Godrej Evergreen Square
Deedo IDDP-PUN-P8N0Completion was pushed back 4 months, to Feb 2031; no MahaRERA orders on record; 71% of its units are booked.
Man, Pune 411057 · Property rates in Man · by Godrej Projects Development Limited
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Feb 2031
- This projectRegistered 29 Nov 2024, completion promised 31 Oct 2030, revised to 28 Feb 2031.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
- Primary sale · May 2026
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| May 2026 | Unit 2203 | Primary sale | 879 sq ft | View Primary sale, May 2026 |
10 buildings
Open a building to see every flat, floor by floor.
- Amenity Building4 floors · 22 units41% booked
- Retail Shop2 floors · 94 units34% booked
- Tower 132 floors72% booked
- Tower 232 floors · 378 units92% booked
- Tower 332 floors · 378 units90% booked
- Tower 432 floors · 250 units50% booked
- Tower 535 floors · 264 units87% booked
- Tower 634 floors · 260 units84% booked
- Tower 733 floors · 142 units0% booked
- Tower 834 floors · 326 units62% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100078240
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100078240 | 29 Nov 2024 | 31 Oct 2030 | 28 Feb 2031 | Godrej Projects Development Limited | Project page |
Documents155
3 documents held by Deedo, 152 filings listed on MahaRERA's project page
Finance
- PAN CardGPDL PAN Card.pdf · uploaded 15 Nov 2024Source
Legal
- Other – LegalDeclaration Cum Undertaking - Annexure A - Signed.pdf · uploaded 15 Nov 2024Source
- Legal Title reportTSR - Updated_compressed - v1.pdf · uploaded 15 Nov 2024Source
- Declaration Form BForm B - Megapolis - Signed_C.pdf · uploaded 15 Nov 2024Source
- Other – LegalDeed of assignment - 3.pdf · uploaded 21 Nov 2024Source
Show all 155 documentsShow fewer documents
Legal
Migrated
- 1 PAN CardGPDL PAN Card.pdf · uploaded 15 Nov 2024Source
- 1 Copy of the legal title reportTSR - Updated_compressed - v1.pdf · uploaded 15 Nov 2024Source
- 1 a Details of encumbrances concerned to FinanceFinance Encumberance.pdf · uploaded 15 Nov 2024Source
- 2 a Details of encumbrances concerned to FinanceLegal Encumbrance 1.pdf · uploaded 15 Nov 2024Source
- 1 Copy of Layout Approval (in case of layout)1-41.pdf · uploaded 15 Nov 2024Source
- 1 Proforma of Allotment letterAllotment Letter - Final.pdf · uploaded 15 Nov 2024Source
- 1 Declaration in FORM BForm B - Megapolis - Signed_C.pdf · uploaded 15 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 15 Nov 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Megapolis.pdf · uploaded 15 Nov 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Engineer's Certificate - Megapolis - Final.pdf · uploaded 15 Nov 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentMegapolis CC 14112024.pdf · uploaded 15 Nov 2024Source
- 1 Building Plan Approval / NA Order for plotted development1-41.pdf · uploaded 15 Nov 2024Source
- 2 Building Plan Approval / NA Order for plotted development2_3-41.pdf · uploaded 15 Nov 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentSanction-pages-3.pdf · uploaded 15 Nov 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentSanction-pages-4.pdf · uploaded 15 Nov 2024Source
