SkyHigh Towers - D1D2
Deedo IDDP-PUN-76NDCompletion was pushed back 4 months, to Jul 2028; 1 listing or order with MahaRERA on record; 94% of its units are booked.
Man, Pune 411057 · Property rates in Man · by New World Landmark Llp
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Jul 2028
- This projectRegistered 9 Apr 2018, completion promised 31 Mar 2028, revised to 31 Jul 2028.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
2 buildings
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory record1
What MahaRERA has published about this project. A listing records what the authority published; it is not a judgment of the project.
- Regulatory order31 Aug 2026Matched by RERA number
Regulatory order: PROJECT NAME: SKY HIGH TOWERS - D1D2 (Regulatory Case No. 595 OF 2026) dated 31 Aug, 2026.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100015918
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100015918 | 9 Apr 2018 | 31 Mar 2028 | 31 Jul 2028 | New World Landmark LLP | Project page |
Documents171
1 document held by Deedo, 170 filings listed on MahaRERA's project page
Finance
- PAN CardPAN card.pdf · uploaded 5 Apr 2018Source
Legal
- Legal Title reportSearch And Tital Report Maan.pdf · uploaded 4 Apr 2018Source
- Declaration Form BForm B declaration.pdf · uploaded 5 Apr 2018Source
- Declaration Form BForm B PH 2 D1 D2.pdf · uploaded 14 Aug 2019Source
- OtherBank Details PH 2.pdf · uploaded 8 Jul 2021Source
- OtherRENEWAL OF CONSENT TO OPERATE.pdf · uploaded 14 Nov 2022Source
- OthersEnvironmental Clearance EC.pdf · uploaded 12 Nov 2025Source
Show all 171 documentsShow fewer documents
Migrated
- 1 Copy of the legal title reportSearch And Tital Report Maan.pdf · uploaded 4 Apr 2018Source
- 1 Copy of Layout Approval (in case of layout)1289-069 Phase II Wise Layout.pdf · uploaded 4 Apr 2018Source
- 1 PAN CardPAN card.pdf · uploaded 5 Apr 2018Source
- 1 Details of encumbrancesEmcumbrance.pdf · uploaded 5 Apr 2018Source
- 1 Building Plan Approval (IOD)Sanction Plan.pdf · uploaded 5 Apr 2018Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 5 Apr 2018Source
- 1 Declaration in FORM BForm B declaration.pdf · uploaded 5 Apr 2018Source
- 1 Certificates of CA (Form 3)Form 3.pdf · uploaded 5 Apr 2018Source
- 1 Proforma of Allotment letterAllotment Letter Draft Agreement.pdf · uploaded 5 Apr 2018Source
- 2 Copy of Layout Approval (in case of layout)Layout PH2 D1 D2.pdf · uploaded 14 Aug 2019Source
- 2 Building Plan Approval (IOD)Layout Plan-(1MB).pdf · uploaded 14 Aug 2019Source
- 2 Commencement Certificates / NA Order for plotted developmentCommencment PH2 D1 D2.pdf · uploaded 14 Aug 2019Source
- 2 Declaration in FORM BForm B PH 2 D1 D2.pdf · uploaded 14 Aug 2019Source
- 2 Proforma of Allotment letterAgmt Allotmt Concern Letter NWLLLP PH2.pdf · uploaded 14 Aug 2019Source
- 2 Certificates of CA (Form 3)FORM 3 HIGHMONTD1D2.pdf · uploaded 9 Sep 2019Source
- 1 Annual Audit Report of Statutory CA (Form 5)Form 5 New World Landmark llp Sky high towers D1,D2.pdf · uploaded 29 Sep 2019Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)New World Ph 2.pdf · uploaded 31 Mar 2021Source
- 2 Details of encumbrances.pdf · uploaded 5 Jul 2021Source
- 3 Details of encumbrancesNO DUES LETTER OF PNB.pdf · uploaded 7 Jul 2021Source
- 3 Proforma of Allotment letterSky High.pdf · uploaded 7 Jul 2021Source
- 1 OtherBank Details PH 2.pdf · uploaded 8 Jul 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A March 2021 SkyHigh.pdf · uploaded 25 Aug 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Annual Audit Report of Statutory CA (Form 5).pdf · uploaded 25 Aug 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Arch cert Sky High.pdf · uploaded 20 Sep 2021Source
