Residential / Group Housing · 1 building · 132 unitsRERA P52100031233

Vrundavan A Wing

Deedo IDDP-PUN-6DG5

Its promised completion date, Dec 2025, has passed and MahaRERA does not show it completed; no MahaRERA orders on record; 100% of its units are booked.

Pune (M Corp.), Pune 411006 · by NG Rathi Promoters

Delivery11 mo past duePromised Dec 2025 · no extension on record · not shown completedRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales100% booked132 of 132 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Its promised completion date, Dec 2025, has passed and MahaRERA does not show it completed

  • This projectRegistered 11 Oct 2021, completion promised 31 Dec 2025, and still not shown completed today.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100031233
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210003123311 Oct 202131 Dec 202531 Dec 2025NG Rathi PromotersProject page
Documents157

1 document held by Deedo, 156 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardNG RATHI PROMOTORS.pdf · uploaded 1 Oct 2021Source

Legal

  • Legal Title reportLegal Title As per RERA_compressed.pdf · uploaded 4 Oct 2021Source
  • Legal Title reportLegal Title as per RERA 1_compressed.pdf · uploaded 4 Oct 2021Source
  • Legal Title reportLegal Title as per RERA 2.pdf · uploaded 4 Oct 2021Source
  • Declaration Form BForn B Scanned Rera_compressed.pdf · uploaded 4 Oct 2021Source
  • Declaration Form BForm B as per Rera.pdf · uploaded 13 May 2025Source

Migrated

  • 1 PAN CardNG RATHI PROMOTORS.pdf · uploaded 1 Oct 2021Source
Show all 157 documentsShow fewer documents

Migrated

  • 1 Details of encumbrancesEncumbrance Certificate.pdf · uploaded 1 Oct 2021Source
  • 1 Copy of Layout Approval (in case of layout)IMG_0005_compressed.pdf · uploaded 1 Oct 2021Source
  • 2 Copy of Layout Approval (in case of layout)IMG_0006_compressed.pdf · uploaded 1 Oct 2021Source
  • 3 Copy of Layout Approval (in case of layout)IMG_0007_compressed.pdf · uploaded 1 Oct 2021Source
  • 4 Copy of Layout Approval (in case of layout)IMG_0008_compressed.pdf · uploaded 1 Oct 2021Source
  • 1 Building Plan Approval / NA Order for plotted developmentIMG_0005_compressed.pdf · uploaded 1 Oct 2021Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 1 Oct 2021Source
  • 2 Commencement Certificates / NA Order for plotted developmentNA Order Sr No-2421B 1.pdf · uploaded 1 Oct 2021Source
  • 1 Declaration about Commencement CertificateDECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf · uploaded 1 Oct 2021Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form3-Vrundavan-DSC.pdf · uploaded 1 Oct 2021Source
  • 1 Proforma of Allotment letterDraft for finalisation.pdf · uploaded 1 Oct 2021Source
  • 1 Copy of the legal title reportLegal Title As per RERA_compressed.pdf · uploaded 4 Oct 2021Source
  • 2 Copy of the legal title reportLegal Title as per RERA 1_compressed.pdf · uploaded 4 Oct 2021Source
  • 3 Copy of the legal title reportLegal Title as per RERA 2.pdf · uploaded 4 Oct 2021Source
  • 1 Declaration in FORM BForn B Scanned Rera_compressed.pdf · uploaded 4 Oct 2021Source
  • 2 Details of encumbrancesMortgage Deed-Index II.pdf · uploaded 11 May 2022Source
  • 1 CERSAI detailsCERSAI_Search_Report_200240771979_For_Asset_Based_Search_27_06_2022_17_36_08_152.pdf · uploaded 27 Jun 2022Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of Sold-Unsold Inventary.pdf · uploaded 27 Jun 2022Source
  • 3 Details of encumbrancesIndex II-NGRP.pdf · uploaded 12 Aug 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE-FORMAT Vrundavan.pdf · uploaded 16 Dec 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE.pdf · uploaded 16 Dec 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form3-Vrundavan-2023Sep.pdf · uploaded 16 Dec 2023Source
  • 5 Copy of Layout Approval (in case of layout)sheet 5 of 6.pdf · uploaded 27 Dec 2023Source
  • 2 Building Plan Approval / NA Order for plotted developmentsheet 1 of 6.pdf · uploaded 27 Dec 2023Source
  • 3 Building Plan Approval / NA Order for plotted developmentsheet 2 of 6.pdf · uploaded 27 Dec 2023Source
  • 4 Building Plan Approval / NA Order for plotted developmentsheet 3 of 6.pdf · uploaded 27 Dec 2023Source
  • 5 Building Plan Approval / NA Order for plotted developmentsheet 4 of 6.pdf · uploaded 27 Dec 2023Source
  • 6 Building Plan Approval / NA Order for plotted developmentsheet 5 of 6.pdf · uploaded 27 Dec 2023Source
  • 7 Building Plan Approval / NA Order for plotted developmentsheet 6 of 6.pdf · uploaded 27 Dec 2023Source
  • 3 Commencement Certificates / NA Order for plotted developmentCommencement certificate.pdf · uploaded 27 Dec 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1-31-03-0214 Vru.pdf · uploaded 12 Aug 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2-31-03-2024 Vru.pdf · uploaded 12 Aug 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A-31-03-2024 Vru.pdf · uploaded 12 Aug 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form3-Vrundavan-Dtd2024Mar31.pdf · uploaded 13 Aug 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 June 24.pdf · uploaded 8 Jan 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sept 24.pdf · uploaded 8 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form3-Vrundavan-Dt2023Jun28-DSC.pdf · uploaded 8 Jan 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form3-Vrundavan-2023Sep.pdf · uploaded 8 Jan 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form3-Vrundavan-Dtd2024Mar31.pdf · uploaded 8 Jan 2025Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form3-Vrundavan-2024Jun30-signed.pdf · uploaded 8 Jan 2025Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Scanned Form 3 Sept 23.pdf · uploaded 8 Jan 2025Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Scanned Form 3 March 24.pdf · uploaded 8 Jan 2025Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Scanned Form 3 June 24.pdf · uploaded 8 Jan 2025Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Scanned Form 3 Sept 24.pdf · uploaded 8 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 June 24.pdf · uploaded 8 Jan 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Sept 24.pdf · uploaded 8 Jan 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form3-Vrundavan-Sep24-Signed.pdf · uploaded 8 Jan 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A March 23.pdf · uploaded 8 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 10 May 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form3-Vrundavan-Dec24.pdf · uploaded 10 May 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 10 May 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 10 May 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Dec 24.pdf · uploaded 10 May 2025Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of Sold Booked Inventory 31 Mar 24.pdf · uploaded 12 May 2025Source
  • 2 Disclosure of sold/ booked inventoryDisclosure of Sold Booked Inventory 30 June 24.pdf · uploaded 12 May 2025Source
  • 3 Disclosure of sold/ booked inventoryDisclosure of Sold Booked Inventory 30 Sept 24.pdf · uploaded 12 May 2025Source
  • 4 Disclosure of sold/ booked inventoryDisclosure of Sold Booked Inventory 31 Dec 24.pdf · uploaded 12 May 2025Source
  • 5 Disclosure of sold/ booked inventoryDisclosure of Sold Booked Inventory 31 Mar 25.pdf · uploaded 12 May 2025Source
  • 1 a Details of encumbrances concerned to FinanceNON ENCUMBRANCE CERTI -Legal.pdf · uploaded 13 May 2025Source
  • 2 a Details of encumbrances concerned to FinanceNON ENCUMBRANCE CERTI -Finance.pdf · uploaded 13 May 2025Source
  • 1 Declaration in FORM BForm B as per Rera.pdf · uploaded 13 May 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 March 25.pdf · uploaded 13 May 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form3-Vrundavan-2025Mar31-DSC-1.pdf · uploaded 13 May 2025Source
  • 1 Declaration about all RERA Designated Bank Accounts (Format A)Format A.pdf · uploaded 13 May 2025Source
  • 1 Deviation Report with respect to Allotment letterDeviation Report of Allottment Letter.pdf · uploaded 13 May 2025Source
  • 1 b Details of encumbrances concerned to LegalNON ENCUMBRANCE CERTI -Legal.pdf · uploaded 13 May 2025Source
  • 2 b Details of encumbrances concerned to LegalNON ENCUMBRANCE CERTI -Finance.pdf · uploaded 13 May 2025Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation Report of Agreement to Sale.pdf · uploaded 13 May 2025Source
  • 1 Proforma of Agreement for saleDraft for finalisation.pdf · uploaded 13 May 2025Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in Other real Estate Projects.pdf · uploaded 13 May 2025Source
  • Form 1Form 1 March 25.pdf · uploaded 14 May 2025Source
  • Form 1Form 2 31 March 25.pdf · uploaded 14 May 2025Source
  • Form 1Form 2 31 March 25.pdf · uploaded 14 May 2025Source
  • Form 1Form 1 March 25.pdf · uploaded 14 May 2025Source
  • Form 1Disclosure of Sold Booked Inventory 31 Mar 25.pdf · uploaded 14 May 2025Source
  • Form 2Form 2 31 March 25.pdf · uploaded 14 May 2025Source
  • Form 2Form 1 March 25.pdf · uploaded 14 May 2025Source
  • Form 2Disclosure of Sold Booked Inventory 31 Mar 25.pdf · uploaded 14 May 2025Source
  • Form 2Form 2 31 March 25.pdf · uploaded 14 May 2025Source
  • Form 2Form3-Vrundavan-2025Mar31-DSC-1.pdf · uploaded 14 May 2025Source
  • Form 3Form3-Vrundavan-2025Mar31-DSC-1.pdf · uploaded 14 May 2025Source
  • Form 3Form3-Vrundavan-2025Mar31-DSC-1.pdf · uploaded 14 May 2025Source
  • Form 3Form3-Vrundavan-2025Mar31-DSC-1.pdf · uploaded 14 May 2025Source
  • Form 3Form3-Vrundavan-2025Mar31-DSC-1.pdf · uploaded 14 May 2025Source
  • Form 3Form 2 31 March 25.pdf · uploaded 14 May 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Booked Inventory 31 Mar 25.pdf · uploaded 14 May 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Booked Inventory 31 Mar 25.pdf · uploaded 14 May 2025Source
  • Disclosure of Sold and Booked InventoryForm 1 March 25.pdf · uploaded 14 May 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Booked Inventory 31 Mar 25.pdf · uploaded 14 May 2025Source
  • Disclosure of Sold and Booked InventoryForm 1 March 25.pdf · uploaded 14 May 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form5-Vrundavan-2024Mar24.pdf · uploaded 16 May 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)Form5-Vrundavan-2024Mar25.pdf · uploaded 16 May 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 June 23.pdf · uploaded 19 May 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec 23.pdf · uploaded 19 May 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 March 25.pdf · uploaded 19 May 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form3-Vrundavan-2023Dec31.pdf · uploaded 19 May 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 June 23.pdf · uploaded 19 May 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Dec 23.pdf · uploaded 19 May 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 31 March 25.pdf · uploaded 19 May 2025Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of Booked sold Inventory June 23.pdf · uploaded 19 May 2025Source
  • 2 Disclosure of sold/ booked inventoryDisclosure of Booked sold Inventory Sept 23.pdf · uploaded 19 May 2025Source
  • 3 Disclosure of sold/ booked inventoryDisclosure of Booked sold Inventory Dec 23.pdf · uploaded 19 May 2025Source
  • Form 1Form 1 June 23.pdf · uploaded 19 May 2025Source
  • Form 1Disclosure of Booked sold Inventory June 23.pdf · uploaded 19 May 2025Source
  • Form 1Form 2 June 23.pdf · uploaded 19 May 2025Source
  • Form 2Form 2 June 23.pdf · uploaded 19 May 2025Source
  • Form 2Form3-Vrundavan-Dt2023Jun28-DSC.pdf · uploaded 19 May 2025Source
  • Form 2Disclosure of Booked sold Inventory June 23.pdf · uploaded 19 May 2025Source
  • Form 3Form3-Vrundavan-Dt2023Jun28-DSC.pdf · uploaded 19 May 2025Source
  • Form 3Form 2 June 23.pdf · uploaded 19 May 2025Source
  • Form 3Form3-Vrundavan-Dt2023Jun28-DSC.pdf · uploaded 19 May 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of Booked sold Inventory June 23.pdf · uploaded 19 May 2025Source
  • Disclosure of Sold and Booked InventoryForm 1 June 23.pdf · uploaded 19 May 2025Source
  • Disclosure of Sold and Booked InventoryForm 1 June 23.pdf · uploaded 19 May 2025Source

Technical

  • DocumentIMG_0005_compressed.pdf · uploaded 1 Oct 2021Source
  • DocumentIMG_0006_compressed.pdf · uploaded 1 Oct 2021Source
  • DocumentIMG_0007_compressed.pdf · uploaded 1 Oct 2021Source
  • DocumentIMG_0008_compressed.pdf · uploaded 1 Oct 2021Source
  • DocumentIMG_0005_compressed.pdf · uploaded 1 Oct 2021Source
  • Documentsheet 5 of 6.pdf · uploaded 27 Dec 2023Source
  • Documentsheet 6 of 6.pdf · uploaded 27 Dec 2023Source
  • Documentsheet 1 of 6.pdf · uploaded 27 Dec 2023Source
  • Documentsheet 2 of 6.pdf · uploaded 27 Dec 2023Source
  • Documentsheet 3 of 6.pdf · uploaded 27 Dec 2023Source
  • Documentsheet 4 of 6.pdf · uploaded 27 Dec 2023Source
  • Documentsheet 5 of 6.pdf · uploaded 27 Dec 2023Source
  • DocumentSheet 1 of 5.pdf · uploaded 16 Jul 2025Source
  • DocumentSheet 2 of 5.pdf · uploaded 16 Jul 2025Source
  • DocumentSheet 3 of 5.pdf · uploaded 16 Jul 2025Source
  • DocumentSheet 4 of 5.pdf · uploaded 16 Jul 2025Source
  • DocumentSheet 5 of 5.pdf · uploaded 16 Jul 2025Source

Technical (Architect)

  • DocumentFORM 1-31-03-0214 Vru.pdf · uploaded 12 Aug 2024Source
  • DocumentForm 1 June 24.pdf · uploaded 8 Jan 2025Source
  • DocumentForm 1 Sept 24.pdf · uploaded 8 Jan 2025Source
  • DocumentForm 1.pdf · uploaded 10 May 2025Source
  • DocumentForm 1 March 25.pdf · uploaded 13 May 2025Source
  • DocumentForm 1 June 23.pdf · uploaded 19 May 2025Source
  • DocumentForm 1 Dec 23.pdf · uploaded 19 May 2025Source
  • DocumentForm 1 March 25.pdf · uploaded 19 May 2025Source

Technical (Engineer)

  • DocumentFORM 2-31-03-2024 Vru.pdf · uploaded 12 Aug 2024Source
  • DocumentForm 2 June 24.pdf · uploaded 8 Jan 2025Source
  • DocumentForm 2 Sept 24.pdf · uploaded 8 Jan 2025Source
  • DocumentForm3-Vrundavan-Sep24-Signed.pdf · uploaded 8 Jan 2025Source
  • DocumentForm 2.pdf · uploaded 10 May 2025Source
  • DocumentForm 2.pdf · uploaded 10 May 2025Source
  • DocumentForm 2 Dec 24.pdf · uploaded 10 May 2025Source
  • DocumentForm 2 June 23.pdf · uploaded 19 May 2025Source
  • DocumentForm 2 Dec 23.pdf · uploaded 19 May 2025Source
  • DocumentForm 2 31 March 25.pdf · uploaded 19 May 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel CTS No. 2761/2, Sr. No. 242/1b

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
—132 units in all
Address
Sr. No. 242/1b, CTS No. 2761/2, Yerawada, Vishrantwadi Road, , Maji Sainik Nagar, (Mohanwadi), Yerawada, PunePIN 411006
Village
Pune (M Corp.), Pune City taluka
Land area for this project
2,465 sq m (26,533 sq ft)
Permissible built-up area
10,272 sq m (1,10,571 sq ft)
Sanctioned built-up area
9,358 sq m (1,00,728 sq ft)
Recreational open space
247 sq m (2,653 sq ft)
Designated bank account
76
Developed in phases
No

Survey, CTS, gat or plot numbers

CTS No. 2761/2Sr. No. 242/1b

Land as published on MahaRERA's project page

Sr. No. 242/1b, CTS No. 2761/2, Yerawada

Boundaries

North
Dhanori Border
South
Existing DP Nala
East
15 MTR Wide Road
West
Dhanori Border

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking132 units

132 units registered

— · 132 units
TypeCarpet areaUnits
——132

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals3

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAbhay Joshi—
Chartered accountantMSDN & Associates—
EngineerJayant Umardand—

Source: MahaRERA project page. Contact details are not shown.