- 5 Building Plan Approval / NA Order for plotted developmentSanction-pages-8.pdf · uploaded 15 Nov 2024Source
- 6 Building Plan Approval / NA Order for plotted developmentSanction-pages-11.pdf · uploaded 15 Nov 2024Source
- 7 Building Plan Approval / NA Order for plotted developmentSanction-pages-12.pdf · uploaded 15 Nov 2024Source
- 1 Other – LegalDeclaration Cum Undertaking - Annexure A - Signed.pdf · uploaded 15 Nov 2024Source
- 1 Declaration about Commencement CertificateDeclaration about CC - D2.pdf · uploaded 15 Nov 2024Source
- 1 CERSAI detailsCERSAI_Search_Report_200327683667_For_Asset_Based_Search_15_11_2024_16_00_57_582.pdf · uploaded 15 Nov 2024Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)Format A - Signed.pdf · uploaded 15 Nov 2024Source
- 1 Deviation Report with respect to Allotment letterAllotment Deviation.pdf · uploaded 15 Nov 2024Source
- 1 b Details of encumbrances concerned to LegalFinance Encumberance.pdf · uploaded 15 Nov 2024Source
- 2 b Details of encumbrances concerned to LegalLegal Encumbrance 1.pdf · uploaded 15 Nov 2024Source
- 1 Other – TechnicalGodrej Projects Development Limited_ Signed Letter- Parking letter.pdf · uploaded 15 Nov 2024Source
- 1 Deviation Report with respect to model copy of AgreementAFS Deviation_C.pdf · uploaded 15 Nov 2024Source
- 1 Proforma of Agreement for saleAFS - Final.pdf · uploaded 15 Nov 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A -Signed.pdf · uploaded 15 Nov 2024Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Format B - Signed.pdf · uploaded 15 Nov 2024Source
- 1 Disclosure for secured/unsecured finance availed for the projectDisclosure for Finance.pdf · uploaded 15 Nov 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentMIDC mail to RERA.pdf · uploaded 20 Nov 2024Source
- 12 Building Plan Approval / NA Order for plotted development19_20-41.pdf · uploaded 20 Nov 2024Source
- 8 Building Plan Approval / NA Order for plotted development4_6-41.pdf · uploaded 20 Nov 2024Source
- 9 Building Plan Approval / NA Order for plotted development7-41.pdf · uploaded 20 Nov 2024Source
- 10 Building Plan Approval / NA Order for plotted development14_16-41.pdf · uploaded 20 Nov 2024Source
- 11 Building Plan Approval / NA Order for plotted development17_18-41.pdf · uploaded 20 Nov 2024Source
- 13 Building Plan Approval / NA Order for plotted development21_22-41.pdf · uploaded 20 Nov 2024Source
- 14 Building Plan Approval / NA Order for plotted development23_24-41.pdf · uploaded 20 Nov 2024Source
- 15 Building Plan Approval / NA Order for plotted development28_29-41.pdf · uploaded 20 Nov 2024Source
- 16 Building Plan Approval / NA Order for plotted development30_31-41.pdf · uploaded 20 Nov 2024Source
- 17 Building Plan Approval / NA Order for plotted development32-41.pdf · uploaded 20 Nov 2024Source
- 18 Building Plan Approval / NA Order for plotted development33_36-41.pdf · uploaded 20 Nov 2024Source
