Skip to content
Deedo home
Menu

Centro

Certificate Signed

Ouatade Handewadi, Pune 412308 |Promoter: Lushlife Real Estate LLP

26 Dec 2017Registered with MahaRERA
30 Sep 2022Promised completion
31 Dec 2024Revised completionPushed back 2 years and 3 months
2Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Commercial
Status on MahaRERA
Certificate Signed
Buildings
2
Address
22, Handewadi Chowk, Autade HandewadiPIN 412308
Designated bank account
76
Developed in phases
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.45554, 73.93352
Centro is at latitude 18.45554, longitude 73.93352.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 2 years and 3 months

The latest completion date on record passed 1 year and 10 months ago.

Registered
26 Dec 2017
Promised
30 Sep 2022
Revised
31 Dec 2024

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210001473426 Dec 201730 Sep 202231 Dec 2024Lushlife Real Estate LLPProject page

2 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A Block5—
B Block3—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Documents

2 documents held by Deedo, 136 filings listed on MahaRERA's project page

Registration certificate

Extension certificate

Finance

  • PAN CardLLRE PAN.pdf · uploaded 12 Sep 2017Source

Legal

  • Legal Title reportLushlife _ Legal report (3).pdf · uploaded 13 Sep 2017Source
  • Other1.pdf · uploaded 18 Dec 2017Source
  • Other2.pdf · uploaded 18 Dec 2017Source
  • Other3.pdf · uploaded 18 Dec 2017Source
  • Other4.pdf · uploaded 18 Dec 2017Source
Show all 138 documentsShow fewer documents

Legal

  • Other5.pdf · uploaded 18 Dec 2017Source
  • Declaration Form Brohan malani scan form b.pdf · uploaded 18 Dec 2017Source
  • OtherRII Plan 15122019 (1) (1).pdf · uploaded 16 Jul 2020Source
  • Declaration Form Baffidavit cum declration centro.pdf · uploaded 24 Nov 2023Source

