Residential / Group Housing · 1 building · 14 unitsRERA P52100045433

Niwant

Deedo IDDP-PUN-ZJV8

Completion was pushed back 4 months, to Jan 2027; no MahaRERA orders on record; 43% of its units are booked.

Shukrawar Peth, Pune 411002 · by Gokhale Ventures LLP

DeliveryExtended 4 moPromised Sep 2026 · now due Jan 2027RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales43% booked6 of 14 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Jan 2027

  • This projectRegistered 18 May 2022, completion promised 15 Sep 2026, revised to 15 Jan 2027.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100045433
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210004543318 May 202215 Sep 202615 Jan 2027Gokhale Ventures LLPProject page
Documents135

2 documents held by Deedo, 133 filings listed on MahaRERA's project page

Extension certificate

Registration certificate

Finance

  • PAN CardGokhale Ventures LLP - PAN.PDF · uploaded 31 Mar 2022Source

Legal

  • Declaration Form BForm B_compressed (1).pdf · uploaded 30 Mar 2022Source
  • Legal Title reportTitle Report_compressed.pdf · uploaded 12 May 2022Source

Migrated

  • 1 Declaration in FORM BForm B_compressed (1).pdf · uploaded 30 Mar 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Niwant_compressed.pdf · uploaded 30 Mar 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2- Niwant.pdf · uploaded 30 Mar 2022Source
Show all 135 documentsShow fewer documents