- 2 Other – TechnicalDeclaration Cum Undertaking - Annexure A - Signed.pdf · uploaded 20 Nov 2024Source
- 2 Other – LegalDeed of assignment - 1.pdf · uploaded 21 Nov 2024Source
- 3 Other – LegalDeed of assignment - 2.pdf · uploaded 21 Nov 2024Source
- 4 Other – LegalDeed of assignment - 3.pdf · uploaded 21 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Godrej Evergreen Square_Q3 FY25.pdf · uploaded 6 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 _ Godrej Evergreen Square _ Q3 FY25.pdf · uploaded 14 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Godrej Evergreen Square - Q3 FY25.pdf · uploaded 1 Apr 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Godrej Evergreen Square - Q3 FY25.pdf · uploaded 1 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryGodrej Evergreen Square _ Inventory Data (Building wise) _ Q3 FY25.pdf · uploaded 1 Apr 2025Source
- 2 Disclosure of sold/ booked inventoryGodrej Evergreen Square _ Inventory Data (Building wise) _ Q3 FY25.pdf · uploaded 1 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Godrej Evergreen Square - Q4 FY25 - C.pdf · uploaded 15 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Godrej Evergreen Square - Q4 FY25.pdf · uploaded 15 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryGodrej Evergreen Square _ Inventory Data (Building wise).pdf · uploaded 15 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Godrej Evergreen Square - Q4 FY25.pdf · uploaded 17 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A - Godrej Evergreen Square - Q4 FY25.pdf · uploaded 17 Apr 2025Source
- Form 1Form 1 _ Godrej Evergreen Square _ Q1 FY26.pdf · uploaded 17 Jul 2025Source
- Form 2Form 2 - Godrej Evergreen Square - Q1 FY26.pdf · uploaded 17 Jul 2025Source
- Form 3Form 3_Godrej Evergreen Square - Q1 FY26.pdf · uploaded 17 Jul 2025Source
- Disclosure of Sold and Booked InventoryGodrej Evergreen Square _ Disclosure of Sold Unsold inventory - Q1 FY26.pdf · uploaded 17 Jul 2025Source
- Form 5 (FY 2024-2025)Megapolis.pdf · uploaded 26 Aug 2025Source
- Form 1Form 1 - Godrej Evergreen Square - Q2FY26.pdf · uploaded 18 Oct 2025Source
- Form 2Form 2 - Godrej Evergreen Square - Q2 FY26_Updated.pdf · uploaded 18 Oct 2025Source
- Form 3Form 3 - Godrej Evergreen Square_30 Sept'25.pdf · uploaded 18 Oct 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold inventory - Godrej Evergreen Square - Q2 FY26.pdf · uploaded 18 Oct 2025Source
- Form 1Godrej Evergreen Square - Form 1 - Q3FY26 RERA.pdf · uploaded 17 Jan 2026Source
- Form 2Godrej Evergreen Square - Form 2 - Q3FY26 RERA.pdf · uploaded 17 Jan 2026Source
- Form 3Godrej Evergreen Square - Form 3 - Q3FY26 RERA.pdf · uploaded 17 Jan 2026Source
- Disclosure of Sold and Booked InventoryGodrej Evergreen Square - Disclosure of Sold Unsold inventory - Q3FY26 RERA.pdf · uploaded 17 Jan 2026Source
- Withdrawal Update Form 1Godrej Evergreen Square - Form 1 - Q4FY26 RERA.pdf · uploaded 21 Apr 2026Source
- Withdrawal Update Form 2Godrej Evergreen Square - Form 2 - Q4FY26 RERA.pdf · uploaded 21 Apr 2026Source
- Withdrawal Update Form 3Godrej Evergreen Square - Form 3 - Q4FY26 RERA.pdf · uploaded 21 Apr 2026Source
- Form 2A (FY 2025-2026)Godrej Evergreen Square - Form 2A - FY26.pdf · uploaded 24 Apr 2026Source
- Withdrawal Update Form 1Godrej Evergreen Square - Form 1 - Q1FY27 RERA.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 2Godrej Evergreen Square - Form 2 - Q1FY27 RERA.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 3Godrej Evergreen Square - Form 3 - Q1FY27 RERA.pdf · uploaded 30 Jul 2026Source
- Form 5 (FY 2025-2026)Godrej Evergreen Square - RERA QPR FY26 - Form 5.pdf · uploaded 21 Sep 2026Source
Technical
- DocumentSanction-pages-12.pdf · uploaded 15 Nov 2024Source
- DocumentSanction-pages-11.pdf · uploaded 15 Nov 2024Source
- DocumentSanction-pages-8.pdf · uploaded 15 Nov 2024Source
- DocumentSanction-pages-4.pdf · uploaded 15 Nov 2024Source
- DocumentSanction-pages-3.pdf · uploaded 15 Nov 2024Source
- Document2_3-41.pdf · uploaded 15 Nov 2024Source
- Document1-41.pdf · uploaded 15 Nov 2024Source
- Document1-41.pdf · uploaded 15 Nov 2024Source
- Other – TechnicalGodrej Projects Development Limited_ Signed Letter- Parking letter.pdf · uploaded 15 Nov 2024Source
- Document33_36-41.pdf · uploaded 20 Nov 2024Source
- Document32-41.pdf · uploaded 20 Nov 2024Source
- Document30_31-41.pdf · uploaded 20 Nov 2024Source
- Document28_29-41.pdf · uploaded 20 Nov 2024Source
- Document23_24-41.pdf · uploaded 20 Nov 2024Source
- Document21_22-41.pdf · uploaded 20 Nov 2024Source
- Document19_20-41.pdf · uploaded 20 Nov 2024Source
- Document17_18-41.pdf · uploaded 20 Nov 2024Source
- Document14_16-41.pdf · uploaded 20 Nov 2024Source
- Document7-41.pdf · uploaded 20 Nov 2024Source
- Document4_6-41.pdf · uploaded 20 Nov 2024Source
- Other – TechnicalDeclaration Cum Undertaking - Annexure A - Signed.pdf · uploaded 20 Nov 2024Source
- DocumentLayout Plan (Pg 1).pdf · uploaded 27 Mar 2026Source
- DocumentBP (Pg 2-6).pdf · uploaded 27 Mar 2026Source
- DocumentBP (Pg 7-9).pdf · uploaded 27 Mar 2026Source
- DocumentBP (Pg 10-12).pdf · uploaded 27 Mar 2026Source
- DocumentBP (Pg 13-15).pdf · uploaded 27 Mar 2026Source
- DocumentBP (Pg 16-18).pdf · uploaded 27 Mar 2026Source
- DocumentBP (Pg 19-21).pdf · uploaded 27 Mar 2026Source
- DocumentBP (Pg 22-24).pdf · uploaded 27 Mar 2026Source
- DocumentBP (Pg 25-27).pdf · uploaded 27 Mar 2026Source
- DocumentBP (Pg 28-30).pdf · uploaded 27 Mar 2026Source
- DocumentBP (Pg 31-33).pdf · uploaded 27 Mar 2026Source
- DocumentBP (Pg 34-37).pdf · uploaded 27 Mar 2026Source
- DocumentLayout Plan Pg 1.pdf · uploaded 3 Apr 2026Source
- DocumentBP Pg 2 to 4.pdf · uploaded 3 Apr 2026Source
- DocumentBP Pg 5 to 7.pdf · uploaded 3 Apr 2026Source
- DocumentBP Pg 8 to 10.pdf · uploaded 3 Apr 2026Source
- DocumentBP Pg 11 to 13.pdf · uploaded 3 Apr 2026Source
- DocumentBP Pg 14 to 16.pdf · uploaded 3 Apr 2026Source
- DocumentBP Pg 17 to 19.pdf · uploaded 3 Apr 2026Source
- DocumentBP Pg 20 to 22.pdf · uploaded 3 Apr 2026Source
- DocumentBP Pg 23 to 25.pdf · uploaded 3 Apr 2026Source
- DocumentBP Pg 26 to 28.pdf · uploaded 3 Apr 2026Source
- DocumentBP Pg 29 to 31.pdf · uploaded 3 Apr 2026Source
