Deedo IDDP-PUN-N50ACompletion was pushed back 1 year, to Dec 2026; no MahaRERA orders on record; 8% of its units are booked.
Loni Kand, Pune 412216 · Property rates in Loni Kand · by Yogesh Developers
Buying a flat here?
See every deed registered on it.
Completion was pushed back 1 year, to Dec 2026
- This projectRegistered 27 Jun 2023, completion promised 31 Dec 2025, revised to 31 Dec 2026.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100051700
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100051700 | 27 Jun 2023 | 31 Dec 2025 | 31 Dec 2026 | Yogesh Developers | Project page |
Documents143
2 documents held by Deedo, 141 filings listed on MahaRERA's project page
Finance
- PAN Card1 PAN Card.pdf · uploaded 18 Mar 2023Source
Legal
Migrated
- 1 PAN Card1 PAN Card.pdf · uploaded 18 Mar 2023Source
Show all 143 documentsShow fewer documents
Migrated
- 1 Copy of the legal title report11-02-2023 Search Report_compressed (1).pdf · uploaded 18 Mar 2023Source
- 2 Copy of the legal title reportlegal rera.pdf · uploaded 18 Mar 2023Source
- 1 a Details of encumbrances concerned to Financeencumbrances.pdf · uploaded 18 Mar 2023Source
- 1 b Details of encumbrances concerned to Legalencumbrances.pdf · uploaded 18 Mar 2023Source
- 1 Copy of Layout Approval (in case of layout)1 (9).pdf · uploaded 18 Mar 2023Source
- 1 Building Plan Approval / NA Order for plotted development4 (4).pdf · uploaded 18 Mar 2023Source
- 2 Building Plan Approval / NA Order for plotted development5 (2).pdf · uploaded 18 Mar 2023Source
- 3 Building Plan Approval / NA Order for plotted development6 (2).pdf · uploaded 18 Mar 2023Source
- 4 Building Plan Approval / NA Order for plotted development7 (2).pdf · uploaded 18 Mar 2023Source
- 5 Building Plan Approval / NA Order for plotted development8 (2).pdf · uploaded 18 Mar 2023Source
- 6 Building Plan Approval / NA Order for plotted development9 (2).pdf · uploaded 18 Mar 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 18 Mar 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentN A.pdf · uploaded 18 Mar 2023Source
- 1 Declaration about Commencement Certificateform d.pdf · uploaded 20 Mar 2023Source
- 1 Declaration in FORM BFORM B D.pdf · uploaded 20 Mar 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM1.pdf · uploaded 20 Mar 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 20 Mar 2023Source
- 1 Disclosure of Interest in Other Real Estate Organizationsannex a.pdf · uploaded 20 Mar 2023Source
- 1 Deviation Report with respect to Allotment letterno deviation allotment.pdf · uploaded 1 Apr 2023Source
- 1 Deviation Report with respect to model copy of Agreementno deviation agreement.pdf · uploaded 1 Apr 2023Source
- 1 Proforma of Agreement for saleAgmt 1.pdf · uploaded 4 Apr 2023Source
- 2 a Details of encumbrances concerned to FinanceFI ENCUM.pdf · uploaded 14 Apr 2023Source
- 2 b Details of encumbrances concerned to LegalFI ENCUM.pdf · uploaded 14 Apr 2023Source
- 1 Proforma of Allotment letterAllotment.pdf · uploaded 14 Apr 2023Source
- 2 Proforma of Allotment letterFINAL DRAFT.pdf · uploaded 14 Apr 2023Source
- 3 Proforma of Allotment letterFINAL DRAFT.pdf · uploaded 14 Apr 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFORMAT A.pdf · uploaded 14 Apr 2023Source
- 1 CERSAI detailsCERSAI.pdf · uploaded 22 Apr 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate- YD-PH3_0001_compressed.pdf · uploaded 22 Apr 2023Source
- 3 a Details of encumbrances concerned to FinanceENCUMBRANCES.pdf · uploaded 9 Jun 2023Source
- 3 b Details of encumbrances concerned to LegalENCUMBRANCES.pdf · uploaded 9 Jun 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)form1 p3_0001.pdf · uploaded 12 Aug 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 p3_0001.pdf · uploaded 12 Aug 2023Source
- 1 Disclosure of sold/ booked inventoryDocument 11 (1).pdf · uploaded 12 Aug 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)form3 p3_0001_compressed.pdf · uploaded 12 Aug 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)YD- Form 1-PH3_0001.pdf · uploaded 28 Oct 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)YD- Form 2-PH3_0001_compressed.pdf · uploaded 28 Oct 2023Source
- 2 Disclosure of sold/ booked inventoryYD- Booking disclouser-PH3_0001.pdf · uploaded 28 Oct 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)YD- Form 3-PH3_0001_compressed.pdf · uploaded 28 Oct 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P-3 F1_0001.pdf · uploaded 3 Feb 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P 3 F2.pdf · uploaded 3 Feb 2024Source
- 3 Disclosure of sold/ booked inventoryP-3 BOOKING_0001.pdf · uploaded 3 Feb 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P-3 F 3_0001.pdf · uploaded 3 Feb 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1.pdf · uploaded 17 Jul 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2.pdf · uploaded 17 Jul 2024Source
- 4 Disclosure of sold/ booked inventorybook.pdf · uploaded 17 Jul 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3_compressed.pdf · uploaded 17 Jul 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_0001.pdf · uploaded 7 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_0001.pdf · uploaded 7 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryBOOKING_0001.pdf · uploaded 7 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_0001_compressed (1).pdf · uploaded 7 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_0001.pdf · uploaded 7 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_0001.pdf · uploaded 7 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryBOOKING_0001.pdf · uploaded 7 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_0001_compressed (1).pdf · uploaded 7 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_0001.pdf · uploaded 7 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_0001.pdf · uploaded 7 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryBOOKING_0001.pdf · uploaded 7 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_0001_compressed (1).pdf · uploaded 7 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_0001.pdf · uploaded 7 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_0001_compressed (1).pdf · uploaded 7 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_0001.pdf · uploaded 7 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryBOOKING_0001.pdf · uploaded 7 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryBOOKING.pdf · uploaded 7 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 7 Dec 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 7 Dec 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_compressed.pdf · uploaded 7 Dec 2024Source
- 1 Disclosure of sold/ booked inventoryBOOKING.pdf · uploaded 7 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 7 Dec 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 7 Dec 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_compressed.pdf · uploaded 7 Dec 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 7 Dec 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_compressed.pdf · uploaded 7 Dec 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 7 Dec 2024Source
- 3 Disclosure of sold/ booked inventoryBOOKING.pdf · uploaded 7 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 1_0001.pdf · uploaded 15 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 31_0001.pdf · uploaded 15 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 1_0001.pdf · uploaded 15 Feb 2025Source
- 1 Disclosure of sold/ booked inventoryBOOKING 1_0001.pdf · uploaded 15 Feb 2025Source
- 1 Declaration in FORM Bform b_0001.pdf · uploaded 25 Mar 2025Source
- 1 Disclosure of sold/ booked inventoryBOOK_0001.pdf · uploaded 25 Mar 2025Source
- DocumentFORM1_0001.pdf · uploaded 29 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_0001.pdf · uploaded 29 Apr 2025Source
- DocumentFORM 2_0001.pdf · uploaded 29 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryBOOK_0001.pdf · uploaded 29 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2 A_0001.pdf · uploaded 29 Apr 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5_0001.pdf · uploaded 29 Apr 2025Source
- Form 1Form 1 Architect Certificate_0001.pdf · uploaded 18 Nov 2025Source
- Form 2Form 2 Engineers Certificate_0001.pdf · uploaded 18 Nov 2025Source
- Form 3Form 3 C A Certificate flora P-3 September qtr_0001.pdf · uploaded 18 Nov 2025Source
- Disclosure of Sold and Booked InventorySold- Booked P-3_0001.pdf · uploaded 18 Nov 2025Source
- Form 1form 1.pdf · uploaded 22 Jan 2026Source
- Form 2form 2.pdf · uploaded 22 Jan 2026Source
- Form 3form 3.pdf · uploaded 22 Jan 2026Source
- Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 22 Jan 2026Source
- Withdrawal Update Form 1form 1.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 2form 2.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 3form 3 (4).pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 1Form 1 flora phase 3_0001.pdf · uploaded 25 May 2026Source
- Withdrawal Update Form 2Form 2 Flora phase 3_0001.pdf · uploaded 25 May 2026Source
- Withdrawal Update Form 3form 3 Oxy flora phase 3_0001.pdf · uploaded 25 May 2026Source
- Form 2A (FY 2025-2026)Form 2 A flora phase 3_0001.pdf · uploaded 26 May 2026Source
- Withdrawal Update Form 1architect YD Ph 3.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 1architect YD Ph 3.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 2engineer certificate form 2 ph 3.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 2engineer certificate form 2 ph 3.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 3Form 3 flora phase 3_0001.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 3Form 3 flora phase 3_0001.pdf · uploaded 20 Jul 2026Source
Technical
- Document1 (9).pdf · uploaded 18 Mar 2023Source
- Document6 (2).pdf · uploaded 18 Mar 2023Source
- Document7 (2).pdf · uploaded 18 Mar 2023Source
- Document8 (2).pdf · uploaded 18 Mar 2023Source
- Document9 (2).pdf · uploaded 18 Mar 2023Source
- Document4 (4).pdf · uploaded 18 Mar 2023Source
- Document5 (2).pdf · uploaded 18 Mar 2023Source
Technical (Architect)
- DocumentFORM 1_0001.pdf · uploaded 7 Oct 2024Source
- DocumentFORM 1_0001.pdf · uploaded 7 Oct 2024Source
- DocumentFORM 1_0001.pdf · uploaded 7 Oct 2024Source
- DocumentFORM 1_0001.pdf · uploaded 7 Oct 2024Source
- DocumentFORM 1.pdf · uploaded 7 Dec 2024Source
- DocumentFORM 1.pdf · uploaded 7 Dec 2024Source
- DocumentFORM 1.pdf · uploaded 7 Dec 2024Source
- DocumentFORM 1 1_0001.pdf · uploaded 15 Feb 2025Source
- DocumentFORM1_0001.pdf · uploaded 29 Apr 2025Source
- Documentarchitect YD Ph 3.pdf · uploaded 20 Jul 2026Source
Technical (Engineer)
- DocumentFORM 2_0001.pdf · uploaded 7 Oct 2024Source
- DocumentFORM 2_0001.pdf · uploaded 7 Oct 2024Source
- DocumentFORM 2_0001.pdf · uploaded 7 Oct 2024Source
- DocumentFORM 2_0001.pdf · uploaded 7 Oct 2024Source
- DocumentFORM 2.pdf · uploaded 7 Dec 2024Source
- DocumentFORM 2.pdf · uploaded 7 Dec 2024Source
- DocumentFORM 2.pdf · uploaded 7 Dec 2024Source
- DocumentFORM 2 1_0001.pdf · uploaded 15 Feb 2025Source
- DocumentFORM 2_0001.pdf · uploaded 29 Apr 2025Source
- Documentengineer certificate form 2 ph 3.pdf · uploaded 20 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 272, 272
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK96 units in all
- Address
- Gat No 271, 272, 275, 277, 278, Pune Nagar RoadPIN 412216
- Village
- Loni-kand, Haveli taluka
- Location
- 18.50303, 74.17786
- Land area for this project
- 7,852 sq m (84,518 sq ft)
- Permissible built-up area
- 3,103 sq m (33,395 sq ft)
- Sanctioned built-up area
- 3,103 sq m (33,395 sq ft)
- Recreational open space
- 693 sq m (7,458 sq ft)
- Designated bank account
- 171
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
GAT NO 271,272,275,277,278
Boundaries
- North
- Adj Pune Nagar Road
- South
- Adj Nala
- East
- Gat No 270
- West
- Gat No 286
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking96 units
8 of 96 units booked (8%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 35.88 sq m · 386 sq ft | 4 | 0 |
| 1BHK | 36.99 sq m · 398 sq ft | 4 | 0 |
| 1BHK | 37.49 sq m · 404 sq ft | 4 | 1 |
| 1BHK | 37.57 sq m · 404 sq ft | 2 | 0 |
| 1BHK | 37.75 sq m · 406 sq ft | 4 | 0 |
| 1BHK | 38.62 sq m · 416 sq ft | 2 | 1 |
| 1BHK | 38.88 sq m · 419 sq ft | 2 | 0 |
| 1BHK | 38.93 sq m · 419 sq ft | 2 | 0 |
Show all 26 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 38.94 sq m · 419 sq ft | 2 | 0 |
| 1BHK | 40.05 sq m · 431 sq ft | 4 | 0 |
| 1BHK | 40.62 sq m · 437 sq ft | 2 | 0 |
| 1BHK | 41.06 sq m · 442 sq ft | 1 | 0 |
| 2BHK | 50.99 sq m · 549 sq ft | 2 | 1 |
| 2BHK | 51.01 sq m · 549 sq ft | 12 | 0 |
| 2BHK | 53.02 sq m · 571 sq ft | 2 | 0 |
| 2BHK | 53.72 sq m · 578 sq ft | 2 | 0 |
| 2BHK | 53.89 sq m · 580 sq ft | 2 | 0 |
| 2BHK | 54.08 sq m · 582 sq ft | 2 | 0 |
| 2BHK | 55.05 sq m · 593 sq ft | 14 | 3 |
| 2BHK | 55.95 sq m · 602 sq ft | 1 | 0 |
| 2BHK | 55.96 sq m · 602 sq ft | 11 | 1 |
| 2BHK | 56.34 sq m · 606 sq ft | 1 | 0 |
| 2BHK | 56.35 sq m · 607 sq ft | 8 | 0 |
| 2BHK | 56.45 sq m · 608 sq ft | 2 | 0 |
| 2BHK | 56.51 sq m · 608 sq ft | 2 | 1 |
| 2BHK | 56.62 sq m · 609 sq ft | 2 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals7
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Atit Shrikant Admulwar | — |
| Chartered accountant | ritesh shah | — |
| Chartered accountant | Yogesh D Mali | — |
| Engineer | Angad khune | — |
| Engineer | Equicom Structural Consultancy | — |
| Engineer | Santosh Pardesi | — |
| Other | Arihant Consulting Engineers LLP | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Loni Kand
- Green CityRERA PP1260002500571
- Guruvista Phase 3RERA P52100055898
- Oxy Flora Phase 2RERA P52100015940
All 4 projects in Loni Kand · Compare Oxy Flora Phase 3 with another project