Deedo IDDP-PUN-6G6DIt is due for completion in Dec 2028, with no extension on record; no MahaRERA orders on record.
Moshi, Pune 412105 · Property rates in Moshi · by Prarambh Buildcon
Buying a flat here?
See every deed registered on it.
It is due for completion in Dec 2028, with no extension on record
- This projectRegistered 27 Jun 2023, completion promised 31 Dec 2028.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
- Primary sale · Oct 2026
- Primary sale · Sep 2026
- Primary sale · Aug 2026
- Primary sale · Aug 2026
- Primary sale · Jun 2026
- Primary sale · Jun 2026
- Primary sale · Jun 2026
- Primary sale · Jun 2026
- Primary sale · Jun 2026
- Primary sale · May 2026
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Oct 2026 | Matoshri Serenity · 1401 | Primary sale | 642 sq ft | View Primary sale, Oct 2026 | |
| Sep 2026 | Matoshri Serenity · 1003 | Primary sale | 403 sq ft | View Primary sale, Sep 2026 | |
| Aug 2026 | Matoshri Serenity · 1410 | Primary sale | 642 sq ft | View Primary sale, Aug 2026 | |
| Aug 2026 | Matoshri Serenity · 1105 | Primary sale | 594 sq ft | View Primary sale, Aug 2026 | |
| Jun 2026 | Matoshri Serenity · 1311 | Primary sale | 594 sq ft | View Primary sale, Jun 2026 | |
| Jun 2026 | Matoshri Serenity · 306 | Primary sale | 594 sq ft | View Primary sale, Jun 2026 | |
| Jun 2026 | Matoshri Serenity · 1303 | Primary sale | 403 sq ft | View Primary sale, Jun 2026 | |
| Jun 2026 | Matoshri Serenity · 1309 | Primary sale | 403 sq ft | View Primary sale, Jun 2026 | |
| Jun 2026 | Matoshri Serenity · 1306 | Primary sale | 594 sq ft | View Primary sale, Jun 2026 | |
| May 2026 | Matoshri Serenity · 1002 | Primary sale | 403 sq ft | View Primary sale, May 2026 |
2 buildings
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100051731
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100051731 | 27 Jun 2023 | 31 Dec 2028 | 31 Dec 2028 | Prarambh Buildcon | Project page |
Documents194
1 document held by Deedo, 193 filings listed on MahaRERA's project page
Finance
- PAN CardPrarambh Buildcon Pan Card.pdf · uploaded 30 May 2023Source
Legal
- Legal Title reportTitle Report_1 (3 files merged).pdf · uploaded 30 May 2023Source
- Declaration Form BFrom B-Developers.pdf · uploaded 2 Jun 2023Source
- Other – LegalDA Ashok Jambholkar.pdf · uploaded 9 Jun 2023Source
- Other – LegalDA Ganesh Jambhulkar-1-22.pdf · uploaded 9 Jun 2023Source
- Other – LegalDA Ganesh Jambhulkar-23-45.pdf · uploaded 9 Jun 2023Source
- Other – LegalDA Pratap Jamhulkar.pdf · uploaded 9 Jun 2023Source
Show all 194 documentsShow fewer documents
Legal
Migrated
- 1 PAN CardPrarambh Buildcon Pan Card.pdf · uploaded 30 May 2023Source
- 1 Copy of the legal title reportTitle Report_1 (3 files merged).pdf · uploaded 30 May 2023Source
- 1 a Details of encumbrances concerned to FinanceWhomsoerver it may c.pdf · uploaded 30 May 2023Source
- 2 a Details of encumbrances concerned to FinanceEncumbrance concerned.pdf · uploaded 30 May 2023Source
- 1 b Details of encumbrances concerned to LegalWhomsoerver it may c.pdf · uploaded 30 May 2023Source
- 2 b Details of encumbrances concerned to LegalEncumbrance concerned.pdf · uploaded 30 May 2023Source
- 1 Copy of Layout Approval (in case of layout)1 (1).pdf · uploaded 30 May 2023Source
- 2 Copy of Layout Approval (in case of layout)2.pdf · uploaded 30 May 2023Source
- 3 Copy of Layout Approval (in case of layout)3.pdf · uploaded 30 May 2023Source
- 1 Building Plan Approval / NA Order for plotted development1 (1).pdf · uploaded 30 May 2023Source
- 2 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 30 May 2023Source
- 3 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 30 May 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 30 May 2023Source
- 1 Declaration about Commencement CertificateDeclaration about c c.pdf · uploaded 30 May 2023Source
- 1 Proforma of Allotment letterModel from allotment letter (1).pdf · uploaded 30 May 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeparate Bank Account Declaration.pdf · uploaded 30 May 2023Source
- 1 Deviation Report with respect to Allotment letterDetails of deviation of allotment letter.pdf · uploaded 30 May 2023Source
- 1 Deviation Report with respect to model copy of AgreementTo whomsoever it may concern.pdf · uploaded 30 May 2023Source
- 1 Declaration in FORM BFrom B-Developers.pdf · uploaded 2 Jun 2023Source
- 1 CERSAI detailsCERSAI Report.pdf · uploaded 2 Jun 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_Prarambh Buildcon_Initial.pdf · uploaded 2 Jun 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in Other Real Estate Organizations.pdf · uploaded 2 Jun 2023Source
- 1 Proforma of Agreement for saleAFS.pdf · uploaded 2 Jun 2023Source
- 1 Other – LegalDA Ashok Jambholkar.pdf · uploaded 9 Jun 2023Source
- 2 Other – LegalDA Ganesh Jambhulkar-1-22.pdf · uploaded 9 Jun 2023Source
- 3 Other – LegalDA Ganesh Jambhulkar-23-45.pdf · uploaded 9 Jun 2023Source
- 4 Other – LegalDA Pratap Jamhulkar.pdf · uploaded 9 Jun 2023Source
- 5 Other – LegalDA Rajesh Jambulkar.pdf · uploaded 9 Jun 2023Source
- 6 Other – LegalDA Sanjjay Jambhulkar-1-27.pdf · uploaded 9 Jun 2023Source
- 7 Other – LegalDA Sanjjay Jambhulkar-28-54.pdf · uploaded 9 Jun 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)architects certificate Q 2.pdf · uploaded 5 Feb 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 Q-2_compressed.pdf · uploaded 5 Feb 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects certificate Q3.pdf · uploaded 7 Feb 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 Q2.pdf · uploaded 7 Feb 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Q3.pdf · uploaded 7 Feb 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Ca Certificate Q3_compressed (1).pdf · uploaded 7 Feb 2024Source
- 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBank Account Chenge.pdf · uploaded 7 Feb 2024Source
- 4 Copy of Layout Approval (in case of layout)plan sanction ground and basement.pdf · uploaded 24 Feb 2024Source
- 5 Copy of Layout Approval (in case of layout)HPSC0051_first flor.pdf · uploaded 24 Feb 2024Source
- 6 Copy of Layout Approval (in case of layout)HPSC0052_2 to fifth.pdf · uploaded 24 Feb 2024Source
- 7 Copy of Layout Approval (in case of layout)HPSC0053_6th floor.pdf · uploaded 24 Feb 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentHPSC0051_first flor.pdf · uploaded 24 Feb 2024Source
- 5 Building Plan Approval / NA Order for plotted developmentHPSC0052_2 to fifth.pdf · uploaded 24 Feb 2024Source
- 6 Building Plan Approval / NA Order for plotted developmentHPSC0053_6th floor.pdf · uploaded 24 Feb 2024Source
- 7 Building Plan Approval / NA Order for plotted developmentplan sanction ground and basement.pdf · uploaded 24 Feb 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentSsekar23120212350_ construction commencement.pdf · uploaded 24 Feb 2024Source
- 1 Disclosure of sold/ booked inventorycertificate-3.pdf · uploaded 24 Feb 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Q4.pdf · uploaded 19 Apr 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER Q4.pdf · uploaded 19 Apr 2024Source
- 2 Disclosure of sold/ booked inventorySOLD UNSOLD Q4.pdf · uploaded 19 Apr 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Q4_compressed.pdf · uploaded 19 Apr 2024Source
- 3 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same4 Project Information (1).pdf · uploaded 19 Apr 2024Source
- 8 Copy of Layout Approval (in case of layout)HPSC0049.pdf · uploaded 20 Apr 2024Source
- 9 Copy of Layout Approval (in case of layout)HPSC0049.pdf · uploaded 3 May 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A-Prarambh 22-23.pdf · uploaded 3 May 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A- Prarambh.pdf · uploaded 3 May 2024Source
- 4 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same3 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same.pdf · uploaded 3 May 2024Source
- 3 Disclosure of sold/ booked inventorySold Unsold - Prarambh.pdf · uploaded 24 May 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Sept 2023.pdf · uploaded 31 May 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- June 2023.pdf · uploaded 31 May 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)2 Architect’s Certificate of Percentage of Completion of Work (Form 1) (3).pdf · uploaded 31 May 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)3 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 31 May 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- June 2023.pdf · uploaded 31 May 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Sept 2023.pdf · uploaded 31 May 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 31 May 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)3 Engineer’s Certificate on Cost Incurred on Project (Form 2) (1).pdf · uploaded 31 May 2024Source
- 4 Disclosure of sold/ booked inventorySold Unsold-Prarambh Sept 2023.pdf · uploaded 31 May 2024Source
- 5 Disclosure of sold/ booked inventorySold Unsold - Prarambh Dec 2023.pdf · uploaded 31 May 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM-5 MATOSHRI.pdf · uploaded 7 Jun 2024Source
- 3 Commencement Certificates / NA Order for plotted developmentCC (2).pdf · uploaded 11 Jun 2024Source
- 1 Other – TechnicalCC (2).pdf · uploaded 11 Jun 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Prarambh Architect Certificate.pdf · uploaded 6 Jul 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2.pdf · uploaded 6 Jul 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)quality assurance certificate.pdf · uploaded 6 Jul 2024Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)quality assurance certificate.pdf · uploaded 6 Jul 2024Source
- 6 Disclosure of sold/ booked inventorysold-unsold.pdf · uploaded 6 Jul 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate.pdf · uploaded 6 Jul 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1.pdf · uploaded 21 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3.pdf · uploaded 21 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-2.pdf · uploaded 21 Oct 2024Source
- 1 Disclosure of sold/ booked inventorySOLD-UNSOLD.pdf · uploaded 21 Oct 2024Source
- 2 Copy of Layout Approval (in case of layout)2.pdf · uploaded 13 Nov 2024Source
- 3 Copy of Layout Approval (in case of layout)3.pdf · uploaded 13 Nov 2024Source
- 4 Copy of Layout Approval (in case of layout)4.pdf · uploaded 13 Nov 2024Source
- 5 Copy of Layout Approval (in case of layout)5.pdf · uploaded 13 Nov 2024Source
- 6 Copy of Layout Approval (in case of layout)5.pdf · uploaded 13 Nov 2024Source
- 7 Copy of Layout Approval (in case of layout)5.pdf · uploaded 13 Nov 2024Source
- 1 Copy of Layout Approval (in case of layout)1.pdf · uploaded 13 Nov 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentREVISED COMMENCEMENT.pdf · uploaded 13 Nov 2024Source
- 1 Building Plan Approval / NA Order for plotted development1.pdf · uploaded 13 Nov 2024Source
- 2 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 13 Nov 2024Source
- 3 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 13 Nov 2024Source
- 4 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 13 Nov 2024Source
- 5 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 13 Nov 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3_compressed.pdf · uploaded 23 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1.pdf · uploaded 15 Mar 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3_compressed.pdf · uploaded 15 Mar 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3_compressed (1).pdf · uploaded 15 Mar 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2.pdf · uploaded 15 Mar 2025Source
- 1 Disclosure of sold/ booked inventorySOLD-UNSOLD Dec-24.pdf · uploaded 15 Mar 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3_compressed.pdf · uploaded 21 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1.pdf · uploaded 20 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3-FINAL.pdf · uploaded 20 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2-FINAL.pdf · uploaded 20 Apr 2025Source
- 1 Disclosure of sold/ booked inventorySU.pdf · uploaded 20 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3.pdf · uploaded 22 Apr 2025Source
- Form 1F1.pdf · uploaded 2 Aug 2025Source
- Form 1F1.pdf · uploaded 2 Aug 2025Source
- Form 1F1.pdf · uploaded 2 Aug 2025Source
- Form 1F1-FINAL.pdf · uploaded 2 Aug 2025Source
- Form 1Prarambh Architect Certificate.pdf · uploaded 2 Aug 2025Source
- Form 1Architects Q4.pdf · uploaded 2 Aug 2025Source
- Form 2from 2.pdf · uploaded 2 Aug 2025Source
- Form 2F2-FINAL.pdf · uploaded 2 Aug 2025Source
- Form 2F2.pdf · uploaded 2 Aug 2025Source
- Form 2F2-FINAL.pdf · uploaded 2 Aug 2025Source
- Form 2F2.pdf · uploaded 2 Aug 2025Source
- Form 2ENGINEER Q4.pdf · uploaded 2 Aug 2025Source
- Form 3FORM-3_compressed.pdf · uploaded 2 Aug 2025Source
- Form 3F3-FINAL.pdf · uploaded 2 Aug 2025Source
- Form 3F3.pdf · uploaded 2 Aug 2025Source
- Form 3F3-FINAL.pdf · uploaded 2 Aug 2025Source
- Form 3CA Certificate.pdf · uploaded 2 Aug 2025Source
- Form 3CA Q4_compressed.pdf · uploaded 2 Aug 2025Source
- Disclosure of Sold and Booked InventorySU.pdf · uploaded 2 Aug 2025Source
- Disclosure of Sold and Booked InventorySU.pdf · uploaded 2 Aug 2025Source
- Disclosure of Sold and Booked InventorySOLD-UNSOLD Dec-24.pdf · uploaded 2 Aug 2025Source
- Disclosure of Sold and Booked InventorySOLD-UNSOLD.pdf · uploaded 2 Aug 2025Source
- Disclosure of Sold and Booked Inventorysold-unsold.pdf · uploaded 2 Aug 2025Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD Q4.pdf · uploaded 2 Aug 2025Source
- Form 1F1-FINAL.pdf · uploaded 6 Nov 2025Source
- Form 2F2-FINAL.pdf · uploaded 6 Nov 2025Source
- Form 3F3-FINAL.pdf · uploaded 6 Nov 2025Source
- Disclosure of Sold and Booked InventorySOLD-UNSOLD.pdf · uploaded 6 Nov 2025Source
- Withdrawal Update Form 1F1-Q3.pdf · uploaded 21 Jan 2026Source
- Withdrawal Update Form 2F2-Q3.pdf · uploaded 21 Jan 2026Source
- Withdrawal Update Form 3F3-Q3.pdf · uploaded 21 Jan 2026Source
- Withdrawal Update Form 1F1-Q3.pdf · uploaded 13 May 2026Source
- Withdrawal Update Form 2F2-Q3.pdf · uploaded 13 May 2026Source
- Withdrawal Update Form 3F1-Q3_compressed.pdf · uploaded 13 May 2026Source
- Withdrawal Update Form 1F1-Q4.pdf · uploaded 22 May 2026Source
- Withdrawal Update Form 2F2-Q4.pdf · uploaded 22 May 2026Source
- Withdrawal Update Form 3F3-Q4.pdf · uploaded 22 May 2026Source
- Withdrawal Update Form 1Form 1 Prarambh.pdf · uploaded 28 Aug 2026Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 28 Aug 2026Source
- Withdrawal Update Form 3Signed Form 3- Prarambh.pdf · uploaded 28 Aug 2026Source
Technical
- Document2.pdf · uploaded 30 May 2023Source
- Document3.pdf · uploaded 30 May 2023Source
- Document1 (1).pdf · uploaded 30 May 2023Source
- Document2.pdf · uploaded 30 May 2023Source
- Document3.pdf · uploaded 30 May 2023Source
- Document1 (1).pdf · uploaded 30 May 2023Source
- Documentplan sanction ground and basement.pdf · uploaded 24 Feb 2024Source
- DocumentHPSC0051_first flor.pdf · uploaded 24 Feb 2024Source
- DocumentHPSC0052_2 to fifth.pdf · uploaded 24 Feb 2024Source
- DocumentHPSC0053_6th floor.pdf · uploaded 24 Feb 2024Source
- DocumentHPSC0051_first flor.pdf · uploaded 24 Feb 2024Source
- DocumentHPSC0052_2 to fifth.pdf · uploaded 24 Feb 2024Source
- DocumentHPSC0053_6th floor.pdf · uploaded 24 Feb 2024Source
- Documentplan sanction ground and basement.pdf · uploaded 24 Feb 2024Source
- DocumentHPSC0049.pdf · uploaded 20 Apr 2024Source
- DocumentHPSC0049.pdf · uploaded 3 May 2024Source
- Other – TechnicalCC (2).pdf · uploaded 11 Jun 2024Source
- Document1.pdf · uploaded 13 Nov 2024Source
- Document2.pdf · uploaded 13 Nov 2024Source
- Document3.pdf · uploaded 13 Nov 2024Source
- Document4.pdf · uploaded 13 Nov 2024Source
- Document5.pdf · uploaded 13 Nov 2024Source
- Document5.pdf · uploaded 13 Nov 2024Source
- Document5.pdf · uploaded 13 Nov 2024Source
- Document1.pdf · uploaded 13 Nov 2024Source
- Document2.pdf · uploaded 13 Nov 2024Source
- Document3.pdf · uploaded 13 Nov 2024Source
- Document4.pdf · uploaded 13 Nov 2024Source
- Document5.pdf · uploaded 13 Nov 2024Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 330, 331
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK, Shop134 units in all
- Address
- Gut No 329, 330, 331, Kudale Vasti, Near Arena City Sport Club, Near Y Junction of Chaudhary Dhaba, Moshi, Pune Maharashtra 412105, Near Arena City Sport Club, Near Y Junction of Chaudhary DhabaPIN 412105
- Village
- Moshi, Haveli taluka
- Land area for this project
- 2,900 sq m (31,215 sq ft)
- Permissible built-up area
- 5,098 sq m (54,876 sq ft)
- Sanctioned built-up area
- 5,098 sq m (54,876 sq ft)
- Recreational open space
- 0 sq m (0 sq ft)
- Designated bank account
- 51
- Developed in phases
- No
- Also registered as
- Matoshri Sereniti, मातोश्री सेरेनीटी
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
Gut No 329, 330, 331, Kudale Vasti, Near Arena City Sport Club, Near Y Junction of Chaudhary Dhaba, Moshi, Pune Maharashtra 412105
Boundaries
- North
- Existing 18 Meter Wide DP Road
- South
- 6 Meter wide Driveway
- East
- 6 Meter Wide Fire Driveway
- West
- 6 Meter Wide Fire Driveway
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking134 units
78 of 134 units booked (58%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 41.11 sq m · 443 sq ft | 40 | 27 |
| 2BHK | 61.6 sq m · 663 sq ft | 45 | 21 |
| 2BHK | 63.43 sq m · 683 sq ft | 30 | 23 |
| 2BHK | 63.69 sq m · 686 sq ft | 11 | 7 |
| Shop | 36.45 sq m · 392 sq ft | 1 | 0 |
| Shop | 42.37 sq m · 456 sq ft | 1 | 0 |
| Shop | 43.27 sq m · 466 sq ft | 1 | 0 |
| Shop | 48.13 sq m · 518 sq ft | 2 | 0 |
Show all 11 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Shop | 50.86 sq m · 547 sq ft | 1 | 0 |
| Shop | 70.74 sq m · 761 sq ft | 1 | 0 |
| Shop | 72.24 sq m · 778 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals4
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Ar. Yogesh Wakchaure | — |
| Chartered accountant | CA Pravin Pise and Associates | — |
| Engineer | R.K.Randhave Consultant | — |
| Engineer | Shivaji Kadam | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Moshi
- Elite VistaRERA PM1260002602696
- Mangalam MyraRERA PM1260002602294
- Lambodar HeightsRERA PR1260002601972
- Evexia ExoticaRERA PR1260002601708
- Mangalam MomentoRERA PR1260002601445
- Shashwat Sai RatnaRERA PM1260002601060
- Shankeshwar Tatva₹6,830 a sq ft
- Rachana PrivanaRERA PM1260002600617
All 1,458 projects in Moshi · Compare Matoshri Serenity with another project
Matoshri Serenity in numbers
Registered deals, summarised
Deedo has 188 registered documents at Matoshri Serenity, from Dec 2023 to Oct 2026: 133 sales, 53 mortgages. The median registered sale since Dec 2023 works out to about ₹6,000 per sq ft, at a median of ₹36 L a deal; 0% of sales were resales.
- What is the price per sq ft at Matoshri Serenity?
- The median registered sale since Dec 2023 works out to about ₹6,000 per sq ft, at a median of ₹36 L a deal; 0% of sales were resales.
- How many properties have been sold at Matoshri Serenity?
- 133 sales are registered at Matoshri Serenity.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Matoshri Serenity by Deedo, last updated with deals registered in Oct 2026.
Latest deal · Primary sale · Oct 2026