- DocumentBP Pg 32 to 34.pdf · uploaded 3 Apr 2026Source
- DocumentBP Pg 35 to 37.pdf · uploaded 3 Apr 2026Source
- DocumentLayout Plan Pg 1.pdf · uploaded 17 Apr 2026Source
- DocumentBuilding Plan Pg 2 to 4.pdf · uploaded 17 Apr 2026Source
- DocumentBuilding Plan Pg 5 to 7.pdf · uploaded 17 Apr 2026Source
- DocumentBuilding Plan Pg 8 to 10.pdf · uploaded 17 Apr 2026Source
- DocumentBuilding Plan Pg 11 to 13.pdf · uploaded 17 Apr 2026Source
- DocumentBuilding Plan Pg 14 to 16.pdf · uploaded 17 Apr 2026Source
- DocumentBuilding Plan Pg 17 to 19.pdf · uploaded 17 Apr 2026Source
- DocumentBuilding Plan Pg 20 to 22.pdf · uploaded 17 Apr 2026Source
- DocumentBuilding Plan Pg 23 to 25.pdf · uploaded 17 Apr 2026Source
- DocumentBuilding Plan Pg 26 to 28.pdf · uploaded 17 Apr 2026Source
- DocumentBuilding Plan Pg 29 to 31.pdf · uploaded 17 Apr 2026Source
- DocumentBuilding Plan Pg 32 to 34.pdf · uploaded 17 Apr 2026Source
- DocumentBuilding Plan Pg 35 to 37.pdf · uploaded 17 Apr 2026Source
Technical (Architect)
Technical (Engineer)
- DocumentForm 2 - Godrej Evergreen Square - Q3 FY25.pdf · uploaded 1 Apr 2025Source
- DocumentForm 2 - Godrej Evergreen Square - Q3 FY25.pdf · uploaded 1 Apr 2025Source
- DocumentForm 2 - Godrej Evergreen Square - Q4 FY25.pdf · uploaded 15 Apr 2025Source
- DocumentGodrej Evergreen Square - Form 2 - Q1FY27 RERA.pdf · uploaded 17 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel R-1/2/C
As registered with MahaRERA and published on its project page
- Project type
- Mixed
- Status on MahaRERA
- Certificate Signed
- Unit types
- Shop, 1BHK, 2BHK, 3BHK2,114 units in all
- Address
- R-1/2/C, Hinjewadi Phase 3, Rajiv Gandhi Infotech Park Phase III Industrial AreaPIN 411057
- Village
- Man, Mulshi taluka
- Location
- 18.42216, 73.31624
- Land area for this project
- 44,170 sq m (4,75,441 sq ft)
- Permissible built-up area
- 2,84,126 sq m (30,58,304 sq ft)
- Sanctioned built-up area
- 2,23,313 sq m (24,03,716 sq ft)
- Recreational open space
- 5,331 sq m (57,388 sq ft)
- Designated bank account
- 220
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
R-1/2/C
Boundaries
- North
- 45M Wide MIDC Road
- South
- MIDC Boundary
- East
- 60M Wide MIDC Road
- West
- Plot No R-1-2-B
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking2,114 units
1,505 of 2,114 units booked (71%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Amenity Building | Shop | 21.52 sq m · 232 sq ft | 1 | 0 |
| Amenity Building | Shop | 21.54 sq m · 232 sq ft | 2 | 2 |
| Amenity Building | Shop | 21.75 sq m · 234 sq ft | 1 | 0 |
| Amenity Building | Shop | 22 sq m · 237 sq ft | 1 | 1 |
| Amenity Building | Shop | 37 sq m · 398 sq ft | 1 | 1 |
| Amenity Building | Shop | 39.67 sq m · 427 sq ft | 1 | 1 |
| Amenity Building | Shop | 56.93 sq m · 613 sq ft | 2 | 0 |
| Amenity Building | Shop | 57.47 sq m · 619 sq ft | 1 | 1 |
Show all 106 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Amenity Building | Shop | 57.66 sq m · 621 sq ft | 2 | 0 |
| Amenity Building | Shop | 58.2 sq m · 626 sq ft | 2 | 2 |
| Amenity Building | Shop | 63.84 sq m · 687 sq ft | 1 | 0 |
| Amenity Building | Shop | 64.38 sq m · 693 sq ft | 1 | 0 |
| Amenity Building | Shop | 78.3 sq m · 843 sq ft | 1 | 1 |
| Amenity Building | Shop | 138.61 sq m · 1,492 sq ft | 1 | 0 |
| Amenity Building | Shop | 176.16 sq m · 1,896 sq ft | 1 | 0 |
| Amenity Building | Shop | 193.74 sq m · 2,085 sq ft | 1 | 0 |
| Amenity Building | Shop | 227.45 sq m · 2,448 sq ft | 1 | 0 |
| Amenity Building | Shop | 257.15 sq m · 2,768 sq ft | 1 | 0 |
| Retail Shop | Shop | 11.85 sq m · 128 sq ft | 1 | 0 |
| Retail Shop | Shop | 16.85 sq m · 181 sq ft | 1 | 1 |
| Retail Shop | Shop | 24.83 sq m · 267 sq ft | 1 | 0 |
| Retail Shop | Shop | 28.28 sq m · 304 sq ft | 1 | 0 |
| Retail Shop | Shop | 36.48 sq m · 393 sq ft | 2 | 1 |
| Retail Shop | Shop | 36.95 sq m · 398 sq ft | 1 | 1 |
| Retail Shop | Shop | 38 sq m · 409 sq ft | 2 | 1 |
| Retail Shop | Shop | 38.26 sq m · 412 sq ft | 2 | 1 |
| Retail Shop | Shop | 38.38 sq m · 413 sq ft | 2 | 1 |
| Retail Shop | Shop | 39 sq m · 420 sq ft | 2 | 1 |
| Retail Shop | Shop | 39.42 sq m · 424 sq ft | 1 | 0 |
| Retail Shop | Shop | 39.73 sq m · 428 sq ft | 2 | 1 |
| Retail Shop | Shop | 40.32 sq m · 434 sq ft | 2 | 1 |
| Retail Shop | Shop | 40.34 sq m · 434 sq ft | 2 | 2 |
| Retail Shop | Shop | 40.42 sq m · 435 sq ft | 2 | 0 |
| Retail Shop | Shop | 40.46 sq m · 436 sq ft | 2 | 0 |
| Retail Shop | Shop | 40.67 sq m · 438 sq ft | 2 | 0 |
| Retail Shop | Shop | 41.31 sq m · 445 sq ft | 2 | 0 |
| Retail Shop | Shop | 41.52 sq m · 447 sq ft | 2 | 0 |
| Retail Shop | Shop | 41.89 sq m · 451 sq ft | 2 | 1 |
| Retail Shop | Shop | 41.99 sq m · 452 sq ft | 2 | 1 |
| Retail Shop | Shop | 42.8 sq m · 461 sq ft | 2 | 0 |
| Retail Shop | Shop | 42.81 sq m · 461 sq ft | 2 | 1 |
| Retail Shop | Shop | 42.85 sq m · 461 sq ft | 2 | 1 |
| Retail Shop | Shop | 42.9 sq m · 462 sq ft | 2 | 1 |
| Retail Shop | Shop | 42.91 sq m · 462 sq ft | 2 | 0 |
| Retail Shop | Shop | 43 sq m · 463 sq ft | 2 | 1 |
| Retail Shop | Shop | 43.16 sq m · 465 sq ft | 2 | 1 |
| Retail Shop | Shop | 43.35 sq m · 467 sq ft | 2 | 1 |
| Retail Shop | Shop | 43.55 sq m · 469 sq ft | 2 | 1 |
| Retail Shop | Shop | 43.62 sq m · 470 sq ft | 2 | 0 |
| Retail Shop | Shop | 43.67 sq m · 470 sq ft | 2 | 1 |
| Retail Shop | Shop | 43.85 sq m · 472 sq ft | 2 | 1 |
| Retail Shop | Shop | 44.3 sq m · 477 sq ft | 2 | 0 |
| Retail Shop | Shop | 44.65 sq m · 481 sq ft | 2 | 2 |
| Retail Shop | Shop | 44.85 sq m · 483 sq ft | 2 | 1 |
| Retail Shop | Shop | 45.36 sq m · 488 sq ft | 2 | 1 |
| Retail Shop | Shop | 45.94 sq m · 494 sq ft | 2 | 0 |
| Retail Shop | Shop | 45.98 sq m · 495 sq ft | 2 | 0 |
| Retail Shop | Shop | 46 sq m · 495 sq ft | 2 | 0 |
| Retail Shop | Shop | 46.72 sq m · 503 sq ft | 2 | 2 |
| Retail Shop | Shop | 47.33 sq m · 509 sq ft | 2 | 1 |
| Retail Shop | Shop | 49.39 sq m · 532 sq ft | 2 | 1 |
| Retail Shop | Shop | 49.54 sq m · 533 sq ft | 2 | 0 |
| Retail Shop | Shop | 53.5 sq m · 576 sq ft | 2 | 0 |
| Retail Shop | Shop | 56.46 sq m · 608 sq ft | 2 | 0 |
| Retail Shop | Shop | 57.35 sq m · 617 sq ft | 2 | 1 |
| Retail Shop | Shop | 58 sq m · 624 sq ft | 2 | 0 |
| Retail Shop | Shop | 86.83 sq m · 935 sq ft | 2 | 0 |
| Retail Shop | Shop | 430.34 sq m · 4,632 sq ft | 2 | 1 |
| Tower 2 | 1BHK | 39 sq m · 420 sq ft | 64 | 64 |
| Tower 2 | 1BHK | 40.72 sq m · 438 sq ft | 64 | 60 |
| Tower 2 | 1BHK | 41 sq m · 441 sq ft | 122 | 108 |
| Tower 2 | 2BHK | 58.2 sq m · 626 sq ft | 128 | 116 |
| Tower 3 | 1BHK | 39 sq m · 420 sq ft | 64 | 62 |
| Tower 3 | 1BHK | 40.72 sq m · 438 sq ft | 64 | 58 |
| Tower 3 | 1BHK | 41 sq m · 441 sq ft | 122 | 108 |
| Tower 3 | 2BHK | 58.2 sq m · 626 sq ft | 128 | 112 |
| Tower 4 | 1BHK | 69 sq m · 743 sq ft | 32 | 23 |
| Tower 4 | 1BHK | 69.83 sq m · 752 sq ft | 32 | 11 |
| Tower 4 | 2BHK | 67.86 sq m · 730 sq ft | 52 | 13 |
| Tower 4 | 2BHK | 69.34 sq m · 746 sq ft | 64 | 29 |
| Tower 4 | 3BHK | 86.28 sq m · 929 sq ft | 6 | 2 |
| Tower 4 | 3BHK | 88.84 sq m · 956 sq ft | 64 | 47 |
| Tower 5 | 2BHK | 58 sq m · 624 sq ft | 32 | 26 |
| Tower 5 | 2BHK | 58.71 sq m · 632 sq ft | 29 | 26 |
| Tower 5 | 2BHK | 58.92 sq m · 634 sq ft | 35 | 24 |
| Tower 5 | 2BHK | 58.93 sq m · 634 sq ft | 32 | 29 |
| Tower 5 | 2BHK | 59.7 sq m · 643 sq ft | 36 | 30 |
| Tower 5 | 2BHK | 59.9 sq m · 645 sq ft | 32 | 32 |
| Tower 5 | 3BHK | 75.97 sq m · 818 sq ft | 68 | 63 |
| Tower 6 | 2BHK | 58 sq m · 624 sq ft | 32 | 21 |
| Tower 6 | 2BHK | 58.71 sq m · 632 sq ft | 34 | 32 |
| Tower 6 | 2BHK | 58.92 sq m · 634 sq ft | 34 | 32 |
| Tower 6 | 2BHK | 58.93 sq m · 634 sq ft | 26 | 18 |
| Tower 6 | 2BHK | 59.7 sq m · 643 sq ft | 35 | 33 |
| Tower 6 | 2BHK | 59.9 sq m · 645 sq ft | 32 | 23 |
| Tower 6 | 3BHK | 75.97 sq m · 818 sq ft | 67 | 60 |
| Tower 7 | 2BHK | 67.86 sq m · 730 sq ft | 36 | 0 |
| Tower 7 | 2BHK | 69.34 sq m · 746 sq ft | 28 | 0 |
| Tower 7 | 3BHK | 88.84 sq m · 956 sq ft | 18 | 0 |
| Tower 7 | 3BHK | 88.86 sq m · 956 sq ft | 56 | 0 |
| Tower 7 | 3BHK | 103.38 sq m · 1,113 sq ft | 4 | 0 |
| Tower 8 | 2BHK | 57.32 sq m · 617 sq ft | 66 | 43 |
| Tower 8 | 2BHK | 57.43 sq m · 618 sq ft | 66 | 47 |
| Tower 8 | 2BHK | 57.59 sq m · 620 sq ft | 60 | 34 |
| Tower 8 | 2BHK | 57.96 sq m · 624 sq ft | 67 | 51 |
| Tower 8 | 2BHK | 59.83 sq m · 644 sq ft | 67 | 27 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Other projects in Man
- VyomoraRERA PM1261012602233
- Sukhwani GemzsRERA PR1260002601952
- Vyomora Phase 1RERA PR1260002600999
- Altis OneRERA PC1260002600470
- HinjewadiRERA PR1260002502408
- 18 AanganRERA PR1260002501338
- You57 Tower DRERA PR1264042501139
- Building B3 Eon HomesRERA P52100080318
All 77 projects in Man · Compare Godrej Evergreen Square with another project
Godrej Evergreen Square in numbers
Registered deals, summarised
Deedo has 1 registered document at Godrej Evergreen Square, from May 2026 to May 2026: 1 sale.
- How many properties have been sold at Godrej Evergreen Square?
- 1 sale is registered at Godrej Evergreen Square.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Godrej Evergreen Square by Deedo, last updated with deals registered in May 2026.
Latest deal · Primary sale · May 2026
₹75 L–1 Cr