- 3 Certificates of CA (Form 3)New World Land mark LLP Form 3 March 21.pdf · uploaded 16 Mar 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)NEW WORLD LANDMARK LLP Sky high D1D2 Form 5.pdf · uploaded 16 Mar 2022Source
- 4 Proforma of Allotment letterSky High Booking Form.pdf · uploaded 27 Jun 2022Source
- 2 OtherRENEWAL OF CONSENT TO OPERATE.pdf · uploaded 14 Nov 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1- MAAN-VK ARCHITECT.pdf · uploaded 14 Dec 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2-MAAN.pdf · uploaded 14 Dec 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 SkyHigh tower D1, D2 31-3 Sign_compressed.pdf · uploaded 17 Jan 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)SkyHigh D1D2 form 2A March 22 signed.pdf · uploaded 13 Feb 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)NEW WORLD LANDMARK LLP-D1-D2 June 2022.pdf · uploaded 20 Feb 2023Source
- 4 Certificates of CA (Form 3)Form 3 Skyhigh D1-D2 30062022 Both Sign_compressed.pdf · uploaded 20 Feb 2023Source
- 4 Details of encumbrancesEncumbrance update D1-D2.pdf · uploaded 21 Feb 2023Source
- 5 Certificates of CA (Form 3)Form-3 Both Sign As on 30092022 Skyhigh D1 D2_compressed.pdf · uploaded 28 Mar 2023Source
- 1 Proforma of Agreement for saleProforma of Agreement to sale.pdf · uploaded 21 Jun 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 MAAN D1 D2.pdf · uploaded 31 Jul 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 SKY HIGH D1-D2 ARCHITECT CERTIFICATE.pdf · uploaded 31 Jul 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 U D DEVELOPERS ARCHITECT CERTIFICATE.pdf · uploaded 31 Jul 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)NEW WORLD LAND MARK LLP-D1D2 Form 2.pdf · uploaded 31 Jul 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 SKY HIGH D1-D2 ENGINEERING CERTIFICATE.pdf · uploaded 31 Jul 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 U D DEVELOPERS ENGINEERING CERTIFICATE.pdf · uploaded 31 Jul 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)From 2A SKY HIGH D1-D2 QUALITY ASSURANCE CERTIFICATE.pdf · uploaded 31 Jul 2023Source
- 6 Certificates of CA (Form 3)Form 3 Skyhigh D1-D2 31122022 both sign.pdf · uploaded 31 Jul 2023Source
- 7 Certificates of CA (Form 3)Form 3 Skyhigh D1-D2 30032023 both sign_compressed.pdf · uploaded 31 Jul 2023Source
- 8 Certificates of CA (Form 3)Form 3 AS Skyhigh D1-D2 30062023-both sign_compressed.pdf · uploaded 7 Sep 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 PC FY 22-23 SkyHigh Towers D1-D2_both sign_compressed.pdf · uploaded 7 Sep 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 SKY HIGH TOWERS D1D2.pdf · uploaded 7 Dec 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 SkyHigh Towers D1D2.pdf · uploaded 7 Dec 2023Source
- 9 Certificates of CA (Form 3)form 3 Sky High Towers D1D2 30092023_compressed.pdf · uploaded 7 Dec 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 SKY HIGH TOWER D1D2.pdf · uploaded 20 Mar 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_Sky High Towners D1D2.pdf · uploaded 20 Mar 2024Source
- 10 Certificates of CA (Form 3)Form 3 Skyhigh D1D2 31122023 both sign_compressed.pdf · uploaded 20 Mar 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 SkyHigh D1D2_compressed.pdf · uploaded 29 Apr 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 D1D2.pdf · uploaded 29 Apr 2024Source
- 11 Certificates of CA (Form 3)form 3 SkyHigh Towers D1D2 31032024_compressed.pdf · uploaded 29 Apr 2024Source
