Residential / Group Housing · 1 building · 84 unitsRERA P52100035086

Anshul Ela D Building

Deedo IDDP-PUN-Z8SZ

Completion was pushed back 4 months, to Aug 2028; no MahaRERA orders on record; 74% of its units are booked.

Moshi, Pune 412105 · Property rates in Moshi · by Anshul Rutuja Promoters And Builders Llp

DeliveryExtended 4 moPromised Apr 2028 · now due Aug 2028RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales74% booked62 of 84 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Aug 2028

  • This projectRegistered 10 May 2022, completion promised 30 Apr 2028, revised to 30 Aug 2028.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100035086
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210003508610 May 202230 Apr 202830 Aug 2028Anshul Rutuja Promoters & Builders LLPProject page
Documents133

1 document held by Deedo, 132 filings listed on MahaRERA's project page

Registration certificate

Legal

  • Legal Title reportFormat A Search report ELA D building.pdf · uploaded 7 May 2022Source
  • Declaration Form BEncumbrances affidavit DJ_page-0001.pdf · uploaded 9 May 2022Source

Migrated

  • 1 Details of encumbrancesARPB Encumbrance Affidavit.pdf · uploaded 13 Apr 2022Source
  • 1 Copy of Layout Approval (in case of layout)Anshul Ela Sanction Layout.pdf · uploaded 13 Apr 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement.pdf · uploaded 13 Apr 2022Source
  • 2 Commencement Certificates / NA Order for plotted developmentNA order.pdf · uploaded 13 Apr 2022Source
  • 1 Proforma of Allotment letterSample Flat Agreement.pdf · uploaded 13 Apr 2022Source
Show all 133 documentsShow fewer documents

Migrated

  • 1 CERSAI detailsAsset Based Search- Ela D Cersai report.pdf · uploaded 23 Apr 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_ElaD_March22.pdf · uploaded 29 Apr 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentElaD_BuildingPlan.pdf · uploaded 5 May 2022Source
  • 2 Proforma of Allotment letterAllotment letter .pdf · uploaded 6 May 2022Source
  • 1 Copy of the legal title reportFormat A Search report ELA D building.pdf · uploaded 7 May 2022Source
  • 1 Declaration about Commencement CertificateFormat D ELA D Building.pdf · uploaded 7 May 2022Source
  • 2 Details of encumbrancesARPB Encumbrance Affidavit.pdf · uploaded 9 May 2022Source
  • 1 Declaration in FORM BEncumbrances affidavit DJ_page-0001.pdf · uploaded 9 May 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC_ElaD_June2022.pdf · uploaded 4 Oct 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC_ElaD_June2022.pdf · uploaded 4 Oct 2022Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_ElaD_June2022.pdf · uploaded 4 Oct 2022Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC_ElaD_Sept22.pdf · uploaded 3 Jan 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC_ElaD_Sept22.pdf · uploaded 3 Jan 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_ElaD_Sept22.pdf · uploaded 3 Jan 2023Source
  • 2 Copy of Layout Approval (in case of layout)Layout Plan_ElaD.pdf · uploaded 30 Jan 2023Source
  • 2 Building Plan Approval / NA Order for plotted developmentFloor Plan_ElaD_compressed.pdf · uploaded 30 Jan 2023Source
  • 3 Building Plan Approval / NA Order for plotted developmentFloor Plan_ElaD__compressed.pdf · uploaded 30 Jan 2023Source
  • 3 a Details of encumbrances concerned to FinanceHDFC Mortgage Deed_IndexII.pdf · uploaded 1 Mar 2023Source
  • 1 b Details of encumbrances concerned to LegalHDFC Mortgage Deed_IndexII.pdf · uploaded 1 Mar 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC_ElaD_Dec22.pdf · uploaded 4 Mar 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC_ElaD_Dec22.pdf · uploaded 4 Mar 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_ElaD_Dec22.pdf · uploaded 4 Mar 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC_ElaD_March23.pdf · uploaded 26 Jun 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC_ElaD_March23.pdf · uploaded 26 Jun 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_ElaD_March23_page-0001.pdf · uploaded 25 Aug 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC_ElaD_Sept23.pdf · uploaded 26 Dec 2023Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_ElaD_Sept23.pdf · uploaded 26 Dec 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC_ElaD_Sept23.pdf · uploaded 6 Feb 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC_ElaD_Dec23.pdf · uploaded 6 Feb 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC_ElaD_Dec23.pdf · uploaded 6 Feb 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_ElaD_Dec23.pdf · uploaded 21 Feb 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Ela-D_Form5_2022_23.pdf · uploaded 29 Mar 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC_ElaD_March24.pdf · uploaded 12 Jul 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC_ElaD_March24.pdf · uploaded 12 Jul 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_ElaD_March24.pdf · uploaded 9 Aug 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_ElaD_June24.pdf · uploaded 29 Nov 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC_ElaD_June24.pdf · uploaded 29 Nov 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC_ElaD_Sept24.pdf · uploaded 29 Nov 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC_ElaD_June24_page-0001.pdf · uploaded 30 Dec 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC_ElaD_Sept24.pdf · uploaded 30 Dec 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC_ElaD_Sept24.pdf · uploaded 30 Dec 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_ElaD_Sept24.pdf · uploaded 30 Dec 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_ElaD_Sept24.pdf · uploaded 30 Dec 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC_ElaD_Dec2024.pdf · uploaded 15 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_ElaD_Dec2024.pdf · uploaded 15 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC_ElaD_Dec24.pdf · uploaded 15 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC_ElaD_March25.pdf · uploaded 3 May 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_ElaD_March25.pdf · uploaded 3 May 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC_ElaD_March25.pdf · uploaded 3 May 2025Source
  • Form 1AC_ElaD_June22_page-0001.pdf · uploaded 21 May 2026Source
  • Form 2EC_ElaD_June22_page-0001.pdf · uploaded 21 May 2026Source
  • Form 3CA_ElaD_June22_page-0001.pdf · uploaded 21 May 2026Source
  • Disclosure of Sold and Booked InventorySold Unsold Inventory_June22.pdf · uploaded 21 May 2026Source
  • Form 1AC_ElaD_Sept22.pdf · uploaded 21 May 2026Source
  • Form 2EC_ElaD_Sept22.pdf · uploaded 21 May 2026Source
  • Form 3CA_ElaD_Sept22.pdf · uploaded 21 May 2026Source
  • Disclosure of Sold and Booked InventorySold Unsold Inventory_Sept22.pdf · uploaded 21 May 2026Source
  • Form 1AC_ElaD_Dec22.pdf · uploaded 21 May 2026Source
  • Form 2EC_ElaD_Dec22.pdf · uploaded 21 May 2026Source
  • Form 3CA_ElaD_Dec22.pdf · uploaded 21 May 2026Source
  • Disclosure of Sold and Booked InventorySold Unsold Inventory_Dec22.pdf · uploaded 21 May 2026Source
  • Form 1AC_ElaD_March23.pdf · uploaded 21 May 2026Source
  • Form 2EC_ElaD_March23.pdf · uploaded 21 May 2026Source
  • Form 3CA_ElaD_March23_page-0001.pdf · uploaded 21 May 2026Source
  • Disclosure of Sold and Booked InventorySold Unsold Inventory_March23.pdf · uploaded 21 May 2026Source
  • Form 1AC_ElaD_June23.pdf · uploaded 22 May 2026Source
  • Form 2EC_ElaD_June23.pdf · uploaded 22 May 2026Source
  • Form 3CA_ElaD_June23.pdf · uploaded 22 May 2026Source
  • Disclosure of Sold and Booked InventorySold Unsold Inventory_June23.pdf · uploaded 22 May 2026Source
  • Form 1AC_ElaD_Sept23.pdf · uploaded 22 May 2026Source
  • Form 2EC_ElaD_Sept23.pdf · uploaded 22 May 2026Source
  • Form 3CA_ElaD_Sept23.pdf · uploaded 22 May 2026Source
  • Disclosure of Sold and Booked InventorySold Unsold Inventory_Sept23.pdf · uploaded 22 May 2026Source
  • Form 1AC_ElaD_Dec23.pdf · uploaded 22 May 2026Source
  • Form 2EC_ElaD_Dec23.pdf · uploaded 22 May 2026Source
  • Form 3CA_ElaD_Dec23.pdf · uploaded 22 May 2026Source
  • Disclosure of Sold and Booked InventorySold Unsold Inventory_Dec23.pdf · uploaded 22 May 2026Source
  • Form 1AC_ElaD_March24.pdf · uploaded 22 May 2026Source
  • Form 2EC_ElaD_March24.pdf · uploaded 22 May 2026Source
  • Form 3CA_ElaD_March24.pdf · uploaded 22 May 2026Source
  • Disclosure of Sold and Booked InventorySold Unsold Inventory_March24.pdf · uploaded 22 May 2026Source
  • Form 1AC_ElaD_June24_page-0001.pdf · uploaded 22 May 2026Source
  • Form 2EC_ElaD_June24.pdf · uploaded 22 May 2026Source
  • Form 3CA_ElaD_June24.pdf · uploaded 22 May 2026Source
  • Disclosure of Sold and Booked InventorySold Unsold Inventory_June24.pdf · uploaded 22 May 2026Source
  • Form 1AC_ElaD_Sept24.pdf · uploaded 22 May 2026Source
  • Form 2EC_ElaD_Sept24.pdf · uploaded 22 May 2026Source
  • Form 3CA_ElaD_Sept24.pdf · uploaded 22 May 2026Source
  • Disclosure of Sold and Booked InventorySold Unsold Inventory_Sept24.pdf · uploaded 22 May 2026Source
  • Form 1AC_ElaD_Dec2024.pdf · uploaded 22 May 2026Source
  • Form 2EC_ElaD_Dec24.pdf · uploaded 22 May 2026Source
  • Form 3CA_ElaD_Dec2024.pdf · uploaded 22 May 2026Source
  • Disclosure of Sold and Booked InventorySold Unsold Inventory_Dec24.pdf · uploaded 22 May 2026Source
  • Form 1AC_ElaD_March25.pdf · uploaded 22 May 2026Source
  • Form 2EC_ElaD_March25.pdf · uploaded 22 May 2026Source
  • Form 3CA_ElaD_March25.pdf · uploaded 22 May 2026Source
  • Disclosure of Sold and Booked InventorySold Unsold Inventory_March25.pdf · uploaded 22 May 2026Source
  • Form 1AC_ElaD_June25_page-0001.pdf · uploaded 25 May 2026Source
  • Form 2EC_Ela D_June25.pdf · uploaded 25 May 2026Source
  • Form 3CA_ElaD_June25.pdf · uploaded 25 May 2026Source
  • Disclosure of Sold and Booked InventorySold Unsold Inventory_June25.pdf · uploaded 25 May 2026Source
  • Form 1AC_ElaD_Sept25.pdf · uploaded 25 May 2026Source
  • Form 2EC_ElaD_Sept25_page-0001.pdf · uploaded 25 May 2026Source
  • Form 3CA_ElaD_Sept25.pdf · uploaded 25 May 2026Source
  • Disclosure of Sold and Booked InventorySold Unsold Inventory_Sept25.pdf · uploaded 25 May 2026Source
  • Form 1AC_ElaD_Dec25.pdf · uploaded 25 May 2026Source
  • Form 2EC_EvaD_Dec25_page-0001.pdf · uploaded 25 May 2026Source
  • Form 3CA_ElaD_Dec25.pdf · uploaded 25 May 2026Source
  • Disclosure of Sold and Booked InventorySold Unsold Inventory_Dec25.pdf · uploaded 25 May 2026Source

Technical

  • DocumentAnshul Ela Sanction Layout.pdf · uploaded 13 Apr 2022Source
  • DocumentElaD_BuildingPlan.pdf · uploaded 5 May 2022Source
  • DocumentLayout Plan_ElaD.pdf · uploaded 30 Jan 2023Source
  • DocumentFloor Plan_ElaD_compressed.pdf · uploaded 30 Jan 2023Source
  • DocumentFloor Plan_ElaD__compressed.pdf · uploaded 30 Jan 2023Source

Technical (Architect)

  • DocumentAC_ElaD_March24.pdf · uploaded 12 Jul 2024Source
  • DocumentAC_ElaD_June24_page-0001.pdf · uploaded 30 Dec 2024Source
  • DocumentAC_ElaD_Sept24.pdf · uploaded 30 Dec 2024Source
  • DocumentAC_ElaD_Sept24.pdf · uploaded 30 Dec 2024Source
  • DocumentAC_ElaD_Dec2024.pdf · uploaded 15 Feb 2025Source
  • DocumentAC_ElaD_March25.pdf · uploaded 3 May 2025Source

Technical (Engineer)

  • DocumentEC_ElaD_March24.pdf · uploaded 12 Jul 2024Source
  • DocumentEC_ElaD_June24.pdf · uploaded 29 Nov 2024Source
  • DocumentEC_ElaD_Sept24.pdf · uploaded 29 Nov 2024Source
  • DocumentEC_ElaD_Dec24.pdf · uploaded 15 Feb 2025Source
  • DocumentEC_ElaD_March25.pdf · uploaded 3 May 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel Gat No. 50 Hissa No. 1at Haveli

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 2BHK84 units in all
Address
Gat No. 50 Hissa No. 1, Pune Nasik Highway, Village MoshiPIN 412105
Village
Moshi, Haveli taluka
Land area for this project
1,038 sq m (11,176 sq ft)
Permissible built-up area
5,601 sq m (60,287 sq ft)
Sanctioned built-up area
5,601 sq m (60,287 sq ft)
Recreational open space
314 sq m (3,375 sq ft)
Designated bank account
76
Developed in phases
No

Survey, CTS, gat or plot numbers

Gat No. 50 Hissa No. 1at Haveli

Land as published on MahaRERA's project page

Gat No. 50 Hissa No. 1

Boundaries

North
D Building Side Margin
South
D Building Side Margin
East
D Building Side Margin
West
Ela E Building

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking84 units

62 of 84 units booked (74%), as the promoter reported to MahaRERA

1BHK · 28 units2BHK · 56 units
TypeCarpet areaUnitsBooked
1BHK46.14 sq m · 497 sq ft2825
2BHK60.34 sq m · 649 sq ft1411
2BHK60.56 sq m · 652 sq ft148
2BHK60.6 sq m · 652 sq ft149
2BHK60.65 sq m · 653 sq ft149

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals3

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSpace Tech—
Chartered accountantNitesh M Shaha & Co—
EngineerVilas Kudale—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Moshi

All 1,458 projects in Moshi · Compare Anshul Ela D Building with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology