate | — |
| Registered real estate agent | Vishal Vishwas Pharat | — |
| Registered real estate agent | Zuber Shaikh | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Undri
- SkylineRERA PR1260002602737
- Palmspring Towers - A9, A10 and A11RERA PR1264042601680
- Kumar Plexus₹5,700 a sq ft
- The Titan TowersRERA PR1261012601027
- Hillcrest ManorRERA PM1260002600370
- Dynamic Solitaire₹8,020 a sq ft
- Sky GateRERA PR1260002502216
- Malhar AarambhRERA PR1260002502170
All 1,159 projects in Undri · Compare Nyati Exuberance IV with another project
Nyati Exuberance IV in numbers
Registered deals, summarised
Deedo has 383 registered documents at Nyati Exuberance IV, from Jun 2024 to Nov 2026: 298 sales, 64 leave and licence agreements, 16 mortgages. The median registered sale since Jun 2024 works out to about ₹8,200 per sq ft, at a median of ₹52 L a deal; 0% of sales were resales.
- What is the price per sq ft at Nyati Exuberance IV?
- The median registered sale since Jun 2024 works out to about ₹8,200 per sq ft, at a median of ₹52 L a deal; 0% of sales were resales.
- How many properties have been sold at Nyati Exuberance IV?
- 298 sales are registered at Nyati Exuberance IV.
- Are properties at Nyati Exuberance IV rented out?
- Yes: 64 leave and licence agreements are registered at Nyati Exuberance IV, at a median rent since Jun 2024 of about ₹22,000 a month with a deposit of about ₹44,000.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Nyati Exuberance IV by Deedo, last updated with deals registered in Nov 2026.
Latest deal · Primary sale · Nov 2026
₹50–75 L