- 1 Disclosure of sold/ booked inventoryd1d2 q1.pdf · uploaded 4 May 2024Source
- 2 Disclosure of sold/ booked inventoryd1d2 q2.pdf · uploaded 4 May 2024Source
- 3 Disclosure of sold/ booked inventoryd1d2 q3.pdf · uploaded 4 May 2024Source
- 4 Disclosure of sold/ booked inventoryd1d2 q4.pdf · uploaded 4 May 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_SkyHigh Towers D1D2_compressed.pdf · uploaded 20 Jul 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)From 2_SkyHigh Towers D1D2.pdf · uploaded 20 Jul 2024Source
- 12 Certificates of CA (Form 3)form 3 SkyHigh D1D2 30-06-2024_compressed.pdf · uploaded 20 Jul 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)From 2_SkyHigh Towers D1D2.pdf · uploaded 31 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)SkyHigh Towers D1D2.pdf · uploaded 13 Aug 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)form 5 SkyHigh Towers D1D2 31-03-2024.pdf · uploaded 8 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 D1-D2.pdf · uploaded 11 Nov 2024Source
- 2 Certificates of CA (Form 3)form 3 Sky High Towers D1-D2 30-09-2024_compressed.pdf · uploaded 11 Nov 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_SkyHigh Towers D1D2.pdf · uploaded 11 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 SkyHigh Towers D1D2-.pdf · uploaded 29 Jan 2025Source
- 1 Certificates of CA (Form 3)form 3 SkyHigh Towers D1D2 31-12-2024_compressed.pdf · uploaded 29 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 SkyHigh Towers D1D2.pdf · uploaded 29 Jan 2025Source
- 1 Disclosure of sold/ booked inventorySky High D1 D2_compressed.pdf · uploaded 29 Jan 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A FY 2019-20.pdf · uploaded 8 Apr 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 FY 2018-19.pdf · uploaded 8 Apr 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 FY 2019-20.pdf · uploaded 8 Apr 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 FY 2020-21.pdf · uploaded 8 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A FY 2020-21.pdf · uploaded 8 Apr 2025Source
- 1 Declaration about Commencement CertificateFormat D.pdf · uploaded 8 Apr 2025Source
- 1 Certificates of CA (Form 3)form 3 sky High tower D1 D2 31-12-2024 sign_11zon.pdf · uploaded 12 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form1 SkyHigh D1D2 Mar 2025.pdf · uploaded 2 May 2025Source
- 1 Certificates of CA (Form 3)Form 3 Skyhigh D1-D2 30032025_compressed.pdf · uploaded 2 May 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form2 SkyHigh D1D2 Mar 2025.pdf · uploaded 2 May 2025Source
- 1 Declaration about Commencement CertificateREVISED Format D_organized.pdf · uploaded 13 May 2025Source
- 1 Disclosure of sold/ booked inventoryCIrcular 29 - Mar 2023.pdf · uploaded 6 Jun 2025Source
- 2 Disclosure of sold/ booked inventoryCircular 29 - Jun 2024.pdf · uploaded 6 Jun 2025Source
- 3 Disclosure of sold/ booked inventoryCircular 29 - Sep 2024.pdf · uploaded 6 Jun 2025Source
- 4 Disclosure of sold/ booked inventoryCircular 29 - Dec 2024.pdf · uploaded 6 Jun 2025Source
- 1 Certificates of CA (Form 3)15 Certificates of CA (Form 3).pdf · uploaded 2 Jul 2025Source
- Withdrawal Update Form 1FORM 1 SKY HIGH TOWERS D1 u0026 D2.pdf · uploaded 11 Nov 2025Source
- Withdrawal Update Form 1FORM 1 SKY HIGH TOWER D1 u0026 D2.pdf · uploaded 11 Nov 2025Source
- Withdrawal Update Form 2Form 2 Skyhigh D1 D2 June 2025Updated.pdf · uploaded 11 Nov 2025Source
- Withdrawal Update Form 2Form 2 Sky High Tower D1D2Upated.pdf · uploaded 11 Nov 2025Source
- Withdrawal Update Form 3Form 3 Skyhigh D1-D2 30062025 Fsign_compressed.pdf · uploaded 11 Nov 2025Source
