Nakshatra i Land

Deedo IDDP-PUN-R12Z

Completion was pushed back 4 months, to Apr 2027; no MahaRERA orders on record.

Moshi, Pune 412105 · Property rates in Moshi · by Ellora Homemakers Pvt. Ltd

DeliveryExtended 4 moPromised Dec 2026 · now due Apr 2027RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readPrice₹6,940 /sq ft1% above Moshi · 202 registered sales

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Apr 2027

  • P52100046743Registered 5 Sep 2022, completion promised 30 Jun 2026.
  • P52100050672Registered 28 Apr 2023, completion promised 30 Dec 2026, revised to 30 Apr 2027.

No extension certificate on record.

2 registrations · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

All 508 deeds →
Latest registered deeds in this project
MonthFlatKindAreaPriceRecord
Sep 2026Wing F · F - 1008Resale631 sq ftView Resale, Sep 2026
Aug 2026Wing F · F - 1008Primary sale631 sq ftView Primary sale, Aug 2026
Jun 2026B Wing · B-702Resale632 sq ftView Resale, Jun 2026
May 2026B Wing · B-702Primary sale632 sq ftView Primary sale, May 2026
May 2026Wing F · F - 302Resale745 sq ftView Resale, May 2026
Feb 2026Co-operative · 503Resale403 sq ftView Resale, Feb 2026
Dec 2025Co-operative · 1103Resale—View Resale, Dec 2025
Nov 2025B WingResale632 sq ftView Resale, Nov 2025
Nov 2025Unit 1103Primary sale578 sq ftView Primary sale, Nov 2025
Jul 2025Unit 408Resale575 sq ftView Resale, Jul 2025

2 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrations2
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P521000467435 Sep 202230 Jun 202630 Jun 2026Ellora Homemakers Pvt. Ltd.Project page
P5210005067228 Apr 202330 Dec 202630 Apr 2027Ellora Homemakers Pvt. Ltd.Project page
Documents187

2 documents held by Deedo, 185 filings listed on MahaRERA's project page

Registration certificate (2)

  • Registration certificateP52100046743 · 5 Sep 2022ViewSource
  • Registration certificateP52100050672 · 28 Apr 2023ViewSource

Finance

  • PAN CardP52100046743 · Ellora Home Makers-Pancad.PDF · uploaded 2 Jul 2022Source
  • PAN CardP52100050672 · 1 PAN Card.pdf · uploaded 11 Mar 2023Source

Legal

  • Declaration Form BP52100046743 · Form - B.pdf · uploaded 18 Jul 2022Source
  • Legal Title reportP52100046743 · Ellora_Homemaker_search_compressed-1-11[1].pdf · uploaded 13 Aug 2022Source
  • Legal Title reportP52100046743 · Ellora_Homemaker_search_compressed-12-24[1]_compressed.pdf · uploaded 13 Aug 2022Source
  • Declaration Form BP52100050672 · Form B Phase 6.pdf · uploaded 11 Mar 2023Source
Show all 187 documentsShow fewer documents

Legal

  • Legal Title reportP52100050672 · Search.pdf · uploaded 5 Apr 2023Source
  • Other – LegalP52100050672 · Adobe Scan 12 Apr 2023 (4).pdf · uploaded 21 Apr 2023Source

Migrated

  • 1 PAN CardP52100046743 · Ellora Home Makers-Pancad.PDF · uploaded 2 Jul 2022Source
  • 1 Copy of Layout Approval (in case of layout)P52100046743 · Layout Plan.pdf · uploaded 2 Jul 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentP52100046743 · Plan - B.pdf · uploaded 2 Jul 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentP52100046743 · Plan - B (1).pdf · uploaded 2 Jul 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52100046743 · Commencement Certificate.pdf · uploaded 2 Jul 2022Source
  • 1 Declaration in FORM BP52100046743 · Form - B.pdf · uploaded 18 Jul 2022Source
  • 1 b Details of encumbrances concerned to LegalP52100046743 · Encumberance Certificate - Ellora Homemakers.pdf · uploaded 25 Jul 2022Source
  • 1 Declaration about Commencement CertificateP52100046743 · Declaration Commencement Certificate - Ellora Homemakers.pdf · uploaded 25 Jul 2022Source
  • 1 Copy of the legal title reportP52100046743 · Ellora_Homemaker_search_compressed-1-11[1].pdf · uploaded 13 Aug 2022Source
  • 2 Copy of the legal title reportP52100046743 · Ellora_Homemaker_search_compressed-12-24[1]_compressed.pdf · uploaded 13 Aug 2022Source
  • 1 a Details of encumbrances concerned to FinanceP52100046743 · No Encumbrance to Finance.pdf · uploaded 13 Aug 2022Source
  • 1 CERSAI detailsP52100046743 · CERSAI_Search_Report_200243906018_For_Asset_Based_Search_03_08_2022_16_38_12_684.pdf · uploaded 13 Aug 2022Source
  • 2 CERSAI detailsP52100046743 · CERSAI Undertaking (1).pdf · uploaded 13 Aug 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046743 · FORM 3.pdf · uploaded 13 Aug 2022Source
  • 1 Proforma of Allotment letterP52100046743 · Allotment Letter.pdf · uploaded 13 Aug 2022Source
  • 2 Proforma of Allotment letterP52100046743 · AGREEMENT AS PER RERA ELLORA HOMEMAKER.pdf · uploaded 13 Aug 2022Source
  • 1 Deviation Report with respect to Allotment letterP52100046743 · Dev AL.pdf · uploaded 13 Aug 2022Source
  • 1 Deviation Report with respect to model copy of AgreementP52100046743 · Dev AFS.pdf · uploaded 13 Aug 2022Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100046743 · Bank Declaration About Bank Details 29-08-2022.pdf · uploaded 29 Aug 2022Source
  • 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100046743 · Bank 70 percent 04-10-2022.pdf · uploaded 4 Oct 2022Source
  • 3 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100046743 · Ellora Homemakers.pdf · uploaded 4 Nov 2022Source
  • 1 Proforma of Agreement for saleP52100046743 · ELLORA HOMEMAKERS.pdf · uploaded 29 Nov 2022Source
  • 1 PAN CardP52100050672 · 1 PAN Card.pdf · uploaded 11 Mar 2023Source
  • 1 a Details of encumbrances concerned to FinanceP52100050672 · No Encu Finance.pdf · uploaded 11 Mar 2023Source
  • 2 a Details of encumbrances concerned to FinanceP52100050672 · No Encu Legal.pdf · uploaded 11 Mar 2023Source
  • 1 b Details of encumbrances concerned to LegalP52100050672 · No Encu Finance.pdf · uploaded 11 Mar 2023Source
  • 2 b Details of encumbrances concerned to LegalP52100050672 · No Encu Legal.pdf · uploaded 11 Mar 2023Source
  • 1 Copy of Layout Approval (in case of layout)P52100050672 · Layout.pdf · uploaded 11 Mar 2023Source
  • 2 Copy of Layout Approval (in case of layout)P52100050672 · GetUserDocumentFileContent.pdf · uploaded 11 Mar 2023Source
  • 1 Building Plan Approval / NA Order for plotted developmentP52100050672 · Plan 1_organized.pdf · uploaded 11 Mar 2023Source
  • 2 Building Plan Approval / NA Order for plotted developmentP52100050672 · Plan 2_organized.pdf · uploaded 11 Mar 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52100050672 · C C.pdf · uploaded 11 Mar 2023Source
  • 1 Declaration about Commencement CertificateP52100050672 · C C Decl.pdf · uploaded 11 Mar 2023Source
  • 1 Declaration in FORM BP52100050672 · Form B Phase 6.pdf · uploaded 11 Mar 2023Source
  • 1 CERSAI detailsP52100050672 · Cersai undertaking.pdf · uploaded 11 Mar 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100050672 · Separate Bank Account.pdf · uploaded 11 Mar 2023Source
  • 1 Deviation Report with respect to Allotment letterP52100050672 · No Dev AL.pdf · uploaded 11 Mar 2023Source
  • 1 Deviation Report with respect to model copy of AgreementP52100050672 · No Dev AFS.pdf · uploaded 11 Mar 2023Source
  • 2 Commencement Certificates / NA Order for plotted developmentP52100050672 · N A ORDER_11zon.pdf · uploaded 14 Mar 2023Source
  • 1 Proforma of Allotment letterP52100050672 · Allotment Letter.pdf · uploaded 14 Mar 2023Source
  • 1 Copy of the legal title reportP52100050672 · Search.pdf · uploaded 5 Apr 2023Source
  • 1 Disclosure of sold/ booked inventoryP52100050672 · Directors Disclosure RERA - Homemakers.pdf · uploaded 5 Apr 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsP52100050672 · Directors Disclosure RERA - Homemakers.pdf · uploaded 5 Apr 2023Source
  • 2 Declaration about Commencement CertificateP52100050672 · Adobe Scan 12 Apr 2023 (4).pdf · uploaded 12 Apr 2023Source
  • 1 Proforma of Agreement for saleP52100050672 · Homemekar DRAFT AGREEMENT 21-04-2023.pdf · uploaded 21 Apr 2023Source
  • 1 Other – LegalP52100050672 · Adobe Scan 12 Apr 2023 (4).pdf · uploaded 21 Apr 2023Source
  • 1 Other – TechnicalP52100050672 · Adobe Scan 12 Apr 2023 (4).pdf · uploaded 21 Apr 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100050672 · FORM 3 HM 26-04-2023.pdf · uploaded 26 Apr 2023Source
  • 2 Proforma of Agreement for saleP52100050672 · ELLORA HOMEMAKERS - RERA Agreement.pdf · uploaded 20 May 2023Source
  • 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100050672 · Adobe Scan Apr 19, 2023 (1).pdf · uploaded 3 Jun 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046743 · FORM 1 June 23.PDF · uploaded 29 Jun 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046743 · Form 3 March 2023.pdf · uploaded 2 Sep 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100050672 · FORM 1 June 23.PDF · uploaded 11 Oct 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046743 · Form 2 March 2023.pdf · uploaded 11 Oct 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046743 · Form 2 June 2023.pdf · uploaded 11 Oct 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100050672 · FORM 1 Sept 23.pdf · uploaded 12 Dec 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046743 · FORM 1 Sept 23.pdf · uploaded 12 Dec 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100046743 · Phase 4 - FORM 5 FY 2022-23.pdf · uploaded 12 Dec 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100050672 · FORM 1 Dec 23.pdf · uploaded 19 Feb 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100050672 · FORM 2 DEC 2023_1.pdf · uploaded 19 Feb 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100050672 · FORM 3 DEC 2023_1.pdf · uploaded 19 Feb 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046743 · FORM 1 Dec 23.pdf · uploaded 19 Feb 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046743 · FORM 2 DEC 2023_1.pdf · uploaded 19 Feb 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046743 · FORM 3 DEC 2023_1.pdf · uploaded 19 Feb 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100050672 · FORM 1 March 24.pdf · uploaded 26 Apr 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046743 · FORM 1 March 24.pdf · uploaded 26 Apr 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100050672 · FORM 2 March 2024.pdf · uploaded 13 Jul 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100050672 · FORM 3 March 2024.pdf · uploaded 13 Jul 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046743 · Form 2 March 2024.pdf · uploaded 13 Jul 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046743 · Form 3 March 2024.pdf · uploaded 13 Jul 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100050672 · FORM 1 June 24.pdf · uploaded 25 Jul 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046743 · FORM 1 June 24.pdf · uploaded 25 Jul 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100050672 · FORM 3 June 2024.pdf · uploaded 9 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046743 · Form 3 June 2024.pdf · uploaded 9 Oct 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100050672 · FORM 1 Sept 24.pdf · uploaded 13 Nov 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046743 · FORM 1 Sept 24.pdf · uploaded 13 Nov 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100050672 · FORM 3 Sept 2024.pdf · uploaded 20 Dec 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100050672 · FORM 2 Sept 2024.pdf · uploaded 20 Dec 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046743 · FORM 3 Dec 2024.pdf · uploaded 20 Dec 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046743 · Form 2 Sept 2024.pdf · uploaded 20 Dec 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100050672 · Phase 6 - FORM 5 FY 2023-24.pdf · uploaded 10 Jan 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100046743 · Phase 4 - FORM 5 FY 2023-24.pdf · uploaded 10 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100050672 · FORM 1 DEC 2024.pdf · uploaded 31 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100050672 · FORM 3 DEC 2024.pdf · uploaded 31 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100050672 · FORM 2 DEC 2024.pdf · uploaded 31 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046743 · FORM 1 Dec 24.pdf · uploaded 31 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046743 · FORM 3 DEC 2024.pdf · uploaded 31 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046743 · FORM 2 DEC 2024.pdf · uploaded 31 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100050672 · FORM 1 March 25.pdf · uploaded 30 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046743 · FORM 1 March 25.pdf · uploaded 30 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100050672 · FORM 3 March 2025.pdf · uploaded 3 May 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100050672 · FORM 2 March 2025.pdf · uploaded 3 May 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046743 · Form 3 March 2025.pdf · uploaded 3 May 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046743 · Form 2 March 2025.pdf · uploaded 3 May 2025Source
  • Form 1P52100046743 · FORM 1 March 25.pdf · uploaded 2 Jul 2026Source
  • Form 3P52100046743 · Form 3 March 2025.pdf · uploaded 2 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP52100046743 · Phase - 4 MIS.pdf · uploaded 2 Jul 2026Source
  • Form 2P52100046743 · Form 2 March 2025_11zon.pdf · uploaded 2 Jul 2026Source
  • Form 1P52100046743 · FORM 1 March 24.pdf · uploaded 2 Jul 2026Source
  • Form 3P52100046743 · Form 3 March 2024.pdf · uploaded 2 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP52100046743 · Phase - 4 MIS.pdf · uploaded 2 Jul 2026Source
  • Form 2P52100046743 · Form 2 March 2024_11zon.pdf · uploaded 2 Jul 2026Source
  • Form 1P52100046743 · FORM 1 Dec 24.pdf · uploaded 2 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP52100046743 · Phase - 4 MIS.pdf · uploaded 2 Jul 2026Source
  • Form 2P52100046743 · FORM 2 DEC 2024_11zon.pdf · uploaded 2 Jul 2026Source
  • Form 3P52100046743 · FORM 3 DEC 2024_11zon.pdf · uploaded 2 Jul 2026Source
  • Form 1P52100046743 · FORM 1 Dec 23.pdf · uploaded 2 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP52100046743 · Phase - 4 MIS.pdf · uploaded 2 Jul 2026Source
  • Form 3P52100046743 · FORM 3 DEC 2023_11zon.pdf · uploaded 2 Jul 2026Source
  • Form 2P52100046743 · FORM 2 DEC 2023_11zon.pdf · uploaded 2 Jul 2026Source
  • Form 1P52100046743 · FORM 1 Sept 24.pdf · uploaded 2 Jul 2026Source
  • Form 2P52100046743 · Form 2 Sept 2024.pdf · uploaded 2 Jul 2026Source
  • Form 3P52100046743 · FORM 3 Sept 2024.pdf · uploaded 2 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP52100046743 · Phase - 4 MIS.pdf · uploaded 2 Jul 2026Source
  • Form 1P52100046743 · FORM 1 June 24.pdf · uploaded 4 Aug 2026Source
  • Form 2P52100046743 · Form 2 June 2023.pdf · uploaded 4 Aug 2026Source
  • Form 3P52100046743 · Form 3 June 2024.pdf · uploaded 4 Aug 2026Source
  • Disclosure of Sold and Booked InventoryP52100046743 · Phase - 4 MIS.pdf · uploaded 4 Aug 2026Source
  • Form 1P52100046743 · FORM 1 Sept 23.pdf · uploaded 4 Aug 2026Source
  • Form 2P52100046743 · Form 2 Sept 2024.pdf · uploaded 4 Aug 2026Source
  • Form 3P52100046743 · FORM 3 Sept 2024.pdf · uploaded 4 Aug 2026Source
  • Disclosure of Sold and Booked InventoryP52100046743 · Phase - 4 MIS.pdf · uploaded 4 Aug 2026Source
  • Form 1P52100046743 · FORM 1 June 23.PDF · uploaded 4 Aug 2026Source
  • Form 2P52100046743 · Form 2 June 2023.pdf · uploaded 4 Aug 2026Source
  • Form 3P52100046743 · Form 3 June 2024.pdf · uploaded 4 Aug 2026Source
  • Disclosure of Sold and Booked InventoryP52100046743 · Phase - 4 MIS.pdf · uploaded 4 Aug 2026Source
  • Withdrawal Update Form 1P52100046743 · FORM 1 June 25.pdf · uploaded 4 Aug 2026Source
  • Withdrawal Update Form 1P52100046743 · Declaration.pdf · uploaded 4 Aug 2026Source
  • Withdrawal Update Form 1P52100046743 · Declaration.pdf · uploaded 4 Aug 2026Source
  • Withdrawal Update Form 1P52100046743 · Declaration.pdf · uploaded 4 Aug 2026Source
  • Withdrawal Update Form 1P52100046743 · Declaration.pdf · uploaded 4 Aug 2026Source
  • Withdrawal Update Form 2P52100046743 · Declaration.pdf · uploaded 4 Aug 2026Source
  • Withdrawal Update Form 2P52100046743 · Declaration.pdf · uploaded 4 Aug 2026Source
  • Withdrawal Update Form 2P52100046743 · Declaration.pdf · uploaded 4 Aug 2026Source
  • Withdrawal Update Form 2P52100046743 · Declaration.pdf · uploaded 4 Aug 2026Source
  • Withdrawal Update Form 2P52100046743 · Declaration.pdf · uploaded 4 Aug 2026Source
  • Withdrawal Update Form 3P52100046743 · Declaration.pdf · uploaded 4 Aug 2026Source
  • Withdrawal Update Form 3P52100046743 · Declaration.pdf · uploaded 4 Aug 2026Source
  • Withdrawal Update Form 3P52100046743 · Declaration.pdf · uploaded 4 Aug 2026Source
  • Withdrawal Update Form 3P52100046743 · Declaration.pdf · uploaded 4 Aug 2026Source
  • Withdrawal Update Form 3P52100046743 · Declaration.pdf · uploaded 4 Aug 2026Source
  • Form 2A (FY 2022-2023)P52100046743 · EH-PH4 2022-2023_11zon.pdf · uploaded 4 Aug 2026Source
  • Form 2A (FY 2023-2024)P52100046743 · EH-PH4-2023-2024_11zon.pdf · uploaded 4 Aug 2026Source
  • Form 2A (FY 2024-2025)P52100046743 · EH-PH4-2024-2025_11zon.pdf · uploaded 4 Aug 2026Source
  • Form 2A (FY 2025-2026)P52100046743 · EH-PH4 2025-2026_11zon.pdf · uploaded 4 Aug 2026Source
  • Form 2A (FY 2026-2027)P52100046743 · EH-PH4 2025-2026_11zon.pdf · uploaded 4 Aug 2026Source
  • Form 5 (FY 2022-2023)P52100046743 · Phase 4 - FORM 5 FY 2022-23.pdf · uploaded 4 Aug 2026Source
  • Form 5 (FY 2023-2024)P52100046743 · Phase 4 - FORM 5 FY 2023-24_11zon.pdf · uploaded 4 Aug 2026Source
  • Form 5 (FY 2024-2025)P52100046743 · FORM 5 FY 2024-25 PHASE 4.pdf · uploaded 4 Aug 2026Source
  • Occupational CertificateP52100046743 · Completion Certificate Phase 4.pdf · uploaded 3 Sep 2026Source
  • Occupational CertificateP52100046743 · Declaration For Completion Update Signed.pdf · uploaded 3 Sep 2026Source
  • Occupational CertificateP52100046743 · OC Verification Mail Screenshot.pdf · uploaded 4 Sep 2026Source

Technical

  • DocumentP52100046743 · Layout Plan.pdf · uploaded 2 Jul 2022Source
  • DocumentP52100046743 · Plan - B.pdf · uploaded 2 Jul 2022Source
  • DocumentP52100046743 · Plan - B (1).pdf · uploaded 2 Jul 2022Source
  • DocumentP52100050672 · Layout.pdf · uploaded 11 Mar 2023Source
  • DocumentP52100050672 · GetUserDocumentFileContent.pdf · uploaded 11 Mar 2023Source
  • DocumentP52100050672 · Plan 1_organized.pdf · uploaded 11 Mar 2023Source
  • DocumentP52100050672 · Plan 2_organized.pdf · uploaded 11 Mar 2023Source
  • Other – TechnicalP52100050672 · Adobe Scan 12 Apr 2023 (4).pdf · uploaded 21 Apr 2023Source
  • OthersP52100046743 · Completion Certificate building B.pdf · uploaded 10 Dec 2025Source

Technical (Architect)

  • DocumentP52100050672 · FORM 1 June 24.pdf · uploaded 25 Jul 2024Source
  • DocumentP52100050672 · FORM 1 Sept 24.pdf · uploaded 13 Nov 2024Source
  • DocumentP52100046743 · FORM 1 Sept 24.pdf · uploaded 13 Nov 2024Source
  • DocumentP52100050672 · FORM 1 DEC 2024.pdf · uploaded 31 Jan 2025Source
  • DocumentP52100046743 · FORM 1 Dec 24.pdf · uploaded 31 Jan 2025Source
  • DocumentP52100050672 · FORM 1 March 25.pdf · uploaded 30 Apr 2025Source
  • DocumentP52100046743 · FORM 1 March 25.pdf · uploaded 30 Apr 2025Source
  • DocumentP52100046743 · Declaration.pdf · uploaded 4 Aug 2026Source

Technical (Engineer)

  • DocumentP52100050672 · FORM 2 March 2024.pdf · uploaded 13 Jul 2024Source
  • DocumentP52100050672 · FORM 2 Sept 2024.pdf · uploaded 20 Dec 2024Source
  • DocumentP52100046743 · Form 2 Sept 2024.pdf · uploaded 20 Dec 2024Source
  • DocumentP52100050672 · FORM 2 DEC 2024.pdf · uploaded 31 Jan 2025Source
  • DocumentP52100046743 · FORM 2 DEC 2024.pdf · uploaded 31 Jan 2025Source
  • DocumentP52100050672 · FORM 2 March 2025.pdf · uploaded 3 May 2025Source
  • DocumentP52100046743 · Form 2 March 2025.pdf · uploaded 3 May 2025Source
  • DocumentP52100046743 · Declaration.pdf · uploaded 4 Aug 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel GAT NO. 669, GAT NUMBER 669

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Phases
2
Unit types
2BHK, 3BHK190 units in all
Address
GAT NO. 669, Off Alandi Moshi Road, MoshiPIN 412105
Village
Moshi, Haveli taluka
Land area for this project
870 sq m (9,361 sq ft)
Permissible built-up area
17,960 sq m (1,93,323 sq ft)
Sanctioned built-up area
8,980 sq m (96,662 sq ft)
Recreational open space
4,230 sq m (45,527 sq ft)
Designated bank account
220
Developed in phases
No
Also registered as
Nakshatra i-Land Phase 4, Nakshatra i Land Phase 6

Survey, CTS, gat or plot numbers

GAT NO. 669GAT NUMBER 669

Land as published on MahaRERA's project page

GAT NO. 669

Boundaries

North
Podium
South
Boundary
East
G Building
West
C Building

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking190 units

137 of 190 units booked (72%), as the promoter reported to MahaRERA

2BHK · 142 units3BHK · 48 units
RERABuildingTypeCarpet areaUnitsBooked
P52100046743B Wing2BHK58.19 sq m · 626 sq ft2422
P52100046743B Wing2BHK58.74 sq m · 632 sq ft2418
P52100046743B Wing2BHK60.82 sq m · 655 sq ft2321
P52100046743B Wing3BHK68.42 sq m · 736 sq ft2423
P52100050672Wing F2BHK58.59 sq m · 631 sq ft2315
P52100050672Wing F2BHK60.22 sq m · 648 sq ft4819
P52100050672Wing F3BHK69.25 sq m · 745 sq ft2419

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals17

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.RERA
ArchitectAr Vikas Achalkar—P52100046743
ArchitectAr Vikas Achalkar—P52100050672
Chartered accountantH M Shah And Associates—P52100050672
Chartered accountantHM Shah & Associates—P52100046743
Chartered accountantShah Vora Tiwari And Associates—P52100050672
EngineerJ W Consultant—P52100050672
EngineerJW Consultants LLP—P52100046743
OtherArunkumae Associates—P52100046743
Show all 17 professionalsShow fewer professionals
RoleNameRegistration no.RERA
OtherGayatri Construction—P52100046743
OtherIdeal Electrical—P52100046743
OtherMukesh—P52100046743
OtherNirmal Nayak—P52100046743
OtherShreenath Enterprises—P52100046743
OtherS R Buildtech—P52100046743
OtherUrjal Consultants Pvt Ltd—P52100046743
OtherWTE Infra Projects Pvt Ltd—P52100046743
OtherZopate Electrical Consultants Pvt Ltd—P52100046743

Source: MahaRERA project page. Contact details are not shown.

Other projects in Moshi

All 1,458 projects in Moshi · Compare Nakshatra i Land with another project

Nakshatra i Land in numbers

Registered deals, summarised

Deedo has 508 registered documents at Nakshatra i Land, from Feb 2015 to Sep 2026: 202 sales, 38 leave and licence agreements, 268 mortgages. The median registered sale since Feb 2015 works out to about ₹6,900 per sq ft, at a median of ₹45 L a deal; 5% of sales were resales.

What is the price per sq ft at Nakshatra i Land?
The median registered sale since Feb 2015 works out to about ₹6,900 per sq ft, at a median of ₹45 L a deal; 5% of sales were resales.
How many properties have been sold at Nakshatra i Land?
202 sales are registered at Nakshatra i Land, 10 of them resales.
Are properties at Nakshatra i Land rented out?
Yes: 38 leave and licence agreements are registered at Nakshatra i Land, at a median rent since Feb 2015 of about ₹16,000 a month with a deposit of about ₹30,000.
Where does this data come from?
The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Nakshatra i Land by Deedo, last updated with deals registered in Sep 2026.

Latest deal · Resale · Sep 2026

₹25–50 L

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · registered documents (Index II)Data through is when MahaRERA's project page was last read.Report a problemMethodology