Ekaant
Deedo IDDP-PUN-7JNDIt is due for completion in Jan 2027, with no extension on record; no MahaRERA orders on record; 43% of its units are booked.
Mamurdi, Pune 412101 · Property rates in Mamurdi · by Shree Balaji Associates
Buying a flat here?
See every deed registered on it.
It is due for completion in Jan 2027, with no extension on record
- This projectRegistered 9 Nov 2022, completion promised 31 Jan 2027.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
2 buildings
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100047560
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100047560 | 9 Nov 2022 | 31 Jan 2027 | 31 Dec 2025 | Shree Balaji Associates | Project page |
Documents192
4 documents held by Deedo, 188 filings listed on MahaRERA's project page
Registration certificate (2)
Other
- OtherDate not statedView
Finance
- PAN CardPAN CARD.pdf · uploaded 11 Jul 2022Source
Show all 192 documentsShow fewer documents
Migrated
- 1 PAN CardPAN CARD.pdf · uploaded 11 Jul 2022Source
- 1 a Details of encumbrances concerned to FinanceFinanace Encumbrance.pdf · uploaded 11 Jul 2022Source
- 1 b Details of encumbrances concerned to LegalEncumbrance legal.pdf · uploaded 11 Jul 2022Source
- 1 Declaration about Commencement CertificateDeclaration about CC.pdf · uploaded 11 Jul 2022Source
- 1 Declaration in FORM Bform b promoters_compressed.pdf · uploaded 11 Jul 2022Source
- 1 Deviation Report with respect to Allotment letterDeviation Allotment letter.pdf · uploaded 11 Jul 2022Source
- 1 Copy of Layout Approval (in case of layout)MYSCAN-20220709-0002.pdf · uploaded 22 Aug 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentCC_page-0001.pdf · uploaded 22 Aug 2022Source
- 1 Copy of the legal title reportSEARCH REPORT.pdf · uploaded 15 Oct 2022Source
- 2 Copy of Layout Approval (in case of layout)Layout_1.pdf · uploaded 15 Oct 2022Source
- 3 Copy of Layout Approval (in case of layout)Layout_2.pdf · uploaded 15 Oct 2022Source
- 4 Copy of Layout Approval (in case of layout)Layout_3.pdf · uploaded 15 Oct 2022Source
- 5 Copy of Layout Approval (in case of layout)Layout_4.pdf · uploaded 15 Oct 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)engineer certificate.pdf · uploaded 15 Oct 2022Source
- 1 CERSAI detailsCERSAI.pdf · uploaded 15 Oct 2022Source
- 1 Proforma of Allotment letterModel Allotment_RERA.pdf · uploaded 15 Oct 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBankDeclaration_compressed.pdf · uploaded 15 Oct 2022Source
- 1 Proforma of Agreement for saleMahaRERA_AnxA_ATS_Model.pdf · uploaded 21 Oct 2022Source
- 1 Deviation Report with respect to model copy of AgreementDocScanner 21-Oct-2022 4-38 pm.pdf · uploaded 21 Oct 2022Source
- 1 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 24 Oct 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentNA.pdf · uploaded 24 Oct 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)DocScanner 25-Oct-2022 1-14 pm.pdf · uploaded 25 Oct 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final_CA_compressed.pdf · uploaded 31 Oct 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)BALAJI REV.pdf · uploaded 23 Jun 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)VIDHATE.pdf · uploaded 23 Jun 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)DocScanner 30-May-2023 12-18 pm_compressed (1).pdf · uploaded 23 Jun 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)ekant rera revised certicate.pdf · uploaded 2 Jan 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Ekaant.pdf · uploaded 2 Jan 2024Source
- 1 Disclosure of sold/ booked inventoryPdf_Scanner_1704179197762.pdf · uploaded 2 Jan 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)doc00795620240102152422.pdf · uploaded 2 Jan 2024Source
- 6 Copy of Layout Approval (in case of layout)HPSC3307_compressed.pdf · uploaded 16 Apr 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentHPSC3310_compressed.pdf · uploaded 16 Apr 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentHPSC3308_compressed.pdf · uploaded 16 Apr 2024Source
- 5 Building Plan Approval / NA Order for plotted developmentHPSC3309_compressed.pdf · uploaded 16 Apr 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentCANONADV6575i (7)_compressed.pdf · uploaded 16 Apr 2024Source
- 7 Copy of Layout Approval (in case of layout)HPSC3307_compressed.pdf · uploaded 2 May 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)VIDHATE RERA.pdf · uploaded 10 Jun 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Ekaant.pdf · uploaded 10 Jun 2024Source
- 2 Disclosure of sold/ booked inventoryPdf_Scanner_1704179197762.pdf · uploaded 10 Jun 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed (2).pdf · uploaded 10 Jun 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)RERA CERTIFICATE (1).pdf · uploaded 29 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed (2).pdf · uploaded 29 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2-EKannt.pdf · uploaded 29 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryPdf_Scanner_1704179197762.pdf · uploaded 29 Oct 2024Source
- 1 Declaration in FORM BDocScanner Jan 30, 2025 2-01 PM.pdf · uploaded 31 Jan 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A- Ekaant.pdf · uploaded 31 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)RERA CERTIFICATE (1).pdf · uploaded 10 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed (2).pdf · uploaded 10 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Ekaant.pdf · uploaded 10 Feb 2025Source
- 1 Disclosure of sold/ booked inventoryPdf_Scanner_1704179197762.pdf · uploaded 10 Feb 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)DocScanner 08-Feb-2025 12-03 pm.pdf · uploaded 10 Feb 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)DocScanner 08-Feb-2025 12-05 pm.pdf · uploaded 10 Feb 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1-MARCH-23.pdf · uploaded 7 Mar 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1-JUNE 23.pdf · uploaded 7 Mar 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1-SEPT 23.pdf · uploaded 7 Mar 2025Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1-DEC-23.pdf · uploaded 7 Mar 2025Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1-MARCH-24.pdf · uploaded 7 Mar 2025Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1-JUNE-24.pdf · uploaded 7 Mar 2025Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1-SEPT-24.pdf · uploaded 7 Mar 2025Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1-DEC-24.pdf · uploaded 7 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1-DEC-22.pdf · uploaded 7 Mar 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2-MARCH-23.pdf · uploaded 7 Mar 2025Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2-DEC-24.pdf · uploaded 7 Mar 2025Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2-SEPT-24.pdf · uploaded 7 Mar 2025Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2-JUNE-24.pdf · uploaded 7 Mar 2025Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2-MARCH-24.pdf · uploaded 7 Mar 2025Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2-DEC-23.pdf · uploaded 7 Mar 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2-SEPT-23.pdf · uploaded 7 Mar 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2-JUNE-23.pdf · uploaded 7 Mar 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2-DEC-22.pdf · uploaded 7 Mar 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)2022-23.pdf · uploaded 7 Mar 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)2023-24.pdf · uploaded 7 Mar 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3-JUNE-23_compressed.pdf · uploaded 8 Mar 2025Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3-DEC-24_compressed.pdf · uploaded 8 Mar 2025Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3-SEPT-24_compressed.pdf · uploaded 8 Mar 2025Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3-JUNE-24_compressed.pdf · uploaded 8 Mar 2025Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3-MARCH-24_compressed.pdf · uploaded 8 Mar 2025Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3-DEC-23_compressed.pdf · uploaded 8 Mar 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3-SEPT-23_compressed.pdf · uploaded 8 Mar 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3-MARCH-23_compressed.pdf · uploaded 8 Mar 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3-DEC-22_compressed.pdf · uploaded 8 Mar 2025Source
- 1 Disclosure of sold/ booked inventorySU-DEC22.pdf · uploaded 8 Mar 2025Source
- 2 Disclosure of sold/ booked inventorySU-MARCH-23.pdf · uploaded 8 Mar 2025Source
- 3 Disclosure of sold/ booked inventorySU-JUNE-23.pdf · uploaded 8 Mar 2025Source
- 4 Disclosure of sold/ booked inventorySU-SEPT-23.pdf · uploaded 8 Mar 2025Source
- 5 Disclosure of sold/ booked inventorySU-DEC23.pdf · uploaded 8 Mar 2025Source
- 6 Disclosure of sold/ booked inventorySU-MARCH-24.pdf · uploaded 8 Mar 2025Source
- 7 Disclosure of sold/ booked inventorySU-JUNE-24.pdf · uploaded 8 Mar 2025Source
- 8 Disclosure of sold/ booked inventorySU-SEPT-24.pdf · uploaded 8 Mar 2025Source
- 9 Disclosure of sold/ booked inventorySU-DEC24.pdf · uploaded 8 Mar 2025Source
- Form 1F1-DEC-22.pdf · uploaded 22 May 2025Source
- Form 2F2-DEC-22.pdf · uploaded 22 May 2025Source
- Form 3F3-DEC-22.pdf · uploaded 22 May 2025Source
- Disclosure of Sold and Booked InventorySU-DEC22.pdf · uploaded 22 May 2025View
- Form 1F1-MARCH-23.pdf · uploaded 22 May 2025Source
- Form 2F2-MARCH-23.pdf · uploaded 22 May 2025Source
- Form 3F3-MARCH-23.pdf · uploaded 22 May 2025Source
- Disclosure of Sold and Booked InventorySU-MARCH-23.pdf · uploaded 22 May 2025View
- Form 1F1-JUNE 23.pdf · uploaded 22 May 2025Source
- Form 2F2-JUNE-23.pdf · uploaded 22 May 2025Source
- Form 3F3-JUNE-23.pdf · uploaded 22 May 2025Source
- Disclosure of Sold and Booked InventorySU-JUNE-23.pdf · uploaded 22 May 2025View
- Form 1F1-SEPT 23.pdf · uploaded 22 May 2025Source
- Form 2F2-SEPT-23.pdf · uploaded 22 May 2025Source
- Form 3F3-SEPT-23.pdf · uploaded 22 May 2025Source
- Disclosure of Sold and Booked InventorySU-SEPT-23.pdf · uploaded 22 May 2025View
- Form 1F1-DEC-23.pdf · uploaded 22 May 2025Source
- Form 2F2-DEC-23.pdf · uploaded 22 May 2025Source
- Form 3F3-DEC-23.pdf · uploaded 22 May 2025Source
- Disclosure of Sold and Booked InventorySU-DEC23.pdf · uploaded 22 May 2025View
- Form 1F1-MARCH-24.pdf · uploaded 22 May 2025Source
- Form 2F2-MARCH-24.pdf · uploaded 22 May 2025Source
- Form 3F3-MARCH-24.pdf · uploaded 22 May 2025Source
- Disclosure of Sold and Booked InventorySU-MARCH-24.pdf · uploaded 22 May 2025View
- Form 1F1-JUNE-24.pdf · uploaded 22 May 2025Source
- Form 2F2-JUNE-24.pdf · uploaded 22 May 2025Source
- Form 3F3-JUNE-24.pdf · uploaded 22 May 2025Source
- Disclosure of Sold and Booked InventorySU-JUNE-24.pdf · uploaded 22 May 2025View
- Form 1F1-SEPT-24.pdf · uploaded 22 May 2025Source
- Form 2F2-SEPT-24.pdf · uploaded 22 May 2025Source
- Form 3F3-SEPT-24.pdf · uploaded 22 May 2025Source
- Disclosure of Sold and Booked InventorySU-SEPT-24.pdf · uploaded 22 May 2025View
- Form 1F1-DEC-24.pdf · uploaded 22 May 2025Source
- Form 2F2-DEC-24.pdf · uploaded 22 May 2025Source
- Disclosure of Sold and Booked InventorySU-DEC24.pdf · uploaded 22 May 2025View
- Form 3F3-DEC-24_compressed.pdf · uploaded 22 May 2025Source
- Form 5 (FY 2022-2023)22-23.pdf · uploaded 22 May 2025Source
- Form 5 (FY 2023-2024)23-24.pdf · uploaded 22 May 2025Source
- Form 1F1.pdf · uploaded 19 Jul 2025Source
- Form 2FORM-2 -MARCH-25.pdf · uploaded 19 Jul 2025Source
- Form 3F3-EKAANT -MARCH-25.pdf · uploaded 19 Jul 2025Source
- Disclosure of Sold and Booked InventorySU-MARCH-25.pdf · uploaded 19 Jul 2025View
- Withdrawal Update Form 1F1.pdf · uploaded 19 Jul 2025Source
- Withdrawal Update Form 2FORM-2-JUNE-25.pdf · uploaded 19 Jul 2025Source
- Withdrawal Update Form 3FORM-3(JUNE-25).pdf · uploaded 19 Jul 2025Source
- Withdrawal Update Form 1F1-Q2.pdf · uploaded 20 Oct 2025Source
- Withdrawal Update Form 2F2-Q2.pdf · uploaded 20 Oct 2025Source
- Withdrawal Update Form 3F3-Q2.pdf · uploaded 20 Oct 2025Source
- Withdrawal Update Form 1F1-Q3.pdf · uploaded 21 Jan 2026Source
- Withdrawal Update Form 2F2-Q3.pdf · uploaded 21 Jan 2026Source
- Withdrawal Update Form 3FORM-3.pdf · uploaded 21 Jan 2026Source
- Form 2A (FY 2022-2023)Form 2A-FY 22-23.pdf · uploaded 8 Oct 2026Source
- Form 2A (FY 2023-2024)Form 2A-FY 23-24.pdf · uploaded 8 Oct 2026Source
- Form 2A (FY 2024-2025)Form 2A-FY 24-25.pdf · uploaded 8 Oct 2026Source
- Form 2A (FY 2025-2026)Form 2A-FY 25-26.pdf · uploaded 8 Oct 2026Source
- Form 5 (FY 2024-2025)RERA AUDIT (FY 24-25).pdf · uploaded 8 Oct 2026Source
- Form 5 (FY 2025-2026)RERA AUDIT (FY 25-26).pdf · uploaded 8 Oct 2026Source
Technical
- DocumentMYSCAN-20220709-0002.pdf · uploaded 22 Aug 2022Source
- DocumentLayout_1.pdf · uploaded 15 Oct 2022Source
- DocumentLayout_2.pdf · uploaded 15 Oct 2022Source
- DocumentLayout_3.pdf · uploaded 15 Oct 2022Source
- DocumentLayout_4.pdf · uploaded 15 Oct 2022Source
- Document5.pdf · uploaded 24 Oct 2022Source
- DocumentNA.pdf · uploaded 24 Oct 2022Source
- DocumentHPSC3307_compressed.pdf · uploaded 16 Apr 2024Source
- DocumentHPSC3310_compressed.pdf · uploaded 16 Apr 2024Source
- DocumentHPSC3308_compressed.pdf · uploaded 16 Apr 2024Source
- DocumentHPSC3309_compressed.pdf · uploaded 16 Apr 2024Source
- DocumentHPSC3307_compressed.pdf · uploaded 2 May 2024Source
- OthersP DEED.pdf · uploaded 22 May 2025Source
Technical (Architect)
- DocumentRERA CERTIFICATE (1).pdf · uploaded 29 Oct 2024Source
- DocumentRERA CERTIFICATE (1).pdf · uploaded 10 Feb 2025Source
- DocumentF1-DEC-22.pdf · uploaded 7 Mar 2025Source
- DocumentF1-MARCH-23.pdf · uploaded 7 Mar 2025Source
- DocumentF1-JUNE 23.pdf · uploaded 7 Mar 2025Source
- DocumentF1-SEPT 23.pdf · uploaded 7 Mar 2025Source
- DocumentF1-DEC-23.pdf · uploaded 7 Mar 2025Source
- DocumentF1-MARCH-24.pdf · uploaded 7 Mar 2025Source
- DocumentF1-JUNE-24.pdf · uploaded 7 Mar 2025Source
- DocumentF1-SEPT-24.pdf · uploaded 7 Mar 2025Source
- DocumentF1-DEC-24.pdf · uploaded 7 Mar 2025Source
- DocumentF1-Q3.pdf · uploaded 21 Jan 2026Source
Technical (Engineer)
- DocumentForm 2-EKannt.pdf · uploaded 29 Oct 2024Source
- DocumentForm 2- Ekaant.pdf · uploaded 10 Feb 2025Source
- DocumentF2-DEC-22.pdf · uploaded 7 Mar 2025Source
- DocumentF2-MARCH-23.pdf · uploaded 7 Mar 2025Source
- DocumentF2-JUNE-23.pdf · uploaded 7 Mar 2025Source
- DocumentF2-SEPT-23.pdf · uploaded 7 Mar 2025Source
- DocumentF2-DEC-23.pdf · uploaded 7 Mar 2025Source
- DocumentF2-MARCH-24.pdf · uploaded 7 Mar 2025Source
- DocumentF2-JUNE-24.pdf · uploaded 7 Mar 2025Source
- DocumentF2-SEPT-24.pdf · uploaded 7 Mar 2025Source
- DocumentF2-DEC-24.pdf · uploaded 7 Mar 2025Source
- DocumentF2-Q3.pdf · uploaded 21 Jan 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel SURVEY NO. 19/1B AT MAMURDI
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK, Landowners49 units in all
- Address
- Survey No. 19/1b At Mamurdi, Mamurdi, MamurdiPIN 412101
- Village
- Mamurdi, Haveli taluka
- Location
- 18.67369, 73.71812
- Land area for this project
- 1,000 sq m (10,764 sq ft)
- Permissible built-up area
- 854 sq m (9,195 sq ft)
- Sanctioned built-up area
- 854 sq m (9,195 sq ft)
- Designated bank account
- 203
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
SURVEY NO. 19/1B AT MAMURDI
Boundaries
- North
- 40 Ft Dp Road
- South
- Property Of Mr Sagar Gaikwad And Mr Degave
- East
- Property Of Mr Mangilal Garewal And Mr Sharma
- West
- 60 Ft Dp Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking49 units
21 of 49 units booked (43%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 39.86 sq m · 429 sq ft | 6 | 5 |
| 1BHK | 41.34 sq m · 445 sq ft | 10 | 10 |
| 1BHK | 42.27 sq m · 455 sq ft | 4 | 4 |
| 2BHK | 59.83 sq m · 644 sq ft | 5 | 2 |
| Landowners | 39.86 sq m · 429 sq ft | 8 | 0 |
| Landowners | 41.34 sq m · 445 sq ft | 11 | 0 |
| Landowners | 42.27 sq m · 455 sq ft | 3 | 0 |
| Landowners | 59.83 sq m · 644 sq ft | 2 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals2
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Chartered accountant | Pravin Eknath Pise | — |
| Engineer | Arjun Vidhate | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Mamurdi
- Austin IraRERA PM1260002601545
- Arohi SkylineRERA PR1260002601521
- Raajwada LegacyRERA PM1260002601324
- Rk AmorRERA PM1260002600597
- Jefro KingsfortRERA PM1260002600286
- My Home SanctuaryRERA PR1261012502725
- Sai StellaRERA PM1260002500576
- Lotus FlorinaRERA P52100080893
All 44 projects in Mamurdi · Compare Ekaant with another project