- Withdrawal Update Form 3Form 3 Skyhigh D1-D2 30092025 F sign_compressed.pdf · uploaded 11 Nov 2025Source
- Withdrawal Update Form 1Form 1 SkyHigh Towers D1D2 31122025.pdf · uploaded 18 Feb 2026Source
- Withdrawal Update Form 2Form 2 NWLLLP D1D2 31122025.pdf · uploaded 18 Feb 2026Source
- Withdrawal Update Form 3Form 3 Skyhigh D1 D2 31122025 F sign.pdf · uploaded 18 Feb 2026Source
- Withdrawal Update Form 1Form 1 D1D2.pdf · uploaded 14 May 2026Source
- Withdrawal Update Form 2Form 2 D1D2.pdf · uploaded 14 May 2026Source
- Withdrawal Update Form 3Form 3 Skyhigh D1 D2 30032026 F sign_compressed.pdf · uploaded 14 May 2026Source
- Withdrawal Update Form 1Form 1 Highsky Tower D1 D2.pdf · uploaded 22 Jul 2026Source
- Withdrawal Update Form 2Form 2- Skyhigh tower D1D2.pdf · uploaded 22 Jul 2026Source
- Withdrawal Update Form 3Form 3 Skyhigh D1 D2 30062026 sign.pdf · uploaded 22 Jul 2026Source
- Withdrawal Update Form 1Form 1 Highsky Tower D1 D2.pdf · uploaded 24 Jul 2026Source
- Withdrawal Update Form 2Form 2- Skyhigh tower D1D2.pdf · uploaded 24 Jul 2026Source
- Withdrawal Update Form 3Form 3 Skyhigh D1 D2 30062026 sign.pdf · uploaded 24 Jul 2026Source
- Form 1Form1 SkyHigh D1D2 Mar 2025.pdf · uploaded 28 Jul 2026Source
- Form 1Form1 SkyHigh D1D2 Mar 2025.pdf · uploaded 28 Jul 2026Source
- Form 2Form2 SkyHigh D1D2 Mar 2025.pdf · uploaded 28 Jul 2026Source
- Form 2Form 2 SkyHigh Towers D1D2.pdf · uploaded 28 Jul 2026Source
- Form 3Form 3 SkyHigh Towers D1D2 mar 2025.pdf · uploaded 28 Jul 2026Source
- Form 3Form 3 SkyHigh Towers D1D1 Dec 2024.pdf · uploaded 28 Jul 2026Source
- Disclosure of Sold and Booked InventoryInventory D1D2.pdf · uploaded 28 Jul 2026Source
- Disclosure of Sold and Booked InventoryInventory SkyHigh Towers D1D2 Dec 2024.pdf · uploaded 28 Jul 2026Source
- OthersD1D2 layout and CC.pdf · uploaded 28 Jul 2026Source
- OthersIOD Plans for SkyHigh Towers.pdf · uploaded 28 Jul 2026Source
- Form 2A (FY 2025-2026)Form 2A SkyHigh Towers D1 D2.pdf · uploaded 3 Aug 2026Source
- Form 5 (FY 2022-2023)Form 5 PC FY 22-23 SkyHigh Towers D1-D2_both sign.pdf · uploaded 3 Aug 2026Source
- Form 5 (FY 2023-2024)form 5 SkyHigh Towers D1D2 31-03-2024.pdf · uploaded 3 Aug 2026Source
- Form 5 (FY 2024-2025)Form 5_SkyHigh Towers D1-D2_FY 2024-2025 sign_compressed.pdf · uploaded 3 Aug 2026Source
- Form 5 (FY 2018-2019)Form 5 2018-2019.pdf · uploaded 4 Aug 2026Source
- Form 5 (FY 2020-2021)Form 5 2020-2021.pdf · uploaded 4 Aug 2026Source
- Form 5 (FY 2021-2022)Form 5 2021-2022.pdf · uploaded 4 Aug 2026Source
- Form 2A (FY 2024-2025)Form2A SkyHigh D1D2 Mar 2025_compressed_compressed.pdf · uploaded 11 Aug 2026Source
- Form 5 (FY 2025-2026)Form 5_SkyHigh Towers D1-D2_FY 2025-26 Sign_compressed.pdf · uploaded 1 Oct 2026Source
Technical
- Document1289-069 Phase II Wise Layout.pdf · uploaded 4 Apr 2018Source
- DocumentSanction Plan.pdf · uploaded 5 Apr 2018Source
- DocumentLayout PH2 D1 D2.pdf · uploaded 14 Aug 2019Source
- DocumentLayout Plan-(1MB).pdf · uploaded 14 Aug 2019Source
- Others01-21 Layout.pdf · uploaded 12 Nov 2025Source
- Others240716 - CC.pdf · uploaded 12 Nov 2025Source
- Document240716 - CC.pdf · uploaded 22 Jul 2026Source
- DocumentLayout Plans - 01-21 - 2024.pdf · uploaded 22 Jul 2026Source
- DocumentLayout Plans - 02-21 - 2024.pdf · uploaded 22 Jul 2026Source
- DocumentLayout Plans - 03-21 - 2024.pdf · uploaded 22 Jul 2026Source
- DocumentLayout Plans - 04-21 - 2024.pdf · uploaded 22 Jul 2026Source
- DocumentLayout Plans - 05-21 - 2024.pdf · uploaded 22 Jul 2026Source
- DocumentLayout Plans - 06-21 - 2024.pdf · uploaded 22 Jul 2026Source
- DocumentLayout Plans - 07-21 - 2024.pdf · uploaded 22 Jul 2026Source
- DocumentLayout Plans - 08-21 - 2024 - D1.pdf · uploaded 22 Jul 2026Source
- DocumentLayout Plans - 09-21 - 2024 - D1.pdf · uploaded 22 Jul 2026Source
- DocumentLayout Plans - 10-21 - 2024 - D1.pdf · uploaded 22 Jul 2026Source
- DocumentLayout Plans - 11-21 - 2024 - D2.pdf · uploaded 22 Jul 2026Source
- DocumentLayout Plans - 12-21 - 2024 - D2.pdf · uploaded 22 Jul 2026Source
- DocumentLayout Plans - 13-21 - 2024 - D2.pdf · uploaded 22 Jul 2026Source
- DocumentLayout Plans - 14-21 - 2024.pdf · uploaded 22 Jul 2026Source
- DocumentLayout Plans - 15-21 - 2024.pdf · uploaded 22 Jul 2026Source
- DocumentLayout Plans - 16-21 - 2024.pdf · uploaded 22 Jul 2026Source
- DocumentLayout Plans - 17-21 - 2024.pdf · uploaded 22 Jul 2026Source
- DocumentLayout Plans - 18-21 - 2024.pdf · uploaded 22 Jul 2026Source
- DocumentLayout Plans - 19-21 - 2024.pdf · uploaded 22 Jul 2026Source
- DocumentLayout Plans - 20-21 - 2024.pdf · uploaded 22 Jul 2026Source
- DocumentLayout Plans - 21-21 - 2024.pdf · uploaded 22 Jul 2026Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 3 Part, New S No. 277 Plot 2
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2BHK, 3BHK178 units in all
- Address
- New S No. 277 Plot 2 and 3 Part, Near Hinjewadi Phase 2, HinjewadiPIN 411057
- Village
- Man, Mulshi taluka
- Location
- 18.58224, 73.72636
- Land area for this project
- 784 sq m (8,437 sq ft)
- Permissible built-up area
- 15,411 sq m (1,65,880 sq ft)
- Sanctioned built-up area
- 15,411 sq m (1,65,880 sq ft)
- Recreational open space
- 0 sq m (0 sq ft)
- Designated bank account
- 76
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
New S No. 277 Plot 2 and 3 Part
Boundaries
- North
- Future and completed phase
- South
- Amenity Space
- East
- Adjoining S No 341
- West
- 15 M wide road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking178 units
168 of 178 units booked (94%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| D1 | 2BHK | 44.14 sq m · 475 sq ft | 20 | 19 |
| D1 | 2BHK | 44.38 sq m · 478 sq ft | 20 | 18 |
| D1 | 2BHK | 45.1 sq m · 485 sq ft | 1 | 1 |
| D1 | 2BHK | 45.33 sq m · 488 sq ft | 2 | 2 |
| D1 | 3BHK | 66.97 sq m · 721 sq ft | 22 | 22 |
| D1 | 3BHK | 67.3 sq m · 724 sq ft | 24 | 22 |
| D2 | 2BHK | 44.63 sq m · 480 sq ft | 1 | 1 |
| D2 | 2BHK | 44.86 sq m · 483 sq ft | 20 | 19 |
Show all 15 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| D2 | 2BHK | 44.87 sq m · 483 sq ft | 2 | 2 |
| D2 | 2BHK | 45.1 sq m · 485 sq ft | 20 | 18 |
| D2 | 2BHK | 46.31 sq m · 498 sq ft | 1 | 1 |
| D2 | 2BHK | 46.55 sq m · 501 sq ft | 2 | 2 |
| D2 | 2BHK | 47.97 sq m · 516 sq ft | 1 | 1 |
| D2 | 2BHK | 47.99 sq m · 517 sq ft | 20 | 20 |
| D2 | 2BHK | 48.23 sq m · 519 sq ft | 22 | 20 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals5
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Chartered accountant | Kailash Agarwal | — |
| Chartered accountant | M A Agarwal And asso | — |
| Chartered accountant | Priyanka Chordiya and Associates | — |
| Chartered accountant | SAC & Co LLp | — |
| Engineer | Manjiri Desai | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Man
- VyomoraRERA PM1261012602233
- Sukhwani GemzsRERA PR1260002601952
- Vyomora Phase 1RERA PR1260002600999
- Altis OneRERA PC1260002600470
- HinjewadiRERA PR1260002502408
- 18 AanganRERA PR1260002501338
- You57 Tower DRERA PR1264042501139
- Building B3 Eon HomesRERA P52100080318
All 77 projects in Man · Compare SkyHigh Towers - D1D2 with another project