Niwant
Deedo IDDP-PUN-ZJV8Completion was pushed back 4 months, to Jan 2027; no MahaRERA orders on record; 43% of its units are booked.
Shukrawar Peth, Pune 411002 · by Gokhale Ventures LLP
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Jan 2027
- This projectRegistered 18 May 2022, completion promised 15 Sep 2026, revised to 15 Jan 2027.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100045433
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100045433 | 18 May 2022 | 15 Sep 2026 | 15 Jan 2027 | Gokhale Ventures LLP | Project page |
Documents135
2 documents held by Deedo, 133 filings listed on MahaRERA's project page
Finance
- PAN CardGokhale Ventures LLP - PAN.PDF · uploaded 31 Mar 2022Source
Legal
Migrated
- 1 Declaration in FORM BForm B_compressed (1).pdf · uploaded 30 Mar 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Niwant_compressed.pdf · uploaded 30 Mar 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2- Niwant.pdf · uploaded 30 Mar 2022Source
Show all 135 documentsShow fewer documents
Migrated
- 1 CERSAI detailsCERSAI_Search_Report_200233951159_For_Debtor_Based_Search_30_03_2022_14_43_23_310.pdf · uploaded 30 Mar 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form -3_compressed.pdf · uploaded 30 Mar 2022Source
- 1 PAN CardGokhale Ventures LLP - PAN.PDF · uploaded 31 Mar 2022Source
- 1 Details of encumbrancesNon Encumberance Certificate-Niwant.pdf · uploaded 31 Mar 2022Source
- 1 Copy of Layout Approval (in case of layout)Plan_compressed (1).pdf · uploaded 31 Mar 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentPlan_compressed (1).pdf · uploaded 31 Mar 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentCC_compressed (1).pdf · uploaded 31 Mar 2022Source
- 1 Declaration about Commencement CertificateDeclaration of Commencement.pdf · uploaded 31 Mar 2022Source
- 1 Proforma of Allotment letterNiwant Flat sale agr -RERA.pdf · uploaded 31 Mar 2022Source
- 1 Copy of the legal title reportTitle Report_compressed.pdf · uploaded 12 May 2022Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)NAYANA.pdf · uploaded 2 Jun 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)niwant.pdf · uploaded 2 Jun 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Niwant.pdf · uploaded 21 Jun 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate Niwant 31-03-2023.pdf · uploaded 27 Jun 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)21 NIwant.pdf · uploaded 30 Sep 2023Source
- 1 Disclosure of sold/ booked inventoryNiwant Sold Unsold 31 03 23 - Signed.pdf · uploaded 8 Apr 2024Source
- 2 Disclosure of sold/ booked inventoryNiwant Sold Unsold 30 06 23 - Signed.pdf · uploaded 8 Apr 2024Source
- 3 Disclosure of sold/ booked inventoryNiwant Sold Unsold 30 09 23 - Signed.pdf · uploaded 8 Apr 2024Source
- 4 Disclosure of sold/ booked inventoryNiwant Sold Unsold 31 12 23 - Signed.pdf · uploaded 8 Apr 2024Source
- 5 Disclosure of sold/ booked inventoryNiuwant Sold Unsold 31 03 24 -Signed.pdf · uploaded 8 Apr 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 NIwant 30 06 2022.pdf · uploaded 23 Apr 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)2A Niwant 22-23 - Signed.pdf · uploaded 17 May 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)2A Niwant 23-24 - Signed.pdf · uploaded 17 May 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Niwant_30 09 2022.pdf · uploaded 20 May 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Niwant_31 12 2022.pdf · uploaded 20 May 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Niwant_31 03 2023.pdf · uploaded 20 May 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Niwant_30 06 2023.pdf · uploaded 20 May 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Niwant_30 09 2023.pdf · uploaded 20 May 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Niwant_31 1 2023.pdf · uploaded 20 May 2024Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Niwant_31 03 2024.pdf · uploaded 20 May 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Niwant 31 03 2024.PDF · uploaded 17 Jun 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Niwant - 30 06 2022.PDF · uploaded 2 Jul 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Niwant - 30 09 2022.PDF · uploaded 2 Jul 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Niwant - 31 12 2022.PDF · uploaded 2 Jul 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Niwant - 30 06 2023.PDF · uploaded 2 Jul 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Niwant - 30 09 2023.PDF · uploaded 2 Jul 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Niwant - 31 12 2023.PDF · uploaded 2 Jul 2024Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Niwant - 30 06 2024.PDF · uploaded 19 Jul 2024Source
- 6 Disclosure of sold/ booked inventoryNiwant Sold Unsold 30 06 24 - Signed.pdf · uploaded 10 Aug 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Niwant.pdf · uploaded 25 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Niwant 31032022_compressed.pdf · uploaded 3 Jan 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 _ Niwant _ 30062023.pdf · uploaded 3 Jan 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 _ Nayana _ 30092023.pdf · uploaded 3 Jan 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 _ Nayana _ 31122023.pdf · uploaded 3 Jan 2025Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 _ Niwant _ 31032024.pdf · uploaded 3 Jan 2025Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 _ Nayana _ 30062024.pdf · uploaded 3 Jan 2025Source
- Form 5 (FY 2024-2025)form 5 - Niwant.pdf · uploaded 1 Oct 2025Source
- Form 1Niwant- Form1- FY22-23 Q1-30-06-2022.pdf · uploaded 10 Jan 2026Source
- Form 2Niwant- Form 2- FY22-23 Q1-30062022.PDF · uploaded 10 Jan 2026Source
- Form 3Niwant- Form 3- FY22-23 Q1-30062022.pdf · uploaded 10 Jan 2026Source
- Disclosure of Sold and Booked Inventory30062022.pdf · uploaded 10 Jan 2026Source
- Form 1Niwant- Form1- FY22-23 Q2-30-09-2022.pdf · uploaded 10 Jan 2026Source
- Form 2Niwant- Form 2- FY22-23 Q2-30092022.PDF · uploaded 10 Jan 2026Source
- Form 3Niwant- Form 3- FY22-23 Q2-30092022.pdf · uploaded 10 Jan 2026Source
- Disclosure of Sold and Booked Inventory30092022.pdf · uploaded 10 Jan 2026Source
- Form 3Niwant- Form 3- FY22-23 Q3-31122022.pdf · uploaded 10 Jan 2026Source
- Disclosure of Sold and Booked Inventory31122022.pdf · uploaded 10 Jan 2026Source
- Form 1Niwant- Form1- FY22-23 Q3-31-12-2022.pdf · uploaded 10 Jan 2026Source
- Form 2Niwant- Form 2- FY22-23 Q3-31122022.PDF · uploaded 10 Jan 2026Source
- Form 1Niwant- Form1- FY22-23 Q4-31-03-2023.pdf · uploaded 10 Jan 2026Source
- Form 2Niwant- Form 2- FY22-23 Q4-31032023.pdf · uploaded 10 Jan 2026Source
- Form 3Niwant- Form 3- FY22-23 Q4-31032023.PDF · uploaded 10 Jan 2026Source
- Disclosure of Sold and Booked Inventory30032023.pdf · uploaded 10 Jan 2026Source
- Form 1Niwant- Form1- FY23-24 Q1-30-06-2023.pdf · uploaded 10 Jan 2026Source
- Form 2Niwant- Form 2- FY23-24 Q1-30062023.PDF · uploaded 10 Jan 2026Source
- Form 3Niwant- Form 3- FY23-24 Q1-30062023.pdf · uploaded 10 Jan 2026Source
- Disclosure of Sold and Booked Inventory30062023.pdf · uploaded 10 Jan 2026Source
- Form 1Niwant- Form1- FY23-24 Q2-30-09-2023.pdf · uploaded 10 Jan 2026Source
- Form 2Niwant- Form 2- FY23-24 Q2-30092023.PDF · uploaded 10 Jan 2026Source
- Form 3Niwant- Form 3- FY23-24 Q2-30092023.pdf · uploaded 10 Jan 2026Source
- Disclosure of Sold and Booked Inventory300923.pdf · uploaded 10 Jan 2026Source
- Form 1Niwant- Form1- FY23-24 Q3-31-12-2023.pdf · uploaded 10 Jan 2026Source
- Form 2Niwant- Form 2- FY23-24 Q3-31122023.PDF · uploaded 10 Jan 2026Source
- Form 3Niwant- Form 3- FY23-24 Q3-31122023.pdf · uploaded 10 Jan 2026Source
- Disclosure of Sold and Booked Inventory311223.pdf · uploaded 10 Jan 2026Source
- Form 1Niwant- Form1- FY23-24 Q4-31-03-2024.pdf · uploaded 10 Jan 2026Source
- Form 2Niwant- Form 2- FY23-24 Q4-31032024.PDF · uploaded 10 Jan 2026Source
- Form 3Niwant- Form 3- FY23-24 Q4-31032024.pdf · uploaded 10 Jan 2026Source
- Disclosure of Sold and Booked Inventory31mar24.pdf · uploaded 10 Jan 2026Source
- Form 1Niwant- Form1- FY24-25 Q1-30-06-2024.pdf · uploaded 10 Jan 2026Source
- Form 2Niwant- Form 2- FY24-25 Q1-30062024.PDF · uploaded 10 Jan 2026Source
- Form 3Niwant- Form 3- FY24-25 Q1-30062024.pdf · uploaded 10 Jan 2026Source
- Disclosure of Sold and Booked InventoryJun-24.pdf · uploaded 10 Jan 2026Source
- Form 1Niwant- Form1- FY24-25 Q2-30-09-2024.pdf · uploaded 10 Jan 2026Source
- Form 2Niwant- Form 2- FY24-25 Q2-30092024.pdf · uploaded 10 Jan 2026Source
- Form 3Niwant- Form 3- FY24-25 Q2-30092024.pdf · uploaded 10 Jan 2026Source
- Disclosure of Sold and Booked InventorySep-24.pdf · uploaded 10 Jan 2026Source
- Form 1Niwant- Form1- FY24-25 Q3-31-12-2024.pdf · uploaded 10 Jan 2026Source
- Form 3Niwant- Form 3- FY24-25 Q3-31122024.pdf · uploaded 10 Jan 2026Source
- Form 2Niwant- Form 2- FY24-25 Q3-31122024.pdf · uploaded 10 Jan 2026Source
- Disclosure of Sold and Booked InventoryDec-24.pdf · uploaded 10 Jan 2026Source
- Form 1Niwant- Form1- FY24-25 Q4-31-03-2025.pdf · uploaded 10 Jan 2026Source
- Form 2Niwant- Form1- FY24-25 Q4-31-03-2025.pdf · uploaded 10 Jan 2026Source
- Form 3Niwant- Form 3- FY24-25 Q4-31032025.pdf · uploaded 10 Jan 2026Source
- Disclosure of Sold and Booked Inventory310325.pdf · uploaded 10 Jan 2026Source
- Form 5 (FY 2022-2023)NIwant - 22-23.pdf · uploaded 4 Feb 2026Source
- Form 5 (FY 2023-2024)Niwant - 23-24.pdf · uploaded 4 Feb 2026Source
- Form 1Niwant-Form1-31-6-25.pdf · uploaded 14 Feb 2026Source
- Form 2Niwant-Form2-31-6-25.pdf · uploaded 14 Feb 2026Source
- Form 3Niwant-Form3- 30-6-25.pdf · uploaded 14 Feb 2026Source
- Disclosure of Sold and Booked Inventory300625.pdf · uploaded 14 Feb 2026Source
- Form 1Niwant-Form1-31-9-25.pdf · uploaded 14 Feb 2026Source
- Form 2Niwant-Form2-31-9-25.pdf · uploaded 14 Feb 2026Source
- Form 3Niwant- Form 3- FY25-26 Q2-30092025.pdf · uploaded 14 Feb 2026Source
- Disclosure of Sold and Booked Inventory300925.pdf · uploaded 14 Feb 2026Source
- Form 1Niwant-Form1-31-12-25.pdf · uploaded 14 Feb 2026Source
- Form 2Niwant-Form2-31-12-25.pdf · uploaded 14 Feb 2026Source
- Form 3Niwant-Form3- 30-12-25.pdf · uploaded 14 Feb 2026Source
- Disclosure of Sold and Booked Inventory31122025.pdf · uploaded 14 Feb 2026Source
- Form 2A (FY 2022-2023)1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23) (1).pdf · uploaded 14 Feb 2026Source
- Form 2A (FY 2023-2024)1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24) (1).pdf · uploaded 14 Feb 2026Source
- Form 2A (FY 2024-2025)Form 2A- 2024-25- NIWANT.pdf · uploaded 28 May 2026Source
- Form 2A (FY 2025-2026)Form 2A- 2025-26- NIWANT.pdf · uploaded 28 May 2026Source
- Withdrawal Update Form 1SIGNED Niwant Form1-31-3-26.pdf · uploaded 23 Jun 2026Source
- Withdrawal Update Form 2Form 2 -Niwant - 31-3-26.pdf · uploaded 23 Jun 2026Source
- Withdrawal Update Form 3SIGNED 20260623160528.pdf · uploaded 23 Jun 2026Source
- Withdrawal Update Form 1Niwant - Form 1 - 30-06-26.pdf · uploaded 5 Sep 2026Source
- Withdrawal Update Form 2NIWANT - FORM 2- 30-6-26.pdf · uploaded 5 Sep 2026Source
- Withdrawal Update Form 3NIWANT Form 3 Q1 FY2627 SIGNED (1) (1).pdf · uploaded 5 Sep 2026Source
- Form 5 (FY 2025-2026)5 Niwantpdf signed.pdf · uploaded 30 Sep 2026Source
Technical
Technical (Architect)
- DocumentNiwant - Form 1 - 30-06-26.pdf · uploaded 5 Sep 2026Source
Technical (Engineer)
- DocumentNIWANT - FORM 2- 30-6-26.pdf · uploaded 2 Sep 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel Plot no.84 CTS No-1072
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2BHK14 units in all
- Address
- Plot no.84 CTS No-1072, Shukrawar Peth, Shukrawar PethPIN 411002
- Village
- Pune (M Corp.), Pune City taluka
- Land area for this project
- 345 sq m (3,711 sq ft)
- Permissible built-up area
- 1,147 sq m (12,342 sq ft)
- Sanctioned built-up area
- 1,147 sq m (12,342 sq ft)
- Designated bank account
- 53
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
Plot no.84 CTS No-1072
Boundaries
- North
- Road
- South
- Property Owned by Mr Pathak
- East
- Plot No-85
- West
- Plot No-83
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking14 units
6 of 14 units booked (43%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK | 54.16 sq m · 583 sq ft | 2 | 2 |
| 2BHK | 64.38 sq m · 693 sq ft | 2 | 2 |
| 2BHK | 64.47 sq m · 694 sq ft | 2 | 2 |
| 2BHK | 69.03 sq m · 743 sq ft | 8 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals6
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Mangesh Gotal | — |
| Architect | Siddharth Harischandrakar | — |
| Chartered accountant | ShantanuG & Associates | — |
| Chartered accountant | Siddharth Smart | — |
| Engineer | Mahesh Mate | — |
| Engineer | Vijendra Gaikwad | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Shukrawar Peth
- VishnupadRERA PR1260002602385
- SamarthRERA PR1260002600396
- ShantiniketanRERA PR1260002502400
- Yugal NirayanRERA P52100080840
- Naik HeritageRERA P52100080182
- Sadashiv Kirti VishnuRERA P52100079876
- Natraj ResidencyRERA P52100076714
- Heera MansionRERA P52100054705