Migrated

  • 1 CERSAI detailsCERSAI_Search_Report_200233951159_For_Debtor_Based_Search_30_03_2022_14_43_23_310.pdf · uploaded 30 Mar 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form -3_compressed.pdf · uploaded 30 Mar 2022Source
  • 1 PAN CardGokhale Ventures LLP - PAN.PDF · uploaded 31 Mar 2022Source
  • 1 Details of encumbrancesNon Encumberance Certificate-Niwant.pdf · uploaded 31 Mar 2022Source
  • 1 Copy of Layout Approval (in case of layout)Plan_compressed (1).pdf · uploaded 31 Mar 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentPlan_compressed (1).pdf · uploaded 31 Mar 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC_compressed (1).pdf · uploaded 31 Mar 2022Source
  • 1 Declaration about Commencement CertificateDeclaration of Commencement.pdf · uploaded 31 Mar 2022Source
  • 1 Proforma of Allotment letterNiwant Flat sale agr -RERA.pdf · uploaded 31 Mar 2022Source
  • 1 Copy of the legal title reportTitle Report_compressed.pdf · uploaded 12 May 2022Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)NAYANA.pdf · uploaded 2 Jun 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)niwant.pdf · uploaded 2 Jun 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Niwant.pdf · uploaded 21 Jun 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate Niwant 31-03-2023.pdf · uploaded 27 Jun 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)21 NIwant.pdf · uploaded 30 Sep 2023Source
  • 1 Disclosure of sold/ booked inventoryNiwant Sold Unsold 31 03 23 - Signed.pdf · uploaded 8 Apr 2024Source
  • 2 Disclosure of sold/ booked inventoryNiwant Sold Unsold 30 06 23 - Signed.pdf · uploaded 8 Apr 2024Source
  • 3 Disclosure of sold/ booked inventoryNiwant Sold Unsold 30 09 23 - Signed.pdf · uploaded 8 Apr 2024Source
  • 4 Disclosure of sold/ booked inventoryNiwant Sold Unsold 31 12 23 - Signed.pdf · uploaded 8 Apr 2024Source
  • 5 Disclosure of sold/ booked inventoryNiuwant Sold Unsold 31 03 24 -Signed.pdf · uploaded 8 Apr 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 NIwant 30 06 2022.pdf · uploaded 23 Apr 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)2A Niwant 22-23 - Signed.pdf · uploaded 17 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)2A Niwant 23-24 - Signed.pdf · uploaded 17 May 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Niwant_30 09 2022.pdf · uploaded 20 May 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Niwant_31 12 2022.pdf · uploaded 20 May 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Niwant_31 03 2023.pdf · uploaded 20 May 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Niwant_30 06 2023.pdf · uploaded 20 May 2024Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Niwant_30 09 2023.pdf · uploaded 20 May 2024Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Niwant_31 1 2023.pdf · uploaded 20 May 2024Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Niwant_31 03 2024.pdf · uploaded 20 May 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Niwant 31 03 2024.PDF · uploaded 17 Jun 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Niwant - 30 06 2022.PDF · uploaded 2 Jul 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Niwant - 30 09 2022.PDF · uploaded 2 Jul 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Niwant - 31 12 2022.PDF · uploaded 2 Jul 2024Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Niwant - 30 06 2023.PDF · uploaded 2 Jul 2024Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Niwant - 30 09 2023.PDF · uploaded 2 Jul 2024Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Niwant - 31 12 2023.PDF · uploaded 2 Jul 2024Source
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Niwant - 30 06 2024.PDF · uploaded 19 Jul 2024Source
  • 6 Disclosure of sold/ booked inventoryNiwant Sold Unsold 30 06 24 - Signed.pdf · uploaded 10 Aug 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Niwant.pdf · uploaded 25 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Niwant 31032022_compressed.pdf · uploaded 3 Jan 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 _ Niwant _ 30062023.pdf · uploaded 3 Jan 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 _ Nayana _ 30092023.pdf · uploaded 3 Jan 2025Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 _ Nayana _ 31122023.pdf · uploaded 3 Jan 2025Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 _ Niwant _ 31032024.pdf · uploaded 3 Jan 2025Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 _ Nayana _ 30062024.pdf · uploaded 3 Jan 2025Source
  • Form 5 (FY 2024-2025)form 5 - Niwant.pdf · uploaded 1 Oct 2025Source
  • Form 1Niwant- Form1- FY22-23 Q1-30-06-2022.pdf · uploaded 10 Jan 2026Source
  • Form 2Niwant- Form 2- FY22-23 Q1-30062022.PDF · uploaded 10 Jan 2026Source
  • Form 3Niwant- Form 3- FY22-23 Q1-30062022.pdf · uploaded 10 Jan 2026Source
  • Disclosure of Sold and Booked Inventory30062022.pdf · uploaded 10 Jan 2026Source
  • Form 1Niwant- Form1- FY22-23 Q2-30-09-2022.pdf · uploaded 10 Jan 2026Source
  • Form 2Niwant- Form 2- FY22-23 Q2-30092022.PDF · uploaded 10 Jan 2026Source
  • Form 3Niwant- Form 3- FY22-23 Q2-30092022.pdf · uploaded 10 Jan 2026Source
  • Disclosure of Sold and Booked Inventory30092022.pdf · uploaded 10 Jan 2026Source
  • Form 3Niwant- Form 3- FY22-23 Q3-31122022.pdf · uploaded 10 Jan 2026Source
  • Disclosure of Sold and Booked Inventory31122022.pdf · uploaded 10 Jan 2026Source
  • Form 1Niwant- Form1- FY22-23 Q3-31-12-2022.pdf · uploaded 10 Jan 2026Source
  • Form 2Niwant- Form 2- FY22-23 Q3-31122022.PDF · uploaded 10 Jan 2026Source
  • Form 1Niwant- Form1- FY22-23 Q4-31-03-2023.pdf · uploaded 10 Jan 2026Source
  • Form 2Niwant- Form 2- FY22-23 Q4-31032023.pdf · uploaded 10 Jan 2026Source
  • Form 3Niwant- Form 3- FY22-23 Q4-31032023.PDF · uploaded 10 Jan 2026Source
  • Disclosure of Sold and Booked Inventory30032023.pdf · uploaded 10 Jan 2026Source
  • Form 1Niwant- Form1- FY23-24 Q1-30-06-2023.pdf · uploaded 10 Jan 2026Source
  • Form 2Niwant- Form 2- FY23-24 Q1-30062023.PDF · uploaded 10 Jan 2026Source
  • Form 3Niwant- Form 3- FY23-24 Q1-30062023.pdf · uploaded 10 Jan 2026Source
  • Disclosure of Sold and Booked Inventory30062023.pdf · uploaded 10 Jan 2026Source
  • Form 1Niwant- Form1- FY23-24 Q2-30-09-2023.pdf · uploaded 10 Jan 2026Source
  • Form 2Niwant- Form 2- FY23-24 Q2-30092023.PDF · uploaded 10 Jan 2026Source
  • Form 3Niwant- Form 3- FY23-24 Q2-30092023.pdf · uploaded 10 Jan 2026Source
  • Disclosure of Sold and Booked Inventory300923.pdf · uploaded 10 Jan 2026Source
  • Form 1Niwant- Form1- FY23-24 Q3-31-12-2023.pdf · uploaded 10 Jan 2026Source
  • Form 2Niwant- Form 2- FY23-24 Q3-31122023.PDF · uploaded 10 Jan 2026Source
  • Form 3Niwant- Form 3- FY23-24 Q3-31122023.pdf · uploaded 10 Jan 2026Source
  • Disclosure of Sold and Booked Inventory311223.pdf · uploaded 10 Jan 2026Source
  • Form 1Niwant- Form1- FY23-24 Q4-31-03-2024.pdf · uploaded 10 Jan 2026Source
  • Form 2Niwant- Form 2- FY23-24 Q4-31032024.PDF · uploaded 10 Jan 2026Source
  • Form 3Niwant- Form 3- FY23-24 Q4-31032024.pdf · uploaded 10 Jan 2026Source
  • Disclosure of Sold and Booked Inventory31mar24.pdf · uploaded 10 Jan 2026Source
  • Form 1Niwant- Form1- FY24-25 Q1-30-06-2024.pdf · uploaded 10 Jan 2026Source
  • Form 2Niwant- Form 2- FY24-25 Q1-30062024.PDF · uploaded 10 Jan 2026Source
  • Form 3Niwant- Form 3- FY24-25 Q1-30062024.pdf · uploaded 10 Jan 2026Source
  • Disclosure of Sold and Booked InventoryJun-24.pdf · uploaded 10 Jan 2026Source
  • Form 1Niwant- Form1- FY24-25 Q2-30-09-2024.pdf · uploaded 10 Jan 2026Source
  • Form 2Niwant- Form 2- FY24-25 Q2-30092024.pdf · uploaded 10 Jan 2026Source
  • Form 3Niwant- Form 3- FY24-25 Q2-30092024.pdf · uploaded 10 Jan 2026Source
  • Disclosure of Sold and Booked InventorySep-24.pdf · uploaded 10 Jan 2026Source
  • Form 1Niwant- Form1- FY24-25 Q3-31-12-2024.pdf · uploaded 10 Jan 2026Source
  • Form 3Niwant- Form 3- FY24-25 Q3-31122024.pdf · uploaded 10 Jan 2026Source
  • Form 2Niwant- Form 2- FY24-25 Q3-31122024.pdf · uploaded 10 Jan 2026Source
  • Disclosure of Sold and Booked InventoryDec-24.pdf · uploaded 10 Jan 2026Source
  • Form 1Niwant- Form1- FY24-25 Q4-31-03-2025.pdf · uploaded 10 Jan 2026Source
  • Form 2Niwant- Form1- FY24-25 Q4-31-03-2025.pdf · uploaded 10 Jan 2026Source
  • Form 3Niwant- Form 3- FY24-25 Q4-31032025.pdf · uploaded 10 Jan 2026Source
  • Disclosure of Sold and Booked Inventory310325.pdf · uploaded 10 Jan 2026Source
  • Form 5 (FY 2022-2023)NIwant - 22-23.pdf · uploaded 4 Feb 2026Source
  • Form 5 (FY 2023-2024)Niwant - 23-24.pdf · uploaded 4 Feb 2026Source
  • Form 1Niwant-Form1-31-6-25.pdf · uploaded 14 Feb 2026Source
  • Form 2Niwant-Form2-31-6-25.pdf · uploaded 14 Feb 2026Source
  • Form 3Niwant-Form3- 30-6-25.pdf · uploaded 14 Feb 2026Source
  • Disclosure of Sold and Booked Inventory300625.pdf · uploaded 14 Feb 2026Source
  • Form 1Niwant-Form1-31-9-25.pdf · uploaded 14 Feb 2026Source
  • Form 2Niwant-Form2-31-9-25.pdf · uploaded 14 Feb 2026Source
  • Form 3Niwant- Form 3- FY25-26 Q2-30092025.pdf · uploaded 14 Feb 2026Source
  • Disclosure of Sold and Booked Inventory300925.pdf · uploaded 14 Feb 2026Source
  • Form 1Niwant-Form1-31-12-25.pdf · uploaded 14 Feb 2026Source
  • Form 2Niwant-Form2-31-12-25.pdf · uploaded 14 Feb 2026Source
  • Form 3Niwant-Form3- 30-12-25.pdf · uploaded 14 Feb 2026Source
  • Disclosure of Sold and Booked Inventory31122025.pdf · uploaded 14 Feb 2026Source
  • Form 2A (FY 2022-2023)1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23) (1).pdf · uploaded 14 Feb 2026Source
  • Form 2A (FY 2023-2024)1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24) (1).pdf · uploaded 14 Feb 2026Source
  • Form 2A (FY 2024-2025)Form 2A- 2024-25- NIWANT.pdf · uploaded 28 May 2026Source
  • Form 2A (FY 2025-2026)Form 2A- 2025-26- NIWANT.pdf · uploaded 28 May 2026Source
  • Withdrawal Update Form 1SIGNED Niwant Form1-31-3-26.pdf · uploaded 23 Jun 2026Source
  • Withdrawal Update Form 2Form 2 -Niwant - 31-3-26.pdf · uploaded 23 Jun 2026Source
  • Withdrawal Update Form 3SIGNED 20260623160528.pdf · uploaded 23 Jun 2026Source
  • Withdrawal Update Form 1Niwant - Form 1 - 30-06-26.pdf · uploaded 5 Sep 2026Source
  • Withdrawal Update Form 2NIWANT - FORM 2- 30-6-26.pdf · uploaded 5 Sep 2026Source
  • Withdrawal Update Form 3NIWANT Form 3 Q1 FY2627 SIGNED (1) (1).pdf · uploaded 5 Sep 2026Source
  • Form 5 (FY 2025-2026)5 Niwantpdf signed.pdf · uploaded 30 Sep 2026Source

Technical

  • DocumentPlan_compressed (1).pdf · uploaded 31 Mar 2022Source
  • DocumentPlan_compressed (1).pdf · uploaded 31 Mar 2022Source
  • DocumentPlan - 1 NIWANT.pdf · uploaded 23 Jun 2026Source
  • DocumentPlan - 2 NIWANT.pdf · uploaded 23 Jun 2026Source
  • DocumentCC - NIWANT.pdf · uploaded 23 Jun 2026Source

Technical (Architect)

  • DocumentNiwant - Form 1 - 30-06-26.pdf · uploaded 5 Sep 2026Source

Technical (Engineer)

  • DocumentNIWANT - FORM 2- 30-6-26.pdf · uploaded 2 Sep 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel Plot no.84 CTS No-1072

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
2BHK14 units in all
Address
Plot no.84 CTS No-1072, Shukrawar Peth, Shukrawar PethPIN 411002
Village
Pune (M Corp.), Pune City taluka
Land area for this project
345 sq m (3,711 sq ft)
Permissible built-up area
1,147 sq m (12,342 sq ft)
Sanctioned built-up area
1,147 sq m (12,342 sq ft)
Designated bank account
53
Developed in phases
No

Survey, CTS, gat or plot numbers

Plot no.84 CTS No-1072

Land as published on MahaRERA's project page

Plot no.84 CTS No-1072

Boundaries

North
Road
South
Property Owned by Mr Pathak
East
Plot No-85
West
Plot No-83

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking14 units

6 of 14 units booked (43%), as the promoter reported to MahaRERA

2BHK · 14 units
TypeCarpet areaUnitsBooked
2BHK54.16 sq m · 583 sq ft22
2BHK64.38 sq m · 693 sq ft22
2BHK64.47 sq m · 694 sq ft22
2BHK69.03 sq m · 743 sq ft80

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals6

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMangesh Gotal—
ArchitectSiddharth Harischandrakar—
Chartered accountantShantanuG & Associates—
Chartered accountantSiddharth Smart—
EngineerMahesh Mate—
EngineerVijendra Gaikwad—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Shukrawar Peth

All 27 projects in Shukrawar Peth · Compare Niwant with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology