Completion was pushed back 4 months, to Apr 2027; no MahaRERA orders on record; 16% of its units are booked.

Moshi, Pune 412105 · Property rates in Moshi · by Sagar Dnyaneshwar Borate

DeliveryExtended 4 moPromised Dec 2026 · now due Apr 2027RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales16% booked5 of 32 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Apr 2027

  • This projectRegistered 30 Aug 2021, completion promised 31 Dec 2026, revised to 30 Apr 2027.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

All 22 deeds →
  • Title transfer · Apr 2015
  • Rental · Sep 2026
  • Rental · Sep 2026
  • Rental · Jul 2026
  • Rental · Jul 2026
  • Mortgage · Jun 2026No amount
  • Rental · May 2026
  • Rental · May 2026
  • Rental · Mar 2026
  • Rental · Apr 2025
Latest registered deeds in this project
MonthFlatKindAreaPriceRecord
Apr 2015Not on recordTitle transfer—View Title transfer, Apr 2015
Sep 2026Not on recordRental—View Rental, Sep 2026
Sep 2026The Rao Heights · 605Rental—View Rental, Sep 2026
Jul 2026The Rao Heights · 8Rental—View Rental, Jul 2026
Jul 2026Not on recordRental—View Rental, Jul 2026
Jun 2026The Rao Heights · 301Mortgage—View Mortgage, Jun 2026
May 2026The Rao HeightsRental—View Rental, May 2026
May 2026The Rao HeightsRental—View Rental, May 2026
Mar 2026The Rao HeightsRental—View Rental, Mar 2026
Apr 2025The Rao Heights · 8Rental—View Rental, Apr 2025

2 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100030512
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210003051230 Aug 202131 Dec 202630 Apr 2027Sagar Dnyaneshwar BorateProject page
Documents137

1 document held by Deedo, 136 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardSagar PAN Card.pdf · uploaded 25 Jul 2021Source

Legal

  • Legal Title report1 Search Report New.pdf · uploaded 25 Jul 2021Source
  • Declaration Form B5 Form B Dev and Landlord.pdf · uploaded 25 Jul 2021Source
  • Other4 Area 1 and 2 BHK.pdf · uploaded 21 Aug 2021Source

Migrated

  • 1 PAN CardSagar PAN Card.pdf · uploaded 25 Jul 2021Source
  • 1 Copy of the legal title report1 Search Report New.pdf · uploaded 25 Jul 2021Source
  • 1 Details of encumbrancesEncumbrance Certificate.pdf · uploaded 25 Jul 2021Source
Show all 137 documentsShow fewer documents

Migrated

  • 1 Copy of Layout Approval (in case of layout)2 Sanctioned Plan Copy.pdf · uploaded 25 Jul 2021Source
  • 1 Declaration in FORM B5 Form B Dev and Landlord.pdf · uploaded 25 Jul 2021Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect.pdf · uploaded 25 Jul 2021Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate_compressed.pdf · uploaded 25 Jul 2021Source
  • 1 Proforma of Allotment letterAllottment letter Draft.pdf · uploaded 25 Jul 2021Source
  • 2 Proforma of Allotment letterFlat Agreement Draft.pdf · uploaded 25 Jul 2021Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 RERA.pdf · uploaded 26 Jul 2021Source
  • 1 Other4 Area 1 and 2 BHK.pdf · uploaded 21 Aug 2021Source
  • 1 Building Plan Approval / NA Order for plotted development2 Sanctioned Plan Copy.pdf · uploaded 23 Aug 2021Source
  • 1 Commencement Certificates / NA Order for plotted developmentcommencement certificate_compressed.pdf · uploaded 24 Aug 2021Source
  • 1 Declaration about Commencement Certificate3 Declaration for Commencement Certificate.pdf · uploaded 24 Aug 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5 21-22.pdf · uploaded 6 Apr 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q2 2023-24.pdf · uploaded 12 Feb 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 22-23.pdf · uploaded 12 Feb 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q3 23-24_compressed.pdf · uploaded 20 Feb 2024Source
  • 1 CERSAI detailsCERSAI BANK OF MAHARASHTRA.pdf · uploaded 21 Feb 2024Source
  • 1 Proforma of Agreement for saleFlat Agreement Draft.pdf · uploaded 21 Feb 2024Source
  • Form 12025.pdf · uploaded 23 Aug 2025Source
  • Form 2march 2025.pdf · uploaded 23 Aug 2025Source
  • Form 3march 2025.pdf · uploaded 23 Aug 2025Source
  • Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 23 Aug 2025Source
  • Form 1december 2024.pdf · uploaded 23 Aug 2025Source
  • Form 2dec 2024.pdf · uploaded 23 Aug 2025Source
  • Form 3dec 2024.pdf · uploaded 23 Aug 2025Source
  • Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 23 Aug 2025Source
  • Form 1dec 2023.pdf · uploaded 23 Aug 2025Source
  • Form 2dec 2023.pdf · uploaded 23 Aug 2025Source
  • Form 3dec 2023.pdf · uploaded 23 Aug 2025Source
  • Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 23 Aug 2025Source
  • Form 1december 2022.pdf · uploaded 23 Aug 2025Source
  • Form 2dec 2022.pdf · uploaded 23 Aug 2025Source
  • Form 3dec 2022.pdf · uploaded 23 Aug 2025Source
  • Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 23 Aug 2025Source
  • Form 12024.pdf · uploaded 23 Aug 2025Source
  • Form 2sep 2024.pdf · uploaded 23 Aug 2025Source
  • Form 3sep 2024.pdf · uploaded 23 Aug 2025Source
  • Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 23 Aug 2025Source
  • Form 12024.pdf · uploaded 23 Aug 2025Source
  • Form 2form 2 30-6-24.pdf · uploaded 23 Aug 2025Source
  • Form 3jun 2024.pdf · uploaded 23 Aug 2025Source
  • Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 23 Aug 2025Source
  • Form 12024.pdf · uploaded 23 Aug 2025Source
  • Form 2Form 2 31-3-24.pdf · uploaded 23 Aug 2025Source
  • Form 3march 2024.pdf · uploaded 23 Aug 2025Source
  • Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 23 Aug 2025Source
  • Form 5 (FY 2024-2025)0 (26).pdf · uploaded 23 Aug 2025Source
  • Form 2A (FY 2024-2025)Form 2A_page-0001.pdf · uploaded 25 Aug 2025Source
  • Withdrawal Update Form 1Form 1 Architect.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 1Form 1 Architect.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 1Form 1 Architect.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 1Form 1 Architect.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 1Form 1 Architect.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 1Form 1 Architect.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 1Form 1 Architect.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 1Form 1 Architect.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 1Form 1 Architect.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 1Form 1 Architect.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 1Form 1 Architect.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 1Form 1 Architect.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 1Form 1 Architect.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 1Form 1 Architect.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 1Form 1 Architect.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 1Form 1 Architect.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 1Form 1 Architect.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 2Engineers Certificate_compressed.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 2Engineers Certificate_compressed.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 2Engineers Certificate_compressed.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 2Engineers Certificate_compressed.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 2Engineers Certificate_compressed.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 2Engineers Certificate_compressed.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 2Engineers Certificate_compressed.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 2Engineers Certificate_compressed.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 2Engineers Certificate_compressed.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 2Engineers Certificate_compressed.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 2Engineers Certificate_compressed.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 2Engineers Certificate_compressed.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 2Engineers Certificate_compressed.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 2Engineers Certificate_compressed.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 2Engineers Certificate_compressed.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 2Engineers Certificate_compressed.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 2Engineers Certificate_compressed.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 3RERA Form 3 Upload 26.07.21.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 3RERA Form 3 Upload 26.07.21.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 3RERA Form 3 Upload 26.07.21.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 3RERA Form 3 Upload 26.07.21.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 3RERA Form 3 Upload 26.07.21.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 3RERA Form 3 Upload 26.07.21.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 3RERA Form 3 Upload 26.07.21.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 3RERA Form 3 Upload 26.07.21.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 3RERA Form 3 Upload 26.07.21.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 3RERA Form 3 Upload 26.07.21.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 3RERA Form 3 Upload 26.07.21.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 3RERA Form 3 Upload 26.07.21.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 3RERA Form 3 Upload 26.07.21.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 3RERA Form 3 Upload 26.07.21.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 3RERA Form 3 Upload 26.07.21.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 3RERA Form 3 Upload 26.07.21.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 3RERA Form 3 Upload 26.07.21.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 1f1_compressed.pdf · uploaded 18 Oct 2025Source
  • Withdrawal Update Form 2form 2.pdf · uploaded 18 Oct 2025Source
  • Withdrawal Update Form 3form 3_compressed.pdf · uploaded 18 Oct 2025Source
  • Withdrawal Update Form 1Form 1-2.pdf · uploaded 14 Feb 2026Source
  • Withdrawal Update Form 1Form 1-2.pdf · uploaded 14 Feb 2026Source
  • Withdrawal Update Form 2form 2.pdf · uploaded 14 Feb 2026Source
  • Withdrawal Update Form 2Form 2-1.pdf · uploaded 14 Feb 2026Source
  • Withdrawal Update Form 3Form 3-1_page-0001.pdf · uploaded 14 Feb 2026Source
  • Withdrawal Update Form 3Form 3-1_page-0001.pdf · uploaded 14 Feb 2026Source
  • Withdrawal Update Form 1Form 1-1.pdf · uploaded 9 Jun 2026Source
  • Withdrawal Update Form 1Form 1-1.pdf · uploaded 9 Jun 2026Source
  • Withdrawal Update Form 1Form 1-1.pdf · uploaded 9 Jun 2026Source
  • Withdrawal Update Form 2Form 2-1.pdf · uploaded 9 Jun 2026Source
  • Withdrawal Update Form 2Form 2-1.pdf · uploaded 9 Jun 2026Source
  • Withdrawal Update Form 2Form 2-1.pdf · uploaded 9 Jun 2026Source
  • Withdrawal Update Form 3Form 3-1.pdf · uploaded 9 Jun 2026Source
  • Withdrawal Update Form 3Form 3-1.pdf · uploaded 9 Jun 2026Source
  • Withdrawal Update Form 3Form 3-1.pdf · uploaded 9 Jun 2026Source
  • Withdrawal Update Form 1Form 1 (1).pdf · uploaded 4 Sep 2026Source
  • Withdrawal Update Form 2form 2 (2).pdf · uploaded 4 Sep 2026Source
  • Withdrawal Update Form 3Form 3 (6).pdf · uploaded 4 Sep 2026Source

Technical

  • Document2 Sanctioned Plan Copy.pdf · uploaded 25 Jul 2021Source
  • Document2 Sanctioned Plan Copy.pdf · uploaded 23 Aug 2021Source
  • Document1.pdf · uploaded 6 Nov 2025Source
  • Document2.pdf · uploaded 6 Nov 2025Source
  • Document3.pdf · uploaded 6 Nov 2025Source
  • Document4.pdf · uploaded 6 Nov 2025Source
  • Document5.pdf · uploaded 6 Nov 2025Source
  • Document6.pdf · uploaded 6 Nov 2025Source

Technical (Architect)

  • DocumentForm 1 (1).pdf · uploaded 4 Sep 2026Source

Technical (Engineer)

  • Documentform 2 (2).pdf · uploaded 4 Sep 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel Gat No 133 - Old Gat No 1253 Borhadewadi

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 2BHK32 units in all
Address
Gat No 133 - Old Gat No 1253 Borhadewadi, Gavthan Moshi, BorhadewadiPIN 412105
Village
Moshi, Haveli taluka
Land area for this project
2,597 sq m (27,954 sq ft)
Permissible built-up area
8,188 sq m (88,135 sq ft)
Sanctioned built-up area
8,188 sq m (88,135 sq ft)
Recreational open space
2,597 sq m (27,954 sq ft)
Designated bank account
119
Developed in phases
No
Also registered as
Dream Heights

Survey, CTS, gat or plot numbers

Gat No 133 - Old Gat No 1253 Borhadewadi

Land as published on MahaRERA's project page

Gat No 133 - Old Gat No 1253 Borhadewadi

Boundaries

North
Gat No 134 of Mr Subhash Raghu Borate and others
South
30 MTRS DP Road and Property of Gat No 131
East
Gat No 138 Property of Mr Sambhaji Baburao Sasane
West
Property of Mr Rohidas Ravaba Borate and Others

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking32 units

5 of 32 units booked (16%), as the promoter reported to MahaRERA

1BHK · 16 units2BHK · 16 units
TypeCarpet areaUnitsBooked
1BHK41.01 sq m · 441 sq ft10
1BHK41.01 sq m · 441 sq ft11
1BHK41.01 sq m · 441 sq ft10
1BHK41.01 sq m · 441 sq ft10
1BHK41.38 sq m · 445 sq ft11
1BHK41.38 sq m · 445 sq ft10
1BHK41.38 sq m · 445 sq ft10
1BHK41.38 sq m · 445 sq ft10
Show all 32 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
1BHK42.72 sq m · 460 sq ft10
1BHK42.72 sq m · 460 sq ft10
1BHK42.72 sq m · 460 sq ft10
1BHK42.72 sq m · 460 sq ft11
1BHK42.74 sq m · 460 sq ft11
1BHK42.74 sq m · 460 sq ft10
1BHK42.74 sq m · 460 sq ft11
1BHK42.74 sq m · 460 sq ft10
2BHK60.49 sq m · 651 sq ft10
2BHK60.49 sq m · 651 sq ft10
2BHK60.49 sq m · 651 sq ft10
2BHK60.49 sq m · 651 sq ft10
2BHK60.63 sq m · 653 sq ft10
2BHK60.63 sq m · 653 sq ft10
2BHK60.63 sq m · 653 sq ft10
2BHK60.63 sq m · 653 sq ft10
2BHK60.64 sq m · 653 sq ft10
2BHK60.64 sq m · 653 sq ft10
2BHK60.64 sq m · 653 sq ft10
2BHK60.64 sq m · 653 sq ft10
2BHK61.56 sq m · 663 sq ft10
2BHK61.56 sq m · 663 sq ft10
2BHK61.56 sq m · 663 sq ft10
2BHK61.56 sq m · 663 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals6

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSeema Narendra Gohad Gohad—
Chartered accountantGohad Architect—
Chartered accountantRohit S Agarwal—
Chartered accountantVinod N Nikam Nikam—
EngineerShoul Kamble—
EngineerShravan Rathi—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Moshi

All 1,458 projects in Moshi · Compare The Rao Heights with another project

The Rao Heights in numbers

Registered deals, summarised

Deedo has 22 registered documents at The Rao Heights, from Apr 2015 to Sep 2026: 1 sale, 20 leave and licence agreements, 1 mortgage.

How many properties have been sold at The Rao Heights?
1 sale is registered at The Rao Heights.
Are properties at The Rao Heights rented out?
Yes: 20 leave and licence agreements are registered at The Rao Heights, at a median rent since Apr 2015 of about ₹7,000 a month with a deposit of about ₹15,000.
Where does this data come from?
The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at The Rao Heights by Deedo, last updated with deals registered in Sep 2026.

Latest deal · Title transfer · Apr 2015

₹25–50 L