Migrated

  • 1 PAN CardLLRE PAN.pdf · uploaded 12 Sep 2017Source
  • 1 Details of encumbrancesLoan Index II.pdf · uploaded 12 Sep 2017Source
  • 1 Copy of Layout Approval (in case of layout)1.pdf · uploaded 12 Sep 2017Source
  • 1 Building Plan Approval (IOD)2.pdf · uploaded 12 Sep 2017Source
  • 2 Building Plan Approval (IOD)3.pdf · uploaded 12 Sep 2017Source
  • 3 Building Plan Approval (IOD)4.pdf · uploaded 12 Sep 2017Source
  • 4 Building Plan Approval (IOD)5.pdf · uploaded 12 Sep 2017Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificates commer (2).pdf · uploaded 12 Sep 2017Source
  • 1 Copy of the legal title reportLushlife _ Legal report (3).pdf · uploaded 13 Sep 2017Source
  • 5 Building Plan Approval (IOD)New Doc 2017-12-18 (1)_1.pdf · uploaded 18 Dec 2017Source
  • 1 Declaration in FORM Brohan malani scan form b.pdf · uploaded 18 Dec 2017Source
  • 1 Certificates of CA (Form 3)CA Certificate - Centro (2).pdf · uploaded 18 Dec 2017Source
  • 1 Proforma of Allotment letterNew Doc 2017-12-18_2.pdf · uploaded 18 Dec 2017Source
  • 1 Other1.pdf · uploaded 18 Dec 2017Source
  • 2 Other2.pdf · uploaded 18 Dec 2017Source
  • 3 Other3.pdf · uploaded 18 Dec 2017Source
  • 4 Other4.pdf · uploaded 18 Dec 2017Source
  • 5 Other5.pdf · uploaded 18 Dec 2017Source
  • 1 Certificates of CA (Form 5)Form 5 - Centro.pdf · uploaded 12 Dec 2018Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Centro-30-09-2019.pdf · uploaded 1 Oct 2019Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Centro-30-09-2019.pdf · uploaded 18 Oct 2019Source
  • 2 Certificates of CA (Form 3)Lushlife form 3 - Centro.PDF · uploaded 18 Nov 2019Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Centro_cert_compressed.pdf · uploaded 30 Nov 2019Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Centro Form 5 FY-18-19.PDF · uploaded 9 Dec 2019Source
  • 6 OtherRII Plan 15122019 (1) (1).pdf · uploaded 16 Jul 2020Source
  • 2 Copy of Layout Approval (in case of layout)1-6-11-02-2020_compressed(1).pdf · uploaded 18 Jul 2020Source
  • 6 Building Plan Approval (IOD)2-6-11-02-2020_compressed.pdf · uploaded 18 Jul 2020Source
  • 7 Building Plan Approval (IOD)2-6-11-02-2020(1)_compressed.pdf · uploaded 29 Jul 2020Source
  • 8 Building Plan Approval (IOD)3-6-11-02-2020_compressed.pdf · uploaded 29 Jul 2020Source
  • 9 Building Plan Approval (IOD)4-6-11-02-2020_compressed.pdf · uploaded 29 Jul 2020Source
  • 10 Building Plan Approval (IOD)5-6-11-02-2020_compressed.pdf · uploaded 29 Jul 2020Source
  • 11 Building Plan Approval (IOD)6-6-11-02-2020_compressed.pdf · uploaded 29 Jul 2020Source
  • 2 Commencement Certificates / NA Order for plotted developmentRevise Centro-11-02-2020_compressed.pdf · uploaded 29 Jul 2020Source
  • 3 Commencement Certificates / NA Order for plotted developmentna_compressed.pdf · uploaded 30 Jul 2020Source
  • 3 Certificates of CA (Form 3)Centro Form 3 29032020_compressed (1).pdf · uploaded 27 Aug 2020Source
  • 4 Certificates of CA (Form 3)Impero Form 3 29032020_compressed (1).pdf · uploaded 27 Aug 2020Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect form 1 centro.PDF · uploaded 19 Feb 2021Source
  • 2 Certificates of CA (Form 5)Form 5 FY 2019-20 LLRE.PDF · uploaded 3 Apr 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 FY 2019-20 LLRE .PDF · uploaded 5 Jul 2021Source
  • 5 Certificates of CA (Form 3)From 3-centro- 30-6.PDF · uploaded 16 Aug 2021Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1-14-08- centro.pdf · uploaded 18 Aug 2021Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers certificate-Centro.pdf · uploaded 18 Aug 2021Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)form2 centro.pdf · uploaded 11 Oct 2021Source
  • 6 Certificates of CA (Form 3)Form 3 RERA LLRE CENTRO-C-.pdf · uploaded 11 Oct 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Lushlife - Centro Form 5 FY 20-21.PDF · uploaded 2 Dec 2021Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)centro rera architects certificate_compressed.pdf · uploaded 1 Feb 2022Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Form -compressed.pdf · uploaded 1 Feb 2022Source
  • 7 Certificates of CA (Form 3)form 3 llre centro_compressed.pdf · uploaded 26 Feb 2022Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Rera Centro-30-04-2022.pdf · uploaded 1 Jun 2022Source
  • 8 Certificates of CA (Form 3)Centro Form 3 -3-2022_compressed (1).pdf · uploaded 9 Jul 2022Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Cert -1-7-2022 compressed (1).pdf · uploaded 12 Jul 2022Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)engineer certificate Centro_compressed.pdf · uploaded 15 Jul 2022Source
  • 9 Certificates of CA (Form 3)Centro (1).PDF · uploaded 20 Sep 2022Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)centero certificts malwadkr_compressed.pdf · uploaded 1 Dec 2022Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer cerificate Centro.pdf · uploaded 1 Dec 2022Source
  • 10 Certificates of CA (Form 3)Centro form 3 CA certificate_compressed.pdf · uploaded 1 Dec 2022Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)rara 2023.pdf · uploaded 10 Jan 2023Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2_compressed.pdf · uploaded 13 Jan 2023Source
  • 11 Certificates of CA (Form 3)FORM-03.pdf · uploaded 16 Jan 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Bhandari Associates Form 5.pdf · uploaded 24 Mar 2023Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCentro oc 2023 _compressed.pdf · uploaded 30 Mar 2023Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)rera certificate malwadkar .pdf · uploaded 15 Apr 2023Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)engineer certificate 2023.pdf · uploaded 26 Apr 2023Source
  • 12 Certificates of CA (Form 3)Centro Form 3_compressed.pdf · uploaded 26 Apr 2023Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)form 5 24-09-2022.pdf · uploaded 26 Apr 2023Source
  • 2 a Details of encumbrances concerned to Financeindex2 11288-2021 (1).pdf · uploaded 27 Apr 2023Source
  • 1 b Details of encumbrances concerned to Legalindex2 11288-2021 (1).pdf · uploaded 27 Apr 2023Source
  • 1 Declaration about Commencement Certificatedeclaration-CC-Centro.pdf · uploaded 27 Apr 2023Source
  • 3 Details of encumbrancesDETAILS OF ENCUMBRANCES CENTRO .pdf · uploaded 2 May 2023Source
  • 1 Disclosure of sold/ booked inventorycentro A WING.pdf · uploaded 2 May 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Centro (4).pdf · uploaded 5 Oct 2023Source
  • 2 Declaration in FORM Baffidavit cum declration centro.pdf · uploaded 24 Nov 2023Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)centro rera form 1.pdf · uploaded 24 Nov 2023Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Centro June 23.pdf · uploaded 24 Nov 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A Centro 2020-21.pdf · uploaded 24 Nov 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A Centro 2021-22.pdf · uploaded 24 Nov 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A Centro 2022-23.pdf · uploaded 24 Nov 2023Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 Sept 23.pdf · uploaded 2 Dec 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A Centro 2019-20.pdf · uploaded 2 Dec 2023Source
  • 2 Disclosure of sold/ booked inventoryCircular 29 Centro.pdf · uploaded 2 Dec 2023Source
  • 13 Certificates of CA (Form 3)Form 3 Centro qtr1_11zon.pdf · uploaded 2 Dec 2023Source
  • 14 Certificates of CA (Form 3)form 3 centro qtr 2_11zon.pdf · uploaded 2 Dec 2023Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)centro architects certificate .pdf · uploaded 1 Apr 2024Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)CENTRO ENGINEER CERTIFICATE.pdf · uploaded 1 Apr 2024Source
  • 15 Certificates of CA (Form 3)Form-3- Feb-2024.pdf · uploaded 1 Apr 2024Source
  • 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)malwadkar certificate form 1.pdf · uploaded 30 Apr 2024Source
  • 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1architects certificate (1).pdf · uploaded 3 May 2024Source
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 engineer certificate .pdf · uploaded 3 May 2024Source
  • 16 Certificates of CA (Form 3)form 3 CENTRO RERA _compressed.pdf · uploaded 13 May 2024Source
  • 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 centro malwadkar 2024 (1).pdf · uploaded 12 Jul 2024Source
  • 17 Certificates of CA (Form 3)rera centro form 3 -compressed.pdf · uploaded 22 Jul 2024Source
  • 1 Certificates of CA (Form 3)ca form 3 centro _compressed.pdf · uploaded 7 Dec 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)form 5 centro 25-10-2024 .pdf · uploaded 7 Dec 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)certificate Form-2 -Centro.pdf · uploaded 7 Feb 2025Source
  • 1 Copy of Layout Approval (in case of layout)1 (7).pdf · uploaded 28 Mar 2025Source
  • 1 Commencement Certificates / NA Order for plotted developmentRevised NA Centro-4-10- 2023 _compressed.pdf · uploaded 28 Mar 2025Source
  • 2 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATES CENTRO 2025 _compressed.pdf · uploaded 28 Mar 2025Source
  • 1 Building Plan Approval (IOD)2 (7).pdf · uploaded 28 Mar 2025Source
  • 2 Building Plan Approval (IOD)3 (7).pdf · uploaded 28 Mar 2025Source
  • 3 Building Plan Approval (IOD)4 (7).pdf · uploaded 28 Mar 2025Source
  • 4 Building Plan Approval (IOD)5 (7).pdf · uploaded 28 Mar 2025Source
  • 5 Building Plan Approval (IOD)6 (7).pdf · uploaded 28 Mar 2025Source
  • 6 Building Plan Approval (IOD)7 7.pdf · uploaded 28 Mar 2025Source

Technical

  • Document1.pdf · uploaded 12 Sep 2017Source
  • Document2.pdf · uploaded 12 Sep 2017Source
  • Document3.pdf · uploaded 12 Sep 2017Source
  • Document4.pdf · uploaded 12 Sep 2017Source
  • Document5.pdf · uploaded 12 Sep 2017Source
  • DocumentNew Doc 2017-12-18 (1)_1.pdf · uploaded 18 Dec 2017Source
  • Document1-6-11-02-2020_compressed(1).pdf · uploaded 18 Jul 2020Source
  • Document2-6-11-02-2020_compressed.pdf · uploaded 18 Jul 2020Source
  • Document2-6-11-02-2020(1)_compressed.pdf · uploaded 29 Jul 2020Source
  • Document3-6-11-02-2020_compressed.pdf · uploaded 29 Jul 2020Source
  • Document4-6-11-02-2020_compressed.pdf · uploaded 29 Jul 2020Source
  • Document5-6-11-02-2020_compressed.pdf · uploaded 29 Jul 2020Source
  • Document6-6-11-02-2020_compressed.pdf · uploaded 29 Jul 2020Source
  • Document1 (7).pdf · uploaded 28 Mar 2025Source
  • Document2 (7).pdf · uploaded 28 Mar 2025Source
  • Document3 (7).pdf · uploaded 28 Mar 2025Source
  • Document4 (7).pdf · uploaded 28 Mar 2025Source
  • Document5 (7).pdf · uploaded 28 Mar 2025Source
  • Document6 (7).pdf · uploaded 28 Mar 2025Source
  • Document7 7.pdf · uploaded 28 Mar 2025Source

Technical (Architect)

  • Documentform 1 centro malwadkar 2024 (1).pdf · uploaded 12 Jul 2024Source

Technical (Engineer)

  • Documentform 2 engineer certificate .pdf · uploaded 3 May 2024Source
  • Documentcertificate Form-2 -Centro.pdf · uploaded 7 Feb 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Ouatade Handewadi, Haveli taluka

Survey, CTS, gat or plot numbers

22

Boundaries

North
Katraj Saswad Bypass Road
South
Sr No 22
East
Sr No 18
West
Sr No 22

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectRahul Malwadkar—
Chartered accountantVinod N Nikam & Co—
EngineerUday Shah—
Otherinvental construction management group—
Registered real estate agentAbhay Motilal Bhurat—
Registered real estate agentMukesh Vinayak Charbhe—
Registered real estate agentProperty Pointer Private Limited—
Registered real estate agentProptiger Marketing Services Private Limited—
Show all 11 professionalsShow fewer professionals
RoleNameRegistration no.
Registered real estate agentShakruddin Mujawar—
Registered real estate agentSunil Chandrakant Suratwala—
Registered real estate agentWisteria Real Vision Pvt Ltd—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology