Residential / Group Housing · 3 buildings · 70 unitsRERA P52100031927

Kshitij Park

Deedo IDDP-PUN-5V23

Its promised completion date, Apr 2024, has passed and MahaRERA does not show it completed; no MahaRERA orders on record.

Moshi, Pune 412105 · Property rates in Moshi · by Pancham Group Of Construction

Delivery2 yrs 7 mo past duePromised Apr 2024 · no extension on record · not shown completedRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readPrice₹6,440 /sq ft6.2% below Moshi · 24 registered sales

Buying a flat here?

See every deed registered on it.

Its promised completion date, Apr 2024, has passed and MahaRERA does not show it completed

  • This projectRegistered 22 Nov 2021, completion promised 22 Apr 2024, and still not shown completed today.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

All 40 deeds →
Latest registered deeds in this project
MonthFlatKindAreaPriceRecord
Aug 2026Unit 303Resale571 sq ftView Resale, Aug 2026
Nov 2024Unit 501Primary sale524 sq ftView Primary sale, Nov 2024
Jan 2024Main building · 105Primary sale365 sq ftView Primary sale, Jan 2024
Mar 2023Main building · 101Primary sale524 sq ftView Primary sale, Mar 2023
Jan 2023Main building · 503Primary sale366 sq ftView Primary sale, Jan 2023
Jan 2023Main building · 501Primary sale524 sq ftView Primary sale, Jan 2023
Dec 2022Main building · 502Primary sale524 sq ftView Primary sale, Dec 2022
Dec 2022Main building · 604Primary sale365 sq ftView Primary sale, Dec 2022
Sep 2022Main building · 402Primary sale524 sq ftView Primary sale, Sep 2022
Sep 2022Main building · 602Primary sale524 sq ftView Primary sale, Sep 2022

3 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100031927
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210003192722 Nov 202122 Apr 202422 Apr 2024Pancham Group Of ConstructionProject page
Documents188

1 document held by Deedo, 187 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPancham pan card.pdf · uploaded 1 Nov 2021Source

Legal

  • Legal Title reportFormat A.pdf · uploaded 1 Nov 2021Source
  • Legal Title reportSearch and Title Report_compressed-1-5.pdf · uploaded 1 Nov 2021Source
  • Legal Title reportSearch and Title Report_compressed-6-10.pdf · uploaded 1 Nov 2021Source
  • Declaration Form Bform B promoter_compressed.pdf · uploaded 1 Nov 2021Source

Migrated

  • 1 PAN CardPancham pan card.pdf · uploaded 1 Nov 2021Source
  • 1 Copy of the legal title reportFormat A.pdf · uploaded 1 Nov 2021Source
Show all 188 documentsShow fewer documents

Migrated

  • 2 Copy of the legal title reportSearch and Title Report_compressed-1-5.pdf · uploaded 1 Nov 2021Source
  • 3 Copy of the legal title reportSearch and Title Report_compressed-6-10.pdf · uploaded 1 Nov 2021Source
  • 1 Details of encumbrancesEncumbarance.pdf · uploaded 1 Nov 2021Source
  • 1 Copy of Layout Approval (in case of layout)Layout Plan.pdf · uploaded 1 Nov 2021Source
  • 1 Building Plan Approval / NA Order for plotted developmentkadam issue copy 02.pdf · uploaded 1 Nov 2021Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Cert_compressed.pdf · uploaded 1 Nov 2021Source
  • 1 Declaration about Commencement CertificateFormat D.pdf · uploaded 1 Nov 2021Source
  • 1 Declaration in FORM Bform B promoter_compressed.pdf · uploaded 1 Nov 2021Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate_compressed.pdf · uploaded 1 Nov 2021Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Kshitij Park_compressed.pdf · uploaded 1 Nov 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A.pdf · uploaded 1 Nov 2021Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 RERA Certification-1_compressed.pdf · uploaded 1 Nov 2021Source
  • 1 Proforma of Allotment letterAllotment letter.pdf · uploaded 1 Nov 2021Source
  • 2 Proforma of Allotment letterAgreement For Sale - Pancham onstructions.pdf · uploaded 1 Nov 2021Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 25 Mar 2022Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Kshitij.pdf · uploaded 25 Mar 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A.pdf · uploaded 25 Mar 2022Source
  • 1 Disclosure of sold/ booked inventorySold unsold (2).pdf · uploaded 25 Mar 2022Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Rera - Pancham Q3_compressed.pdf · uploaded 25 Mar 2022Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects certificate 21 jun 2022_compressed.pdf · uploaded 27 Jun 2022Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Revise Form 2- Kshitij Park_compressed.pdf · uploaded 27 Jun 2022Source
  • 2 Disclosure of sold/ booked inventorySold Unsold data.pdf · uploaded 27 Jun 2022Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Rera Form 3 Q1 Pancham Group of Construction_compressed.pdf · uploaded 27 Jun 2022Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 30 Sep 2022Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_compressed.pdf · uploaded 30 Sep 2022Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 New Rera Certificate Sept 22 (1).pdf · uploaded 30 Sep 2022Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed.pdf · uploaded 8 Oct 2022Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech Certificate _compressed_organized_compressed-compressed (1).pdf · uploaded 23 Dec 2022Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2- kshitij park.pdf · uploaded 23 Dec 2022Source
  • 3 Disclosure of sold/ booked inventoryRERA DEC 22 (1).pdf · uploaded 23 Dec 2022Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Pancham Group of Constructions Rera Form 3 Dec 2022 (1)_compressed (1).pdf · uploaded 23 Dec 2022Source
  • 4 Disclosure of sold/ booked inventorysold unsold.pdf · uploaded 17 Mar 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect's Certificate.pdf · uploaded 23 Mar 2023Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)kshitij park_compressed.pdf · uploaded 23 Mar 2023Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate March updat.pdf · uploaded 27 Mar 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 F Y 21-22 Divya.pdf · uploaded 26 May 2023Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Ms KISHOR BORKAR.pdf · uploaded 26 May 2023Source
  • 5 Disclosure of sold/ booked inventoryKshitij Park - Sold Unsold (June 2023).pdf · uploaded 15 Jun 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 15 Jun 2023 8-15 pm.pdf · uploaded 16 Jun 2023Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Kshitij f2.pdf · uploaded 22 Jun 2023Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Kshitij Park form 3 June 2023 (1)_compressed.pdf · uploaded 26 Jun 2023Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Kshitij Parj f1.pdf · uploaded 20 Sep 2023Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)kshitij September 23 (1).pdf · uploaded 20 Sep 2023Source
  • 6 Disclosure of sold/ booked inventoryRERA UPDATE Q3 2023.pdf · uploaded 20 Sep 2023Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate for Kshitij park sep 23_11zon.pdf · uploaded 22 Sep 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Kshitij Park F5.pdf · uploaded 19 Oct 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A.pdf · uploaded 26 Oct 2023Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Adobe Scan 17-Dec-2023.pdf · uploaded 18 Dec 2023Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Emailing Rera Form Dec 23 Pancham Grouppdf_231217_101202.pdf · uploaded 18 Dec 2023Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 8 Jan 2024Source
  • 7 Disclosure of sold/ booked inventorySold unsoldRERA UPDATE Q3 2023 (1).pdf · uploaded 10 Jan 2024Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate kshitij park .pdf · uploaded 15 Mar 2024Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer certificate Compressed.pdf · uploaded 15 Mar 2024Source
  • 8 Disclosure of sold/ booked inventorySold Unsold.pdf · uploaded 15 Mar 2024Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)kshitij park CA certificate .pdf · uploaded 18 Mar 2024Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Kshitij park.pdf · uploaded 26 Jun 2024Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer certificate Kshitij park .pdf · uploaded 26 Jun 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)kshitij park Form 2A.pdf · uploaded 26 Jun 2024Source
  • 9 Disclosure of sold/ booked inventorySold unSold Kshitij park_organized.pdf · uploaded 26 Jun 2024Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Form 33.pdf · uploaded 26 Jun 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Audit Form 5 Rera - Pancham.pdf · uploaded 29 Jun 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate Kshitij park_compressed.pdf · uploaded 19 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)From 3 CA Certificate.pdf · uploaded 19 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Eng certificate Kshitij park Oct 24_11zon.pdf · uploaded 19 Oct 2024Source
  • 1 Disclosure of sold/ booked inventorysold unsold Kshitij park.pdf · uploaded 19 Oct 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate kshitij Park 18-12-2024_0001_0001.pdf · uploaded 27 Dec 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Dec 24 Form 3 Pancham_scanned.pdf · uploaded 27 Dec 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)kshitij park 2024Dec.pdf · uploaded 27 Dec 2024Source
  • 2 Disclosure of sold/ booked inventorySold unsold Khitij park 18-12-2024_0001_0001.pdf · uploaded 27 Dec 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate Kshitij park 20-3-2025__0001.pdf · uploaded 31 Mar 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Mar 24 Form 3 Pancham_scanned.pdf · uploaded 31 Mar 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Kshitij park.pdf · uploaded 31 Mar 2025Source
  • 1 Disclosure of sold/ booked inventorySold unsold Kshitij park 20-3-2025.pdf · uploaded 31 Mar 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)6 Architect’s Certificate of March 2023.pdf · uploaded 13 May 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)5 Architect’s Certificate of Dec 2022.pdf · uploaded 13 May 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)4 Architect’s Certificate of Sep 2022.pdf · uploaded 13 May 2025Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)3 Architect’s Certificate ofJune 2022.pdf · uploaded 13 May 2025Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)2 Architect’s Certificate of March 2022.pdf · uploaded 13 May 2025Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)1 Architect’s Certificate of PSep 2021.pdf · uploaded 13 May 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)9 Architect’s Certificate of Sep 2023.pdf · uploaded 13 May 2025Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)1 CA Certificate Sep 2021.pdf · uploaded 13 May 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)2 CA Certificate march 2022.pdf · uploaded 13 May 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)4 CA Certificate June 2022.pdf · uploaded 13 May 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)6 CA Certificate Dec 2022.pdf · uploaded 13 May 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)7 Architect’s Certificate of June 2023.pdf · uploaded 13 May 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)9 Engineer’s Certificate Des 2023.pdf · uploaded 13 May 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)8 Engineer’s Certificate Sep 2023.pdf · uploaded 13 May 2025Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)7 Engineer’s Certificate June 2023.pdf · uploaded 13 May 2025Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)6 Engineer’s Certificate March 2023.pdf · uploaded 13 May 2025Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)5 Engineer’s Certificate Dec 2022.pdf · uploaded 13 May 2025Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)4 Engineer’s Certificate Sep 2022.pdf · uploaded 13 May 2025Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)3 Engineer’s Certificate June 2022.pdf · uploaded 13 May 2025Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 Engineer’s Certificate March 2022.pdf · uploaded 13 May 2025Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)1 Engineer’s Certificate Sep 2021.pdf · uploaded 13 May 2025Source
  • Form 119 March 2022 Form 1.pdf · uploaded 15 Jun 2025Source
  • Form 221 March 2022 Form 2.pdf · uploaded 15 Jun 2025Source
  • Form 323 March 2022 Form 3.pdf · uploaded 15 Jun 2025Source
  • Disclosure of Sold and Booked Inventory17 March 2022 Sold Unsold.pdf · uploaded 15 Jun 2025Source
  • Self-declaration of Quarterly ProgressJanuary - March 2022 Declaration.pdf · uploaded 15 Jun 2025Source
  • Form 121 June 2022 Form 1.pdf · uploaded 15 Jun 2025Source
  • Form 223 June 2022 Form 2.pdf · uploaded 15 Jun 2025Source
  • Form 325 June 2022 Form 3.pdf · uploaded 15 Jun 2025Source
  • Disclosure of Sold and Booked Inventory20 June 2022 Sold Unsold.pdf · uploaded 15 Jun 2025Source
  • Self-declaration of Quarterly ProgressApril - June 2022 Declaration.pdf · uploaded 15 Jun 2025Source
  • Form 18 December 2022 Form 1.pdf · uploaded 15 Jun 2025Source
  • Form 212 December 2022 Form 2.pdf · uploaded 15 Jun 2025Source
  • Form 322 December 2022 Form 3.pdf · uploaded 15 Jun 2025Source
  • Disclosure of Sold and Booked Inventory12 December 2022 Sold Unsold.pdf · uploaded 15 Jun 2025Source
  • Self-declaration of Quarterly ProgressOctober - December 2022.pdf · uploaded 15 Jun 2025Source
  • Form 116 June 2023 Form 1.pdf · uploaded 15 Jun 2025Source
  • Form 217 June 2023 Form 2.pdf · uploaded 15 Jun 2025Source
  • Form 324 June 2023 Form 3.pdf · uploaded 15 Jun 2025Source
  • Disclosure of Sold and Booked Inventory15 June 2023 Sold Unsold.pdf · uploaded 15 Jun 2025Source
  • Self-declaration of Quarterly ProgressApril - June 2023 Declaration.pdf · uploaded 15 Jun 2025Source
  • Form 112 November 2023 Form 1.pdf · uploaded 15 Jun 2025Source
  • Form 220 Sepetember 2023 Form 2.pdf · uploaded 15 Jun 2025Source
  • Form 320 Sepetember 2023 Form 3.pdf · uploaded 15 Jun 2025Source
  • Disclosure of Sold and Booked Inventory20 Sepetember 2023 Sold Unsold.pdf · uploaded 15 Jun 2025Source
  • Self-declaration of Quarterly ProgressKshitij Park Sep 2023 Declaration.pdf · uploaded 15 Jun 2025Source
  • Form 112 November 2023 Form 1.pdf · uploaded 15 Jun 2025Source
  • Form 28 December 2023 Form 2.pdf · uploaded 15 Jun 2025Source
  • Form 316 December 2023 Form3.pdf · uploaded 15 Jun 2025Source
  • Disclosure of Sold and Booked Inventory13 November 2023 Sold Unsold.pdf · uploaded 15 Jun 2025Source
  • Self-declaration of Quarterly ProgressOctober - December 2023 Declaration.pdf · uploaded 15 Jun 2025Source
  • Form 111 March 2024 Form 1.pdf · uploaded 15 Jun 2025Source
  • Form 211 March 2024 Form 2.pdf · uploaded 15 Jun 2025Source
  • Form 315 March 2024 Form 3.pdf · uploaded 15 Jun 2025Source
  • Disclosure of Sold and Booked Inventory11 March 2024 Sold Unsold.pdf · uploaded 15 Jun 2025Source
  • Self-declaration of Quarterly ProgressKshitij Park Mar 2024 Declaration.pdf · uploaded 15 Jun 2025Source
  • Form 114 June 2024 Form 1.pdf · uploaded 15 Jun 2025Source
  • Form 218 June 2024 Form 2.pdf · uploaded 15 Jun 2025Source
  • Form 320 June 2024 Form 3.pdf · uploaded 15 Jun 2025Source
  • Disclosure of Sold and Booked Inventory14 June 2024 Sold Unsold.pdf · uploaded 15 Jun 2025Source
  • Self-declaration of Quarterly ProgressApril - June 2024 Declaration.pdf · uploaded 15 Jun 2025Source
  • Form 1dec f1 kp.pdf · uploaded 28 Jun 2025Source
  • Form 2f2 kp.pdf · uploaded 28 Jun 2025Source
  • Form 3f3 kp.pdf · uploaded 28 Jun 2025Source
  • Disclosure of Sold and Booked Inventorysold cer kp (1).pdf · uploaded 28 Jun 2025Source
  • Form 126 Sepetember 2022 Form 1.pdf · uploaded 28 Jun 2025Source
  • Form 227 Sepetember 2022 Form 2.pdf · uploaded 28 Jun 2025Source
  • Form 328 Sepetmber 2022 Form 3.pdf · uploaded 28 Jun 2025Source
  • Disclosure of Sold and Booked Inventorysep sold (1).pdf · uploaded 28 Jun 2025Source
  • Form 118 March 2023 Form 1.pdf · uploaded 28 Jun 2025Source
  • Form 223 March 2023 Form 2.pdf · uploaded 28 Jun 2025Source
  • Form 325 March 2023 Form 3.pdf · uploaded 28 Jun 2025Source
  • Disclosure of Sold and Booked Inventorymar 23 sold (1).pdf · uploaded 28 Jun 2025Source
  • Form 5 (FY 2021-2022)form 5 21-22.pdf · uploaded 28 Jun 2025Source
  • Form 5 (FY 2022-2023)form 5 22-23.pdf · uploaded 28 Jun 2025Source
  • Form 5 (FY 2023-2024)23-24 form 5.pdf · uploaded 28 Jun 2025Source
  • Form 2A (FY 2021-2022)Form 2A_0001 21 -22.pdf · uploaded 29 Jun 2025Source
  • Form 2A (FY 2022-2023)Form 2A_0001 22-23(1).pdf · uploaded 29 Jun 2025Source
  • Form 2A (FY 2023-2024)Form 2A_0001 23-24(1).pdf · uploaded 29 Jun 2025Source
  • Form 2A (FY 2024-2025)Form 2A_0001 24-25.pdf · uploaded 29 Jun 2025Source

Technical

  • DocumentLayout Plan.pdf · uploaded 1 Nov 2021Source
  • Documentkadam issue copy 02.pdf · uploaded 1 Nov 2021Source

Technical (Architect)

  • DocumentArchitect certificate Kshitij park_compressed.pdf · uploaded 19 Oct 2024Source
  • DocumentArchitects Certificate kshitij Park 18-12-2024_0001_0001.pdf · uploaded 27 Dec 2024Source
  • DocumentArchitect certificate Kshitij park 20-3-2025__0001.pdf · uploaded 31 Mar 2025Source
  • Document9 Architect’s Certificate of Sep 2023.pdf · uploaded 13 May 2025Source
  • Document6 Architect’s Certificate of March 2023.pdf · uploaded 13 May 2025Source
  • Document5 Architect’s Certificate of Dec 2022.pdf · uploaded 13 May 2025Source
  • Document4 Architect’s Certificate of Sep 2022.pdf · uploaded 13 May 2025Source
  • Document3 Architect’s Certificate ofJune 2022.pdf · uploaded 13 May 2025Source
  • Document2 Architect’s Certificate of March 2022.pdf · uploaded 13 May 2025Source
  • Document1 Architect’s Certificate of PSep 2021.pdf · uploaded 13 May 2025Source
  • DocumentForm 1.pdf · uploaded 16 Apr 2026Source

Technical (Engineer)

  • DocumentEng certificate Kshitij park Oct 24_11zon.pdf · uploaded 19 Oct 2024Source
  • Documentkshitij park 2024Dec.pdf · uploaded 27 Dec 2024Source
  • DocumentKshitij park.pdf · uploaded 31 Mar 2025Source
  • Document7 Architect’s Certificate of June 2023.pdf · uploaded 13 May 2025Source
  • Document9 Engineer’s Certificate Des 2023.pdf · uploaded 13 May 2025Source
  • Document8 Engineer’s Certificate Sep 2023.pdf · uploaded 13 May 2025Source
  • Document7 Engineer’s Certificate June 2023.pdf · uploaded 13 May 2025Source
  • Document6 Engineer’s Certificate March 2023.pdf · uploaded 13 May 2025Source
  • Document5 Engineer’s Certificate Dec 2022.pdf · uploaded 13 May 2025Source
  • Document4 Engineer’s Certificate Sep 2022.pdf · uploaded 13 May 2025Source
  • Document3 Engineer’s Certificate June 2022.pdf · uploaded 13 May 2025Source
  • Document2 Engineer’s Certificate March 2022.pdf · uploaded 13 May 2025Source
  • Document1 Engineer’s Certificate Sep 2021.pdf · uploaded 13 May 2025Source
  • DocumentForm 2.pdf · uploaded 16 Apr 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel SURVEY NO 245 P

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 2BHK70 units in all
Address
Survey No 245 P, Moshi, Moshi PunePIN 412105
Village
Moshi, Haveli taluka
Land area for this project
1,300 sq m (13,993 sq ft)
Permissible built-up area
2,873 sq m (30,921 sq ft)
Sanctioned built-up area
2,873 sq m (30,921 sq ft)
Recreational open space
666 sq m (7,164 sq ft)
Designated bank account
85
Developed in phases
Yes
Also registered as
Kshitij Park Ech Ving, क्षितिज पार्क एच विंग, Kshitij Park H Wing

Survey, CTS, gat or plot numbers

SURVEY NO 245 P

Land as published on MahaRERA's project page

SURVEY NO 245 P

Boundaries

North
S No 245 From Goodwill Infra
South
Sr No 246 And Balaji Infrastructure
East
By Property Of Gulab Saste
West
By Remaining Property Of Goodwill Infra Of S N 245

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking70 units

20 of 70 units booked (29%), as the promoter reported to MahaRERA

1BHK · 55 units2BHK · 15 units
BuildingTypeCarpet areaUnitsBooked
D Building1BHK40.15 sq m · 432 sq ft60
D Building1BHK41.29 sq m · 444 sq ft10
D Building1BHK41.67 sq m · 449 sq ft50
D Building1BHK41.79 sq m · 450 sq ft160
H Building1BHK39.27 sq m · 423 sq ft143
H Building1BHK40.87 sq m · 440 sq ft136
H Building2BHK63.13 sq m · 680 sq ft1410
H Building2BHK70.87 sq m · 763 sq ft11

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals7

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectVAASTU ASSOCIATES Dnyaneshwar Adikrao sabale—
Chartered accountantDinesh Nandgaonkar—
Chartered accountantRamesh Giri—
Chartered accountantVpchorghade & Co—
EngineerK P BADGUJAR CONSULTANTS PVT LTD Rohinee Kailas Badgujar—
EngineerShivaji Kadam—
OtherMr Sachin Baban Kadam—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Moshi

All 1,458 projects in Moshi · Compare Kshitij Park with another project

Kshitij Park in numbers

Registered deals, summarised

Deedo has 40 registered documents at Kshitij Park, from Mar 2022 to Sep 2026: 24 sales, 9 leave and licence agreements, 5 mortgages. The median registered sale since Mar 2022 works out to about ₹6,400 per sq ft, at a median of ₹31 L a deal; 4% of sales were resales.

What is the price per sq ft at Kshitij Park?
The median registered sale since Mar 2022 works out to about ₹6,400 per sq ft, at a median of ₹31 L a deal; 4% of sales were resales.
How many properties have been sold at Kshitij Park?
24 sales are registered at Kshitij Park, 1 of them a resale.
Are properties at Kshitij Park rented out?
Yes: 9 leave and licence agreements are registered at Kshitij Park, at a median rent since Mar 2022 of about ₹10,000 a month with a deposit of about ₹25,000.
Where does this data come from?
The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Kshitij Park by Deedo, last updated with deals registered in Sep 2026.

Latest deal · Resale · Aug 2026

₹25–50 L

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · registered documents (Index II)Data through is when MahaRERA's project page was last read.Report a problemMethodology